Determination 337877

Water damage to rental bedroom ceiling denied as not an insured storm event

FirmFinancial Firm (Unknown - Insurer)
Decided2014-06-27
ProductGeneral Insurance · Landlord
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The landlord claimed for water damage to a rental bedroom ceiling, which the FSP denied because the water entered through an incorrectly installed roof tile rather than a storm-made opening. AFCA found the Applicant had not established an insured event, so the denial stands.

A defined events storm policy only covers water entry through openings made by the storm, and the claimant bears the onus of proving that cause.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim-Exclusion/ condition Determination Case No: 337877 Determination Page 1 of 3 Case number : 337877 26 June 2014 1 Overview 1.1 Dispute This dispute is under a landlord protection policy following water damage to a bedroom ceiling of a rented property. The FSP has denied the claim under the grounds that the damage did not arise from an insured event. This dispute has been subject to a Recommendation issued by the Service on 11 April 2014. The Recommendation was in favour of the FSP and has been rejected by the Applicant. A copy of the Recommendation is attached to this Determination. 1.2 Issues and key findings Was the FSP entitled to deny the Applicant’s claim? The FSP was entitled to deny the Applicant’s claim because:  The policy is an insured events policy.  The onus under an insurance events policy is on the Applicant to establish the damage was caused by an insured event.  The policy provides cover for the insured event of storm subject to damage being caused by water entering the building through openings in the walls or roofs made by the storm.  The available evidence indicates the water entered the buildings due to a different profile tile being installed causing a gap.  There was no evidence that the water entered the building through a storm created openi ng. 1.3 Determination The Determination is in favour of the FSP. The FSP is entitled to deny indemnity for the Applicant’s claim. Case No: 337877 Determination Page 2 of 3 2 Reasons for Determination This Determination follows a Recommendation issued by the Service on 11 April 2014. It was the Recommendation of the Case Manager that the FSP be entitled to deny indemnity of the Applicant’s claim as there was no evidence to establish that an insured event caused the damage. The Applicant has rejected the Recommendation and in doing so relies essentiall y on his prior submissions. I t is the Applicant’s argument that as there is no dispute there was a storm and heavy rain then it follows that the water damage was sustained because of the storm. I have carefully considered the Case Manager’s Recommendation and I am satisfied that it contains an accurate summary of the background of this dispute, the parties’ position and the issues to be determined. Having considered the information, exchanged as a whole, I agree with the Case Manager’s reasons for the Recommendation and the recommended outcome for the following reasons. 2.1 Policy is a defined events policy The policy is a defined events policy which provides limited cover for certain specified or defined events. Under the defined event of storm, cover is excluded for loss or damage: “(b) by water to the Buildings unless caused by water entering the Buildings through openings in walls or roofs made by the storm and/or tempest or the direct consequence thereof” In order for the Applicant to succeed with the Applicant’s claim it is necessary to establish not only that there was a storm but to also that the damage was caused by water entering the buildings through openings in the walls or roofs made by the storm and/or tempest. The onus of proof is on the Applicant to establish that the damage was caused by the defined event. 2.2 The evidence does not establish that the damage was due to a defined event The Applicant provided a report from a builder who quoted for the repair work. The builder noted that a new ceili ng was needed as there was a very large water stain in the ceiling closest to the window. The builder did not know where the leak came from. No other evidence has been provided by the Applicant to establish that the water entered the building through an opening made by a storm. The FSP’s assessor on an inspection of the building documented the damage was ceiling damage from water ingress. The report specifically comments that the cause of water ingress at the time of reporting had not been identified. Case No: 337877 Determination Page 3 of 3 The F SP’s builder, inspected the roof area and identified that a tile of a different profile had been installed, creating gaps in the roof between that tile and the original existing tiles which subsequently allowed the water entry. There is no evidence that the storm caused the tiles to lift or cause the misalignment of the tiles. In the absence of any other evidence, I am not satisfied that the Applicant has been able to establish the damage was sustained due to an insured event. Recommendation General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim - Exclusion/Condition Recommendation Case No: 337877 Recommendation Page 1 of 3 Case number : 337877 11 April 2014 3 Overview 3.1 Dispute The Applicant held a landlord protection policy under which he lodged a claim for water damage to a bedroom ceiling. The Financial Services Provider (FSP) denied the claim on the grounds the water ingress causing the damage was not the result of an insured event (storm or otherwise) but an incorrectly installed roof tile, which is not covered under the policy. 