Home / Financial Firm (Unknown - Insurer) / Determination 336611
Determination 336611
Denial of storm damage claim for replacement elevator in apartment complex
Summary
The applicant sought $45,303.50 for a replacement elevator in a commercial apartment complex damaged in a January 2013 storm. The FSP accepted the rest of the storm damage but declined the elevator, and the determination found the elevator was already in end-of-life condition before the storm and that the FSP did not unduly delay the claim.
The policy excludes wear and tear and gradual deterioration, and under the dominant cause rule the excluded deterioration defeated the claim even if the storm was also a cause.
Issues
- Claim denial primary · not upheld
“The FSP was entitled to decline the claim because there was no insurable loss for the elevator as it required replacement prior to the storm event.”
- Delay secondary · not upheld
“The FSP has not unduly delayed the claim or caused further deterioration of the elevator.”
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Determination
General Insurance - Small Business/Farm Insurance - Commercial Property - FSP
Decision - Claim Amount
Determination
Case No: 336611 Determination Page 1 of 5
Case number : 336611 1 1 June 2014
1 Overview
1.1 Dispute
The Applicant holds a commercial investment property policy covering an
apartment complex, for which a claim for storm damage was submitted on 29
January 2013.
The Financial Services Provider (FSP) accepted the majority of the claimed
damage, however, declined to cover the costs for a replacement elevator on the
basis that the elevator required replacement prior to the storm.
The Applicant disputes that decision and seeks the sum of $45,303.50 towards
the cost of the replacement elevator in settlement of his claim.
1.2 Issues and key findings
Was the FSP entitled to decline the claim for the elevator?
The FSP was entitled to decline the claim for the elevator because:
the policy specifically excludes loss or damage arising from wear and tear and
gradual deterioration
the elevator was in poor condition and required replacement prior to the storm
event
there is insufficient evidence to suggest the elevator was damaged by the
storm
established case law operates to defeat the claim.
Did the FSP unduly delay the claim and cause further damage to the
elevator?
The FSP has not unduly delayed the claim and there is insufficient evidence to
suggest any action on behalf of the FSP has caused further deterioration of the
elevator.
1.3 Determination
This Determination is in favour of the FSP.
The FSP was entitled to decline the claim because there was no insurable loss for
the elevator as it required replacement prior to the storm event.
The FSP has not unduly delayed the claim or caused further deterioration of the
elevator.
Case No: 336611 Determination Page 2 of 5
2 Reasons for Determination
2.1 Was the FSP entitled to decline the claim for the replacement
elevator?
The FSP’s policy does not cover wear and tear or gradual deterioration
The FSP‟s policy does not cover all risks. Whilst the policy will respond to claims
for loss or damage arising from storm, it specifically excludes loss or damage
caused by or arising from wear and tear, gradual deterioration and normal up
keeping.
The onus rests with the Applicant to establish that he has suffered a loss which is
claimable under the terms of the policy.
The elevator was in poor condition and required replacement prior to the
storm event
The material provided confirms the elevator was in poor condition prior to the
storm event of 28 January 2013 and had been „shut down‟ due to its condition and
safety concerns in June 2012, by elevator technicians “T”.
T‟s report of 7 August 2013 , is unequivocal in stating that any repairs to the
elevator should only be considered as a temporary or short term solution. It is
clear that T recommends a total replacement of the unit; however they have
provided a quote for $23,400 (plus GST) to restore the elevator to working order
temporarily, in light of the Applicant‟s intention to demolish the building in the near
future.
T estimates these repairs would hold for 1 -3 years at most, however, make it clear
in their correspondence that the elevator suffered significant issues and this
estimate was a „best case‟ scenario.
It has not been established the storm significantly contributed to the
deteriorated condition of the elevator
T has submitted a revised report and quotation dated 19 March 2013. Whilst this
report confirms the elevator is no longer a repairable proposition due to being
subjected to an extensive amount of water and insufficient protection against the
elements, the report does not attribute any of these issues specifically to the
storm event.
T‟s report is silent on whether it was likely that as at January 2013 , prior to the
storm occurring, whether the elevator remained a repairable proposition given its
lack of utilisation and maintenance since June.
Elevator assessment experts “V”s reports state that whilst the elevator might have
been repairable in August when T submitted their quote, an elevator shut down
for any length of time is at an increased risk of further deterioration, particularly
due to the lack of lubrication and ongoing maintenance and a build up of
corrosion. Therefore it could well have been the case that the elevator was no
Case No: 336611 Determination Page 3 of 5
longer repairable in January, however, this would now be impossible to
determine.
