Strata building claim declined under subsidence and soil movement exclusion
Summary
The strata body claimed for building cracking and damage linked to a blocked stormwater drain. AFCA accepted engineering evidence that long-term soil subsidence caused the damage, found the drain exception not established, and ordered no payment.
The subsidence and soil movement exclusion applies unless a blocked or leaking pipe caused the movement, and the Applicant did not prove that on the balance of probabilities.
Subjects and remedies
home or building damageno remedy
Text of the determination
Determination
General Insurance - Domestic Insurance - Residential Strata Title - FSP Decision -
Denial of claim
Determination
Case No: 338757 Determination Page 1 of 5
Case number : 338757 26 June 2014
1 Overview
1.1 Dispute
The residential strata insurance policy covering accidental damage claim was
lodged on the Residential Strata Insurance Policy on 20 March 2013 for damage
to the insured building caused by leaking/faulty plumbing.
The FSP denied the claim on the basis the damage occurred as a result of soil
movement and settlement, both of which are specifically excluded under the
terms of the policy.
1.2 Issues and key findings
Has the Applicant established a prima facie claim?
The Applicant has established a prima facie claim under the terms of the policy
because:
the policy is designed to cover accidental loss or damage to the property.
damage has been identified as a result of movement of the property causing
structural cracks
there is no evidence that the damage was intentional.
Was the FSP entitled to decline the claim?
The FSP was entitled to decline the claim because:
the policy includes a number of specific exclusions including exclusions
relating to subsidence and earth movement
engineering evidence establishes the cracking and damage to the premises is
primarily due to subsidence, shrinking and earth movement.
Whilst it is possible that the blocked drainage was a cause of the loss, the
Applicant is unable to establish on the balance of probabilities that the blocked
drainage was the cause of the loss.
1.3 Determination
This Determination is in favour of the FSP.
The FSP is entitled to decline the Applicant‟s claim and rely upon the specific
exclusions contained within the terms of the policy.
Case No: 338757 Determination Page 2 of 5
2 Reasons for Determination
2.1 Has the Applicant established a prima facie claim under the terms
of the policy?
The policy is an accidental damage policy providing cover for accidental damage
sustained to the Applicant‟s buildings.
Whilst the term „accidental damage‟ is not defined in the terms of the policy, the
term „accidental damage‟ should be given its normal meaning which means
„damage that is unintended and unexpected‟.
An engineering report commissioned from B identifies the damage was due to
movement occurring around the building structure, due to moisture changes in the
reactive clay soil being influenced by trees, poor drainage and possible plumbing
leaks.
A report from plumbing firm C dated 5 March 2013 identifies that the stormwater
line at the complex had been blocked by tree roots and this may have contributed
to the issue of water on the front right hand corner of the building.
The evidence establishes on the balance of probabilities that the damage
sustained to the property was accidental damage.
2.2 Is the FSP entitled to decline the claim?
The policy specifically excludes loss or damage arising from soil movement or
subsidence, except where such movement has been caused by a blocked or
leaking pipe.
Engineering firm “B” inspected the damaged building and concluded the damage
had arisen as a result of foundation movement due to moisture changes in the
reactive clay soils. This was also impacted by tree roots, poor drainage a t the site
and possible plumbing leaks.
Engineering firm "E" inspected the damaged building and concluded the damage
had arisen as a result of subsidence of the founding soils and subsequent
movement of building foundations. The blocked drain had not contributed to the
damage.
The soils had subsided, whereas had any water leaks been the cause of the
damage, the soil would have heaved. The building was situated on moderately to
highly reactive clay soils and the cracks now visible appeared to be in areas
previously repaired.
The evidence from both engineering firms who are qualified and experienced to
comment on the matter supports a view on the balance of probabilities that the
damage was sustained as a result of soil movement or subsidence.
The evidence is sufficient for the FSP to establish on the balance of probabilities
the application of the exclusion.
Case No: 338757 Determination Page 3 of 5
The Applicant has not established the exemption applies
The policy provides under the relevant exclusion relating to subsidence and earth
movement that it will pay the loss or damage if it is due to:
“ bursting, leaking and overflowing of water tanks, pipes, drains, gutters or other
water or liquid carrying apparatus (but not flood).”
