Denial of building damage claim attributed to reactive soil movement excluded under policy
Summary
An investor policyholder claimed for building damage from storm and flood water runoff, while the FSP said the damage was caused by excluded soil movement. AFCA's panel found the claim was not brought within the policy's 72-hour terms and that the dominant cause was reactive soil and construction, so it ordered nothing.
A defined-events policy responds only to listed events, and the insurer may rely on the earth movement exclusion where the excluded cause is dominant.
Issues
- Claim denial primary · not upheld
“The FSP was entitled to decline the claim as the loss did not arise from any of the insured events but rather arose from causes specifically excluded from cover.”
- Product terms interpretation secondary · not upheld
“The policy will respond to damage caused by soil movement provided that it occurs as a result of a storm or flood event, but only where such damage arises within 72 hours of the event.”
Subjects and remedies
home or building damageno remedy
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of
claim
Determination
Case No: 339839 Determination Page 1 of 6
Case number : 3 3 39839 21 July 2014
1 Overview
1.1 Dispute
The Applicant holds an investor insurance policy with the Financial Services
Provider (FSP) for which a claim was lodged on 29 February 2012 in respect of
damage sustained to the building.
The Applicant says the damage arose as a result of storm and flood water runoff
which caused damage to the property.
The FSP denied the claim on the basis the damage is not the result of any
insured event but rather occurred as a result of soil movement, which is
specifically excluded under the terms of the policy. The Applicant disputes that
decision.
1.2 Issues and key findings
Was the FSP entitled to decline the claim?
The FSP was entitled to decline the claim because:
the Applicant has not discharged the onus on him to establish a valid claim
under the policy
the loss arises from causes specifically excluded from cover under the policy.
1.3 Determination
This Determination is in favour of the FSP.
The FSP was entitled to decline the claim as the loss did not arise from any of the
insured events but rather arose from causes specifically excluded from cover.
This decision has been made by a Panel consisting of an Ombudsman and two
representatives with consumer and insurance expe rience.
Case No: 339839 Determination Page 2 of 6
2 Reasons for Determination
2.1 Was the FSP entitled to decline the claim?
The damage did not arise as a result of an insured event
The FSP’s policy is a defined events policy. Therefore, the policy only responds
where the damage has been caused by o ne or more of the listed events, subject
to any exclusions. One of these listed events is storm and flood.
The onus rests with the policyholder to establish that a loss has been suffered
which is covered by the terms of the contract. Once the Applicant has discharged
this onus, it then shifts to the FSP to demonstrate that one or more of the listed
exclusions operates to defeat the claim.
The Applicant initially asserted the damage was caused by a storm and/or flood
water saturation of the soils during the extreme weather events in south western
Queensland in 2011 and specifically November 2011. The saturated soils caused
the foundations of the building to move and occasioned damage to the property.
However, the later history gathered by engineers D and C refer to flooding in
January 2011.
The policy will respond to damage caused by soil movement provided that it
occurs as a result of a storm or flood event, but only where such damage arises
within 72 hours of the event.
The Applicant asserts that the damage may have arisen within the 72 hour period
although because the tenants were away, it was not noticed immediately. It was
reported to the FSP as soon as he became aware.
However, the Applicant did not lodge his claim until 29 January 2012, more than
12 months after the January 2011 event and more than 2 months after the
November event. Therefore, even if it were to be accepted that the weather
events of 2011 could reasonably be considered to be a proximate or contributing
factor to the damage arising, it now cannot be determined whether any damage
arose within the initial 72 hours immediately post the storm/flood.
The Panel therefore considers the Applicant has not brought his claim within the
terms of the policy.
The loss arose from causes specifically excluded from cover
However, in any event the evidence supplied does not support the Applicant’s
position that the damage arose from this event.
Engineering firm “D” inspected the damaged building at the instruction of the
Applicant. D concluded the damage had arisen as a result of foundation
movement due to moisture changes in the reactive clay soils. Although D does
make mention of the possibility that the extreme weather events of January 2011,
may have contributed or hastened the loss, it is clear he attributed the proximate
cause of the damage to the reactive soils and inadequate design and construction
of the building.
Case No: 339839 Determination Page 3 of 6
Engineering firm "R" were subsequently engaged by the Applicant and did not
attribute the damage in any way to the storm/flood event. Rather, R considered
the sole cause of the damage was the incorrect classification of the soils
originally, which led to a method of construction utilised which was never going to
be able to adequately withstand the variations in soil moisture content. R
considered the failure of the slab was inevitable due to the manner in which it was
constructed.
Engineering firm "C" inspected the damage at the instruction of the FSP. C also
concluded the damage had arisen as a result of variations in the soil moisture
content principally due to the extremely reactive soils at the site, although it had
been contributed to by inadequate drainage.
Whilst C considered the weather events of 2011, may have contributed or
hastened the damage occurring, it is clear C did not consider this a primary cause
of the damage.
The Panel accepts the three engineers are appropriately qualified and
experienced to comment on this matter and in the absence of conflicting
information; the FSP is entitled to rely on their findings.
Whilst there are minor variations in the experts' opinions, all are in agreement that
the dominant cause of the movement to the slab and footings is the extremely
reactive soils at the site combined with inadequate slab design and construction
methods to combat this.
Whilst the problem may not have been evident prior to the January and November
2011 events, the Panel is not persuaded that these events precipitated the loss as
much as merely highlighted an existing problem with the soils at the property, one
that both R and C state was inevitably going to occur due to the method and
manner of the home’s construction.
The Panel also recognises established case law which provides that if there are
two proximate causes of a loss where one is subject to cover and the other is not,
an insurer is not liable for the claim as the excluded cause is dominant.
