Claim amount for further subsidence damage after prior repairs

FirmFinancial Firm (Unknown - Insurer)
Decided2014-10-02
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$770
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant sought further repairs to his home after earlier water-main repairs by the FSP's repairers failed, and the FSP accepted part of the damage but denied the garage wall under an earth movement exclusion. AFCA found the 2006 repairs were inadequate, the exclusion did not apply, and ordered the claim settled under the policy with interest on any cash settlement and reimbursement of $770 for the applicant's engineer.

The subsidence exclusion did not apply because the 72-hour limit only applies to specified events, and the damage was caused by the FSP's defective repairs.

Issues

Subjects and remedies

home or building damagepay claimpay compensationpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim amount Determination Case No: 338545 Determination Page 1 of 7 Case number : 338545 26 September 2014 1 Overview 1.1 Dispute In 2006, the Financial Services Provider (FSP) repaired damage to the Applicant’s home, pursuant to his home building insurance policy (policy) held with the FSP. The damage was caused by a leaking and burst water main. In 2013, the Applicant sought to have the FSP rectify further damage which had subsequently appeared. The FSP agreed to rectify the further damage to the driveway, garage slab and cracking to the walls, on the basis the original works had not been carried out properly. The FSP denied damage to other parts of the building (namely the garage wall) on the basis that it was not caused by an insured event or the previous repairs and was specifically excluded by the policy. 1.2 Issue and key findings Is the FSP liable for the subsequent damage to the Applicant’s building ? The FSP is liable for the subsequent damage to the Applicant’s building because the 2006 repairs were inadequate. The exclusion clause referred to by the FSP does not apply. 1.3 Determination This Determination is in favour of the Applicant. The FSP must:  Settle the Applicant’s claim, including the costs associated with underpinning of the building as recommended by D, in accordance with the terms and conditions of the policy. In the event a cash settlement is chosen, the FSP must pay the Applicant interest in accordance with the Insurance Contracts Act from 8 August 2013, being the date the claim was denied.  Reimburse the Applicant the full costs of obtaining the expert report from D.  Waive any excess that may be applicable. Case No: 338545 Determination Page 2 of 7 2 Reasons for Determination I have decided this dispute on its merits, doing what is fair in the all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties. I am satisfied that the documentation I have relied on has been provided to both parties. The dispute has been expedited to a Determination as FOS considered this was appropriate in the circumstances. No Recommendation was issued. 2.1 Is the FSP li able for the damage to the Applicant’s building ? The parties have engaged various experts since the 2006 water main burst The Applicant says that the water main feeding the pipes on his property had been leaking for between 15 and 25 years prior to 2006, causing saturation to his garden and extensive damage to his driveway and the walls and floor of his garage. He also notes that local authorities and plumbers were unable to locate the source of the leak, which was only revealed when the water main burst in 2006. The following then occurred:  In 2006, the FSP’s engineer “C” reported that the cause of the damage to the Applicant’s building was long term leaking from the water main and suggested repair works, which did not allow any time for the foundation soil to dry out.  The repair works were completed between mid June 2006 and late 2007 (the 2006 repairs).  Subsequent damage was noted by the Applicant after the 2006 repairs. He initially thought the cracking was minor, but lodged a further claim with the FSP in April 2013 after the condition of the building continued to deteriorate.  The FSP engaged an engineer “F” who noted the 2006 repairs were defective due to the failure to compact the sub base before concreting occurred.  On this basis, the FSP accepted liability in respect for all damage other than the garage wall, which F had said was caused by the adjoining garden bed.  