Home / Financial Firm (Unknown - Insurer) / Determination 336336

Determination 336336

Denial of accidental damage claim for mould and sub-floor moisture

FirmFinancial Firm (Unknown - Insurer)
Decided2014-05-16
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicants claimed under a home insurance policy for mould and sub-floor moisture damage, which the FSP denied as caused by building non-compliance. The Panel found the damage accidental but applied the gradual loss exclusion and determined the FSP was entitled to deny the claim.

Where a general exclusion for gradual loss of any kind applies, it bars cover even if the gradual loss is a consequence of an accidental proximate cause.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 336336 Determination Page 1 of 9 Case number: 336336 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim-Exclusion/ condition 14 May 2014 Summary Description  A claim under a home insurance policy for loss and damage to the home. Basis of Determination  A consideration of the cause of the loss, the coverage provided by the policy and in particular, the relevant exclusions. Determination  The Panel determines that the FSP is entitled to deny the Applicants‟ claim. Background 1. The Applicants held a home insurance policy with the Financial Services Provider (FSP), which was current at the time of the loss. 2. In November 2012, the Applicants lodged a claim for storm damage after discovering mould growth throughout their house. They believed this to be the result of a storm and/or a flash flood that occurred several years prior. 3. The FSP denied indemnity for the claim on the basis the damage was not caused by an insured event but the result of building non-compliance issues and thereby, excluded from cover under the policy. 4. The Applicants disagree with the FSP‟s decision and expect it to honour the claim. Summary of Applicants’ position 5. The Applicants submit: Determination Case No: 336336 Determination Page 2 of 9  They were horrified to discover the sub-floor was not built in accordance with the Building Code of Australia (BCA) guidelines, when advised of same by the FSP;  They do not understand why the damage (which has subsequently become much more extensive since the claim was lodged) is not deemed accidental as it is not their fault and they co uld not have foreseen this occurring;  They are pursuing the Council, draftsman, engineer and builder to establish who was liable but have had no success to date. They have had to serve Statements of Claim as required by the Supreme Court, due to the Statute of Limitations. However, they will be unable to formally pursue the matter through the Courts due to the financial cost involved and if the matter is not resolved, likely to have to declare themselves bankrupt;  Only one of three builders is willing to undertake rectification works, due to the significant liability. This builder has quoted rectification works in the amount of $250,000 or a re-build in the amount of $330,000;  Had the FSP continued to investigate the matter, they are sure a naturally occurri ng water course would have been identified under the house;  The whole experience has been very stressful and a health issue;  They work for themselves and as of 9 September 2012, had suffered a loss of income in the amount of $20,000, as a result of this matter; and  They understand the FOS jurisdictional limit of $280,000 and the $3,000 compensation limit. Summary of FSP’s position 6. The FSP submits:  The Applicants have not been able to establish the damage resulted from an insured event;  The damage is the result of building non-compliance issues excluded from cover under the policy;  The non-compliance issues need to be settled with the Council directly;  Section 46 of the Insurance Contracts Act 1984 (the Act) has no application to the Applicants‟ claim; and  If the Applicants decide to litigate, clause 5.2 (l) of the Service‟s Terms of Reference would be enlivened and the Service prevented from considering the dispute. Case No: 336336 Determination Page 3 of 9 Issues 7. Whether the Service is prevented from considering the dispute in accordance with clause 5.2 (l) of its Terms of Reference. 8. Whether the Applicants have established a prima facie claim under the policy. 9. Whether the FSP has established the claim is excluded under the policy. 10. Whether section 46 of the Act has any application to the Applicants‟ claim. Reasons for decision 11. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of nature and complexity of the matter. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 12. This decision has been made by a Panel consisting of an Ombudsman and two members with experience in general insurance matters and consumer claims. 13. A full exchange of the relevant information has taken place between the respective parties and each party has had the opportunity of addressing any issues raised. Terms of Reference clause 5.2 (l) 14. Prior to considering this dispute, the Panel needs to consider clause 5.2 (l) of its Terms of Reference. The relevant part of clause 5.2 (l) states: “The Service may not consider a Dispute: ... that has already been dealt with by a court” 15. The FSP says that if the Applicants decide to litigate, clause 5.2 (l) would be enlivened. 16. There is no dispute the Applicants have been pursuing the Council, draftsman, engineer and builder to establish who was technically liable for the damage claimed and further, as confirmed in an email dated 7 March 2014: “At the moment w e have had to do a statement of claim to the defendants as we had no choice as this is what the Supreme Court demands.” Case No: 336336 Determination Page 4 of 9 17. From the material available, the Panel understands the Statute of Limitations required the Applicants to instigate formal legal proceedi ngs but there has been no formal determination of the matter by the Courts. 