Home / Financial Firm (Unknown - Insurer) / Determination 338849
Determination 338849
Storm damage to roof ridge cappings and scope of repairs
Summary
The Applicant rejected the FSP's offer of $2,811.60 for replacing storm-damaged ridge cappings and sought full roof replacement because of timber frame damage and asbestos. AFCA found the limited repairs sufficient and agreed the FSP could cash settle at $2,811.60.
The storm did not establish frame damage beyond the cappings, wear and tear excludes the frame, and asbestos does not require wholesale roof replacement where targeted repairs can be done safely.
Issues
- Claim denial primary · not upheld
“The FSP is entitled to settle the claim by cash settlement of $2,811.60, and is not liable for the entire replacement of the roof.”
- Repairs or contractors secondary · not upheld
“I am not persuaded by the presence of asbestos in the roof that the roof must be wholly replaced.”
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of
claim
Determination
Case No: 338849 Determination Page 1 of 7
Case number : 338849 14 November 2014
1 Overview
1.1 Dispute
The Applicant has claimed the costs of repair or replacement of the roof of his
home which was damaged in a storm. The FSP has offered to settle the claim by
a cash payment of $2,811.60 for limited repairs to replace damaged cappings on
the roof. The Applicant has rejected the offer because there is also damage to the
wooden frame and because the limited repairs might disturb asbestos.
FOS recommended on 4 April 2014 that the FSP cash settle the claim by the
payment of $2,811.60.
1.2 Issues and key findings
The Applicant has not established that the storm caused any damage to the
wooden frame. The limited repairs proposed by the FSP will not pose a greater
risk of disturbing asbestos than a complete replacement of the roof.
1.3 Determination
The FSP is entitled to settle the claim by cash settlement of $2,811.60.
Case No: 338849 Determination Page 2 of 7
2 Reasons for Determination
2.1 The damage
It is not in dispute that the Applicant’s home was damaged in a storm on 26
January 2013. A number of ridge caps were blown off the roof and some landed
in the front yard. The FSP says its liability is limited to replacement of these ridge
caps. The Applicant says that proper inspection of the damage might reveal that
the timber support has been damaged and that this would necessitate
replacement of the whole roof.
2.2 Terms of the policy
Storm which causes loss or damage to the insured property is an insured event.
This is subject to the following exclusions:
“ If only part of your home is affected
When only part of your home is damaged or destroyed, then we pay to repair or
rebuild
only the area that was affected by the damage.
We don’t pay for:
• extra expenses to replace or match undamaged parts to create a uniform
appearance
• extra costs to rebuild or repair your home to a better condition than it was in
before it was damaged or destroyed (unless we need to meet current building
standards).
...
General exclusions
What we don’t cover
...
We don’t cover you under your policy for loss or damage to your home or
contents or legal liability which is caused by or arises in connection with any
of the following items or events:
...
Consequential loss x Any loss or expense which indirectly results from the
cover we provide under your policy. ...
Rust and mould ✘ Rust, corrosion, rot, mould or gradual deterioration
caused by light, air, the climate (which includes wind, rain or sand or the passage of
time.
Wear and tear ✘ Wear and tear through normal use. ”
The FSP relies on these exclusions to say that it is only liable to replace the three
ridge caps which blew off the roof.
Case No: 338849 Determination Page 3 of 7
2.3 FSP repairers’ reports
The FSP has submitted the following reports.
S - 28/3/13
S submitted a report dated 28 March 2013 following an inspection of the property
on 26 March. The report identified asbestos as a potential hazard. It confirmed
that high winds had dislodged asbestos ridge cappings to the roof and photos
showed this. It requested a roof report into the cause of the fixing failure of the
ridge cappings.
H – 28/3/13
This report was by a firm which specialises in hazardous material removal. It
recorded that about 10 ridge caps had been dislodged completely and two had
landed in the front yard. It stated that a tarpaulin had been placed over the roof
where the caps had been dislodged, the front yard had been decontaminated and
all asbestos removed from the site. H said further as follows:
“3. Overall property is in fair condition. The roof is in good condition but most of the
ridge capping will need to be re-screwed.
