Home / Financial Firm (Unknown - Insurer) / Determination 337585

Determination 337585

Storm roof damage claim partly denied

FirmFinancial Firm (Unknown - Insurer)
Decided2014-08-05
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The Applicants claimed under a home building policy for storm damage to their roof and internal water damage, and sought roof replacement. AFCA found the cracking was caused by foot traffic rather than a storm or the FSP's consultant, so the FSP need not replace the roof or pay for the cracking, but must settle the reasonable cost of hail repairs.

The insured bears the onus of proving a storm event caused the loss, and the evidence did not establish that the cracking was storm damage.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 3337585 Determination Page 1 of 12 Case number: 337585 General Insurance - Domestic Insurance - Home Building - Storm - FSP Decision - Claim Amount 10 July 2014 Summary Description:  This dispute concerns a claim by the Applicants under a home building and contents insurance policy for damage to the roof of their home and internal water damage which they claim was caused by a storm event. Basis for Determination :  The FSP accepted the part of the claim that related to hail damage but denied cover for the cracking damage to the roof sheeting on the basis it was not caused by an insured event but by pedestrian foot traffic on the roof. The evidence provided supports the FSP’s submission that the only storm damage to the roof is that caused by hail damage and that damage can be repaired by encapsulation.  The evidence does not establish the cracking damage to the roof was caused by a storm event or by the FSP’s consultant . Determination:  The FSP is not liable to replace the roof;  the FSP is liable to pay the reasonable cost of repair caused by hail damage by encapsulation of the roof and arrange those repairs or cash settle the cost of repairs as a result of the hail damage to the roof;  the FSP is not responsible to repair or pay for the repairs of cracking to the roof including the 9 visible cracks in the upper layer of capping identified by S and the 2 other fractured areas of roof sheeting consistent with foot traffic observed by S and any internal damage as a result of the water entering the house from cracking in the roof from these indentified areas;  Within 15 days of notification of the Applicants’ acceptance of the Determination, the FSP is to arrange an independent inspection and quotation for the repair of the hail damage only; Determination Case No: 3337585 Determination Page 2 of 12  Within 15 days of notification of the Applicants’ acceptance of the Determination, the FSP is to ensure the cracks to the roof are repaired before the encapsulation process is carried out; and  Within 30 days of notification of the Applicants’ acceptance o f the Determination, the FSP is to settle the claim by either cash settling the Applicants for the said cost of repairs of the hail damage or arranging for a qualified professional to perform the repairs, in accordance with the terms of the policy. Background 1. I have reviewed all the material submitted by the parties and save where I make note specifically, I am satisfied the Background as set out in the Recommendation is accurate and is as follows. 2. The Applicants held a home building and contents insurance policy with the Financial Services Provider (FSP) which was in place at the time of the loss and provided cover against listed insured events. 3. On 8 April 2013, the Applicants lodged a claim for storm damage to their property. 4. The FSP accepted the part of the claim that related to hail damage but denied cover for the cracking damage to the roof sheeting on the basis it was not caused by an insured event but by pedestrian foot traffic on the roof. 5. The Applicants were dissatisfied with this decision and said the FSP is liable for all the damage to the roof. They say they have sealed the cracked and broken roof sheets with gap filler but want the FSP to replace the roof. 6. The dispute was the subject of a Recommendation. The Recommendation was in favour of the Applicants and not accepted by the FSP. In the circumstances, the matter has been referred to me for Determination. Issue 7. Whether the FSP is entitled to deny the claim for the cracking damage to the roof and subsequent internal damage or whether the only liability of the FSP is for the hail damage to the roof. Reasons for Decision 8. There has been an exchange of material between each party, and I am satisfied each party has had an opportunity to reply to the issues raised. Case No: 3337585 Determination Page 3 of 12 9. Each FOS case is decided on its merits, taking into account the facts of the case. I have reviewed all the material submitted by the parties both before and after the Recommendation was issued, in order to reach my decision. I will only refer to the relevant submissions and materials raised. Material and contentions of the parties both before and after the Recommendation M report and photographs 23 April 2013 10. M is a building consultant and was appointed by the FSP to inspect the site for water damage. M attended the insured property with the male Applicant on 15 April 2013. He also took photographs of the areas of claimed damage and the roof. There is a dispute between the parties as to whether he properly inspected the roof and took photographs of the roof from on the roof or from a ladder. I will refer to this later. 