Determination 337877
Water damage to rental bedroom ceiling denied as not an insured storm event
Summary
The landlord claimed for water damage to a rental bedroom ceiling, which the FSP denied because the water entered through an incorrectly installed roof tile rather than a storm-made opening. AFCA found the Applicant had not established an insured event, so the denial stands.
A defined events storm policy only covers water entry through openings made by the storm, and the claimant bears the onus of proving that cause.
Issues
- Claim denial primary · not upheld
“The FSP was entitled to deny the Applicant's claim as there was no evidence that the water entered the building through a storm created opening.”
- Poor claim handling secondary · not upheld
“The assessor did initially advise the claim should be accepted but this decision was subsequently overturned by the FSP.”
Subjects and remedies
home or building damageno remedy
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of
claim-Exclusion/ condition
Determination
Case No: 337877 Determination Page 1 of 3
Case number : 337877 26 June 2014
1 Overview
1.1 Dispute
This dispute is under a landlord protection policy following water damage to a
bedroom ceiling of a rented property.
The FSP has denied the claim under the grounds that the damage did not arise
from an insured event.
This dispute has been subject to a Recommendation issued by the Service on
11 April 2014.
The Recommendation was in favour of the FSP and has been rejected by the
Applicant. A copy of the Recommendation is attached to this Determination.
1.2 Issues and key findings
Was the FSP entitled to deny the Applicant’s claim?
The FSP was entitled to deny the Applicant’s claim because:
The policy is an insured events policy.
The onus under an insurance events policy is on the Applicant to establish the
damage was caused by an insured event.
The policy provides cover for the insured event of storm subject to damage
being caused by water entering the building through openings in the walls or
roofs made by the storm.
The available evidence indicates the water entered the buildings due to a
different profile tile being installed causing a gap.
There was no evidence that the water entered the building through a storm
created openi ng.
1.3 Determination
The Determination is in favour of the FSP. The FSP is entitled to deny indemnity
for the Applicant’s claim.
Case No: 337877 Determination Page 2 of 3
2 Reasons for Determination
This Determination follows a Recommendation issued by the Service on 11 April
2014. It was the Recommendation of the Case Manager that the FSP be entitled
to deny indemnity of the Applicant’s claim as there was no evidence to establish
that an insured event caused the damage.
The Applicant has rejected the Recommendation and in doing so relies essentiall y
on his prior submissions.
I t is the Applicant’s argument that as there is no dispute there was a storm and
heavy rain then it follows that the water damage was sustained because of the
storm.
I have carefully considered the Case Manager’s Recommendation and I am
satisfied that it contains an accurate summary of the background of this dispute,
the parties’ position and the issues to be determined. Having considered the
information, exchanged as a whole, I agree with the Case Manager’s reasons for
the Recommendation and the recommended outcome for the following reasons.
2.1 Policy is a defined events policy
The policy is a defined events policy which provides limited cover for certain
specified or defined events.
Under the defined event of storm, cover is excluded for loss or damage:
“(b) by water to the Buildings unless caused by water entering the Buildings
through openings in walls or roofs made by the storm and/or tempest or the direct
consequence thereof”
In order for the Applicant to succeed with the Applicant’s claim it is necessary to
establish not only that there was a storm but to also that the damage was caused
by water entering the buildings through openings in the walls or roofs made by the
storm and/or tempest.
The onus of proof is on the Applicant to establish that the damage was caused by
the defined event.
2.2 The evidence does not establish that the damage was due to a
defined event
The Applicant provided a report from a builder who quoted for the repair work.
The builder noted that a new ceili ng was needed as there was a very large water
stain in the ceiling closest to the window. The builder did not know where the leak
came from.
No other evidence has been provided by the Applicant to establish that the water
entered the building through an opening made by a storm.
The FSP’s assessor on an inspection of the building documented the damage
was ceiling damage from water ingress. The report specifically comments that the
cause of water ingress at the time of reporting had not been identified.
Case No: 337877 Determination Page 3 of 3
The F SP’s builder, inspected the roof area and identified that a tile of a different
profile had been installed, creating gaps in the roof between that tile and the
original existing tiles which subsequently allowed the water entry.
There is no evidence that the storm caused the tiles to lift or cause the
misalignment of the tiles.
In the absence of any other evidence, I am not satisfied that the Applicant has
been able to establish the damage was sustained due to an insured event.
Recommendation
General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of
Claim - Exclusion/Condition
Recommendation
Case No: 337877 Recommendation Page 1 of 3
Case number : 337877 11 April 2014
3 Overview
3.1 Dispute
The Applicant held a landlord protection policy under which he lodged a claim for
water damage to a bedroom ceiling.