4. The broken ridge capping will have to be replaced and some of the old capping
should be re- screwed as they are loose.”
R – 2/4/13
The roof report requested by S was provided by R after an inspection on 2 April.
This report stated as follows:
“The roof is in excess of 40 years old and displays normal wear and tear. There are
maintenance issues that require attention. Replacing existing screws, seals and
washers with new and rusted zinc sheet installed above vent pipe needs replacing.
Recommend resurfacing using encapsulation to protect further erosion to the
surface of the fibro.
…
This roof can be repaired using zinc moulded to the same shape, (barrel caps) and
installed. These are not to the same colour or texture but return the roof to a better
condition prior hail.”
A – Undated
An undated report was obtained from A. It stated that the overall condition of the
roof, including the ridge caps, was good. It stated that the only repair needed was
replacement of the ridge capping tiles; however, if the ridge tiles could not be
sourced then it may be necessary to replace the whole roof.
U – 29/7/13
Case No: 338849 Determination Page 4 of 7
The final report obtained by the FSP was from U dated 29 July 2013. This report
stated as follows:
“ -3 caps had been blown off the roof and destroyed
- 2 had shifted further up the roof
- All of the remaining caps had been loosened
On closer inspection of the timber frame which the capping is secured to, it was
discovered that part of the timber had split as a result of the wind tearing the
capping out if it.”
U went on to recommend that all barge capping be removed so the timber frame
could be assessed as to whether it could be repaired or would have to be
replaced. U said they did not have the expertise to advise whether the frame
could be repaired. They noted that the asbestos caps once removed could not be
re-used and would have to be replaced.
2.4 FSP’s offer
On 3 June 2013, before receipt of U’s report, the FSP offered to sett le the claim
by paying for the cost of replacing three broken ridge caps made of zincalume.
The offer did not quantify the value of the claim but later the FSP assessed it at
$2,811.60, based on a scope of works from S containing a quote for replacement
of the ridge caps.
The Applicant rejected the offer and instead requested that the recommendation
by U be followed, and therefore that all the capping be removed and the timber
frame be assessed.
2.5 FOS recommendation
By a recommendation dated 2 April 2104 FOS recommended that the Applicant
accept the FSP’s offer of a cash settlement. The Applicant rejected the
recommendation and has filed three repairers’ reports since the recommendation.
2.6 Applicant’s reports
The Applicant obtained these reports after the Recommendation.
C – 5/6/14
C provided a report dated 5 June 2014. It gave the following report on the
condition of the roof:
“Asbestos super six profile roof, generally good condition for age, screws have
surface rust, 3-4 ridges have been blown off and covered in blue tarp. A few ridges
have been re- screwed by others, as a form of makesafe.”
In “Recommended Action” C said:
Case No: 338849 Determination Page 5 of 7
“Replace roof as we are not able to repair an asbestos roof without potentially
disturbing asbestos fibres.”
This warning is then repeated:
“We cannot carry out repairs to an asbestos roof without potentially disturbing more
asbestos fibres. We can only offer to replace the roof with a new colorbond roof.”
K – 24/6/14
K provided a report to the Applicant on 24 June 2014. K’s report was critical of the
make-safe repairs undertaken on behalf of the FSP. It also contained the
following:
“In my opinion the roof requires to be replaced due to the existing roof product
being Asbestos. Regulations require this product to be removed and disposed of
properly rather than repaired.”
T – 8/7/14
The Applicant also provided a report from T dated 8 July 2014. This report
contained the following:
“The basis of my assessment was to ascertain the probability of further damage
occurring, taking into consideration the present state of the roof, and to assess
whether asbestos contamination or exposure has occurred, or has the potential to
occur in the event of another storm.
…
Upon initial examination of the roof, I noted that the asbestos was in stable
condition, considering the age of the material, and the fact that no surface
protection has been applied. If left in-situ and undisturbed, the ACM in general,
would pose minimal risk in terms of respirable fibre dispersion. To be sure, I would
recommend the roof be painted to encapsulate any fibres. …
The ridge capping however, is an area of major concern. My inspection concluded
that the majority of the caps inspected, had been dislodged from the timber lengths.