11. In any event, I note the following from the report:  M notes the male Applicant told him that the property sustained water damage because of a storm on 7 April 2013  The roofing is pitched asbestos cement  The house is 50 years old and faces south  M noted evidence of water staining in the lounge room ceiling (he later says this was meant to read no damage)  M also noted the exposed rafters in an enclosed veranda/ sunroom and noted the flexible gap sealer had discoloured over time as it was not painted or sealed  M says he inspected the roof and noted it was in a fair condition consistent with its age. 12. The Applicant told S (and has always maintained to the FSP and in various submissions to this Service) that M did not go on to the roof on this occasion but inspected from a ladder at the gutter edge. 13. The FSP says M did inspect the roof and that the photographs taken confirm that M did go onto the roof but that as there was no cracking in the roof then that the cracks occurred between the first and second visit by M. 14. S notes in his report that the Applicants told S that after M left, the Applicant climbed to the roof surface and took photographs which he showed to the FSP representative. M report and photographs 23 July 2013 15. M returned to the site on 16 July 2013 as the Applicant reported the asbestos roof sheeting was cracked which they continued to claim had been Case No: 3337585 Determination Page 4 of 12 caused in the storm. M took further photographs of the ceiling and the roof. I note the following from this report:  M notes the ridge capping has been cracked about every 900-1000mm along the entire length of the ridge capping  M says this is not consistent with storm damage but is consistent with pedestrian traffic which he says was caused after he inspected the roof on 15 April 2013  He says the cracking is clean and shows no signs of weathering so it recently occurred  The cracks are confined to the top ridge sections occurring along the entire length of the ridge line and are not consistent with damage caused by flying debris or falling branches as other areas of the roof would have been damaged – there are not large trees nearby and the roof was clear of debris  The cracks are to the outer layer of the saddle ridge capping and the cracks to the outer layer will not cause rainwater to enter the house  M noted the asbestos ceilings had been relined with plasterboard before his original inspection. M reinspected the plasterboard ceiling linings though out the house and could not find water damage or rainwater ingress. 16. The Applicants agree that M went on to the roof on this occasion. The female Applicant says she saw him walk all over the roof. She says he did not go into the manhole in the bathroom or look at the bayonet that showed signs of water damage. 17. After the Recommendation the FSP says the only reason for the second inspection by M was because of a direct request from the Applicants. S report and photographs 30 August 2013 18. S is a licensed builder and inspected the roof for the FSP on 28 August 2013 with the Applicants. He took photographs which are annotated with his comments. He read M’s reports. I note the following from the report:  S notes the Applicants said that the intense storm on 26 -28 th January 2013 caused damage to the roof.  The property is about 50 years old and is generally in good condition for its age  The roof is a corrugated asbestos cement sheet  He noted pit marks and chips and splash markings across all the roof which are caused by recent hailstones  He also noted two layers of capping and that there are 9 visible cracks in the upper layer of capping, 8 of which are recently damaged  He noted tread marks throughout the roof surface consistent with pedestrian traffic Case No: 3337585 Determination Page 5 of 12  He agrees with M that the damage to the capping is pedestrian related but couldn’t says conclu sively when this occurred but says it is fresh and displays no ageing or weathering  S also noted 2 other fractured areas of roof sheeting consistent with foot traffic and with the movement on the roof of a person not familiar with the roofing profile  He disagrees with M in that S says that the observed cracking to the capping will allow the ingress of water because the capping was installed for ventilation and the air gap leaves the capping unsupported and susceptible to breakage  He observed the