The Applicant engaged engineer “D” who stated the 2006 repairs were defective in that a drying out period was not undertaken before the 2006 repairs commenced. D recommended underpinning of the garage wall and the wall adjoining the house and the garage, to prevent further damage. The various reports are set out in more detail in section 3 below. Escaping water penetrated into foundation soils Consistently with C’s 2006 report, I accept that the water main was leaking for many years prior to bursting, and that local authorities subsequently sought to rectify these problems in early July 2006. The Applicant notes the burst water main caused water to travel underground across the neighbour’s property (the Applicant’s property is at the bottom of the Case No: 338545 Determination Page 3 of 7 hill), causing a quagmire in the front garden and right across the other side of the garden. He states the water travelled under the foundations, the floor of the den, the garage and the driveway and moisture began to appear in the expansion joints of the concrete slab. Given the mains pipe had been leaking for considerable time prior to it bursting, I accept that the water leaking (and then bursting) from the water main would have penetrated into the foundation soil beneath the footings of the building. In reaching this conclusion I have considered F’s report, which while noting the burst water main, was silent as to the leak prior to the burst. Therefore it is likely that F did not consider the effect of long term water penetration to the foundation soils. The 2006 repairs were inadequate The FSP accepts that some of the 2006 repairs were inadequate, based on F’s report. In addition to the failure to compact the sub base noted by F, D’s report establishes that the 2006 repairs were also inadequate in that they were conducted:  without permitting an adequate drying out period, and  without consideration that the foundation soils had been saturated. On balance, I accept that these issues with the 2006 repairs have caused the continued subsidence of the building. This is because the drying out period was necessary prior to the compacting work (and / or underpinning) to prevent further damage. Neither C’s 2006 report on the scope of rectification works nor F’s initial report considered either the drying out time required or the effect of saturation of the foundation soils. These issues may therefore not have been considered in determining the scope of the necessary works. The Applicant’s building continues to move. It is doing so to such an extent that in May 2014 the garage ceiling was on the verge of collapsing and had to be secured. This was damage F initiall y referred to as “minor”, but the continual deterioration of the building has demonstrated the damage is not minor. I do not consider the extent of this damage to be consistent solely with normal seasonal earth movement. It is reasonable to conclude that the saturated foundation soils that were not permitted to dry out before rectification works were undertaken, have been gradually drying out over the years. The first effects of this were evident to the Applicant soon after the initial repairs were complete, but he considered them minor at the time. However, as the soil has continued to s hrink, the footings have further subsided causing more significant damage. This is consistent with D’s findings. In reaching this conclusion I have considered F’s comment s that as 12-18 months is sufficient drying out time for the foundation soils the current subsidence cannot Case No: 338545 Determination Page 4 of 7 be caused by the failure to dry out the soil before commencing the 2006 repairs. However, I note:  The Applicants referred to cracking shortly after the initial repairs were complete. This is within the timeframe referred to by F.  The damage to the concrete works (which the FSP has accepted was due to the inadequate 2006 repairs) has continued to occur some seven years after the mains pipe was fixed. Accordingly, on the balance of probabilities, I conclude the subsequent damage to the garage wall was caused by the failure of the FSP’s repairers to permit a drying out period, together with the failure to compact the soils and / or underpin the walls as required. Complete rectification works are required The FSP has denied cover in respect of the moisture to the garage wall where it is apparent salt is rising. This was because F stated the moisture was due to the adjoining garden bed. Subsequent to this, the garage ceiling has required work to prevent it from collapse. The Applicant seeks complete rectification works, including underpinning, as recommended by D to prevent further movement. The Applicant has stated that the portion of the garage wall below the level of the garden bed has been waterproofed, rendered with a cold mix of bitumen and covered with cement sheets for protection. Further, the front garden slopes towards the driveway and not towards the wall as suggested by F. This is supported by C’s report. In addition , the Applicant states there is an agricultural pipe running alongside the wall taking any excess water to the drain located in the driveway. The presence of the cement sheets is confirmed in photographs attached to F’s report. On balance, I do not accept that the garden bed is the proximate cause of damage to the southern garage wall. This is unlikely in the context of the damage to the other parts of the building caused by the inadequate 2006 repairs. The FSP must therefore recti fy the damage to the Applicant’s building (including the garage wall and underpinning of the home as recommended by D) in accordance with the terms and conditions of the policy. I note in this regard that D does not recommend waiting a further 12 to 18 months to commence works, but rather states that following completion of the recommended works (including underpinning of parts of the building) to then allow a period of 12 to 