Home / Financial Firm (Unknown - Insurer) / Determination 335408

Determination 335408

Insurer declined accidental damage claim for swimming pool plumbing leaks relying on tree root and other exclusions

FirmFinancial Firm (Unknown - Insurer)
Decided2014-06-23
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$36,750
SourceAFCA PDF

Summary

The applicants claimed under an accidental damage home policy for swimming pool plumbing damage, leak detection and landscaping costs. The FSP declined relying on tree root and wear and tear exclusions. AFCA found the FSP entitled to decline and refused non-financial loss compensation, having regard to the FSP's admitted IDR delay and apology.

Damage caused by roots from trees, plants, shrubs or grass is excluded under the policy, and exploratory costs are only covered where the FSP accepts the claim.

Issues

Subjects and remedies

no remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim Determination Case No: 335408 Determination Page 1 of 4 Case number : 335408 20 June 2014 1 Overview 1.1 Dispute The Applicants held a Accidental Damage Home Insurance Policy (the policy) with the Financial Services Provider (FSP). A claim was lodged upon the policy seeking indemnity for damage to the swimming pool plumbing and exploratory costs incurred in locating several leaks. The FSP declined the claim and relies on the exclusions contained in the policy. 1.2 Issues and key findings The Applicants have established a prima facie claim under the terms of the policy The Applicants’ policy is an accidental damage policy. Accidental damage is damage that is unintended and unexpected. The damage sustained to the swimming pool area has been sustained due to the leaking pipes which necessitated the removal of concrete and paving. The damage was unintended and unexpected and therefore fits the definition of accidental damage. Does an exclusion apply to allow the FSP to decline the Applicants’ claim T he FSP is entitled to decline the Applicants’ claim and rely upon the exclusions contained within the policy.  the evidence available from the various consultants establishes that most likely the damage to the pipes and subsequent leaking was due to the choking and cracking of the pipes by tree roots.  damage caused by roots from trees, plants, shrubs or grass is excluded under the policy.  the breaking and removal of the concrete surface around the pool and subsequent repair as well as the exploratory costs associated with the detection of the leaks are not covered under the terms of the policy.  damage relating to the shut off valve and pool cleaner are related to general maintenance and wear and tear and are not covered under the terms of the policy. 1.3 Determination This Determination is in favour of the FSP. The FSP is entitled to rely upon the exclusions contained within the terms of the policy to de ny liability with respect to the Applicants’ claim. Case No: 335408 Determination Page 2 of 4 2 Reasons for Determination 2.1 The Applicants have established a prima facie claim under the terms of the policy. The policy is an Accidental Damage policy that covers damage to the Applicants’ building and contents for accidental loss or damage. Whilst the policy does not specifically define accidental loss or damage, accidental loss or damage is generally defined as loss or damage that is unexpected and unintended. There is no dispute that the Applicants first noticed damage to the property in or about November 2010 and a claim lodged for a burst water pipe after noticing the pool cleaner had stopped working. Some exploratory work was done near a banana tree and on 9 December 2010 during heavy winds, a banana tree came down with its roots breaking pipes to the pool including a gas pipe. The damage sustained to the pipes was connected with the swimming pool plumbing. The evidence establishes that the damage could be classified as accidental loss or damage under the terms of the policy. 2.2 Is the FSP entitled to rely upon exclusions within the terms of the policy to deny the claim? The FSP is entitled to rely upon the exclusion contained in the policy to decline liability for the claim The policy specifically excludes cover for accidental loss or damage caused by:  Rust, corrosion, gradual deterioration, depreciation, wear and tear.  