Text of the determination
Case No: 339623 Determination Page 1 of 8
Case number: 339623
General Insurance - Small Business/Farm Insurance - Commercial Property -
FSP Decision - Denial of claim
14 April 2014
Summary
Description
A claim under a farm insurance policy for damage to farm property
following severe winds.
Basis of Determination
A consideration of the evidence regarding the coverage provided by the
policy and the circumstances of the Applicant‟s loss.
Determination
The FSP is entitled to deny the Applicant‟s claim.
Background
1. The Applicant held a farm insurance policy with the Financial Services
Provider (FSP), covering a farm property and buildings in Queensland.
2. In March 2013, tanks and buildings on the insured property suffered damage
following severe winds reported to be up to 140km/h.
3. The FSP assessed the subsequent claim and agreed to cover damage to
water tanks but refused liability for the shearing quarters, on the basis the
building was suffering from wear and tear and the damage was not caused
by the storm.
4. The Applicant seeks a review of the FSP‟s decision to decline the claim f or
the shearing quarters.
Summary of Applicant’s position
5. The Applicant says the shearing quarters were damaged by winds of up to
140km/h.
Determination
Case No: 339623 Determination Page 2 of 8
6. The quarters are only 20 metres from where a water tank was blown off its
stand and the FSP agreed to cover the water tank as being storm damaged.
7. He accepts the building was old and basic but it still had practical uses and
that is why it was insured.
8. Further storms occurred between the loss and the assessment some six
weeks later.
9. He has paid premiums for many years without issue and they have
increased significantly in the last two years.
10. The FSP has been difficult to contact and he was disappointed that the
building consultant‟s assessment went ahead while he was at a funeral,
believing it could have been held back a week so he could be on site. He
feels the FSP has been dismissive in its handling of the claim.
11. The FSP did mention over the phone a payout of 70% of the sum insured of
$132,000 (actual figure is $132,700).
12. The Applicant seeks a settlement of $92,890, being 70% of the (corrected)
sum insured of the shearing quarters. If the claim is not met, in the very least
he should receive a refund of premiums.
Summary of FSP’s position
13. The FSP says that the experts appointed to view the shearing quarters ,
report the issues with the building were not caused by the storm and rather
there is settlement of the foundation and rot and termite damage.
14. The reports indicate the shearing quarters had not been used and had been
unusable for some time.
15. As the loss was not caused by a listed event in the policy, the loss is not
covered.
16. In relation to the reported maintenance co nducted on the property, it accepts
new screws were installed at some stage, however, as the timber was rotten
the screws had no purchase.
17. While the building consultant did attend while the Applicant was not on site,
the report is thorough and valid.
18. It accepted the claim for storm damage to water tanks, but these were not
affected by earth movement, termites and rot.
19. While discussion about cash settlement may have occurred before the claim
was refused, this was the only realistic way to settle the claim in the event it
was accepted, given the state of the building. The Applicant was not advised
a cash settlement would be made.
Case No: 339623 Determination Page 3 of 8
20. The FSP apologies if the Applicant had difficulty in making contact.
21. It submits it assessed the claim thoroughly in appointing a building
consultant to ensure it was making a fully informed decision, after the loss
adjustor reported the damage was not storm related.
Issue
22. Whether the FSP was entitled to refuse liability for the shearing quarters
under the terms and conditions of the policy?
Reasons for decision
23. As advised to the parties, this matter has been expedited in accordance with
the Operational Guidelines of the Service‟s Terms of Reference, due to the
complex nature of the issues. Accordingly, this dispute has not been the
subject of a Recommendation but has proceeded directly to Determination.
24. I am satisfied that there has been an exchange of material between the
parties and that each party has had the opportunity to respond to the issues
raised therein.
25. The FSP has accepted and settled the loss of water tanks on the property
and there is no dispute in relation to those items. Accordingly, I am not
required to address the water tanks in this Determination other than to
acknowledge the Applicant‟s submission that the FSP has accepted the
water tanks were damaged by the wind.
The policy
26. I have reviewed the terms and conditions of the policy and the Renewal
Schedule and I am satisfied that the shearing quarters were covered under
Section 2 of the policy for loss caused by listed e vents, including „Storm,
rainwater and wind‟.
27. The policy stipulates that there must be damage from a listed event, to a
farm building, in order to make a claim.
28. The sum insured for the shearing quarters is noted on the Renewal
Schedule as $132,700.
