The Applicants claimed under a home building policy for storm damage to their roof and internal water damage, and sought roof replacement. AFCA found the cracking was caused by foot traffic rather than a storm or the FSP's consultant, so the FSP need not replace the roof or pay for the cracking, but must settle the reasonable cost of hail repairs.
The insured bears the onus of proving a storm event caused the loss, and the evidence did not establish that the cracking was storm damage.
Issues
- Claim denial primary · not upheld
“the FSP is not responsible to repair or pay for the repairs of cracking to the roof ... the cracking was caused by someone walking on it”
- Claim amount dispute secondary · not upheld
“the FSP is not liable to replace the roof; encapsulation of the hail damage is sufficient”
- Inadequate claim investigation secondary · not upheld
“I am unable to accept that the cracks to the roof were caused by M either as the Applicants took photographs ... after M left in April”
Subjects and remedies
home or building damagenatural disasterpay claimrepair or rectify
Text of the determination
Case No: 3337585 Determination Page 1 of 12
Case number: 337585
General Insurance - Domestic Insurance - Home Building - Storm - FSP
Decision - Claim Amount
10 July 2014
Summary
Description:
This dispute concerns a claim by the Applicants under a home building and
contents insurance policy for damage to the roof of their home and internal
water damage which they claim was caused by a storm event.
Basis for Determination :
The FSP accepted the part of the claim that related to hail damage but
denied cover for the cracking damage to the roof sheeting on the basis it
was not caused by an insured event but by pedestrian foot traffic on the roof.
The evidence provided supports the FSP’s submission that the only storm
damage to the roof is that caused by hail damage and that damage can be
repaired by encapsulation.
The evidence does not establish the cracking damage to the roof was
caused by a storm event or by the FSP’s consultant .
Determination:
The FSP is not liable to replace the roof;
the FSP is liable to pay the reasonable cost of repair caused by hail damage
by encapsulation of the roof and arrange those repairs or cash settle the cost
of repairs as a result of the hail damage to the roof;
the FSP is not responsible to repair or pay for the repairs of cracking to the
roof including the 9 visible cracks in the upper layer of capping identified by
S and the 2 other fractured areas of roof sheeting consistent with foot traffic
observed by S and any internal damage as a result of the water entering the
house from cracking in the roof from these indentified areas;
Within 15 days of notification of the Applicants’ acceptance of the
Determination, the FSP is to arrange an independent inspection and
quotation for the repair of the hail damage only;
Determination
Case No: 3337585 Determination Page 2 of 12
Within 15 days of notification of the Applicants’ acceptance of the
Determination, the FSP is to ensure the cracks to the roof are repaired
before the encapsulation process is carried out; and
Within 30 days of notification of the Applicants’ acceptance o f the
Determination, the FSP is to settle the claim by either cash settling the
Applicants for the said cost of repairs of the hail damage or arranging for a
qualified professional to perform the repairs, in accordance with the terms of
the policy.
Background
1. I have reviewed all the material submitted by the parties and save where I
make note specifically, I am satisfied the Background as set out in the
Recommendation is accurate and is as follows.
2. The Applicants held a home building and contents insurance policy with the
Financial Services Provider (FSP) which was in place at the time of the loss
and provided cover against listed insured events.
3. On 8 April 2013, the Applicants lodged a claim for storm damage to their
property.
4. The FSP accepted the part of the claim that related to hail damage but
denied cover for the cracking damage to the roof sheeting on the basis it
was not caused by an insured event but by pedestrian foot traffic on the roof.
5. The Applicants were dissatisfied with this decision and said the FSP is liable
for all the damage to the roof. They say they have sealed the cracked and
broken roof sheets with gap filler but want the FSP to replace the roof.
6. The dispute was the subject of a Recommendation. The Recommendation
was in favour of the Applicants and not accepted by the FSP. In the
circumstances, the matter has been referred to me for Determination.
Issue
7. Whether the FSP is entitled to deny the claim for the cracking damage to the
roof and subsequent internal damage or whether the only liability of the FSP
is for the hail damage to the roof.
Reasons for Decision
8. There has been an exchange of material between each party, and I am
satisfied each party has had an opportunity to reply to the issues raised.
