Water inundation of contents in shed denied under flood exclusion
Summary
The applicants claimed for contents damaged when water inundated their shed during Cyclone Oswald in January 2013. The FSP denied the claim under the flood exclusion. AFCA found the FSP had not established the exclusion and ordered it to meet the claim under the policy, with interest from 13 May 2013.
The insurer bears the onus of proving the flood exclusion on the balance of probabilities, and its hydrology report, based on desktop review, did not exclude stormwater inundation.
Issues
- Claim denial primary · upheld
“The onus is on the FSP to establish the application of the flood exclusion ... the FSP is required to indemnify the Applicants for this loss.”
- Inadequate claim investigation secondary · upheld
“The FSP's hydrology report is not based on a site inspection of the property.”
Subjects and remedies
natural disasterpay claimpay interest
Text of the determination
Case No: 336706 Determination Page 1 of 6
Case number: 336706
General Insurance - Domestic Insurance - Home Contents - FSP Decision -
Denial of claim
17 April 2014
Summary
Description
Claim under a home contents policy for damage sustained due to water
inundation following Cyclone Oswald in or around late January 2013.
The FSP has declined the claim relying on a flood exclusion.
Basis of Determination
The policy provides cover for accidental loss or damage.
The inundation of the Applicants‟ property by water on or about 27
January 2013 would be considered accidental loss or damage and
therefore attract cover under the terms of the policy.
The onus is therefore on the FSP to establish the application of the
flood exclusion.
The FSP‟s hydrology report is not based on a site ins pection of the
property.
The hydrology report includes information that is inconsistent with the
information provided by the assessor‟s report.
On the balance of probabilities, the FSP has not established the
application of the relevant exclusion.
Determination
The FSP is to meet its liability in accordance with the terms of the
policy.
Background
1. The Applicants held a personal insurance policy with the Financial Services
Provider (FSP), which provided cover under the home contents section of
the policy for contents up to a sum insured of $60,000. The policy was
Determination
Case No: 336706 Determination Page 2 of 6
renewed by the Applicants on 14 July 2012 and provided cover until 14 July
2013.
2. The Applicants‟ home was under construction at the time of the inundation
and the Applicants were living in a shed situated on the site with the
contents, the subject of the claim, held within the shed. The floor of the shed
was at ground level.
3. Water inundated the Applicants‟ shed on or about 27 January 2013,
following the heavy rainfall produced by Cyclone Oswald.
4. The FSP rejected the Applicants‟ claim on the basis that the inundation of
the shed was due to flood waters which were excluded under the terms of
the policy. The Applicants dispute the FSP‟s decision and maintain the
inundation was due to storm water runoff.
Summary of Applicants ’ position
5. The Applicants submit that as a result of having been paid out for similar
events in the past, the FSP should indemnify them for this claim.
6. The Applicants maintain that most likely the water that arrived at their
property was stormwater runoff. Further, the nearby creek, One Mile Creek
is classified as a dry creek.
S ummary of FSP’s position
7. The FSP relies on a hydrology report, an assessor‟s report and the following
policy provisions to deny the claim:
“Words with special meaning …
4. „Flood‟
The covering of normally dry land by water that has escaped or been
released from the normal confines of any:
a. lake, or natural water course, whether or not altered or
modified.
b. reservoir, canal, dam or stormwater channel.
…
We will not pay for loss or Damage …
2. resulting from or caused by …
o. Flood.”
Case No: 336706 Determination Page 3 of 6
Issue
8. Whether t he FSP is entitled to deny the Applicants‟ claim on the basis it was
due to flood.
Reasons for decision
9. As advised to the parties, due to the nature of the dispute, the matter has
been referred to the Panel for Determination in line with the Operational
Gu idelines to the Service‟s Terms of Reference . This dispute has not been
the subject of a FOS Recommendation and has proceeded directly to
Determination.
10. The Panel consists of an Ombudsman and two Panel members with
extensive experience in the insurance industry and consumer claims.
11. There is no dispute that the Applicants intended home was under
construction or that the Applicants were living in a shed situated on the site
at the time of the loss. There is no dispute that the contents, the subject of
this claim, were contained within the shed. The floor of the shed was at
ground level.
12. The Applicants‟ policy provides cover for accidental loss or damage. There is
no dispute that the inundation of the property falls within this insured event.
13. The FSP relies on the flood exclusion in the policy to deny the claim.
Therefore, it has the onus of establishing the exclusion clause applies to the
dispute.
14. The FSP obtained a hydrology report dated 23 April 2013 which states the
following:
The property is located approximately 40m from Wide Bay Creek.
The male Applicant provided the following evidence:
It had been raining for weeks prior to the event. The rain was
particularly heavy for a week or more immediately before the
event.
Heavy rain was falling when he went to bed. He woke up at
approximately 2.00am and realised there was water in the shed.
The inundation water came from Wide Bay Creek
Rainfall totals were obtained from the nearby Kilkivan rain gauge. This
recorded 326mm in the 24 hours to 09:00 on Sunday 27 January. This
was substantively higher than the previous highest 24 hour total of
243mm, recorded in January 1898.
It is considered the extreme 24 hour rainfall recorded on 27 January
2013, would have resulted in flooding in many creeks in the area,
including Wide Bay Creek.
