Home / Financial Firm (Unknown - Insurer) / Determination 339212

Determination 339212

Extent of cover for malicious damage to driveway and cash settlement of $2,200 for partial replacement without matching materials

FirmFinancial Firm (Unknown - Insurer)
Decided2014-05-12
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed$7,690
SourceAFCA PDF

Summary

The applicant wanted the whole driveway replaced after paint and oil were thrown on part of it, but the FSP cash settled $2,200 for replacing the damaged middle section. AFCA found the FSP was entitled to limit cover to the damaged section, but ordered that it will repair any damage caused to adjoining sections if the applicant uses the FSP's contractor.

The policy covers only the damaged part of an item, the original materials cannot be matched, and the policy's closest-match and cash-settlement terms were applied.

Issues

Subjects and remedies

home or building damagerepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 339212 Determination Page 1 of 4 Case number: 339212 General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim Amount - Matching Materials 8 May 2014 Summary Description:  This dispute is about the extent of the FSP’s liability to repair damage to the driveway of the Applicant’s home. Basis for Determination:  The material provided supports the FSP’s contention that the claim was settled as per the terms of the policy. The policy does not oblige the FSP to repair parts that are not damaged by an insured event. Determination:  The FSP was entitled to rely upon the cash settlement for the partial replacement of the driveway to resolve the claim.  As detailed in the Recommendation and referred to herein I also determine that if the Applicant retains t he FSP’s contractor to attend to the partial replacement of the driveway (subject to making payment for this from the cash settlement) and if this work damages the adjoining sections of the driveway, the FSP will have to repair this damage which may include replacing the adjoining sections of the driveway. Background 1. This disp ute is about the extent of the FSP’s liability to repair damage to the driveway of the Applicant’s home. Conclusions in Recommendation 2. The case manager provided the parties with a Recommendation on the issues in dispute. The Recommendation was in favour of the FSP. A copy of the Recommendation is attached to this Determination. 3. The FSP accepted the Recommendation but it was not accepted by the Applicant. Determination Case No: 339212 Determination Page 2 of 4 Further submissions 4. After the Applicant rejected the Recommendation, she provided no new documentary information in support of her position. She wrote a letter dated 10 March 2014 which essentially restates her position as follows:  The driveway is one item – joins do not determine separate panels;  The BM quote cannot be relied upon as BM has never sent a qualified driveway repairer to the insured premises;  The cleaning by BM was ineffective;  BM made a disclaimer;  The Applicant is not satisfied that the work can be done safely or competently by BM;  The driveway was laid 33.5 years ago and if there is no reinforcement then if the middle section only is replaced then it will be elevated above the other 2 sections;  IM did not want to do the work as they can’t match the quotes;  As she lives on a corner property all the access points of services must be taken into account;  The property is very well maintained and if only part of the driveway is replaced it will adversely affect the property; and  The material from BM was not made available to the Applicant at the pertinent time. 5. After the Recommendation was rejected by the Applicant the FSP made no further submissions. Ombudsman’s consideration 6. I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties, both before and after the Recommendation. I am satisfied that the documentation I have relied on has been provided to both parties. 7. I have carefully considered the case manager ’s Recommendation, together with the pa rties’ further submissions. 8. I am satisfied that the Case M anager’s Recommendation contains an accurate summary of the background to this dispute, the parties’ positions, the issues to be determined, any applicable paragraphs of the Terms of Reference and any relevant law. 9. I agree with the Case M anager’s reasons for the Recommendation and the recommended outcome. I have carefully considered the lengthy letter from the Applicant written after the Recommendation. The post-Recommendation Case No: 339212 Determination Page 3 of 4 submissions do not advance her case or affect the outcome. I have considered the further information, but it does not change my view that the case manager’s Recommendation was correct. 