Storm damage to roof ridge cappings and scope of repairs

FirmFinancial Firm (Unknown - Insurer)
Decided2015-01-07
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The Applicant rejected the FSP's offer of $2,811.60 for replacing storm-damaged ridge cappings and sought full roof replacement because of timber frame damage and asbestos. AFCA found the limited repairs sufficient and agreed the FSP could cash settle at $2,811.60.

The storm did not establish frame damage beyond the cappings, wear and tear excludes the frame, and asbestos does not require wholesale roof replacement where targeted repairs can be done safely.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim Determination Case No: 338849 Determination Page 1 of 7 Case number : 338849 14 November 2014 1 Overview 1.1 Dispute The Applicant has claimed the costs of repair or replacement of the roof of his home which was damaged in a storm. The FSP has offered to settle the claim by a cash payment of $2,811.60 for limited repairs to replace damaged cappings on the roof. The Applicant has rejected the offer because there is also damage to the wooden frame and because the limited repairs might disturb asbestos. FOS recommended on 4 April 2014 that the FSP cash settle the claim by the payment of $2,811.60. 1.2 Issues and key findings The Applicant has not established that the storm caused any damage to the wooden frame. The limited repairs proposed by the FSP will not pose a greater risk of disturbing asbestos than a complete replacement of the roof. 1.3 Determination The FSP is entitled to settle the claim by cash settlement of $2,811.60. Case No: 338849 Determination Page 2 of 7 2 Reasons for Determination 2.1 The damage It is not in dispute that the Applicant’s home was damaged in a storm on 26 January 2013. A number of ridge caps were blown off the roof and some landed in the front yard. The FSP says its liability is limited to replacement of these ridge caps. The Applicant says that proper inspection of the damage might reveal that the timber support has been damaged and that this would necessitate replacement of the whole roof. 2.2 Terms of the policy Storm which causes loss or damage to the insured property is an insured event. This is subject to the following exclusions: “ If only part of your home is affected When only part of your home is damaged or destroyed, then we pay to repair or rebuild only the area that was affected by the damage. We don’t pay for: • extra expenses to replace or match undamaged parts to create a uniform appearance • extra costs to rebuild or repair your home to a better condition than it was in before it was damaged or destroyed (unless we need to meet current building standards). ... General exclusions What we don’t cover ... We don’t cover you under your policy for loss or damage to your home or contents or legal liability which is caused by or arises in connection with any of the following items or events: ... Consequential loss x Any loss or expense which indirectly results from the cover we provide under your policy. ... Rust and mould ✘ Rust, corrosion, rot, mould or gradual deterioration caused by light, air, the climate (which includes wind, rain or sand or the passage of time. Wear and tear ✘ Wear and tear through normal use. ” The FSP relies on these exclusions to say that it is only liable to replace the three ridge caps which blew off the roof. Case No: 338849 Determination Page 3 of 7 2.3 FSP repairers’ reports The FSP has submitted the following reports. S - 28/3/13 S submitted a report dated 28 March 2013 following an inspection of the property on 26 March. The report identified asbestos as a potential hazard. It confirmed that high winds had dislodged asbestos ridge cappings to the roof and photos showed this. It requested a roof report into the cause of the fixing failure of the ridge cappings. H – 28/3/13 This report was by a firm which specialises in hazardous material removal. It recorded that about 10 ridge caps had been dislodged completely and two had landed in the front yard. It stated that a tarpaulin had been placed over the roof where the caps had been dislodged, the front yard had been decontaminated and all asbestos removed from the site. H said further as follows: “3. Overall property is in fair condition. The roof is in good condition but most of the ridge capping will need to be re-screwed. 4. The broken ridge capping will have to be replaced and some of the old capping should be re- screwed as they are loose.” R – 2/4/13 The roof report requested by S was provided by R after an inspection on 2 April. This report stated as follows: “The roof is in excess of 40 years old and displays normal wear and tear. There are maintenance issues that require attention. Replacing existing screws, seals and washers with new and rusted zinc sheet installed above vent pipe needs replacing. Recommend resurfacing using encapsulation to protect further erosion to the surface of the fibro. … This roof can be repaired using zinc moulded to the same shape, (barrel caps) and installed. These are not to the same colour or texture but return the roof to a better condition prior hail.” A – Undated An undated report was obtained from A. It stated that the overall condition of the roof, including the ridge caps, was good. It stated that the only repair needed was replacement of the ridge capping tiles; however, if the ridge tiles could not be sourced then it may be necessary to replace the whole roof. U – 29/7/13 Case No: 338849 Determination Page 4 of 7 The final report obtained by the FSP was from U dated 29 July 2013. This report stated as follows: “ -3 caps had been blown off the roof and destroyed - 2 had shifted further up the roof - All of the remaining caps had been loosened On closer inspection of the timber frame which the capping is secured to, it was discovered that part of the timber had split as a result of the wind tearing the capping out if it.” U went on to recommend that all barge capping be removed so the timber frame could be assessed as to whether it could be repaired or would have to be replaced. U said they did not have the expertise to advise whether the frame could be repaired. They noted that the asbestos caps once removed could not be re-used and would have to be replaced. 2.4 FSP’s offer On 3 June 2013, before receipt of U’s report, the FSP offered to sett le the claim by paying for the cost of replacing three broken ridge caps made of zincalume. The offer did not quantify the value of the claim but later the FSP assessed it at $2,811.60, based on a scope of works from S containing a quote for replacement of the ridge caps. The Applicant rejected the offer and instead requested that the recommendation by U be followed, and therefore that all the capping be removed and the timber frame be assessed. 2.5 FOS recommendation By a recommendation dated 2 April 2104 FOS recommended that the Applicant accept the FSP’s offer of a cash settlement. The Applicant rejected the recommendation and has filed three repairers’ reports since the recommendation. 