Whether the FSP was entitled to refuse liability for the shearing quarters under
the terms and conditions of the policy?
29. The Applicant says the shearing quarters were damaged by the storm and
notes a damaged water tank only 20 metres from the quarters was covered
by the FSP, for the same event.
Case No: 339623 Determination Page 4 of 8
30. The FSP says the shearing quarters are in a state of disrepair and there is
no evidence the building was damaged solely by the storm.
31. The FSP‟s first assessment report, dated 29 March 2013 , from loss adjustor
„C‟, outlines the shearing quarters were built in 1958 and are “poorly
maintained”. The report states:
“… The insured claimed that the storm had caused the building to move on its
piers, which caused the collapse at the kitchen recess area and cooks rooms
end of the building, and partial collapse of piers in other areas. Storm damage
caused sleeping room doors to be inoperable. Further, that the roof was not
bowed. All flyscreening to the verandahs had been torn from their frames. …
Both insureds advised that the building had not been in this condition prior to
the storm. Further, that although the building was old, it had been maintained
prior to the storm, and had been in operating condition. Further, that they had
not known of pre-existing problems.
We did not sight any indication that the storm had caused the building to
move on its piers. Whilst the piers show movement, it appeared long term and
expected to be commonly due to being in black soil.
We did sight severe rot to timbers at this end of the building. There was
evidence of previous severe termite infestation and damage. Areas of dry rot
were also through the other end, but did not appear as severe…” [sic]
32. C‟s report concluded that a building consultant be appointed to provi de a
thorough report to work out what if any of the damage was storm related.
33. The building consultant‟s report from „M‟ dated 30 April 2013, concluded the
following:
“ Conclusion
… From my inspection it is clear to state the claim of storm damage to the
Shearing Quarters, Laundry/Shower and Toilet cannot be agreed with. The
three structures damage observed was without doubt aged and deterioration
dilapidation, with the structures having not been occupied, repaired or
maintained for a period of more than 10 years…
Proximate Cause and Effect
In my opinion the claimed storm damage to the Shearing Quarters,
Laundry/Shower and Toilets is damage caused by the ground movement, with
the soil being highly reactive black soil, and is aged and deteriorated
dilapidation, and also a total lack of general repairs and maintenance, which
has been for a period of more than 10 years.
In my opinion the dislodgement of the awning roof of the Laundry/Shower
structure may have occurred during a storm with winds, although clearly the
poor condition of the structure had been the main attribute to the obvious
damage.
Case No: 339623 Determination Page 5 of 8
Pre-existing Issues
In general and in my opinion the three structures being the Shearing Quarters,
Laundry/Shower and Toilet were in an extremely poor condition prior to any
recent storm event, which included timber rot, Termite damage, rusting and
corrosion, which in fact I would consider these structures are not considered
economical to repair, due to the extensive repairs required, which are in no
way storm damage. …” [sic]
34. M‟s report includes a number of photographs that show the shearing
quarters are in a poor state of repair, with extensive rot inside and out.
35. The FSP sought further comment from M to clarify whether the damage
noted could have occurred if the building was in good condition.
36. M provided a response via email on 23 May 2013, which states:
“In my opinion, from the evidence and images obtained by me, this
Laundry/Shower structure has not become dislodged as a result of the storm
but may have become dislodged during the storm. The proximate cause of the
failure of the Laundry/Shower is the significantly aged and deterioration state
of the structure and not the storm itself. In my opinion, the pre-loss condition
of the Laundry/Shower was extremely poor, having been defectively and very
poorly constructed. In my opinion had this structure been in good condition it
would not have become dislodged, or suffered any damage, during the
storm.”
37. The Applicant advised the FSP that the building was subjected to extreme
temperatures for six months of the year, explaining why toilet rubbers etc
were withered and required constant replacement. In relation to the old
bedding in the building, the Applicant noted that contractors at the farm
supplied their own bedding. The gas stove and refrigerator were in perfect
working order.
38. The Applicant also provided the FSP a copy of the General Ledger, showing
materials had been purchased from stores such as Bunnings to undertake
repairs at the property over the preceding years.
39. The Applicant specifically noted that iron roofing and screws purchased in
2011, were used to maintain the shearing quarters.
Discussion
40. I have considered the reports of M and the Applicant‟s submissions that the
building, while old was serviceable.