Case No: 3337585 Determination Page 3 of 12
9. Each FOS case is decided on its merits, taking into account the facts of the
case. I have reviewed all the material submitted by the parties both before
and after the Recommendation was issued, in order to reach my decision. I
will only refer to the relevant submissions and materials raised.
Material and contentions of the parties both before and after the
Recommendation
M report and photographs 23 April 2013
10. M is a building consultant and was appointed by the FSP to inspect the site
for water damage. M attended the insured property with the male Applicant
on 15 April 2013. He also took photographs of the areas of claimed damage
and the roof. There is a dispute between the parties as to whether he
properly inspected the roof and took photographs of the roof from on the roof
or from a ladder. I will refer to this later.
11. In any event, I note the following from the report:
M notes the male Applicant told him that the property sustained water
damage because of a storm on 7 April 2013
The roofing is pitched asbestos cement
The house is 50 years old and faces south
M noted evidence of water staining in the lounge room ceiling (he later
says this was meant to read no damage)
M also noted the exposed rafters in an enclosed veranda/ sunroom and
noted the flexible gap sealer had discoloured over time as it was not
painted or sealed
M says he inspected the roof and noted it was in a fair condition
consistent with its age.
12. The Applicant told S (and has always maintained to the FSP and in various
submissions to this Service) that M did not go on to the roof on this occasion
but inspected from a ladder at the gutter edge.
13. The FSP says M did inspect the roof and that the photographs taken confirm
that M did go onto the roof but that as there was no cracking in the roof then
that the cracks occurred between the first and second visit by M.
14. S notes in his report that the Applicants told S that after M left, the Applicant
climbed to the roof surface and took photographs which he showed to the
FSP representative.
M report and photographs 23 July 2013
15. M returned to the site on 16 July 2013 as the Applicant reported the
asbestos roof sheeting was cracked which they continued to claim had been
Case No: 3337585 Determination Page 4 of 12
caused in the storm. M took further photographs of the ceiling and the roof. I
note the following from this report:
M notes the ridge capping has been cracked about every 900-1000mm
along the entire length of the ridge capping
M says this is not consistent with storm damage but is consistent with
pedestrian traffic which he says was caused after he inspected the roof
on 15 April 2013
He says the cracking is clean and shows no signs of weathering so it
recently occurred
The cracks are confined to the top ridge sections occurring along the
entire length of the ridge line and are not consistent with damage
caused by flying debris or falling branches as other areas of the roof
would have been damaged – there are not large trees nearby and the
roof was clear of debris
The cracks are to the outer layer of the saddle ridge capping and the
cracks to the outer layer will not cause rainwater to enter the house
M noted the asbestos ceilings had been relined with plasterboard
before his original inspection. M reinspected the plasterboard ceiling
linings though out the house and could not find water damage or
rainwater ingress.
16. The Applicants agree that M went on to the roof on this occasion. The
female Applicant says she saw him walk all over the roof. She says he did
not go into the manhole in the bathroom or look at the bayonet that showed
signs of water damage.
17. After the Recommendation the FSP says the only reason for the second
inspection by M was because of a direct request from the Applicants.
S report and photographs 30 August 2013
18. S is a licensed builder and inspected the roof for the FSP on 28 August 2013
with the Applicants. He took photographs which are annotated with his
comments. He read M’s reports. I note the following from the report:
S notes the Applicants said that the intense storm on 26 -28 th January
2013 caused damage to the roof.