The Applicant has not provided any evidence to suggest the elevator had been
maintained since being shut down in June 2012 or of its condition in January
2013, prior to the storm occurrence.
Further, it is clear that the overriding factor in the poor condition of the lift was its
positioning, as it faced the open ocean and was not protected against the
elements in general and salt water spray in particular. Whether this was hastened
by the storm blowing away the door to the lift room plant is pure speculation.
Accordingly, regardless of any storm event, it is clear the elevator was reaching, if
not already reached, the end of its serviceable life. On this basis, the Applicant
has not suffered an insurable loss in regard to the elevator and the FSP is entitled
to decline this aspect of the Applicant‟s claim.
Established case law operates to defeat the claim
The case of Wayne Tank and Pump Co Ltd v Employers Liability Assurance Corp
Ltd [1974] QB 57) provides that where a loss has two or more proximate causes,
if one of those causes is subject to an exclusion from cover, the excluded cause is
dominant and defeats the claim.
Therefore, even if it were to be accepted that the insured event of storm was a
proximate cause of the loss, the excluded cause of faulty design is dominant and
defeats the claim.
2.2 Did the FSP contribute to the elevator requiring replacement?
There is no evidence to suggest the FSP delayed the claim and caused
additional damage to the lift
The Applicant asserts the FSP is at least partially responsible for the lift
replacement on the basis that it deteriorated significantly from a repairable
proposition to a replacement required , due to the delay in the FSP appointing an
assessor.
The Applicant has not provided any evidence to support this assertion.
Further, the evidence suggests that whilst the Applicant‟s broker “F” lodged the
claim with the FSP the day after the storm, the FSP was not made aware of the
elevator damage until April 2013. The FSP then appointed an assessor to assess
the cause and extent of the loss once it became aware of the inclusion of the
elevator in the claim. The FSP‟s actions were r easonable in the circumstances.
Case No: 336611 Determination Page 4 of 5
3 Supporting information
3.1 Expert evidence supplied
Record Key points
Applicant’s expert ( T )
Report
07 Aug 2012
a full replacement unit is recommended due to the
condition and age of the unit
the elevator is in poor condition due to severe rust and
corrosion throughout the installation
the lift motor room door frame was rotted and there are
signs of water ingress to the motor room ceiling
it was suspected that water was entering into the lift shaft
via the ceiling
as there are plans to demolish the building in the near
future, a quotation for repairs is supplied
the repairs should be viewed as a sh ort term solution only
and the elevator will not be returned to optimal condition
due to the existing corrosion
FSP’s expert ( V )
Report
13 Jun 2013
the photographs taken by T from May, June and July 2012
show considerable deterioration has occurred
the lift is not located inside the building but is exposed at
each landing
the lift has minimal protection from the elements in a
seaboard environment, in particular salt spray which has a
corrosive effect on the components
the lift was shut down on 12 June 20 12 and remained out
of service from that date
T provided a new quotation for replacement in February
2013 as the lift represented a safety hazard and they were
not prepared to move it or try to make it operational
the plant room had experienced considerabl e water
ingress over its lifespan
given the visible corrosion in the photographs, there would
have been additional damage to unseen elements
the lift posed a safety hazard due to the car door hanger
rusted and bent
with this amount of deterioration, repair would not be
recommended and the unit should be replaced
the lift was in a significantly deteriorated condition prior to
the storm event and close to requiring replacement at that
time
Applicant’s expert ( T )
Report
19 Mar 2013
examination revealed the lift equipment had been subject
to an extensive amount of water and insufficient protection
against the weather
all major electrical and mechanical components were
rusted
the point of corrosion reached meant the lift was no longer
Case No: 336611 Determination Page 5 of 5
a repairable proposition
a new lift was required to be installed
FSP’s expert ( V )
Report
1 August 2013
as the lift had been inoperable since June 2012 (roughly
200 days) and not maintained since that time, the rate of
deterioration would have been higher due to the lack of
lubri cation of moving parts
this would have allowed for further build up of corrosion
once a controller has been shut down for more than a few
days the probability of the controller failing on attempted
re - start is increased
it is impossible to determine if the corrosion occurring
between August and January prior to the storm made the
lift into being unrepairable, or whether the storm was the
final factor that tipped it over
there is no evidence confirming the condition of the lift
immediately prior to the storm to conclusively determine
the effect, if any, the storm had on the lift
T‟s quote is quite clear in stating that whilst they could
repair the lift, this was a temporary solution only
T‟s quote was valid for 30 days only therefore the lift would
have required re - assessment before the Applicant was due
to commence repairs in February 2013
at best, repairs would have been effective for only 12
months
in conclusion the lift required replacement prior to the
storm event of January 2013
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.