underside of the sheets displayed watermarking and said they had become porous. He thought this was recent damage  He concluded that ingress of water to the ceilings had occurred as a result of the cracking to the upper layer of the corrugated asbestos cement sheet ridge cap profiles  He also said the hail had degraded the roof sheets and pitted it significantly. This had dislodged the asbestos fibres. He said that the roof surface is to be encapsulated. Alternatively S said replacement of the corrugated asbestos roof sheeting is required. January 2013 daily weather observations from BOM 19. The FSP provided this and it show rain events on 26, 27 and 28 January 2013 with significant rain on 28 January 2013. There are also rain events on three days in mid and late February, o n 3 and 25 March and on 1 and 13 April 2013. M report 16 April 2014 20. This report and photographs were provided by the FSP after the Recommendation. It says:  M did get onto the roof on 15 April 2013 and took several photographs of the roof. The roof had no cracking then but did on 16 July 2013. There was pitting to the roof but it was not recent  The male Applicant was there at the first inspection and told M the roof was damaged in a storm on 7 April 2103  The female Applicant was at the second inspection. Again he accessed the roof and observed recent cracking along the ridge capping caused by pedestrian traffic  He says he also accessed the roof cavity the second time via the manhole in the bathroom ceiling and only partially accessed the roof space but saw no recent rainwater ingress  The asbestos ceiling in the bathroom has mould growth which is not recent and which is typical with an asbestos roofing which become porous over time and allow moisture to penetrate into the roof space Case No: 3337585 Determination Page 6 of 12  He agrees he was shown a light fitting which was deteriorated and says this is the cause  The moisture problems are covered by the plasterboard which has lined the asbestos ceilings to most rooms  He says that on both occasions there was no evidence of water damage to the internal linings and no evidence of rainwater ingress. Screen shots from FSP 21. After the Recommendation the FSP provided these which show:  A call on 26 June 2013 when the insured was asked to send through images he had of the damaged roof  A call on 28 June 2013 when the insured says he doesn’t think the assessor went on the roof as he would have seen cracks  A call on 23 August 2013 shows from IDR notes that the FSP agreed to appoint S to inspect the roof and comment on the cause of cracking Photographs taken by the Applicants 22. The Applicants say they took photographs after the first visit by M. The photos are taken from a phone. They are not dated. They were given to the local branch of the FSP on a date unknown. They show cracked roofing and that the person who took the photographs was wearing thongs. The male Applicant says he did not walk all over the roof. 23. In a letter received by the Service on 25 September 2013 the Applicants provided other photographs of the cracks filled with gap filler given to the Applicants by a qualified roofer. The male Applicant was on the roof a second time about then and did not notice pedestrian marks and says recent rain may have washed them off. He noted a number of loose tiles which may have been storm related. 24. The Applicants took photographs on 17 January 2014 to show that the photographs taken by M on his first visit could not have been taken from the roof. 25. The Applicants also provided new photographs of the bathroom and ceiling under cover of their letter of 30 April 2014. Analysis 26. Insurance law provides that the insured has the onus of establishing that on the balance of probabilities the claimed loss and damage occurred because of an insured event. This is known as a prima facie claim. Once a prima facie claim has been established, the onus then shifts to the FSP to demonstrate that the loss is excluded from cover or the claim can be denied. Case No: 3337585 Determination Page 7 of 12 27. Accordingly, in this matter the Applicants have the onus to establish a storm event caused the loss and damage to the roof and any ensuing damage to the inside of the house. 28. If established, the onus shifts to the FSP to establish the facts necessary to be able to rely on any policy exclusions or limitations. 29. After the attendance by S, the FSP accepted liability for the hail degradation to the roof. The FSP says that the hail damage has caused asbestos fibre to come loose and that the loose asbestos fibres can be repaired by encapsulation of the roof. 30. The FSP has agreed to pay for or repair the damage to the roof caused by hail and was to obtain quotes to do this encapsulation work. No quotes have been made available to me. 31. The Applicants agree that the encapsulation does contain the flaking fibres but says it is a temporary fix and does not restrict the ingress of water long term. However, even I was to accept that this is so the FSP is only liable for the damage caused by the hail. I accept from the material made available to me that the damage caused by the hail was to loosen the asbestos fibres. There is no persuasive material made available to me that the hail damage has damaged the roof to such an extent that water is coming into the house. 