The property is about 50 years old and is generally in good condition
for its age
The roof is a corrugated asbestos cement sheet
He noted pit marks and chips and splash markings across all the roof
which are caused by recent hailstones
He also noted two layers of capping and that there are 9 visible cracks
in the upper layer of capping, 8 of which are recently damaged
He noted tread marks throughout the roof surface consistent with
pedestrian traffic
Case No: 3337585 Determination Page 5 of 12
He agrees with M that the damage to the capping is pedestrian related
but couldn’t says conclu sively when this occurred but says it is fresh
and displays no ageing or weathering
S also noted 2 other fractured areas of roof sheeting consistent with
foot traffic and with the movement on the roof of a person not familiar
with the roofing profile
He disagrees with M in that S says that the observed cracking to the
capping will allow the ingress of water because the capping was
installed for ventilation and the air gap leaves the capping unsupported
and susceptible to breakage
He observed the underside of the sheets displayed watermarking and
said they had become porous. He thought this was recent damage
He concluded that ingress of water to the ceilings had occurred as a
result of the cracking to the upper layer of the corrugated asbestos
cement sheet ridge cap profiles
He also said the hail had degraded the roof sheets and pitted it
significantly. This had dislodged the asbestos fibres. He said that the
roof surface is to be encapsulated. Alternatively S said replacement of
the corrugated asbestos roof sheeting is required.
January 2013 daily weather observations from BOM
19. The FSP provided this and it show rain events on 26, 27 and 28 January
2013 with significant rain on 28 January 2013. There are also rain events on
three days in mid and late February, o n 3 and 25 March and on 1 and 13
April 2013.
M report 16 April 2014
20. This report and photographs were provided by the FSP after the
Recommendation. It says:
M did get onto the roof on 15 April 2013 and took several photographs
of the roof. The roof had no cracking then but did on 16 July 2013.
There was pitting to the roof but it was not recent
The male Applicant was there at the first inspection and told M the roof
was damaged in a storm on 7 April 2103
The female Applicant was at the second inspection. Again he accessed
the roof and observed recent cracking along the ridge capping caused
by pedestrian traffic
He says he also accessed the roof cavity the second time via the
manhole in the bathroom ceiling and only partially accessed the roof
space but saw no recent rainwater ingress
The asbestos ceiling in the bathroom has mould growth which is not
recent and which is typical with an asbestos roofing which become
porous over time and allow moisture to penetrate into the roof space
Case No: 3337585 Determination Page 6 of 12
He agrees he was shown a light fitting which was deteriorated and says
this is the cause
The moisture problems are covered by the plasterboard which has
lined the asbestos ceilings to most rooms
He says that on both occasions there was no evidence of water
damage to the internal linings and no evidence of rainwater ingress.
Screen shots from FSP
21. After the Recommendation the FSP provided these which show:
A call on 26 June 2013 when the insured was asked to send through
images he had of the damaged roof
A call on 28 June 2013 when the insured says he doesn’t think the
assessor went on the roof as he would have seen cracks
A call on 23 August 2013 shows from IDR notes that the FSP agreed to
appoint S to inspect the roof and comment on the cause of cracking
Photographs taken by the Applicants
22. The Applicants say they took photographs after the first visit by M. The
photos are taken from a phone. They are not dated. They were given to the
local branch of the FSP on a date unknown. They show cracked roofing and
that the person who took the photographs was wearing thongs. The male
Applicant says he did not walk all over the roof.
23. In a letter received by the Service on 25 September 2013 the Applicants
provided other photographs of the cracks filled with gap filler given to the
Applicants by a qualified roofer. The male Applicant was on the roof a
second time about then and did not notice pedestrian marks and says recent
rain may have washed them off. He noted a number of loose tiles which may
have been storm related.
24. The Applicants took photographs on 17 January 2014 to show that the
photographs taken by M on his first visit could not have been taken from the
roof.
25. The Applicants also provided new photographs of the bathroom and ceiling
under cover of their letter of 30 April 2014.
Analysis
26. Insurance law provides that the insured has the onus of establishing that on
the balance of probabilities the claimed loss and damage occurred because
of an insured event. This is known as a prima facie claim. Once a prima facie
claim has been established, the onus then shifts to the FSP to demonstrate
that the loss is excluded from cover or the claim can be denied.
Case No: 3337585 Determination Page 7 of 12
27. Accordingly, in this matter the Applicants have the onus to establish a storm
event caused the loss and damage to the roof and any ensuing damage to
the inside of the house.
28. If established, the onus shifts to the FSP to establish the facts necessary to
be able to rely on any policy exclusions or limitations.
29. After the attendance by S, the FSP accepted liability for the hail degradation
to the roof. The FSP says that the hail damage has caused asbestos fibre to
come loose and that the loose asbestos fibres can be repaired by
encapsulation of the roof.