18. The Panel notes that the litigation commenced by the Applicants is against the Council, draftsman, engineer and builder and not the FSP. 19. The issues to be litigated in the Applican ts‟ Supreme Court proceedings, whilst involving similar factual circumstances, are about different issues and obligations and as stated, involve different parties. 20. For these reasons, the Panel is satisfied the dispute has not „already been dealt with by a court‟ for the purpose of clause 5.2 (l) and thereby the Panel proposes to consider the dispute. Damage claimed 21. The parties appear to agree with the FSP‟s expert reports regarding the damage in existence (albeit the Applicants submit structural damage has not been adequately documented) and the suggested causes of same. The relevant parts of these reports state: Assessor‟s report from a site attendance on 21 November 2012;  The building had been maintained in excellent condition;  Moisture was identified in the bedroom walls and carpet and the skirting had become discoloured;  The second bedroom windows suffer extreme condensation;  Soil under the house was wet, but the timber above was not discoloured or water marked;  No leaks were identified;  Vents within the house are as per Australian Standards and the BCA guidelines, but the amount of moisture may be too great for the vents to fully dry the area;  The cause of the damage was unknown. Having asked various people, no one is 100% sure on the cause of the water under the house;  An underpinning specialist advised that drying under the house will cause the soil to decrease and cause foundation issues at a later date; and  Exploratory works would be required to find the cause of dampness under the house. Engineer‟s report dated 13 February 2013;  An initial inspection was inconclusive and a further inspection took place with the assistance of a geotechnician;  The sub-floor ground was abnormally damp; Case No: 336336 Determination Page 5 of 9  One to two courses of sub-floor brickwork on the eastern and southern walls were damp along with the southern strip footing;  Brick piers and the timber floor structure appeared undamaged;  One small leak existed in the kitchen‟s sewer line, but this was not the major contributing factor to the elevated sub-floor moisture conditions;  No structural damage was identified, but the elevated moisture levels may become a structural concern over time;  The BCA current at the time of construction says ventilation shall be provided at the rate of 7300mm²/m. It was found the residence has approximately 2800mm²/m on the northern and southern walls and 2150mm²/m on the eastern and western walls based on the location of 230mm x 75mm brick vents;  There is additional ventilation provided by vertical mortar cores that are hollow but their effect is estimated to be minimal;  The northern deck is semi-enclosed and this will obstruct some of the air flow in the sub-floor;  It can therefore be estimated that the sub-floor of the residence is insufficiently ventilated in accordance with BCA requirements;  Bringing the ventilation up to BCA requirements will aid in stabilisation of moisture levels, but unlikely to rectify the elevated sub -floor moisture levels;  The elevated moisture conditions since construction of the house suggests same has remained fairly consistent;  There may be a naturally occurring water source on the eastern side of the house. This could be due to a number of sub-surface occurrences, including but not limited to the presence of a natural spring or localised sub-surface water flow due to dispersive sub-soil clays that are prone to tunnel erosion;  The cut-off drain is functioning, but it was not possible to determine how efficiently. Although likely designed and installed to collect the amount of surface water and sub-soil water flow that could be reasonably expected, it is unlikely it was designed to collect the significant amount of water that may be emerging from a naturally occurring water source; and  There is potential for foundation movement if the moisture content of the soil is significantly altered from its current condition. 22. It should be noted the Applicants have provided details of further damage identified since the claim was lodged and which the FSP does not appear to dispute is related to the original claim. Case No: 336336 Determination Page 6 of 9 Prima facie claim 23. The onus is on the Applicants to establish, on the balance of probabilities, that they have suffered a loss caused by a risk insured against under the policy. This is known as a prima facie claim. 24. The FSP submits the Applicants have not established the damage claimed is the result of an insured event including storm or flood. 25. Whilst the panel agrees the proximate cause of the damage was neither storm nor flood, it is noted the Applicants had selected additional cover for „accidental damage‟ under their policy. The relevant policy provision states: “ Accidental damage In addition to the cover provided by the insured events detailed on pages 21 to 24, the accidental damage option covers damage to the building that is caused unintentionally. We will cover the cost of repairing or replacing that part of the building which suffers physical loss or damage caused by an accident at the insured address. The general exclusions on pages 18 and 19 apply. In addition, we will not cover damage caused by or attributable to:  atmospheric conditions, mould, mildew or rot” The policy provides the following associated definitions: “ accident Something that was not intended, planned or expected and which did not occur through a malicious act. … damage Actual physical damage to your building, contents or personal valuables.” 26. The FSP have detailed what it says are failings on the part of the council, to argue that the Applicants have not established an insured event under the policy. 