Home / Financial Firm (Unknown - Insurer) / Determination 339543
Determination 339543
Claim denial
Summary
The Applicants' business property claim for storm damage to the roof, balcony and short wall was declined, although the FSP accepted internal water damage. AFCA upheld the decline for those parts and ordered the FSP to make good a ceiling hole cut during the investigation.
The insured must first establish sudden and unforeseen physical damage, and wear and tear, design, workmanship and maintenance problems are not damage under the policy.
Issues
- Claim denial primary · not upheld“The Applicants have failed to establish the balcony, roofs, metal flashing and short wall which require repairs and redesign sustained damage as defined in the policy.”
- Poor claim handling secondary · upheld“There appears to be an issue of damage being done in the investigation of this claim. I find that it is fair in the circumstances that the FSP arrange to make good.”
- Repairs or contractors secondary · not upheld“The findings above rule out the Applicants' view that water damage to the sunroom was a result of W's poor workmanship.”
Subjects and remedies
home or building damagesmall businessrepair or rectify
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
General Insurance - Small Business/Farm Insurance - Commercial Property - FSP
Decision - Claim Amount
Determination
Case No: 339543 Determination Page 1 of 5
Case number : 339543 20 August 2014
1 Overview
1.1 Dispute
The Applicants held a business insurance policy (the policy) with the Financial
Services Provider (FSP) under which they lodged a claim for storm damage
sustained to the property in March 2010 and thereafter in June 2011.
The FSP accepted liability in full for the initial claim and appointed repairer (W) to
conduct repairs.
After the storms in June 2011, the FSP accepted liability for internal water
damage sustained to the property and the repairs relating to the exploratory work
performed by another builder WB. However, it declined liability for repairs to the
roof and balcony on the grounds the problems were associated with wear and
tear, gradual deterioration, faulty design and faulty workmanship for which cover
is excluded under the policy.
The Applicants dispute the FSP’s denial of the claim and believe the damage was
caused by W’s poor workmanship and method of repair.
1.2 Issue and key findings
Was the FSP entitled to deny the Applicants’ claim?
Even though the FSP accepted liability for water damage to internal sections of
the property, it is entitled to deny the remaining parts of the claim because the
Applicants have failed to establish the balcony flooring, roof structures and short
wall sustained sudden and unforeseen physical damage. There appears to be an
issue of damage being done in the investigation of this claim.
The Applicants maintain that W, with the consent of the FSP, cut a hole in the
ceiling in the premises. I find that it is fair in the circumstances that the FSP
arrange to make good in this regard if it has not already done so.
1.3 Determination
This determination is in favour of the FSP in the main.
The FSP was entitled to deny the Applicants’ claim but is required to make good
any hole in the ceiling cut by W.
Case No: 339543 Determination Page 2 of 5
2 Reasons for Determination
2.1 Was the FSP entitled to deny liability for the claim?
The onus of proof rests on the Applicants to establish, on the balance of
probabilities, that they have suffered a loss caused by an insured risk. This is
called a prima facie claim. Once the Applicants have established a prima facie
claim under the policy, the onus then shifts to the FSP to show, on the balance of
probabilities, the loss falls within an exclusion clause of the policy or else is not
covered.
The policy covers damage sustained to the property and “damage” is defined in
the policy as:
“ Sudden and unforeseen physical damage or destruction to the insured property but
does not include wear and tear.”
The Applicants have established there was water damage sustained to the
internal section of the property
After storms in June 2011, the Applicants noted water entering the sunroom via a
balcony, which had been previously repaired by W following storms in March
2010.
There is no dispute among the parties that the internal damage sustained to the
property was sudden and unforeseen. The Applicants have therefore established
a prima facie claim under the policy. The FSP has accepted this part of the claim.
The Applicants have not established the roof structures and the tiled
flooring of the balcony have sustained “ damage ”
In order for the repair or rectification works to the roof and balcony flooring to be
covered under the policy, the Applicants are obliged to establish the roof and
balcony flooring s ustained “damage”, that is, sudden and unforeseen physical
damage.
Upon the Applicants’ lodgement of the claim in June 2011 and the Applicants’
belief the current damage was a result of W’s poor workmanship (repairs to the
balcony performed after the storm event in March 2010), the FSP appointed a
loss assessor (C) to assess the cause of the damage.
C was unsure why W had attended to sealing of the tiles of the balcony flooring
after the storms in March 2010 as it was not part of the scope of works at that
time.