30. The FSP has agreed to pay for or repair the damage to the roof caused by
hail and was to obtain quotes to do this encapsulation work. No quotes have
been made available to me.
31. The Applicants agree that the encapsulation does contain the flaking fibres
but says it is a temporary fix and does not restrict the ingress of water long
term. However, even I was to accept that this is so the FSP is only liable for
the damage caused by the hail. I accept from the material made available to
me that the damage caused by the hail was to loosen the asbestos fibres.
There is no persuasive material made available to me that the hail damage
has damaged the roof to such an extent that water is coming into the house.
32. The Applicants say the roof is also cracked and damaged and has caused
water ingress and that the encapsulation of the roof is not a remedy for this
damage. They have repaired the cracks but are concerned about future
damage and want the roof replaced.
33. The Applicants contend the cracking damage was caused by storm. I accept
from the material provided by the FSP from BOM that there were storm
events in the area in the months before the claim was made. In particular
there was a very heavy rain event on the weekend of 26-28 January 2013.
34. The Applicants say the storm event cracked the roof. Alternatively they say if
the roof was cracked by pedestrian traffic as contended by M and S that the
only person on the roof at the relevant time wearing the pertinent footwear
was M, the FSP’s consultant. They criticise M’s inspection and findings.
They say he did not go onto the roof the first time, did not go into the
manhole and that his report was inaccurate about other details too.
35. The Applicants have provided photographs of a cracked roof which they say
were taken by the male Applicant after M first inspected the roof. The
photographs are not dated. They do show cracks to roof sheeting. They also
show the person who took the photographs was wearing thongs.
36. The Applicants say that in order to stop water coming into the house, the
roof should be replaced not sealed. They say encapsulation does contain the
flaking fibres but it is a temporary fix and it does not restrict the ingress of
water long term. They have repaired the cracks with gap filler and have
provided photographs of the repairs.
Case No: 3337585 Determination Page 8 of 12
37. The FSP argues that the Applicant has not established that the cracking
damage to the roof was caused by a storm event or that the roof requires
replacement because of a storm event. It says the cracking was caused by
pedestrian traffic after M first inspected the building. It says M’s photographs
taken when on the roof on the first inspection show no cracking of the roof.
38. The FSP accepts that hail caused pitting and this dislodged asbestos fibres
and says that this damage can be repaired by encapsulation.
39. The FSP agrees that the building is insured for storm damage but that the
policy requires that it pay:
The reasonable cost of repair
Only those costs that directly apply to the part of the property that has
suffered loss or damage
And wear, tear and gradual deterioration are excluded from cover.
40. In its IDR letter dated 11 September 2013 the FSP was prepared to pay to
encapsulate the roof and was to obtain quotes.
41. The nub of the dispute therefore is the cracking damage to the roof caused
by an insured event such as storm or by another cause such as pedestrian
traffic and if so, who walked on the roof and caused it to crack.
42. The Applicants criticise the inspection and findings of M. However S has also
inspected the roof. I accept that both M and S have the expertise to
comment on the cause of damage. Both M and S say the cracking on the
roof was not caused by a storm related e vent.
43. Even if I was to accept that M’s opinion should not be taken into account
because of the adverse comments made about M’s inspections and reports
by the Applicants, the Applicants says that S listened to them, inspected the
property properly and was fair and honest. S does not support the Applicants
as aside from the hail damage he says the cracking damage to the roof was
caused by pedestrian traffic not by a storm event.
44. I accept that the Applicants have provided photographs that show cracking
damage to the roof but the Applicants have not provided any other material
to say how that cracking was caused. In the absence of any other
information from the Applicants I am satisfied that the cracking on the roof
observed by S was not caused by a storm related event.
45. The next question to answer then is if the cracking damage to the roof was
not caused by a storm event, then what caused the cracking on the roof and
who caused the cracking. The FSP may have liability if the cracking damage
was caused by its consultant, M.
46. S agrees with M that the damage to the capping is caused by someone
walking on the roof. He noted nine visible cracks and two other fractured
areas of roof sheeting. He said one crack was old. He said the other eight
“are of relatively recent origin”. He says he can’t conclusively state when the
Case No: 3337585 Determination Page 9 of 12
person walked on the roof but says the cracking is fresh. I am satisfied
therefore that the cracking on the roof was caused by someone walking on it.