The Financial Services Provider (FSP) denied the claim on the grounds the water
ingress causing the damage was not the result of an insured event (storm or
otherwise) but an incorrectly installed roof tile, which is not covered under the
policy.
3.2 Issue and key findings
W as the FSP entitled to deny the Applicant’s claim?
The FSP was entitled to deny the Applicant’s claim as there is not enough
information to establish that an insured event (storm or otherwise) caused the
damage.
The expert evidence suggests, on balance, the damage was the result of an
incorrectly installed roof tile which is not covered under the policy.
3.3 Recommendation
This Recommendation is in favour of the FSP.
The FSP was entitled to deny indemnity for the Applicant’s claim.
Case No: 337877 Recommendation Page 2 of 3
4 Reasons for Recommendation
4.1 Was the FSP entitled to deny indemnity for the Applicant’s claim?
Policy only covers damage for certain events
The Applicant’s policy covers damage caused by specific events which includes
storm but excludes damage resulting from water ingress unless the water entered
through an opening made by a storm.
Under insurance law, the Applicant bears the onus of establishing that, on the
balance of probabilities, the damage was due to storm or some other insured
event. This is called a prima facie claim.
Experts’ reports do not establish an insured event
The Applicant and FSP’s contracted experts provide no evidence to suggest the
water ingress resulted from an opening made by the storm.
Whilst neither the Applicant’s repairer (B) nor the FSP’s assessor (P) were able to
identify the actual source of the water ingress, the FSP’s builder (T) reports:
A roof tile had been replaced at some stage with a slightly different profile to
the existing tiles creating gaps between it and the surrounding tiles.
This allowed water to enter directly above the bedroom where the damage
occurred.
The Applicant does not provide any expert evidence to refute that of T but says:
Neither he nor the tenant know who installed the tile or when this was done.
He purchased the house in 2002 and there had been no prior water ingress
issues.
The tile in question is located over a metre away from the damaged ceiling
with no evidence of water staining directly below it.
Without the storm, the water ingress would not have occurred and therefore
the damage must have been caused by storm.
The claim was initially accepted by the assessor.
The assessor did initially advise the claim should be accepted but this decision
was subsequently overturned by the FSP. There is no evidence available to
suggest the Applicant relied on such acceptance to his detriment ie, the repairs
were required to be undertaken regardless of whether the policy responded to the
claim. It is further noted the repairs were to the internal damage only and did not
prevent further investigation of the actual source of the water ingress by either
party.
The issue confronting the Applicant is establishing the storm itself created an
opening (whether around the tile or elsewhere) allowing the water ingress to
occur. The only associated evidence available is that of T who states it was due to
pre-existing openings around the replaced tile.
For this reason, the Applicant has been unable to establish a prima facie claim to
which the policy could respond.
Case No: 337877 Recommendation Page 3 of 3
5 Supporting information
5.1 Key points from supporting reports
Record Key points
FSP’s assessor (P)
Report
16 May 2013
The ceiling was discovered cracked across a join and
partly fallen away from its fixed position against the ceiling
joists with water staining and leaking across its expanse.
It appeared a significant amount of rainwater had entered
through the roof at some point duri ng severe storms and
heavy rainfall the week prior. This saturated the insulation
material and caused pooling over the upper surface of the
ceiling material which caused it to soften and fall away
from its fixings against the joists.
The tenant’s and Appl icant’s actions likely prevented
further collapse of the ceiling and damage to the timber
laminate flooring in the room.
Water ingress was of recent origin and claim acceptance
was recommended.
FSP’s builder (T)
Report
16 May 2013
Water damage had occurred to approximately four square
metres of Gyprock ceiling and mould growth had occurred
to the robe ceiling.
The damage is consistent with water entry past dislodged
roof tiles identified directly above the damaged area of
ceiling wh ich caused plaster board and paint damage.
It appeared a roof tile had been replaced at some stage
with a slightly different profile. This in turn allowed adjacent
tiles to sit incorrectly allowing water ingress.
Applicant’s repairer ( B)
Report
17 Dec 201 3
A new ceiling was required.
There was a large water stain on the ceiling closest to the
window.
The source of the leak was not investigated.
FSP ’s builder (T )
Report
22 Jan 2014
An internal and external inspection of the roof was
conducted including th e lifting of tiles to confirm the water
entry point.
A tile of a different profile had been installed on the roof
creating gaps between the tile and the original existing tiles
allowing water to enter directly above the bedroom where
the damage occurred.