Case No: 336706 Determination Page 4 of 6
15. The hydrologist concluded:
“Based on our observations during the site inspection, discussions with
witnesses at the site and in the area, as well as data analysed, we conclude
that the sole cause of water inundation at the site was a flood, in accordance
with [WT‟s] definition of „Flood” as described in this report. We further
conclude that there was no inundation by stormwater, in accordance with
[WT‟s] definition of „stormwater‟ as described in this report.
We have arrived at this conclusion because we believe the inundation of the
property to be caused by water from Wide Bay Creek and not from any
localised rainfall event that would generate sufficient localised runoff to cause
stormwater type inundation.”
16. The comments contained in t he hydrologist‟s report about its observations
being based on a site inspection and discussion with witnesses, are not
supported by other comments in the report.
17. It is clear from the report that the inspection was based on a phone interview
and desktop review. Observations of the general location of the property and
the surrounding catchment were assessed by Google Earth and not by an
onsite inspection.
18. It‟s abundantly clear to the Panel, despite the language employed by the
hydrologist:
„Based on our obs ervations during the site inspection, discussions with
witnesses at the site and in the area…‟
that in respect of this property, no site inspection was conducted nor were
discussions held with witnesses at the site.
19. While it may be possible the FSP‟s fir m of hydrologists made on-site visits to
other affected properties in the general area in connection with water
inundation emanating from the fall- out of Tropical Cyclone Oswald, it didn‟t
happen in respect of this dispute.
20. As the report specifically indentified, in terms of site specific topography and
interaction with the surrounding water catchment, the hydrologist relied upon
Google Earth. Given the number of flood disputes that insurers and the
Service have collectively worked through since January 2011, the Panel
would expect the FSP to have clearly identified these deficiencies in its
hydrologist‟s report in its Notice of Response dated 29 October 2013 .
I nstead the FSP, via its lawyers, consistently refers to the „Site Hydrology
Report.‟
21. The hydrolo gist‟s conclusion is based on limited investigation given the
following substantive issues were not obtained and/or considered:
No data was obtained measuring the water levels of any of the nearby
watercourses. Therefore, there was no specific data to substantiate his
position that the nearby watercourses topped their banks .
Case No: 336706 Determination Page 5 of 6
There was no consideration of the local topography to attempt to
reconstruct the likely water path.
There was no consideration provided as to the likelihood of stormwater
runoff inundation given there was an ARI event of more than 100 years
for rainfall over a 24 hour period. For instance, it is unclear why hourly
rainfall data was not obtained to dismiss this possibility.
There are no references that any eyewitnesses noticed the water
overtopping the banks of the nearby watercourses.
22. The hydrologist‟s conclusion appears to be based on the male Applicant‟s
conclusion that the water came from the creek and there was heavy rainfall
contemporaneous to the event.
23. It is clear from the App licants‟ statements that they only observed the
inundation of the property after it had occurred. The Applicants‟ observations
do not discount the possibility that stormwater runoff inundation could have
been the cause of the initial damage to the property in particular, the
damage to the shed, given the floor of the shed was at ground level.
24. In the Panel‟s view, the hydrologist‟s opinion would have held more weight if
he was able to dismiss, on a plausible basis, the possibility that stormwater
runoff inundation could have been caused. This could have been achieved if
he conducted a more detailed analysis of the property‟s topography,
obtaining more specific rainfall data and measured levels of nearby
watercourses and canvassed eyewitness evidence of the events of the day.
25. None of this was obtained. Instead, the hydrologist simply concluded
stormwater runoff could not have caused the inundation because the
localised rainfall event could not generate sufficient runoff. It is unclear how
a 24 hour rainfall event of greater capacity than ever recorded in over 100
years could not, of itself, raise the possibility of stormwater runoff inundation.
26. In the Panel‟s view, the report from the hydrologist is of limited value in
establishing the cause of the initial inu ndation of the Applicants‟ property.
27. Insofar as the FSP relies upon the assessor‟s report, the assessor‟s
comments on the issue are equivocal as evidenced by the following:
“The allegation is that the Wide Bay Creek had begun to swell and
stormwaters from One Mile Creek could not enter Wide Bay Creek and
subsequently overflowed across various farmlands in the general vicinity. A
depth of approximately 720mm was recorded inside the domestic garage.”
28. The Panel notes the assessor‟s evidence contradicts the hydrologist‟s
conclusion that the water came from Wide Bay Creek.
29. It is also unclear how reliable the male Applicant‟s observation of the source
of the water inundation could have been, given it was dark at the time he first
noticed the water inundation (2.00am). It is open to infer his conclusion is
based on an assumption rather than direct observation.
Case No: 336706 Determination Page 6 of 6
30. The onus is on the FSP to establish the application of the flood exclusion on
the balance of probabilities.
31. In the Panel‟s view, the information as presente d by the FSP is insufficient to
establish on the balance of probabilities that the Applicants‟ property was not
initially inundated by stormwater runoff. Insofar that the property may have
subsequently been affected by flood waters, the Panel is of the view that the
evidence as established is insufficient to identify the timing with respect to
this.
32. Accordingly, the FSP is required to indemnify the Applicants for this loss.
Determination
33. On the basis of the available information, the Panel determines the FSP is
required to indemnify the Applicants for this loss.
34. In the event any aspect of the claim is resolved by way of cash settlement,
the FSP is to pay interest on any sum paid in accordance with Section 57 of
the Insurance Contracts Act 1984 from 13 May 2013 (the date it initially
denied the claim) to the date when payment is affected.