18 months for movement to stabilise before completing other remedial work such as plastering and painting. Case No: 338545 Determination Page 5 of 7 FSP is not entitled to exclude cover under the policy The policy provides cover for damage from the bursting or leaking of a water main, at or near the home. However, the FSP states it is not required to cover the Applicant’s claim because the policy states that any type of earth movement is not covered, if the damage does not result within 72 hours of an insured event. The policy states: “ What is not covered under any part of your policy We do not cover loss or damage caused by or as a result of … subsidence … or earth movement but we will cover subsidence damage to your home if it was caused by: -insured event 2 (burst pipes, leaks and overflows) -contents items insured by portable cover -these insured events if the damage occurs wit hin 72 hours of the event happening:  insured event 1 (storm and flood)  insured event 8 (explosion)  insured event 11 (earthquak e and tsunami). Given the damage to the house was a result of subsidence from a leaking and burst water main and / or the faulty repairs, the exclusion above does not apply. The 72 hour time limit applies only in respect of specified defined events, none of which apply to the Applicant’s claim. Other costs to be reimbursed to the Applicant The Applicant engaged his own engineer, D, at a cost of $770. The FSP agreed to contribute $500 to those costs. Given D’s report was instrumental in reaching this Determination, the FSP must reimburse the Applicant, to the extent it has not already done so, the full amount of D’s engagement, being $770. Further, given the further rectification works now required are as a result of the initial inadequate works, the FSP must not apply an excess to the claim. 3 Supporting information 3.1 Chronology of events and reports Date Report 26 October 2006 FSP’s engineer “C”  C states: “…it would appear the most likely causation to the excessive moisture problem which has allegedly been on - going for a Case No: 338545 Determination Page 6 of 7 Date Report period of almost 3 years within the front sections of this site, is most likely from a long - term leaking water main which was located uphill of this property…” [sic]  C sets out rectification works, that do not include a drying out period. Late 2006 to mid to late 2007  Rectification works undertaken by C. 21 June 2013 FSP’s engineer “F”  Subsequent damage to driveway was caused by defective concrete works in that an inadequate compacted sub base had been provided.  Damage to the southern wall of the garage was most likel y due to soil pressure as well as moisture from the adjoining garden bed.  Damage to the other parts of the building is minor and due to long term reactive clay moisture variations. It is unrelated to the 2006 repairs. 8 August 2013  FSP accepts liability for damage to the driveway and garage slab as well as cracking to the walls as this was caused by the defective 2006 repairs.  FSP does not accept liability in respect of the moisture to the garage wall on the basis it was caused by soil pressure and moist ure from the adjoining garden. 17 March 2014 Applicant’s engineer “D”  D states: “…the cracking is due to the effects of moisture changes in the foundation clays. Water has saturat ed the ground d ue to the leaking water main and has not b een allowed to dry out and stabili ze before remedial works were carried out.”  D recommends underpinning of some parts of the building. 7 April 2014 F’s supplementary report  A period of 12 - 18 months of drying is required before carrying out any repair work as the leaked water had penetrated to depths that would cause significant foundation movement.  F states the foundation soil is clay material of relatively stiff consistency, high plasticity, and with a relatively low permeability rate. Such foundation soils require lar ge volumes of water accumulating over a prolonged period of time (e.g. a pressurised underground plumbing leak lasting several months) before the water can penetrate downwards to depths that would increase the moisture content of the clay soils below the f ounding depth of the footings .  There is no relationship between the burst water main that occurred in 2006 and current foundation soil moisture given 7 years is more than an adequate drying period.  Damage is consistent with poorly compacted sub base, whi ch is consistent with gradual settlement over the years rather than sudden collapse. Case No: 338545 Determination Page 7 of 7 Date Report  Damage to the concrete works including driveway paving has occurred due to poor workmanship and / or inadequate construction. 15 May 2014 FSP builder “B”  B notes the fro nt left hand side of the garage ceiling was on the verge of collapse and required to be secured.  B sates: “Possible cause of the ceiling dropping is due to movement caused by prolonged soaking of ground underneath garage which is causing walls to crack and move.”  B made the ceiling safe.  B notes the movement issue will require rectification before repair work is done to prevent further damage.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.