47. But who walked on the roof and caused the cracking? The Applicants say it
was M as he was the only one on the roof wearing the type of shoe identified
by S. The FSP denies it was M.
48. M inspected the roof on 15 April 2013 and 16 July 2013. S inspected the roof
on 28 August 2013. S observed a number of tread marks corresponding with
a sports shoe or similar. He noted these marks throughout the roof surface.
He says “the positioning of the damage is consistent with movement on the
roof of a person not familiar with Super Six roofing profile.”
49. I have looked at the photographs taken by S and I agree that Photograph 6
taken by S shows a sand shoe type imprint on the roof surface.
50. The male Applicant is adamant that M did not go on the roof on 15 April
2013. He has said this on many occasions in his submissions to both the
FSP and the Service. I accept that photographs of the roof were taken by the
male Applicant which show cracks and that the Applicants told the FSP as
early as 28 June 2013 that he did not think that M went on the roof. This is
evidenced by the FSP’ s file notes.
51. The male Applicant also says that after M left after the first visit, the male
Applicant went on the roof and took photographs. The photographs are not
dated but I accept they were taken some time after M’s first inspection on 15
April 2013 and they show cracks. I also accept that when he took the
photographs he was wearing thongs not sports shoes.
52. The Applicants agree that M went on the roof on 16 July 2013.
53. M says he went on the roof on both occasions. In his first report he says he
inspecte d the roof and that it was in fair condition. He doesn’t elaborate on
the nature of the inspection. He attaches 2 photographs numbered 7 and 8. I
have considered those photographs carefully and I am unable to say
whether they were taken from the roof or from a ladder leaning on the gutter
even with the help of the photographs taken by the Applicants and provided
under cover of the letter of 17 January 2014.
54. In M’s second report, it is clear that M does go on the roof as evidenced by
the photographs. He says the cracks that he saw on that occasion were not
there at the time of the first inspection. Photographs 13 and 14 show M was
wearing a sports shoe.
55. After the Recommendation M was asked to comment about the first
inspection. M says he did get on the roof o n 15 April 2013 and in support of
this assertion produces 5 photographs. Image 1 and image 4 appear to be
images 7 and 8 taken on 15 April 2013. I have considered the 3 remaining
photographs carefully but there is nothing in them or about them intrinsically
that assist me to accept that they were taken on 15 April 2013. They are not
Case No: 3337585 Determination Page 10 of 12
date stamped. Most critically they were not produced at the time of the first
report or even in the second report and this is of concern.
56. I acknowledge that S also says that the “the positioning of the damage is
consistent with movement on the roof of a person not familiar with Super Six
roofing profile.” I also acknowledge that M is a firm of building consultants.
However, I do not know the exact expertise of the writer of the report and I
do not accept that this necessarily leads to the conclusion that it was the
male Applicant who walked on the roof and cracked the tiles.
57. However, having carefully considered all the material, I am unable to accept
that the cracks to the roof were caused by M either as the Applicants took
photographs of the roof after M left in April, or before M inspected the roof
again in July and these show the roof was cracked. And so if I accept that M
did not go on the roof in April and the roof was already cracked, then it
follows that M did not cause the cracking.
58. The opinion of both M and S is that the cracking to the roof was not caused
by a storm event but by pedestrian traffic. For the Applicants to succeed this
leads to the need to be able to conclude that M walked on the roof and
damaged it in April before the male Applicant took the photographs but the
Applicants are adamant that M did not inspect the roof in April.
59. Alternatively, if I accept that the Applicants are mistaken in that regard and
accept what M says which is that he did go on the roof in April, it is possible
that he cracked the tiles by walking on the roof then. However, the
photographs which he says he took on that occasion support the FSP’s
contention that the roof was not cracked then.
60. The Applicants have produced photographs which they say were taken after
M first inspected the roof. The photographs do show cracks in the roof. The
photographs are not dated. I do not know exactly when they were taken save
to say they were taken sometime after M inspected the roof on 15 April 2013
and before the Applicant went to the FSP’s representative which was before
the file note dated 26 June 2013.