32. The Applicants say the roof is also cracked and damaged and has caused water ingress and that the encapsulation of the roof is not a remedy for this damage. They have repaired the cracks but are concerned about future damage and want the roof replaced. 33. The Applicants contend the cracking damage was caused by storm. I accept from the material provided by the FSP from BOM that there were storm events in the area in the months before the claim was made. In particular there was a very heavy rain event on the weekend of 26-28 January 2013. 34. The Applicants say the storm event cracked the roof. Alternatively they say if the roof was cracked by pedestrian traffic as contended by M and S that the only person on the roof at the relevant time wearing the pertinent footwear was M, the FSP’s consultant. They criticise M’s inspection and findings. They say he did not go onto the roof the first time, did not go into the manhole and that his report was inaccurate about other details too. 35. The Applicants have provided photographs of a cracked roof which they say were taken by the male Applicant after M first inspected the roof. The photographs are not dated. They do show cracks to roof sheeting. They also show the person who took the photographs was wearing thongs. 36. The Applicants say that in order to stop water coming into the house, the roof should be replaced not sealed. They say encapsulation does contain the flaking fibres but it is a temporary fix and it does not restrict the ingress of water long term. They have repaired the cracks with gap filler and have provided photographs of the repairs. Case No: 3337585 Determination Page 8 of 12 37. The FSP argues that the Applicant has not established that the cracking damage to the roof was caused by a storm event or that the roof requires replacement because of a storm event. It says the cracking was caused by pedestrian traffic after M first inspected the building. It says M’s photographs taken when on the roof on the first inspection show no cracking of the roof. 38. The FSP accepts that hail caused pitting and this dislodged asbestos fibres and says that this damage can be repaired by encapsulation. 39. The FSP agrees that the building is insured for storm damage but that the policy requires that it pay:  The reasonable cost of repair  Only those costs that directly apply to the part of the property that has suffered loss or damage  And wear, tear and gradual deterioration are excluded from cover. 40. In its IDR letter dated 11 September 2013 the FSP was prepared to pay to encapsulate the roof and was to obtain quotes. 41. The nub of the dispute therefore is the cracking damage to the roof caused by an insured event such as storm or by another cause such as pedestrian traffic and if so, who walked on the roof and caused it to crack. 42. The Applicants criticise the inspection and findings of M. However S has also inspected the roof. I accept that both M and S have the expertise to comment on the cause of damage. Both M and S say the cracking on the roof was not caused by a storm related e vent. 43. Even if I was to accept that M’s opinion should not be taken into account because of the adverse comments made about M’s inspections and reports by the Applicants, the Applicants says that S listened to them, inspected the property properly and was fair and honest. S does not support the Applicants as aside from the hail damage he says the cracking damage to the roof was caused by pedestrian traffic not by a storm event. 44. I accept that the Applicants have provided photographs that show cracking damage to the roof but the Applicants have not provided any other material to say how that cracking was caused. In the absence of any other information from the Applicants I am satisfied that the cracking on the roof observed by S was not caused by a storm related event. 45. The next question to answer then is if the cracking damage to the roof was not caused by a storm event, then what caused the cracking on the roof and who caused the cracking. The FSP may have liability if the cracking damage was caused by its consultant, M. 46. S agrees with M that the damage to the capping is caused by someone walking on the roof. He noted nine visible cracks and two other fractured areas of roof sheeting. He said one crack was old. He said the other eight “are of relatively recent origin”. He says he can’t conclusively state when the Case No: 3337585 Determination Page 9 of 12 person walked on the roof but says the cracking is fresh. I am satisfied therefore that the cracking on the roof was caused by someone walking on it. 47. But who walked on the roof and caused the cracking? The Applicants say it was M as he was the only one on the roof wearing the type of shoe identified by S. The FSP denies it was M. 48. M inspected the roof on 15 April 2013 and 16 July 2013. S inspected the roof on 28 August 2013. S observed a number of tread marks corresponding with a sports shoe or similar. He noted these marks throughout the roof surface. He says “the positioning of the damage is consistent with movement on the roof of a person not familiar with Super Six roofing profile.” 