Roots from trees, plants, shrubs or grass. The evidence from SQ who was appointed by the Applicant in his opinion the leaks were due to the choking and cracking of the pipes by tree roots. The evidence establishes that the damage to the pipes was most likely caused as a result of roots from trees, plants, shrubs or grass which is specifically excluded under the terms of the policy. A leak detection expert AL identified leaks located near a palm tree and arranged for the palm tree to be removed and the leak fixed. Removal of the concrete and pebble mix paving was for the purpose of exploratory works to locate and repair the leak. Insofar as the damage sustained was caused during the exploratory works to detect the leaks, the policy only extends to cover the cost of exploratory works where the FSP accepts the claim. As the FSP has not accepted the Applicants’ Case No: 335408 Determination Page 3 of 4 claim, the costs incurred as part of the exploratory works, are not covered under the terms of the policy. Issues were detected with the pool cleaner and a shut off valve relating to wear and tear with the Applicant installing a new air relief valve to the cleaner. This is excluded under the exclusions relating to gradual deterioration, depreciation, wear and tear. Insofar as there are issues raised with respect to the installation of pool pipes and the design which may require alteration, these are concerns that would be excluded under the policy as a defect, faulty workmanship, structural defect or faulty design. Has damage been sustained to the building as a result of the water leaks? On balance, there is no evidence that any of the damage claimed by the Applicants was caused by water which had escaped or leaked from the damaged pipes. The exclusion relating to damage caused by roots from trees, plants, shrubs or grass, only applies to damage caused directly by the roots, trees etc. Is the Applicants entitled to compensation for non-financial loss pursuant to paragraph 9.3 of the Terms of Reference? Paragraph 9.3 of the Terms of Reference provides a compensation of up to $3,000 may be awarded for non-financial loss where the Applicants have experienced an unusual degree of time taken or interference with irritation of enjoyment of life as a result of the claims procedure. The FSP has admitted fault with its procedures and has admitted that it has breached a relevant industry code relating to its contact in dealing with these matters. The FSP has admitted that it has breached the relevant industry code and has apologised to the Applicants with respect to this in its IDR letter of 26 June 2013. The Applicants claim was originally lodged on or about 15 November 2010 for damage sustained on or about 9 November 2010. The FSP arranged for inspection of the Applicants’ property and following a number of reports, initially accepted claims for the repair of a gas leak and associated exploratory costs in the amount of $387 less excess. No significant delay appears to have occurred at this stage of the Applicants’ claim. In November 2011, the Applicants appear to have made a further claim for the costs of landscaping in the amount of $35,420 and for the cost of repairs of the leaks in the sum of $1,330. The FSP conducted relevant investigations and notified the Applicants’ of the decision to reject this claim on 23 January 2012. Again, the FSP appears to have acted within a reasonable period. In December 2012 the Applicants’ br oker contacted the FSP. There appears to have been delays by the FSP in completing its IDR process although it appears Case No: 335408 Determination Page 4 of 4 the FSP’s claims department was in contact with the broker during this time. I t was when the Applicants’ broker confirmed the Applicants wished to dispute the decision that the matter was eventually referred to the FSP’s IDR Review Panel. The FSP has then dealt with this matter and rejected t he Applicants’ claim on 26 June. At this time, the FSP acknowledges it had breached the Industry Code of Practice. Whilst I am satisfied that the FSP’s conduct has caused delay , in this case, I am satisfied that the FSP’s actions in apologising to the Applicants for the delay is sufficient. I am not satisfied on the information as presented that the Applicants suffered inconvenience or loss of enjoyment of life as a result of the delay to justify an award of compensation for non-financial loss. 3 Supporting information 3.1 FOS approach for this dispute There has been a full exchange of material between the parties and each party has had the opportunity of addressing the issues raised. In determining this dispute on the basis of what is fair in all the circumstances, I have considered all of the material exchanged and have regard to the relevant legal principles, general insurance code of practise, good industry practise and the terms of the policy. I have read and considered all of the provided material including the following consultants’ reports :  SQ Reports dated 9 February 2011 & 22 October 2012  “C” Report dated 15 January 2012  FPL Reports dated 5 January 2012  AL’s Leak Detection Report  AR’s Landscaping Quote dated 30 August 2012  M’s Invoice for concrete breaking and debris removal  F’s Water Damage Report 2 December 2010

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.