10. I have carefully considered all the material provided including photographs of the driveway. I am satisfied that:  The policy is clear and unambiguous in that the FSP only has to repair the parts that are damaged by an insured event and that the FSP does not have to replace the undamaged parts of the driveway to create a uniform appearance;  Only the middle section of the driveway was damaged by the persons unknown;  The driveway was not new and was cracked through wear and tear over the years – cover is not provided for damage caused by wear and tear and gradual deterioration;  The FSP tried to clean the damaged area but the stain remained albeit to a lesser degree but the solvent penetrated the driveway and this could not be removed;  In the circumstances the FSP was entitled to cash settle the claim for the amount offered of $2,200;  The Applicant can use the $2,200 for any purpose and if she decides to repair the driveway she can use this money to best affect an outcome by any method that she chooses;  The driveway is one item but the FSP is still entitled under the terms of the policy to repair the damaged part of the driveway only and this is the case even if I accept that the property is well maintained;  The FSP’s experts agree the replacement of the middle section ca n be done without damaging the adjoining sections of the driveway;  The experts appointed by the parties are all qualified to comment on the subject matter of the claim;  The disclaimer by BM referred to is irrelevant to the issues in dispute;  The access points of services must be taken into account but IN has covered off on this point;  It is clear from the FSP’s file notes that IN did not want the work not only because of the fact that he could not match the quotes from others but because he does not do work in the relevant area and this is a legitimate reason to refuse the repair work. 11. I acknowledge that the Applicant may not wish that the work is done by BM but this is the only way she can obtain the extra benefit intrinsic in the Recommendation which was accepted by the FSP. In this regard I make specific note that I agree with paragraphs 36 – 38 of the Recommendation. 12. Finally I note the complaint made about the conduct of the FSP but having read the voluminous file notes of the FSP I am not persuaded this complaint Case No: 339212 Determination Page 4 of 4 is made out. I agree that the material from BM was not made available to the Applicant at the time the offer of settlement was made but I am not satisfied that this would have made any difference to the outcome. For the reasons stated in the file notes the FSP was not going to repair or repaint the whole driveway and had decided that it was only going to cash settle for the one option proposed by BM that dealt solely with the damaged middle section of the driveway. Determination 13. I determine in favour of the FSP. The FSP was entitled to rely upon the cash settlement for the partial replacement of the driveway to resolve the claim. 14. As detailed in the Recommendation and referred to herein I also determine that if the Applicant retains the FSP’s cont ractor to attend to the partial replacement of the driveway (subject to making payment for this from the cash settlement) and if this work damages the adjoining sections of the driveway, the FSP will have to repair this damage which may include replacing the adjoining sections of the driveway. Case No: 339212 Recommendation Page 1 of 6 Case number: 339212 General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim Amount - Matching Materials 24 February 2014 Background 15. The Applicant held a home and contents insurance policy with the Financial Services Provider (FSP) from 31 December 2010. The policy provided building cover for up to $200,000 and contents cover for up to $50,000. 16. On 14 October 2012, the Applicant’s driveway was damaged when an unknown person threw a mixture of oil and paint on it. She lodged a claim. 17. The FSP accepted the claim for malicious damage and attempted to clean the substances on the driveway. This was unsuccessful and the FSP offered to replace the affected section, although it informed the Applicant that it could not match the original materials. The Applicant did not want a mismatched driveway and the FSP chose to cash settle the Applicant for the estimated cost of replacing the damaged section. 18. The Applicant considers that the entire driveway should be replaced and does not agree with the replacement quotes relied upon by the FSP. Summary of Applicant’s p osition 19. The Applicant says that her relied-upon contractors are of the view that the entire driveway requires replacement and that she should not have to accept a partial replacement, which will not match the original style of the driveway. 20. She considers that the FSP has been dishonest in its dealings with her. The policy provides “new for old” cover and it should indemnify her for the replacement of the entire driveway. Summary of FSP’ s position 21. The FSP says that it is not obliged to replace the entire driveway, only the section directly affected by the insured event. 22. It is not in dispute that only the middle section of the driveway was damaged. Recommendation Case No: 339212 Determination Page 2 of 6 23. A quote was prepared by the FSP’s repairer, “BM”, and it relied upon this for its cash settlement of the claim, noting that the Applicant refused the offer to have the damaged section replaced. 