49. I have looked at the photographs taken by S and I agree that Photograph 6 taken by S shows a sand shoe type imprint on the roof surface. 50. The male Applicant is adamant that M did not go on the roof on 15 April 2013. He has said this on many occasions in his submissions to both the FSP and the Service. I accept that photographs of the roof were taken by the male Applicant which show cracks and that the Applicants told the FSP as early as 28 June 2013 that he did not think that M went on the roof. This is evidenced by the FSP’ s file notes. 51. The male Applicant also says that after M left after the first visit, the male Applicant went on the roof and took photographs. The photographs are not dated but I accept they were taken some time after M’s first inspection on 15 April 2013 and they show cracks. I also accept that when he took the photographs he was wearing thongs not sports shoes. 52. The Applicants agree that M went on the roof on 16 July 2013. 53. M says he went on the roof on both occasions. In his first report he says he inspecte d the roof and that it was in fair condition. He doesn’t elaborate on the nature of the inspection. He attaches 2 photographs numbered 7 and 8. I have considered those photographs carefully and I am unable to say whether they were taken from the roof or from a ladder leaning on the gutter even with the help of the photographs taken by the Applicants and provided under cover of the letter of 17 January 2014. 54. In M’s second report, it is clear that M does go on the roof as evidenced by the photographs. He says the cracks that he saw on that occasion were not there at the time of the first inspection. Photographs 13 and 14 show M was wearing a sports shoe. 55. After the Recommendation M was asked to comment about the first inspection. M says he did get on the roof o n 15 April 2013 and in support of this assertion produces 5 photographs. Image 1 and image 4 appear to be images 7 and 8 taken on 15 April 2013. I have considered the 3 remaining photographs carefully but there is nothing in them or about them intrinsically that assist me to accept that they were taken on 15 April 2013. They are not Case No: 3337585 Determination Page 10 of 12 date stamped. Most critically they were not produced at the time of the first report or even in the second report and this is of concern. 56. I acknowledge that S also says that the “the positioning of the damage is consistent with movement on the roof of a person not familiar with Super Six roofing profile.” I also acknowledge that M is a firm of building consultants. However, I do not know the exact expertise of the writer of the report and I do not accept that this necessarily leads to the conclusion that it was the male Applicant who walked on the roof and cracked the tiles. 57. However, having carefully considered all the material, I am unable to accept that the cracks to the roof were caused by M either as the Applicants took photographs of the roof after M left in April, or before M inspected the roof again in July and these show the roof was cracked. And so if I accept that M did not go on the roof in April and the roof was already cracked, then it follows that M did not cause the cracking. 58. The opinion of both M and S is that the cracking to the roof was not caused by a storm event but by pedestrian traffic. For the Applicants to succeed this leads to the need to be able to conclude that M walked on the roof and damaged it in April before the male Applicant took the photographs but the Applicants are adamant that M did not inspect the roof in April. 59. Alternatively, if I accept that the Applicants are mistaken in that regard and accept what M says which is that he did go on the roof in April, it is possible that he cracked the tiles by walking on the roof then. However, the photographs which he says he took on that occasion support the FSP’s contention that the roof was not cracked then. 60. The Applicants have produced photographs which they say were taken after M first inspected the roof. The photographs do show cracks in the roof. The photographs are not dated. I do not know exactly when they were taken save to say they were taken sometime after M inspected the roof on 15 April 2013 and before the Applicant went to the FSP’s representative which was before the file note dated 26 June 2013. 