3.2 Issue and key findings W as the FSP entitled to deny the Applicant’s claim? The FSP was entitled to deny the Applicant’s claim as there is not enough information to establish that an insured event (storm or otherwise) caused the damage. The expert evidence suggests, on balance, the damage was the result of an incorrectly installed roof tile which is not covered under the policy. 3.3 Recommendation This Recommendation is in favour of the FSP.  The FSP was entitled to deny indemnity for the Applicant’s claim. Case No: 337877 Recommendation Page 2 of 3 4 Reasons for Recommendation 4.1 Was the FSP entitled to deny indemnity for the Applicant’s claim? Policy only covers damage for certain events The Applicant’s policy covers damage caused by specific events which includes storm but excludes damage resulting from water ingress unless the water entered through an opening made by a storm. Under insurance law, the Applicant bears the onus of establishing that, on the balance of probabilities, the damage was due to storm or some other insured event. This is called a prima facie claim. Experts’ reports do not establish an insured event The Applicant and FSP’s contracted experts provide no evidence to suggest the water ingress resulted from an opening made by the storm. Whilst neither the Applicant’s repairer (B) nor the FSP’s assessor (P) were able to identify the actual source of the water ingress, the FSP’s builder (T) reports:  A roof tile had been replaced at some stage with a slightly different profile to the existing tiles creating gaps between it and the surrounding tiles.  This allowed water to enter directly above the bedroom where the damage occurred. The Applicant does not provide any expert evidence to refute that of T but says:  Neither he nor the tenant know who installed the tile or when this was done.  He purchased the house in 2002 and there had been no prior water ingress issues.  The tile in question is located over a metre away from the damaged ceiling with no evidence of water staining directly below it.  Without the storm, the water ingress would not have occurred and therefore the damage must have been caused by storm.  The claim was initially accepted by the assessor. The assessor did initially advise the claim should be accepted but this decision was subsequently overturned by the FSP. There is no evidence available to suggest the Applicant relied on such acceptance to his detriment ie, the repairs were required to be undertaken regardless of whether the policy responded to the claim. It is further noted the repairs were to the internal damage only and did not prevent further investigation of the actual source of the water ingress by either party. The issue confronting the Applicant is establishing the storm itself created an opening (whether around the tile or elsewhere) allowing the water ingress to occur. The only associated evidence available is that of T who states it was due to pre-existing openings around the replaced tile. For this reason, the Applicant has been unable to establish a prima facie claim to which the policy could respond. Case No: 337877 Recommendation Page 3 of 3 5 Supporting information 5.1 Key points from supporting reports Record Key points FSP’s assessor (P) Report 16 May 2013  The ceiling was discovered cracked across a join and partly fallen away from its fixed position against the ceiling joists with water staining and leaking across its expanse.  It appeared a significant amount of rainwater had entered through the roof at some point duri ng severe storms and heavy rainfall the week prior. This saturated the insulation material and caused pooling over the upper surface of the ceiling material which caused it to soften and fall away from its fixings against the joists.  The tenant’s and Appl icant’s actions likely prevented further collapse of the ceiling and damage to the timber laminate flooring in the room.  Water ingress was of recent origin and claim acceptance was recommended. FSP’s builder (T) Report 16 May 2013  Water damage had occurred to approximately four square metres of Gyprock ceiling and mould growth had occurred to the robe ceiling.  The damage is consistent with water entry past dislodged roof tiles identified directly above the damaged area of ceiling wh ich caused plaster board and paint damage.  It appeared a roof tile had been replaced at some stage with a slightly different profile. This in turn allowed adjacent tiles to sit incorrectly allowing water ingress. Applicant’s repairer ( B) Report 17 Dec 201 3  A new ceiling was required.  There was a large water stain on the ceiling closest to the window.  The source of the leak was not investigated. FSP ’s builder (T ) Report 22 Jan 2014  An internal and external inspection of the roof was conducted including th e lifting of tiles to confirm the water entry point.  A tile of a different profile had been installed on the roof creating gaps between the tile and the original existing tiles allowing water to enter directly above the bedroom where the damage occurred.