2.6 Applicant’s reports The Applicant obtained these reports after the Recommendation. C – 5/6/14 C provided a report dated 5 June 2014. It gave the following report on the condition of the roof: “Asbestos super six profile roof, generally good condition for age, screws have surface rust, 3-4 ridges have been blown off and covered in blue tarp. A few ridges have been re- screwed by others, as a form of makesafe.” In “Recommended Action” C said: Case No: 338849 Determination Page 5 of 7 “Replace roof as we are not able to repair an asbestos roof without potentially disturbing asbestos fibres.” This warning is then repeated: “We cannot carry out repairs to an asbestos roof without potentially disturbing more asbestos fibres. We can only offer to replace the roof with a new colorbond roof.” K – 24/6/14 K provided a report to the Applicant on 24 June 2014. K’s report was critical of the make-safe repairs undertaken on behalf of the FSP. It also contained the following: “In my opinion the roof requires to be replaced due to the existing roof product being Asbestos. Regulations require this product to be removed and disposed of properly rather than repaired.” T – 8/7/14 The Applicant also provided a report from T dated 8 July 2014. This report contained the following: “The basis of my assessment was to ascertain the probability of further damage occurring, taking into consideration the present state of the roof, and to assess whether asbestos contamination or exposure has occurred, or has the potential to occur in the event of another storm. … Upon initial examination of the roof, I noted that the asbestos was in stable condition, considering the age of the material, and the fact that no surface protection has been applied. If left in-situ and undisturbed, the ACM in general, would pose minimal risk in terms of respirable fibre dispersion. To be sure, I would recommend the roof be painted to encapsulate any fibres. … The ridge capping however, is an area of major concern. My inspection concluded that the majority of the caps inspected, had been dislodged from the timber lengths. Most likely by pressure & stress, as the timbers were relatively consistent with splits. This does not necessarily mean that the damage has been a result of this particular storm, but the owner has advised that two of the caps had actually been found shattered around the property thereafter. This is where it becomes an exposure risk, and my recommendation would be to remove & replace the capping, with a durable alternative to ACM. When considering risk minimisation, it is sensible to have an A or B Class licensed professional remove the capping and dispose of it then replace with an alternative. Should they decide to re-affix the caps, the ACM will be disturbed as holes will have to be drilled through the ACM releasing fibres, Without specific safeguards, this practice is also fully prohibited under current regulations. ” Case No: 338849 Determination Page 6 of 7 2.7 FSP’s response The FSP has provided responses to the Applicant’s reports. The first was by letter dated 18 June 2014, which responded specifically and in some detail to the report by C. The FSP disputed C’s qualifications in asbestos roofing but quoted from C’s website about methods for safe repair of asbestos roofs. The FSP also made the point that the risk of disturbing asbestos in complete removal of a roof is not likely to be less, and may even be greater, than in repair of the roof. The FSP’s response contains several pages of materials concerning the safe renovation of asbestos products. The FSP also provided a response dated 3 July 2014 to the report of K. In that letter the FSP rejects the criticisms by K of the make-safe repairs. In relation to asbestos, the FSP rejected the conclusion of K that the entire roof must be replaced because K did not identify the regulations it relied on. It otherwise relied on its earlier submissions. By an email dated 11 July 2014 the FSP responded to the report by T as follows: “The Member is unsure the purpose or intent of the report prepared by [T]; if the purpose is to demonstrate that the entire roof (or even all ridge capping) requires replacement due to storm damage and/or legislative requirements prohibiting repair of asbestos, then it fails to assist the Applicant in every regard. The Member does not wish to make further submissions in this instance, and consider the dispute is ready for a Determination to be issued.” 2.8 Conclusions There are two issues requiring resolution for this Determination. First, are the limited repairs proposed by the FSP for replacement of the broken cappings sufficient to repair the damage caused by the storm or are further repairs required to the wooden frame? Secondly, can these repairs be undertaken safely or does the risk of disturbance of asbestos require the replacement of the whole roof? Regarding the first question, I am satisfied that the limited repairs proposed by the FSP are sufficient to repair the storm damage. In my view the reports do not enable a finding to be made that there has been some more extensive damage to the wooden frame caused by the storm. U’s report suggested that there may be damage to the wooden frame caused by the storm but T’s report contradicted this and concluded that, since the timber splits were consistent, they had probably resulted from pressure and stress rather than the storm. Therefore I think that the FSP is not liable to repair the damage to the wooden frame as to do so would return the roof to a better condition than before the storm. Furthermore the general exclusion under the policy for wear and tear applies to this damage. Regarding the second question I am not persuaded by the presence of asbestos in the roof that the roof must be wholly replaced. Of course great care must be taken whenever asbestos is involved but I do not understand how the risks of Case No: 338849 Determination Page 7 of 7 replacing the entire roof are less than the risks of repairing a small part of it. Only the reports of C and K advocate the entire replacement of the roof but they do so without much elaboration. T’s report, on the other hand, is quite detailed but it does not recommend the replacement of the roof. Indeed it proposes more limited repairs noting only that safeguards must be taken to ensure that asbestos fibres are not released. Therefore I do not think that the FSP is liable for the entire replacement of the roof. 2.9 Determination On the basis of the available evidence I agree with the Recommendation that the FSP is entitled to settle the claim by a cash payment of $2,811.60. 3 Supporting information I am satisfied that there has been a full exchange of all relevant information between the parties. In addition to the materials considered for the Recommendation I have also considered the reports of C, K and T referred to above, and the FSP’s responses to them.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.