61. I accept that the roof is cracked and I accept what S says which is that water has come into the house. The Applicants have the onus to establish the cracking on the roof was caused by storm damage and on the balance of probabilities I do not accept that the Applicants have established this. Rather, I am satisfied that the material establishes the roof was cracked by foot traffic by persons unknown at a time unknown. 62. S disagrees with M about the ingress of water into the house. S says that there is evidence of ingress of water into the house. I accept S’s findings as I am satisfied that he more thoroughly describes the nature of the capping and he observed watermarking on the underside of sheets which are supported by his photographs. In support of his findings, he also observed and photographed the presence of moisture in the light fitting. Case No: 3337585 Determination Page 11 of 12 63. However even if there is water ingress into the house, the available evidence does not persuade me that the water ingress was caused by a storm event or by M walking on the roof. 64. On the information to hand and for the reason stated I accept that the FSP is responsible for only the costs that directly apply to the part of the property that has suffered loss or damage as identified by S and as a result of the storm. 65. S concludes his report by saying: “The hail related damage to the corrugated asbestos roofing sheets requires either encapsulation or replacement of the roofing sheets to prevent the free movement of asbestos fibres.” 66. The Applicants say in their letter to the Service 17 January 2014 that: “We have done our own research into encapsulation and dispite the fact that it does contain the flaking fibres it is only a temporary fix and it does not restrict the ingress of water long term. This is therefore not correcting the damage as in the future it could happen again, and we find this totally unexceptable. (sic)” 67. Having considered that material provided I am satisfied the FSP accepts that it is responsible to ensure that the hail damage to the roof is to be repaired so that the free movement of the asbestos fibres is prevented. If encapsulation achieves that end, and the Applicants acknowledge that it does “contain the flaking fibres”, then I do not accept on the material provided that the roof has to be replaced. 68. The FSP is responsible for only the reasonable cost to repair the loss and damage caused by an insured event. On the information provided and for the reasons stated, I accept that the FSP is not responsible for the cracking to the roof. I also accept that it is the cracking that caused the ingress of water and not the hail damage, and so the encapsulation does not have to “restrict the ingress of water long term”. 69. The Applicants say they have repaired the cracks to the roof as evidenced by the photographs. The FSP is to ensure the cracks to the roof are repaired before the encapsulation process is affected or pursuant to the policy, it can cash settle the Applicants for the cost of the encapsulation process. 70. On the information provided and for the reasons stated, I am satisfied that the FSP is not responsible to repair or pay for the repairs of the 9 visible cracks in the upper layer of capping identified by S, the 2 other fractured areas of roof sheeting consistent with foot traffic observed by S and any internal damage as a result of the water entering the house from these indentified areas. Determination 71. On the basis of the available information and for the reasons stated, I determine: Case No: 3337585 Determination Page 12 of 12  the FSP is not liable to replace the roof;  the FSP is liable to pay the reasonable cost of repair caused by hail damage by encapsulation of the roof and arrange those repairs or cash settle the cost of repairs as a result of the hail damage to the roof;  the FSP is not responsible to repair or pay for the repairs of cracking to the roof including the 9 visible cracks in the upper layer of capping identified by S and the 2 other fractured areas of roof sheeting consistent with foot traffic observed by S and any internal damage as a result of the water entering the house from cracking in the roof from these indentified areas;  Within 15 days of notification of the Applicants’ acceptance of the Determination, the FSP is to arrange an independent inspection and quotation for the repair of the hail damage only;  Within 15 days of notification of the Applicants’ acceptance of the Determination, the FSP is to ensure the cracks to the roof are repaired before the encapsulation process is carried out; and  Within 30 days of notification of the Applicants’ acceptance o f the Determination, the FSP is to settle the claim by either cash settling the Applicants for the said cost of repairs of the hail damage or arranging for a qualified professional to perform the repairs, in accordance with the terms of the policy.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.