27. Whilst the Panel agrees that the Applicants have not demonstrated that the loss arises from the insured events of storm or flood, the Panel is satisfied that the damage is accidental insofar as the Applicants are concerned. 28. The Panel is satisfied the damage claimed was something neither intended, planned nor expected by the Applicants and thereby a prima facie claim for accidental damage has been established. 29. On this basis, the onus shifts to the FSP to show, on the balance of probabilities, that the claim falls within an exclusion under the policy. Policy exclusion 30. There now appears to be general agreement between the parties that the proximate cause of the damage is a combination of non-compliance issues when the house was built. Case No: 336336 Determination Page 7 of 9 31. From the evidence available, the Panel understands these non-compliance issues primarily appear to be the insufficient sub-floor ventilation (in accordance with BCA requirements) accentuated by the high moisture content (possibly due to a naturally occurring water course) of the foundation soils which had not been tested/identified by the Council during the build. There is also suggestion that the footings may not have been established correctly, although there is no expert opinion available directly on this point. 32. In denying indemnity for the Applicants‟ claim, the FSP relie s upon the following policy exclusions: “ General exclusions - apply to the overall policy Unless included in additional cover, we will not cover loss, damage or legal liability caused by: …  Gradual loss or damage of any kind;  Structural defects and faulty workmanship in the construction of the building or lack of maintenance to the building and/or contents; …  Toxic mould;  Erosion or earth movement including shrinkage; … Unless it is stated specifically in the policy, this policy does not provide cover for: …  Damage to any building or part of a building that at the time it was built, renovated or installed was not compliant with the relevant local government regulations, or the requirements of any other statutory authority” 33. The Applicants submit that failings on the part of the council, draftsmen, engineer and builder during the original construction of their home, is the cause of their current predicament. 34. The Applicants point to a deterioration in the condition of their home over a period of time. 35. The Applicants have said that there have been ongoing problems with moisture on the site and particularly with elevated levels of moisture under the house, since soon after they moved into the house. 36. Further, the Applicants say that during 2012 they became aware of very significant mould growth in the built-in cupboards and on the carpets in various parts of the house. 37. Since the last test carried out by the consulting engineers, the Applicants say that the condition of their home is considerably worse. Case No: 336336 Determination Page 8 of 9 38. On the basis of the expert evidence presented and the descriptions provided by the Applicants, the Panel is satisfied that the failings alleged by the Applicants, on the part of the Council, draftsmen, engineer and builder, have contributed to, if not caused, the ongoing problems suffered by the Applicants. 39. Given that the alleged failings date back to the initial construction of the house in 2003 and that the Applicants‟ description of the problems is one that confirms a deteriorating condition over time, the Panel is sa tisfied it is necessary to give consideration to the FSP‟s exclusion “ gradual loss or damage of any kind. ” 40. This exclusion clause needs to be considered in light of the proximate cause of the loss. 41. As previously stated, the Panel is satisfied that the Applicants are entitled to claim under the policy because of the coverage for accidental loss, but this entitlement to claim is subject to the exclusions contained within the policy. 42. The Service has previously given consideration to the question of whether the exclusion sought to be relied upon by the FSP forms part of the proximate cause of the loss, or is simply a consequence of the proximate cause of the loss. 43. Previous determinations of the Service have concluded that if the exclusion sought to be relied upon is a consequence of the proximate cause of the loss, then the FSP would not be able to rely upon that exclusion to prevent coverage. 44. This, in part, depends upon how the exclusion clause itself is framed. For example, in this dispute the FSP also relies upon the exclusion for toxic mould. 45. In the Panel‟s view, the toxic mould which is present in the Applicants‟ home is a consequence of the accidental damage suffered by the Applicants, that is, the increase in the moisture content within and around the home. 46. The Panel is satisfied that the FSP is not entitled to rely upon its exclusion for toxic mould in this dispute. 47. However, the exclusion in relation to gradual loss or damage is in regard to gradual loss or damage “ of any kind”. 48. The result is that whether or not the gradual loss or damage is the proximate cause or a consequence of the proximate cause, gradual loss or damage of any kind is excluded from coverage under the policy. 49. In the Panel‟s view, the loss and damage suffered by the Applicants is of a gradual kind and in those circumstances, the FSP is entitled to rely upon the exclusion within the policy to deny the Applicants‟ claim. Case No: 336336 Determination Page 9 of 9 50. Having made this finding, the Panel is also satisfied that it is unnecessary to consider the other exclusions upon which the FSP seeks to rely. Determination 51. The Panel determines that the FSP is entitled to deny the Applicants‟ claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.