41. I my view M‟s report is thorough a nd clearly indicates the building is in a
state of disrepair. I have reviewed a CD of further photographs taken at the
time of assessment and I am persuaded that the shearing quarters were in a
severally poor state of repair.
Case No: 339623 Determination Page 6 of 8
42. The report and photographs show evidence of severe rot in structural
elements of the building, gaps in the iron roofing, termite damage, old water
ingress stains and ongoing water damage to walls.
43. Image 14 of M‟s report also reportedly shows a stump from the shearing
quarters that has rotted, with M stating it is an example of the rotting of the
stumps that is occurring below ground.
44. At law the initial onus rests with an insured to establish that a loss claimed is
covered under the policy of insurance.
45. In this case, in order to find that the FSP is liable in part or whole for the
damage, I need to be persuaded that the loss or part of the loss has been
caused by the storm.
46. Based on the material before me and in particular the reports of the building
consultant M, I am not persuaded that the damage to the shearing quarters
was caused by the storm.
47. I accept that the building may have suffered damage at the time of the storm,
but I am not persuaded that the building would have suffered loss had it
been in a good condition.
48. I accept the Applicant‟s submission that contractors may have used the
quarters, however, that does not change the fact that the evidence clearly
establishes the building was in a poor state of repair and significantly, that
stumps and structural elements of the buildi ng were in a very poor state
before the storm.
49. I have considered the Applicant‟s submission that the water tanks at the
property were covered for the same event, however, the water tanks are
different structures and while the damage to them does indicate there was
severe storm in the area, it does not follow that a building in a poor state of
repair should also be covered under the same claim.
50. Accordingly, based on the material before me I determine that the available
evidence does not establish the loss was caused by the storm and therefore
the FSP is entitled to refuse liability for the shearing quarters.
Other
51. The Applicant has raised concerns with the FSP‟s handling of the claim,
including that the building consultant (M) attended whilst the Applicant was
at a funeral.
52. I accept that this scenario was less than ideal and that the FSP perhaps
could have arranged a different time for the building consultant to attend
once it was aware the Applicant could not attend.
53. However, I do find the 34 page report from M is thorough and I am of the
view that there is little that the Applicant could have added at the visit which
would change my view of the condition of the building in question.
Case No: 339623 Determination Page 7 of 8
54. Further, the Applicant was onsite at the time of the original assessment and
provided details of the loss at that time. In conclusion, while I accept it would
have been preferable that the building assessment was completed while the
Applicant was available, I do not consider the Applicant has been prejudiced
by the fact he was not on site with the building consultant.
55. I find the FSP was thorough in its assessment of the claim, noting it
requested further clarification from M after its report to check whether some
of the damage may have been storm related , irrelevant of the maintenance
issues with the building.
56. Further, I accept the FSP may have initially discussed the option of cash
settlement due to the condition of the property, however, there is no
evidence the Applicant was specifically told he would be cash settled 70% of
the sum insured and even if that did occur, there is no evidence that the
Applicant acted on such advice to his prejudice.
57. The Applicant also raised the issue with the Case Manager of the Service,
that the FSP used to inspect the property and buildings every two years , at
the time of policy renewal, but that this had not been occurring recently.
58. I accept that this method might have assisted the Applicant in looking at his
buildings at the time of renewing policies, however, the onus to maintain
buildings on an insured property, rests with the policyholder.
59. In this case the shearing quarters were clearly in a poor state of repair, with
various water stains and areas of severely rotted timber. I accept the
Applicant and his contractors undertook some maintenance in 2011 (based
on the General Ledger), but this does not mean the maintenance was
sufficient to keep the building in a reasonable state of repair.
60. The Applicant has also noted that the service from the FSP has been
generally poor. The FSP has apologised if its service was not up to his
expectations.
61. I acknowledge that the Applicant has not been satisfied with the FSP‟s
service or the outcome of the claim with respect to the shearing quarters.
However, I am not of the view that compensation for non-financial loss is
payable in this instance.
62. Further, there is no basis upon which the premium can be refunded, noting
the building was still on risk and a loss such as a fire at the property may
well have been covered depending on whether the cause was purely
accidental or the poor state of the building was a factor.
Determination
63. On the basis of the available information, I determine that the FSP is entitled
to refuse liability for the shearing quarters.
Case No: 339623 Determination Page 8 of 8
64. I further determine the FSP is not required to reimburse premiums.