Plumbing firm C engaged by the Applicant determined there was a blockage in
the stormwater line. The blockages were caused by tree roots and included
blockage in an old earthenware pipe. C considered that the blockage may have
contributed to the issue of water on the front right had corner of the building and
contributed to the damage.
Engineer B whilst conceding it was possible the soil movement was due to
plumbing leaks considered the moisture changes in the reactive clay as being
influenced by trees and poor drainage.
Engineer E concluded the damage was most probably caused by moisture
changes in the ground due to the effects of the nearby vegetations. It was highly
unlikely that the ground movement was significantly affected by the reported
blocked drains and no direct evidence was found of a cause or link between the
blocked drain and the subsidence with the structure.
The Applicant has been critical of this report in particular that the engineer was at
the property for less than 20 minutes. Nevertheless, the Applicant does not
dispute the qualifications of either engineer E or engineer B.
Whilst I am satisfied the evidence establishes it is possible that the blocked
stormwater drainage causing the water to leak into the soil may have contributed
to the subsidence, I am satisfied on the balance of probabilities this was unlikely.
Both B and E concluded the damage to the building had arisen principally as a
result of differential footing movement caused by a combination of factors
including changes in soil moisture content due to vegetation, poor drainage and
the moderately reactive soils at the site.
Had the blocked pipe been the cause of the damage, the soil would have swollen
and heaved from the increased moisture content. However, the soil had settled
and subsided from loss of moisture.
On balance, the damage was caused by long term foundation movement
consistent with the soil type at the site and the age of the structure.
Having considered the information as a whole, I am not satisfied that the
Applicant has established the application of the exemption to the exclusion.
In the circumstances, as the loss is specifically excluded by the terms of the
policy, the FSP is entitled to decline the claim.
3 Supporting information
There has been a full exchange of material between the parties and each party
has had the opportunity of addressing the issues that arise from the material. In
Case No: 338757 Determination Page 4 of 5
reaching this determination, I have considered all the relevant material and
submissions made by both parties and the relevant expert evidence.
3.1 Expert evidence
Record Key points
FSP’s expert ( E )
Engineer
24 May 2013
a sub - surface drain at the front right of the property was
blocked by tree roots
the blockage has since been repaired
there was very slight to slight gapping and cracking to
numerous locations on the external walls particularly
around the front right corner and along the right side wall
close examination of the cracks revealed them to be in
areas that had been repaired in the past
E's own experience was that the building was founded on
moderate ly to highly reactive soils
the evidence of the pattern of cracking indicates
subsidence of the front right corner of the building, being
footing movement
this was confirmed by the level survey undertaken by B
the movement in the building and fence has bee n caused
by changes in the ground moisture content due to
vegetation
there was no causal link between the blocked pipe and the
subsidence of the structure
such a link was highly improbable as increased moisture in
soils causes heaving not subsidence
Applicant’s expert (B)
Engineer
16 January 2013
there is limited fall across the property with generally poor
and uneven drainage
cracking was noted on the external walls ranging from
hairline up to 5mm in width
trees and shrubs were not growing close to t he building
which should be removed or root and moisture barriers
installed
poor drainage conditions around the building were noted
with likely plumbing leaks
plumbing tests should be undertaken and any leaks
repaired. drainage should also be upgraded
no a rticulation joints were noted in the brickwork across the
building, these should be installed to increase the flexibility
of the building
a floor level survey was undertaken with the maximum
difference being 38mm
the lowest levels were towards the front ri ght of the
building and the levels fall sharply towards this area
the founding soils are classified P/M to P/H, with the clay
soils being moderately reactive and potential footing
movement up to 40mm would be expected
the movement is related to moisture ch anges in the
Case No: 338757 Determination Page 5 of 5
reactive clay being influenced by trees, poor drainage and
possible plumbing leaks
Applicant’s expert ( C )
Plumber
16 January 2013
an inspection of the stormwater line at the complex
revealed it was blocked
blockages of tree roots were cleared between 11 and 15
metres
the line was holding water through two sections and is old
earthenware pipe
the man hole lid was lifted and it was found to be blocked
by tree roots
C suspected this may have contributed to the water issues
at the front right of t he building
replacement of the stormwater line from the front right
downpipe to the street was recommended