Home / Financial Firm (Unknown - Insurer) / Determination 338757

Determination 338757

Strata building claim declined under subsidence and soil movement exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2014-06-25
ProductGeneral Insurance · Strata
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The strata body claimed for building cracking and damage linked to a blocked stormwater drain. AFCA accepted engineering evidence that long-term soil subsidence caused the damage, found the drain exception not established, and ordered no payment.

The subsidence and soil movement exclusion applies unless a blocked or leaking pipe caused the movement, and the Applicant did not prove that on the balance of probabilities.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Residential Strata Title - FSP Decision - Denial of claim Determination Case No: 338757 Determination Page 1 of 5 Case number : 338757 26 June 2014 1 Overview 1.1 Dispute The residential strata insurance policy covering accidental damage claim was lodged on the Residential Strata Insurance Policy on 20 March 2013 for damage to the insured building caused by leaking/faulty plumbing. The FSP denied the claim on the basis the damage occurred as a result of soil movement and settlement, both of which are specifically excluded under the terms of the policy. 1.2 Issues and key findings Has the Applicant established a prima facie claim? The Applicant has established a prima facie claim under the terms of the policy because:  the policy is designed to cover accidental loss or damage to the property.  damage has been identified as a result of movement of the property causing structural cracks  there is no evidence that the damage was intentional. Was the FSP entitled to decline the claim? The FSP was entitled to decline the claim because:  the policy includes a number of specific exclusions including exclusions relating to subsidence and earth movement  engineering evidence establishes the cracking and damage to the premises is primarily due to subsidence, shrinking and earth movement.  Whilst it is possible that the blocked drainage was a cause of the loss, the Applicant is unable to establish on the balance of probabilities that the blocked drainage was the cause of the loss. 1.3 Determination This Determination is in favour of the FSP. The FSP is entitled to decline the Applicant‟s claim and rely upon the specific exclusions contained within the terms of the policy. Case No: 338757 Determination Page 2 of 5 2 Reasons for Determination 2.1 Has the Applicant established a prima facie claim under the terms of the policy? The policy is an accidental damage policy providing cover for accidental damage sustained to the Applicant‟s buildings. Whilst the term „accidental damage‟ is not defined in the terms of the policy, the term „accidental damage‟ should be given its normal meaning which means „damage that is unintended and unexpected‟. An engineering report commissioned from B identifies the damage was due to movement occurring around the building structure, due to moisture changes in the reactive clay soil being influenced by trees, poor drainage and possible plumbing leaks. A report from plumbing firm C dated 5 March 2013 identifies that the stormwater line at the complex had been blocked by tree roots and this may have contributed to the issue of water on the front right hand corner of the building. The evidence establishes on the balance of probabilities that the damage sustained to the property was accidental damage. 2.2 Is the FSP entitled to decline the claim? The policy specifically excludes loss or damage arising from soil movement or subsidence, except where such movement has been caused by a blocked or leaking pipe. Engineering firm “B” inspected the damaged building and concluded the damage had arisen as a result of foundation movement due to moisture changes in the reactive clay soils. This was also impacted by tree roots, poor drainage a t the site and possible plumbing leaks. Engineering firm "E" inspected the damaged building and concluded the damage had arisen as a result of subsidence of the founding soils and subsequent movement of building foundations. The blocked drain had not contributed to the damage. The soils had subsided, whereas had any water leaks been the cause of the damage, the soil would have heaved. The building was situated on moderately to highly reactive clay soils and the cracks now visible appeared to be in areas previously repaired. The evidence from both engineering firms who are qualified and experienced to comment on the matter supports a view on the balance of probabilities that the damage was sustained as a result of soil movement or subsidence. The evidence is sufficient for the FSP to establish on the balance of probabilities the application of the exclusion. Case No: 338757 Determination Page 3 of 5 The Applicant has not established the exemption applies The policy provides under the relevant exclusion relating to subsidence and earth movement that it will pay the loss or damage if it is due to: “ bursting, leaking and overflowing of water tanks, pipes, drains, gutters or other water or liquid carrying apparatus (but not flood).” Plumbing firm C engaged by the Applicant determined there was a blockage in the stormwater line. The