Determination 336826
Claim for earthquake damage to ceilings denied
Summary
The applicant claimed under his home building policy for ceiling damage he attributed to a June 2012 earthquake, which was 130km from the epicentre. AFCA accepted expert evidence that the damage was caused by inadequate fixing and deterioration, so the FSP was entitled to deny the claim.
The applicant bears the onus of showing an insured event caused the loss, and the only expert evidence excluded earthquake as the cause, leaving the policy exclusions for wear and poor installation to apply.
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Case No: 336826 Determination Page 1 of 3
DETERMINATION INCORPORATING A RECOMMENDATION
Case number: 336826
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
28 April 2014
Summary
Description:
This dispute concerns a claim by the Applicant under a Home Insurance
Policy for damage to the home that he submits was caused by an earthquake.
Basis for Determination:
The material provided supports the FSP’s contention that the damage was not
caused by the insured event of earthquake. Rather, the property was
damaged because of wear and tear or faulty workmanship which causes are
excluded from cover.
Determination:
The FSP is entitled to deny the claim.
Background
1. This disp ute is about damage to the Applicant’s property which he alleges is
as a result of an insured event, namely an earthquake. The FSP disputes the
earthquake caused the loss and damage.
Conclusions in Recommendation
2. The Case Manager provided the parties with a Recommendation on the
issues in dispute. The Recommendation was in favour of the FSP. A copy of
the Recommendation is attached to this Determination.
3. The FSP accepted the Recommendation but it was not accepted by the
Applicant.
Determination
Case No: 336826 Determination Page 2 of 3
Further submissions
4. After the Recommendation was rejected, the Applicant made further
submissions as follows:
the house is not that old;
due to the vibrations from the earthquake, the glue obviously has come
off in areas and/or partially and therefore deteriorated more and more
following the months after, due to that one incident;
the glue has come off but not the screws and from the report of the
FSP’s appointed personnel on site, when doing evaluation, he said
there is a gap in between the plaster and wood (ceiling frame) where
the glue was stuck on. This would mean that the plaster has been
pushed down by other form of pressure as plaster is dropping through
the screws holding it up. This obviously proves the vibration was a
factor to the damaged ceiling plaster; and
just because the glue has apparently unstuck on its own was the
reason plaster held up by so many screws would just push through the
screws without any force (sic).
5. The FSP did not provide any further submissions.
Ombudsman’s consideration
6. I have decided this case on its merits, having regard to the relevant law,
good industry practice, codes of practice and previous FOS decisions. I have
taken into account all the material submitted by the parties both before and
after the Recommendation. I am satisfied that the documentation I have
relied on has been provided to both parties.
7. I have carefully considered the Case Manager ’s Recommendation together
with the pa rties’ further submissions.
8. I am satisfied that the Case M anager’s Recommendation contains an
accurate summary of the background to this dispute, the parties’ positions,
the issues to be determined, any applicable paragraphs of the Terms of
Reference and any relevant law.
9. I agree with the Case M anager’s reasons for the Recommendation and the
recommended outcome. I do not accept that the damage claimed was
caused by an insured event namely the earthquake. The only expert
evidence is that the cause of the damage is not from the earthquake as the
epicentre of the earthquake was too far away to cause the damage.
10. Further, the expert says that the damage inflicted by earthquake occurs
directly after the event and this was not the case here. The damage was not
observed until sometime later.
Case No: 336826 Determination Page 3 of 3
11. The expert also says the observed damage is not consistent with the type of
damage typically caused by an earthquake. Further, no other parts of the
building show damage. Rather, the expert observed the kind of and extent of
the damage and said that the damage was because of the inadequate fixing
of the plasterboard ceiling sheets to the ceiling joists and the long term
deterioration of the adhesion between the sheets and the substrates.
12. I have considered the policy terms and I am satisfied that these causes are
excluded from cover.
13. The Applicant has provided no expert evidence about the cause of the
damage. His post-Recommendation submissions do not advance his case or
affect the outcome as it is simply the Applicant’s own speculation about how
the damage occurred. The Applicant is not an expert. Further, the Applicant
does not explain how the damage occurred so far from the epicentre of the
earthquake.
14. I have considered the further information, but it does not change my view
that the Case M anager’s Recommendation was correct.
Determination
15. I determine in favour of the FSP.
Christine McCarthy
Ombudsman
Financial Ombudsman Service
Case No: 336826 Recommendation Page 1 of 2
Case number: 336826
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim
18 March 2014
Background
16. The Applicant held a home building insurance policy with the Financial
Services Provider (FSP) which was current at the time he lodged a claim for
damage to his home following an earthquake in June 2012.
17. The FSP denied the claim on the grounds the damage was not caused by an
insured event rather it was as a result of causes e xcluded under the policy.
Issue
18. Whether the FSP is entitled to deny the Applicant’s claim.
Reasons for Recommendation
19. I am satisfied a full exchange of information has taken place between the
parties with each being afforded the opportunity of addressing any issues
raised and providing any expert material upon which they intend to rely.
20. When lodging a claim for consideration, the onus lies first and foremost with
the Applicant to demonstrate, on the balance of probabilities, the loss
claimed is as a result of an event insured against under the policy.
21. Only once this has been established does the onus transfer to the FSP to
show, on the balance of probabilities, the loss claimed falls within an
exclusion of the policy or somehow otherwise not covered.
22. It is not in dispute an earthquake occurred in the Moe region of Victoria in
June 2012. Furthermore, it is not in dispute the earthquake may have been
felt at the Applicant’s residence approximately 130kms from the epicentre.
What is in dispute is whether the d amage sustained to the Applicant’s
property was as a direct result of the effects of the earthquake.
23. Following lodgement of the claim on 8 February 2013, the FSP appointed a
builder to attend the Applicant’s property to report on the cause of the
Recommendation
Case No: 336826 Recommendation Page 2 of 2
damage. As the builder was unable to definitively conclude the cause of the
damage, an engineer (F) was appointed. F reported:
The Applicant had felt the property shake during the earthquake;
The Applicant first noticed damage to the plasterboard ceilings a few
months after the earthquake;
The property had not shown any evidence of cracking prior to the
earthquake;
Seismological data would indicate the property was at such a distance
away from the epicentre that it would not have suffered structural
damage; and
The cracking to the plasterboard is not consistent with earthquake
damage but rather with long term loss/deterioration of the adhesion
between the sheets and substrates or the inadequate installation of the
plasterboard linings.
24. The Applicant has been provided with the opportunity of supplying an expert
report to counter the findings of F but has chosen not to. Accordingly, I am
persuaded by the findings of F that the cause of the damage was not as a
result of the insured event of earthquake. As such, I am satisfied the FSP
was entitled to deny the claim.
Recommendation
25. On the basis of the available information, I recommend the FSP was entitled
to deny the Applicant’s claim.