Most likely by pressure & stress, as the timbers were relatively consistent with
splits. This does not necessarily mean that the damage has been a result of this
particular storm, but the owner has advised that two of the caps had actually been
found shattered around the property thereafter. This is where it becomes an
exposure risk, and my recommendation would be to remove & replace the capping,
with a durable alternative to ACM.
When considering risk minimisation, it is sensible to have an A or B Class licensed
professional remove the capping and dispose of it then replace with an alternative.
Should they decide to re-affix the caps, the ACM will be disturbed as holes will have
to be drilled through the ACM releasing fibres, Without specific safeguards, this
practice is also fully prohibited under current regulations. ”
Case No: 338849 Determination Page 6 of 7
2.7 FSP’s response
The FSP has provided responses to the Applicant’s reports. The first was by letter
dated 18 June 2014, which responded specifically and in some detail to the report
by C. The FSP disputed C’s qualifications in asbestos roofing but quoted from C’s
website about methods for safe repair of asbestos roofs. The FSP also made the
point that the risk of disturbing asbestos in complete removal of a roof is not likely
to be less, and may even be greater, than in repair of the roof. The FSP’s
response contains several pages of materials concerning the safe renovation of
asbestos products.
The FSP also provided a response dated 3 July 2014 to the report of K. In that
letter the FSP rejects the criticisms by K of the make-safe repairs. In relation to
asbestos, the FSP rejected the conclusion of K that the entire roof must be
replaced because K did not identify the regulations it relied on. It otherwise relied
on its earlier submissions.
By an email dated 11 July 2014 the FSP responded to the report by T as follows:
“The Member is unsure the purpose or intent of the report prepared by [T]; if the
purpose is to demonstrate that the entire roof (or even all ridge capping) requires
replacement due to storm damage and/or legislative requirements prohibiting repair
of asbestos, then it fails to assist the Applicant in every regard.
The Member does not wish to make further submissions in this instance, and
consider the dispute is ready for a Determination to be issued.”
2.8 Conclusions
There are two issues requiring resolution for this Determination. First, are the
limited repairs proposed by the FSP for replacement of the broken cappings
sufficient to repair the damage caused by the storm or are further repairs required
to the wooden frame? Secondly, can these repairs be undertaken safely or does
the risk of disturbance of asbestos require the replacement of the whole roof?
Regarding the first question, I am satisfied that the limited repairs proposed by the
FSP are sufficient to repair the storm damage. In my view the reports do not
enable a finding to be made that there has been some more extensive damage to
the wooden frame caused by the storm. U’s report suggested that there may be
damage to the wooden frame caused by the storm but T’s report contradicted this
and concluded that, since the timber splits were consistent, they had probably
resulted from pressure and stress rather than the storm.
Therefore I think that the FSP is not liable to repair the damage to the wooden
frame as to do so would return the roof to a better condition than before the storm.
Furthermore the general exclusion under the policy for wear and tear applies to
this damage.
Regarding the second question I am not persuaded by the presence of asbestos
in the roof that the roof must be wholly replaced. Of course great care must be
taken whenever asbestos is involved but I do not understand how the risks of
Case No: 338849 Determination Page 7 of 7
replacing the entire roof are less than the risks of repairing a small part of it. Only
the reports of C and K advocate the entire replacement of the roof but they do so
without much elaboration. T’s report, on the other hand, is quite detailed but it
does not recommend the replacement of the roof. Indeed it proposes more limited
repairs noting only that safeguards must be taken to ensure that asbestos fibres
are not released. Therefore I do not think that the FSP is liable for the entire
replacement of the roof.
2.9 Determination
On the basis of the available evidence I agree with the Recommendation that the
FSP is entitled to settle the claim by a cash payment of $2,811.60.
3 Supporting information
I am satisfied that there has been a full exchange of all relevant information
between the parties. In addition to the materials considered for the
Recommendation I have also considered the reports of C, K and T referred to
above, and the FSP’s responses to them.