24. The FSP relies on the following policy provisions: Page 49 of the Product Disclosure Statement (PDS) “ We do not cover: ... Wear, tear, rust or mould The cost of repairing or replacing mechanical or electrical failure or breakdown, anything that fails to operate properly, or loss or damage caused by a computer virus or hacker, but we will cover damage caused by: – fire spreading from an electrical fault to other parts of your home and contents under insured event 3 (fire) – lightning under insured event 4 (lightning) – motor burnout under optional cover 2 (motor burnout). ” Page 62 of the PDS “ New for old means: – new materials, new items we replace or repair with new items or new materials that are available at the time of replacement or repair from Australian suppliers. – new for old, regardless of age we replace or repair new for old regardless of age, with no allowance for depreciation. For example, a leather lounge which was purchased 5 years ago for $5,000 and now worth $2,000, will be replaced with a brand new leather lounge equivalent to your old lounge when it was new. Cover is not limited to $2,000. – same type, standard and [specification] as when new we replace or repair to the same type, standard and specification as when new. If the same is not available, it means of a similar type, standard and specification when new. It can be a different brand. New for old does not: – include paying the extra cost of replacing or purchasing an extended warranty on any home or contents item or – mean of a better standard, specification or quality than when new. ” Page 64 of the PDS “ When we cannot match materials If we cannot find new materials to match undamaged parts, w e will use the closest match available to us.  Case No: 339212 Determination Page 3 of 6 If you are not satisfied with the materials we find as the closest match:   If we agree, you can pay the extra cost of replacing undamaged parts of your home to achieve a uniform appearance. Or we will pay you what it would have cost us to repair or rebuild the damaged part. ...” Issues 25. Whether the FSP is obliged under the terms of the insurance contract to replace the entire driveway. 26. If not, whether the quote provided by BM is reasonable to rely upon for the proposed settlement of the claim. Reasons for Recommendation 27. I am satisfied that a full exchange of the relevant information has taken place between the respective parties and that each party has had the opportunity of addressing any issues raised. 28. The parties have supplied fairly extensive submissions in support of their respective positions in relation to this dispute. I have read and considered all of the provided material. For the sake of brevity, I will restrict my commentary in this Recommendation to only those issues I consider relevant to the outcome. 29. It is not in dispute that the Applicant’s loss arose as a result of an insured event and that she is entitled to cover under the terms of the policy. The parties differ over the extent of cover that should extend to the repair of the damage and the quote relied upon by the FSP to settle the claim. 30. It is not suggested by the Applicant that she did not receive a copy of the PDS from the FSP and it is therefore assumed that she did and had opportunity to avail herself of the terms and conditions of cover. 31. After the report of the loss, the FSP attempted through one of its contractors to clean the damaged section of the driveway but this proved unsuccessful. The FSP then determined that settlement of the claim should be based on the replacement of the damaged section. 32. The Applicant refused to have the settlement of the claim limited to replacement of the damaged section only. The FSP then chose to cash settle the Applicant based on the estimated cost to replace the middle section of the damaged driveway only, as quoted by BM. The Applicant Case No: 339212 Determination Page 4 of 6 disputes that this work can be safely done and further suggests that replacing only the middle section would leave the driveway mismatched. 33. I am satisfied that the relevant damage to the property is limited to the middle section of the driveway, having reviewed the provided photographs of the damage from the FSP. 34. The Applicant considers that the driveway should be fully replaced and relies upon the expert opinion of her preferred contractors, “MC” and “CT”. 35. CT suggested that it would not be able to match the damaged section of the driveway with new materials and that there was a risk of “damaging [the] concrete” if only the middle section was replaced. The contractor quoted a price of $5,940 to replace the driveway. 36. MC suggested that if only the damaged section of the driveway was replaced the “rest of the driveway would not stand up to any heavy machinery” and that the materials could not be matched. This e xpert also recommended a complete replacement of the driveway at a cost of $7,690. 37. The two experts engaged by the FSP (BM and “IN”) both suggested that the centre area of the driveway could be safely removed and replaced, noting that an exact match could not be achieved. BM indicated its preparedness to do the job, whereas IN confirmed it could be done but that it was not contracted to work in this area and could not attend to it personally. IN was of the view that another contractor could attend to the job. 38. IN provided a detailed report dated 15 August 2013 to consider whether the damaged driveway section could be safely repaired without affecting the balance of the concrete in place. IN noted that: “ The section affected by the claimed event is the middle third as pointed out by the [Applicant]. In our professional opinion, the middle section can be cut out into sections and easily removed without damaging the two adjoining remaining thirds. By replacing the middle section, it will not affect the driveway’s integrity or gradient. In our professional opinion, there are no services in or directly under the middle section of concrete which is entirely on the insured’s [property]... Once the middle section (approx. 18sqm) is removed, it can successfully be conne cted with the remaining sections of the driveway.” 