Home / Financial Firm (Unknown - Insurer) / Determination 337148

Determination 337148

Denial of storm damage claim

FirmFinancial Firm (Unknown - Insurer)
Decided2014-06-20
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant claimed under his home insurance for storm damage to buildings. AFCA found the damage was caused by poorly drained soil and excluded defects, not an insured event, so the insurer was entitled to deny the claim.

The insured must establish on the balance of probabilities that the loss falls within an insured event, and the expert evidence pointed to drainage, design and workmanship causes that the policy excludes.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim Determination Case No: 337148 Determination Page 1 of 4 Case number : 337148 20 June 2014 1 Overview 1.1 Dispute On 17 February 2012 the Applicant lodged a claim under his Home and Contents Insurance Policy for storm damage to the buildings on about 17 June 2011. Following investigation, the Financial Services Provider (FSP) denied liability for the claim on the grounds the damage was caused by defects in design, construction, workmanship, mould, mildew and atmospheric conditions. The Applicant maintains the damage was the result of a one in fifty years rainfall event in the area. He believes a flooding event reported by the local newspaper in April 2011 resulted in the existing drains clogging from excessive surface water inflow. As such, the water damage was due to blockage in drainage after the extreme rainfall event. 1.2 Issues and key findings Has the Applicant established a claim under the terms of the policy? The Applicant has not been able to establish on the balance of probabilities a claim under the terms of the policy.  The policy is an insured events policy and includes cover for storm and the escape of liquid  Although the Applicant claims the inundation occurred following a storm in April 2011 causing a blockage to existing drainage there is no evidence to support that this has occurred. Was the FSP entitled to deny the Applicant’s claim? The FSP was entitled to deny the claim because:  The Applicant has not established on the balance of probabilities damage due to an insured event  The expert evidence is that the water damage was most likely due to poorly drained soil, poor drainage.  Most likely the damage is due to pre -existing defects in the design, construction, workmanship which were all events specifically excluded under the terms of the policy. 1.3 Determination This Determination is in favour of the FSP. The FSP was entitled to deny the claim. Case No: 337148 Determination Page 2 of 4 2 Reasons for Determination 2.1 Has the Applicant established damage due to an insured event The Applicant is seeking payment of a benefit under the policy and therefore has the burden of establishing on the balance of probabilities the cause for the damage falls within the cover provided by the policy. The Applicant maintains the water damage to his property was due to intense rainfall in April 2011 which in turn blocked drains to the site. The policy provides cover for loss or damage arising from a number of insured events including ‘Storm’ and ‘Escape of Liquid’. The Applicant therefore must show, on balance, the cause for the damage was a result of a storm or from the accidental escape of water from a fixed pipe. The water damage was due to soil conditions, damp course bridged by extraneous material and poorly drained subsoil adjacent to the dwelling A loss adjuster appointed by the FSP following inspection of the site made the following observations:  The rear wall of the lower level was located in excavation cut installed during the extension development and water is seeping between the foundation and base of the wall.  Debris from the excavated embankment has accumulated against the rear wall. A consultant engineer commissioned to investigate the presence of rising damp and moisture damage to the studio and lower level addition reported:  The site was located on poorly draining dispersive type soil. At the time of his inspection the soil was saturated with surface water visible.  Surrounding earth and gravel material forming the walking path directly adjacent bridged the damp course resulting in water soaking the edge of the slab.  Water pooled in this area due to poor drainage.  Investigation under the lower story of the dwelling revealed water leeching from the excavation cut installed during the extension development.  The moisture damage was the result of poorly drained subsoil adjacent to the dwelling. Significantly, no reference has been made by either consultant to blocked drains having caused or contributed to the rising damp conditions in the premises. Three Certificates of Completion submitted by the Applicant in support of his claim that plumbing work was carried out in accordance with the building Act 2000 were referred to the consultant engineer. The engineer responded the certificates related to new and additional plumbing works for the garage and work shop and did not include any existing plumbing works. The engineer confirmed he was satisfied with his original findings. Case No: 337148 Determination Page 3 of 4 Although the certificates were provided in response to the reasons for the FSP’s denial of the claim, the sake of completeness, compliance with building regulations does not of itself establish pipes were blocked resulting in water escaping. The recommended remedial works involved installation of sub surface drains and removal of all ground resting against the retaining wall Remedial measures recommended to prevent further damage are indicative of the problems which have been identified as the dominant cause for the damage. As such, they give considerable weight to the conclusions made by the respective consultants involved in the investigation. In order to prevent ongoing moisture damage, the engineer recommended installation of a new sub surface drain on the upslope from the dwelling, construction of a new sloping path around the studio, renewal of existing drainage layer, installation of a subsurface drain and remove all ground resting against the retaining wall. Based on the evidence it is reasonable to conclude the damage claimed by the Applicant did not arise from water escaping from blocked drains. Instead, the damage was due to a range of issues predominately drainage resulting from poorly drai ning sub soil which may be rectified by installation of appropriate drainage and ground movement. Damage arising from these causes do not fall within any of the insured events provided by the policy. Accordingly the Applicant has not established the loss falls within the cover provided by the policy. 2.2 Is the FSP entitled to deny liability for the claim? As the Applicant has not established an insured event was the cause of the damage, then the FSP is entitled to deny liability for the claim. Further under t he insured event ‘Storm’, the policy specifically excludes cover for loss or damage caused by or resulting from gradual deterioration from rain and rain entering the buildings because of poor maintenance, defects in design, structure or construction. The evidence as presented establishes that most likely any water entering the property was due to defects in design, structure or construction. Further, the policy under its general exclusion excludes damage caused or arising from:  defects in design, structure, materials or workmanship  wear and tear, gradual deterioration  rust, corrosion, oxidization, mould, mildew or atmospheric conditions. Having considered the evidence as presented, I am satisfied that the FSP is entitled to deny liability for the claim in accordance with the terms and conditions of the policy. Case No: 337148 Determination Page 4 of 4 3 Supporting information 3.1 FOS approach for this dispute This dispute has not been the subject of a Recommendation. Due to its nature, it was appropriate to proceed directly to a Determination in line with the Operational Guidelines to the FOS Terms of Reference. There has been a full exchange of information between the parties and each party has had the opportunity to address the issues raised. In considering this dispute, I have taken into account all information exchanged and in particular consider the information referred to in 3.2 relevant. 3.2 Information relied upon Applicant’s submission dated 12/3/2013 and subsequent submissions. FSP’s Notice of Response dated 18/10/2013 and Home and Contents Insuranc e Product Disclosure Statement. Record Key points Consultant engineer Report 1/8/11  The site is located on poorly draining dispersive type soil.  Earth and gravel forming the path directly adjacent to the concrete slab had bridged the damp course resulting in water soaking the edge of the slab.  Water was leeching from the excavation cut installed during the extension development.  Moisture ingress can be rectified by installation of appropriate drainage and some ground works. Consultant engineer Report 12/2/14  The certificate relates to plumbing works relevant to the works associated with the garage and workshop only.  These works were new and additional plumbing related the garage and workshop.  He was satisfied with his findings in the report of 1/8/11

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.