W was reappointed to investigate the cause of the loss and to repair the damage
to the balcony, if any. W’s attempt to reseal the balcony was unsuccessful and W
was of the view that water entry via the balcony was due to inadequate
waterproofing by the original tiler.
Case No: 339543 Determination Page 3 of 5
The Applicants reject this view and say they had no issues with water entering t he
property until the storms in March 2010 and the repairs thereafter by W.
The Applicants state the water leak worsened after W used jack hammers on the
balcony. The sealant applied by W was also peeling away.
Reports provided by qualified professionals found:
Expert Findings
Builder CT
30 October 2012
L arge amounts of wind assisted storm
water within a short period of time w ere
overflowing from the flashing .
F lashing and roof sheeting abutting the
balcony was the cause of the water
entry.
Builder WB and Roof Plumber
14 May 2013
A rea of water staining in the sun room
was on the junction between trim - deck
metal roof/low height compressed sheet
wall and tiled concrete balcony .
V isual inspection of the tiled balcony
revealed the structure under this area
was dry with no signs of moisture .
L arge amount of foam filler and silicone
on the metal roof flashings adjoining low
height wall suggested water ingress
occurring in the past .
T y pe of roofs used over the sunroom did
not suit fitting of down lights and the
current pitching of the roofs .
R oof sheeting on the trim - de c k roof were
p an fixed and not crest fixed as per
manufacturer’s specifications .
P itch of the trim - de c k roof was
inadeq uate and was an incorrect set up
with poor design .
P roblems with both roofs over the
sunroom w ere the cause of water entry.
The findings above rule out the Applicant s’ view that water damage to the
sunroom was a result of W’s poor workmanship by sealing or resealing of the tiles
on the balcony. As such, there is no evidence the balcony flooring sustained any
“damage” as defined by the policy.
However, it was noted the sealant applied by W was deteriorating and the FSP’s
further investigations revealed an incorrect type of sealant had been applied by
W. The FSP has agreed to reimburse the cost of resealing the balcony with the
appropriate sealant.
WB concluded the cause of water ingress was related to the design and
workmanship of the roof structures over the sunroom. The roof structures
therefore require redesign to suit the design of the remaining property.
Case No: 339543 Determination Page 4 of 5
Further, CT noted water could overflow the metal flashing during large amounts of
wind assisted rain. WB was able to view a large amount of foam filler and silicone
under this area. It was suggested that the property may have experienced this
issue with water entry previously.
Based on the above , there was no evidence of any “damage” sustained to the
roof structures. As such, the FSP is not obliged to accept the cost of repairs to the
roof structures.
The damage to the short wall w as a maintenance issue and not “damage” as
defined by the policy
WB’s invasive investigations revealed:
short wall was made of metal frame with compressed sheeting over it
small amount of water entry via the cavity of the wall was detected
small cracks to the joints of the compressed sheeting was noticed along this
wall
water was entering via these cracks and affecting the ceiling below, and
issue with the short wall was maintenance related.
WB concluded the damage to the short wall was a maintenance issue and, upon
reviewing the photographs, it appears the joints have given away over time and
not as a result of sudden and unforeseen physical damage.
For the reasons stated above, the Applicants have failed to establish the balcony,
roofs, metal flashing and short wall which require repairs and redesign sustained
“damage” as defined in the policy.
As explained above, the FSP has accepted liability for internal damage. The onus
remains with the Applicants to establish there was sudden and unforeseen
physical damage to the balcony flooring, roof structures and short wall to claim
cover under the policy.
Since the Applicants have failed to establish a prima facie claim under the policy,
the FSP is entitled to deny liability for these parts of the claim.
The Applicants are responsible for rectifying the issues relating to design,
workmanship and maintenance.
Making Good
There appears to be an issue of damage being done in the investigation of this
claim. The Applicants maintain that W, with the consent of the FSP, cut a hole in
the ceiling. I find that it is fair in the circumstances that the FSP arrange to make
good in this regard, if it has not already done so.
Case No: 339543 Determination Page 5 of 5
3 Supporting information
3.1 Evidence from the parties
Loss Assessor M’s report dated 28 May 2010
Email from W to the FSP dated 5 August 2011
Email from W to the building coordinator dated 23 December 2011
Loss Assessor C’s Report dated 31 May 2012
Report from Builder CT dated 31 October 2012
Email from CT 19 December 2012
Report from Builder WB dated 14 May 2013