As the policy specifically excludes loss or damage arising from any form of earth
movement, the FSP has correctly declined the claim.
3 Supporting information
3.1 Expert evidence
Record Key points
Applicant's expert ( D )
Engineer
14 Feb 2012
since the significant rainfall and flood events of 2011
cracking has been identified to the house
the property is a brick veneer slab on ground and was
constructed in 2005
the current owners purchased it in 2007
Case No: 339839 Determination Page 4 of 6
there is significant surface cracking in the walls, cornices,
external concrete slabs and external brickwork
there is significant evidence of ground movement
as the initial identification of the cracking aligned with the
period of extreme weather in January 2011, it is likely the
problem has been initiated by this phenomena
the primary factors at play are likely to be a combination of
the original subdivision earthworks inadequate and the
rolled slab was not properly prepared
the re is poor drainage to the rainwater tank in the backyard
there is poor surface drainage of the runoff from the
backyard
there are approximately 1 - 2 other allotments draining
towards this one including tank drainage from neighbours
the infiltration of back yard and adjacent surface drainage
has the potential to enter the subsurface of the slab and
create significant differential ground movement
it is possible the footings and foundations were
inadequately designed and poor workmanship has left the
substructu re and superstructure with the inability to deal
with the imposed loads
Applicant's expert ( R )
Engineer
10 Sept 2012
geotechnical testing was undertaken including two test
holes and two shallow pits were excavated and a floor
level survey completed
the soil classification at the site is classified "E", which are
extremely reactive soils
the original pre - construction classification was "P" for
problem soils however no laboratory testing was
conducted to quantify the predicted ground surface
movement chara cteristics of the soil
the original classification is a significant misinterpretation of
the site conditions
the soil is actually capable of differential ground
movements in the order of 200% more than those
predicted by the original engineer
in the absenc e of geotechnical laboratory testing it is not
considered reasonable to have made appraisals or
classifications as to how the 'ripped' soil will behave
in order to provide control for moisture related movement
in the soil the screw in pier system was requi red to be
anchored at depths which exceed the seasonal soil
moisture variation
in addition the ground was require to have been effectively
isolated from the underside of the footing and slab system
as the footing and slab system are out of level it is
appa rent that the extremely reactive clay soils have
heaved against the underside of the floor which has led to
movement and caused structural failure
the cutting and filling at the site have resulted in the
Case No: 339839 Determination Page 5 of 6
underlying stratum of weathered rock becoming relati vely
shallow
therefore the depth of the screw in piers system was
inadequate and are not adequately founded to provide
appropriate anchorage to resist soil related movement
effects
the site had been ripped but the soil was not scarified even
remotely to t he standard which would have provided the
required isolation to ground heave
the slab system is not capable of resisting future ground
movement and damage will be ongoing unless significant
stablisation measures are implemented
this type of footing and slab system including the site
ripping is not deemed to comply with the standards and is
an extremely unreliable method when dealing with soils of
this nature
the slab system is considered to have failed as it can no
longer perform in the intended manner
a ny issues of site drainage are considered to be of
secondary importance compared to the failure to have
adequately scarified ground surfaces
there is poor drainage along the right side of the house
which encourages moisture absorption and retention
this is exacerbated by pavers along the front of the house
which restricts drainage toward the street
the rear and side are poor drained and hold water,
elevating soil moisture during periods of heavy rain
the driveway slabs have heaved upwards at the interfaces
between the concrete footings and the pavement
there is evident leakage to ground from the rainwater tank
and there is at least one downpipe broken
the building has moved up to 42mm out of alignment as
the slab has pulled away from the screw in piers and t he
soil beneath has heaved
ongoing movement would be expected to occur as soil
moisture conditions beneath the slab vary
it may be more economical to replace the house on a
conventionally designed very heavily stiffened slab
significant remedial works are required (and outlined)
FSP's expert ( C )
Engineer
14 Feb 2012
minor to moderate degrees of damage was found to a
number of areas of the property, including cracks in the
ceiling, cornices, separation of skirting boards, and
differential movement between intersecting walls
a floor level survey showed differential mov ement of up to
45mm
this is a clear indication that the residence has experienced
movement due to subsidence within the foundation soils
a number of newly installed drainage sumps were visible to
arrest drainage issues at the site, as previously during
Case No: 339839 Determination Page 6 of 6
wea ther events the land would retain water like a
'swimming pool'
there were inadequate provisions made for drainage of
storm water that ponds on the surface
inadequate measures were taken to prevent water entering
into the foundation of the dwelling
there wa s a number of trees and other vegetation close to
the dwelling which would affect the moisture condition of
the soil and be another contributing factor for the
movement of the building
there was moderate concrete cracking of 2 - 10mm in the
driveway at rando m intervals
no drainage of any type was provided to divert storm water
away from the driveway area and the control joints
installed did not comply with the standard
the soil classification indicates the property was situated on
extremely reactive soils wit h moisture changes
the soil under the footings has a high potential for
shrink/swell and a large degree of surface movement due
to changes in the soil moisture content would be expected
it is therefore inevitable that the underlying soils will swell
and/or shrink
the significant rainfall in 2010/2011 has exacerbated
movement of the footings due to excessive volume
changes of the extremely reactive soils, causing damage
to the building, however pre - existing movement had
occurred prior to that period of time
the degree of movement has gradually increased over the
past years until it reached the extent that it was noticeable
in addition to the primary cause of the damage being
reactive soils, inadequate drainage, vegetation, failure of
soil isolation and inadeq uate control joint have contributed
to the damage
remedial measures were required
3.2 Relevant Legislation
Wayne Tank and Pump Co Ltd v Employers Liability Assurance Corp Ltd [1974]
QB 57.