blockages were caused by tree roots and included blockage in an old earthenware pipe. C considered that the blockage may have contributed to the issue of water on the front right had corner of the building and contributed to the damage. Engineer B whilst conceding it was possible the soil movement was due to plumbing leaks considered the moisture changes in the reactive clay as being influenced by trees and poor drainage. Engineer E concluded the damage was most probably caused by moisture changes in the ground due to the effects of the nearby vegetations. It was highly unlikely that the ground movement was significantly affected by the reported blocked drains and no direct evidence was found of a cause or link between the blocked drain and the subsidence with the structure. The Applicant has been critical of this report in particular that the engineer was at the property for less than 20 minutes. Nevertheless, the Applicant does not dispute the qualifications of either engineer E or engineer B. Whilst I am satisfied the evidence establishes it is possible that the blocked stormwater drainage causing the water to leak into the soil may have contributed to the subsidence, I am satisfied on the balance of probabilities this was unlikely. Both B and E concluded the damage to the building had arisen principally as a result of differential footing movement caused by a combination of factors including changes in soil moisture content due to vegetation, poor drainage and the moderately reactive soils at the site. Had the blocked pipe been the cause of the damage, the soil would have swollen and heaved from the increased moisture content. However, the soil had settled and subsided from loss of moisture. On balance, the damage was caused by long term foundation movement consistent with the soil type at the site and the age of the structure. Having considered the information as a whole, I am not satisfied that the Applicant has established the application of the exemption to the exclusion. In the circumstances, as the loss is specifically excluded by the terms of the policy, the FSP is entitled to decline the claim. 3 Supporting information There has been a full exchange of material between the parties and each party has had the opportunity of addressing the issues that arise from the material. In Case No: 338757 Determination Page 4 of 5 reaching this determination, I have considered all the relevant material and submissions made by both parties and the relevant expert evidence. 3.1 Expert evidence Record Key points FSP’s expert ( E ) Engineer 24 May 2013  a sub - surface drain at the front right of the property was blocked by tree roots  the blockage has since been repaired  there was very slight to slight gapping and cracking to numerous locations on the external walls particularly around the front right corner and along the right side wall  close examination of the cracks revealed them to be in areas that had been repaired in the past  E's own experience was that the building was founded on moderate ly to highly reactive soils  the evidence of the pattern of cracking indicates subsidence of the front right corner of the building, being footing movement  this was confirmed by the level survey undertaken by B  the movement in the building and fence has bee n caused by changes in the ground moisture content due to vegetation  there was no causal link between the blocked pipe and the subsidence of the structure  such a link was highly improbable as increased moisture in soils causes heaving not subsidence Applicant’s expert (B) Engineer 16 January 2013  there is limited fall across the property with generally poor and uneven drainage  cracking was noted on the external walls ranging from hairline up to 5mm in width  trees and shrubs were not growing close to t he building which should be removed or root and moisture barriers installed  poor drainage conditions around the building were noted with likely plumbing leaks  plumbing tests should be undertaken and any leaks repaired. drainage should also be upgraded  no a rticulation joints were noted in the brickwork across the building, these should be installed to increase the flexibility of the building  a floor level survey was undertaken with the maximum difference being 38mm  the lowest levels were towards the front ri ght of the building and the levels fall sharply towards this area  the founding soils are classified P/M to P/H, with the clay soils being moderately reactive and potential footing movement up to 40mm would be expected  the movement is related to moisture ch anges in the Case No: 338757 Determination Page 5 of 5 reactive clay being influenced by trees, poor drainage and possible plumbing leaks Applicant’s expert ( C ) Plumber 16 January 2013  an inspection of the stormwater line at the complex revealed it was blocked  blockages of tree roots were cleared between 11 and 15 metres  the line was holding water through two sections and is old earthenware pipe  the man hole lid was lifted and it was found to be blocked by tree roots  C suspected this may have contributed to the water issues at the front right of t he building  replacement of the stormwater line from the front right downpipe to the street was recommended

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.