61. I accept that the roof is cracked and I accept what S says which is that water
has come into the house. The Applicants have the onus to establish the
cracking on the roof was caused by storm damage and on the balance of
probabilities I do not accept that the Applicants have established this.
Rather, I am satisfied that the material establishes the roof was cracked by
foot traffic by persons unknown at a time unknown.
62. S disagrees with M about the ingress of water into the house. S says that
there is evidence of ingress of water into the house. I accept S’s findings as I
am satisfied that he more thoroughly describes the nature of the capping and
he observed watermarking on the underside of sheets which are supported
by his photographs. In support of his findings, he also observed and
photographed the presence of moisture in the light fitting.
Case No: 3337585 Determination Page 11 of 12
63. However even if there is water ingress into the house, the available evidence
does not persuade me that the water ingress was caused by a storm event
or by M walking on the roof.
64. On the information to hand and for the reason stated I accept that the FSP is
responsible for only the costs that directly apply to the part of the property
that has suffered loss or damage as identified by S and as a result of the
storm.
65. S concludes his report by saying:
“The hail related damage to the corrugated asbestos roofing sheets requires
either encapsulation or replacement of the roofing sheets to prevent the free
movement of asbestos fibres.”
66. The Applicants say in their letter to the Service 17 January 2014 that:
“We have done our own research into encapsulation and dispite the fact that it
does contain the flaking fibres it is only a temporary fix and it does not restrict the
ingress of water long term. This is therefore not correcting the damage as in the
future it could happen again, and we find this totally unexceptable. (sic)”
67. Having considered that material provided I am satisfied the FSP accepts that
it is responsible to ensure that the hail damage to the roof is to be repaired
so that the free movement of the asbestos fibres is prevented. If
encapsulation achieves that end, and the Applicants acknowledge that it
does “contain the flaking fibres”, then I do not accept on the material
provided that the roof has to be replaced.
68. The FSP is responsible for only the reasonable cost to repair the loss and
damage caused by an insured event. On the information provided and for
the reasons stated, I accept that the FSP is not responsible for the cracking
to the roof. I also accept that it is the cracking that caused the ingress of
water and not the hail damage, and so the encapsulation does not have to
“restrict the ingress of water long term”.
69. The Applicants say they have repaired the cracks to the roof as evidenced
by the photographs. The FSP is to ensure the cracks to the roof are repaired
before the encapsulation process is affected or pursuant to the policy, it can
cash settle the Applicants for the cost of the encapsulation process.
70. On the information provided and for the reasons stated, I am satisfied that
the FSP is not responsible to repair or pay for the repairs of the 9 visible
cracks in the upper layer of capping identified by S, the 2 other fractured
areas of roof sheeting consistent with foot traffic observed by S and any
internal damage as a result of the water entering the house from these
indentified areas.
Determination
71. On the basis of the available information and for the reasons stated, I
determine:
Case No: 3337585 Determination Page 12 of 12
the FSP is not liable to replace the roof;
the FSP is liable to pay the reasonable cost of repair caused by hail
damage by encapsulation of the roof and arrange those repairs or cash
settle the cost of repairs as a result of the hail damage to the roof;
the FSP is not responsible to repair or pay for the repairs of cracking to
the roof including the 9 visible cracks in the upper layer of capping
identified by S and the 2 other fractured areas of roof sheeting
consistent with foot traffic observed by S and any internal damage as a
result of the water entering the house from cracking in the roof from
these indentified areas;
Within 15 days of notification of the Applicants’ acceptance of the
Determination, the FSP is to arrange an independent inspection and
quotation for the repair of the hail damage only;
Within 15 days of notification of the Applicants’ acceptance of the
Determination, the FSP is to ensure the cracks to the roof are repaired
before the encapsulation process is carried out; and
Within 30 days of notification of the Applicants’ acceptance o f the
Determination, the FSP is to settle the claim by either cash settling the
Applicants for the said cost of repairs of the hail damage or arranging
for a qualified professional to perform the repairs, in accordance with
the terms of the policy.