39. I am satisfied that the FSP’s policy does not require it to match materials where it has established that it is not possible to do so. The evidence from the various experts confirms that the material used for the original driveway is no longer available and therefore an exact match will not be possible. 40. The FSP’s policy provides, in relation to the matching of materials, that where it cannot exactly match materials, it will obtain the closest possible match possible. The policy gives the Applicant the option of either paying extra to ensure a complete replacement and match or to be cash settled for the repair of the damaged section only. Case No: 339212 Determination Page 5 of 6 41. There is a question of whether the driveway should be considered a single item (and therefore only replaced as a whole) or the sum total of several parts, each of which might be separately attended to. 42. In general, where an item might be repaired a part or a section at a time, without interference or damage being caused to the whole, I consider that it is not unreasonable for the FSP to restrict its policy coverage (subject to this policy wording) to the damaged area only. 43. I am not persuaded by the provided evidence that the driveway requires a complete replacement in order for it to be functional. On this basis, noting the wording of the policy, I am satisfied that the FSP is entitled to limit the work to replacing the damaged section only. 44. Noting that the Applicant did not want to accept this option, I am further satisfied that it was appropriate that the FSP provided a cash settlement to the Applicant. The estimate to attend to this work from BM was marginally less than $2,200 and therefore the settlement amount proposed is, in my opinion, reasonable. 45. Whilst this settlement is not to the Applicant’s satisfaction, it is consistent with the cover offered under the terms of the policy. It is clearly a concern of the Applicant’s that her driveway should not be left with a “patchwork” appearance that she believes might eventuate given that the materials used for the original driveway are no longer available. 46. The FSP’s policy provides for it to obtain materials for the closest possible match. It is conceivable that the amended section will be noticeable but the Applicant’s driveway is not an intricate or “one off” type of design and a reasonable match should be achievable. 47. In my view, the FSP’s policy does not extend its cover to repair damage not caused in the incident. This includes those sections of the driveway which remain undamaged and means that the FSP is entitled to limit the cover to only the damaged section. 48. I accept that the Applicant has been dissatisfied with the overall claims process, the ineffective first attempt to clean the driveway, the attitude of some of the FSP’s staff members and the limited settlement offered by the FSP. 49. I accept that the FSP might have handled the matter better with respect to some aspects of the claims process but on the whole I am satisfied that the Applicant was not unduly prejudiced through the FSP’s actions. It was not unreasonable to attempt to clean the driveway first and when this was unsuccessful, to look at other options. 50. Some valid concerns have been raised and these are in relation to the prospect of further damage being done if the FSP limits the repair work to replacement of the middle section of the driveway. In fairness to the FSP, BM offered to do this job and I am satisfied that should the Applicant take up Case No: 339212 Determination Page 6 of 6 this offer and if it proves to be unsuccessful, then the FSP would need to consider other options. 51. On this basis, I am of the view that the Applicant may either:  Accept the offer proposed for settlement and retain her preferred contractors to attend to the job; or  She may choose to use the FSP’s contractors with the cash settlement she has previously received. Should the final job then prove unsuccessful or if the remainder of the driveway is or needs to be damaged to attend to the middle section, the FSP will have to cover this as part of the claim. 52. The above solution should provide some certainty as to the quality of the job, if the Applicant is prepared to allow the FSP’s contractor to attend to it. If BM is no longer prepared to attend to the work, the FSP is at liberty to choose another contractor if it is necessary. 53. In my consideration of the submitted material, I am not satisfied that the FSP has been untruthful in its representations to the Applicant. I accept that there may have been some errors made but I am not of the view that these were done with deliberate or malicious intent. 54. On the whole, I consider that the FSP has worked reasonably well to attend to the Applicant’s concerns and to propose a settlement of the claim that was consistent with the terms of the insurance contract. Recommendation 55. On the basis of the available information, I recommend that the FSP is entitled to rely upon the provided cash settlement amount to resolve the claim, for the partial replacement of the driveway. 56. Notwithstanding this, I am satisfied as detailed in paragraphs 35-36 of this Rec ommendation that the Applicant may choose to retain the FSP’s contractor to attend to the work (subject to making payment for this from the already provided settlement funds). If this repair attempt proves unsuccessful, the FSP may have to consider replacing the entire driveway.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.