Text of the determination
Determination
Case No: 335124 Determination Page 1 of 17
C ase number : 335124 21 January 201 5
1 Overview
1.1 Dispute
The Applicants entered into a house and land package in early 2011 but it was
not completed until April 2014 due to the failure of their builder: The Applicants
say they suffered further losses because the Financial Services Provider (FSP):
Lost their title and associated settlement documents following the purchase of
the land.
Delayed processing their finance request.
Harassed them to repay their debt.
1.2 Issues and key findings
Did the loss of the title documents cause the Applicants damage?
The loss of the title caused the Applicants’ building insurance claim to be delayed
by 18 days, which contributed to a delay in construction and the property being
available to rent.
Did the FSP unreasonably delay responding to the Applicants ’ lending
application, so causing construction to be delayed?
The available information in this dispute does not support a finding that the FSP
unreasonably de layed responding the Applicant’s lending application – causing
construction to be delayed.
Did the FSP engage in inappropriate debt collection practices and breach
the ASIC Debt Collection Guidelines?
The available information in this dispute does not support a finding that the FSP
engaged in inappropriate debt collection practices and breached the ASIC Debt
Collection Guidelines.
Is the FSP liable to pay the Applicants compensation?
The Applicants are entitled to compensation of $950 for the delay arising from the
lost title.
The Applicants are also jointly entitled to non-financial loss compensation of
$3,000 for the stress and anxiety caused by the lost title.
Case No: 335124 Determination Page 2 of 17
1.3 Determination
I have concluded partially in favour of the Applicants.
If the Applicants accept this Determination within 30 days of its date (above),
within a further 14 days of that acceptance the FSP must pay them $3,950.
Case No: 335124 Determination Page 3 of 17
2 Reasons for Determination
Details of the background to this dispute are set out in section 3.3 of this
Determination.
2.1 Did the loss of the title documents cause the Applicants damage?
The FSP has accepted responsibility for the loss of the title
The FSP has acknowledged responsibility for the lost title which appears to have
been lost as early as April 2011, with all the settlement documentation, following
the Applicants’ purchase of a house and land investment package in late 2010.
Following the appointment of the administrator, the Applicants lodged an
insurance claim and it was at this point they became aware the title was missing.
The loss of the settlement documents meant that the transfer of ownership of the
property to the Applicants had not been completed, and was not, for over 2 years.
The loss of the title caused the Applicants ’ insurance claim to be delayed by
18 days
After the Applicants contacted the building insurer on 21 November 2012, the
insurer immediately wrote back setting out its requirements which included a copy
of the Certificate of Title as well as a number of other documents.
The Applicants wrote to the FSP asking for the title on 3 December 2012:
Following some communications between the Applicants, the FSP and the
Applicants’ solicitor, the FSP’s notes show that it confirmed to the Applicants on
14 December 2012 that the certificate of title had been lost and that it would
contact the solicitor to arrange a replacement title.
The Applicants then wrote to the FSP on 17 December 2012 following the matter
up and asking for a time frame. The FSP’s records then show it wrote to the
Applicants’ solicitors the following day to arrange new documents.
The Applicants lodged the documents for the insurance claim, but without the title,
on 24 December 2012.
But for the loss of the title, it is reasonable to conclude that the Applicants could
have lodged the insurance claim on 6 December 2012 (18 days earlier). This is
because after asking the FSP for the title on 3 December 2012, in the normal
course, if available, it would be reasonable to expect that the title could be
produced within 3 working days, so by 6 December 2012 and this would allow the
claim to be lodged on that date.
The Applicants have not provided documentation to show that the lack of the title
otherwise delayed the claim process so the FSP’s responsibility is limited to the
18 days between 6 and 24 December 2012. I have assessed the compensation
due for that period later in this Determination.
Case No: 335124 Determination Page 4 of 17
The Applicants’ claim they would have sold but for the loss of the title is not
established
The Applicants say they had discussions with real estate agents about selling but
were told the missing title would be an issue. They have not provided
documentation to establish this but it is apparent from the FSP’s internal notes
that the Applicants had informed it they were contemplating selling the property as
early as February 2013 and had mentioned the loss of the title as an issue. The
collection notes also indicated the Applicants were experiencing financial difficulty
at the time.
Despite this, I am not satisfied that the Applicants failed to sell solely because of
the lost title for the following reasons:
The Applicants have not provided documentation to show they progressed
any plans to sell beyond any general contemplation.
When the title issued in August 2013, they did not sell the property.
There were other substantive issues impacting on a potential sale such as the
incomplete property and the potential for the Applicants to crystallise a
significant loss given the state of the property.
In emails between the Applicants and two real estate agents in November
2013, they sought informal appraisals about the value and likely rental income
for the properties, the email says, to assist them to consider whether to hold
and rent or to sell.
On balance, the Applicants have not provided information and documentation
which establishes that they would have sold the property but for the loss of the
title.
I do accept, however, that the lost title would have exacerbated the already
significant level of stress and distress the Applicants would have been feeling:
Consequently, I consider that an award of compensation for non-financial loss
would be appropriate in this case.
The Applicants’ claim they would have refinanced but for the loss of the title
is not established
It is evident from the information supplied in this dispute that the Applicants
threatened to refinance in June 2013 and July 2013 when they became frustrated
about the release of the progress payment and about the time taken by the FSP
to respond to the finance request.
However, I do not accept that the lack of title solely prevented financing because:
The Applicants have not provided any information to show they took steps to
refinance at that stage.
By 8 August 2013, shortly after their frustration became evident in emails in
late July 2013, the new title had been sent to the FSP and the Applicants did
not refinance at this point.
Even if they had taken steps to refinance, it is not apparent there was any
guarantee an application would be approved because:
Case No: 335124 Determination Page 5 of 17
Any loan proposal would not be straightforward given the property was
incomplete.
In July/August the loan was in arrears and the Applicants were in the final
stage of a repayment arrangement which would likely be adversely viewed in
a credit assessment.
Accordingly, I do not accept that the Applicants were prevented from refinancing
by the loss of the title and so they are not entitled to financial loss compensation
in this regard.
2.2 Did the FSP unreasonably delay responding to the Applicant s ’
lending application, so causing construction to be delayed?
The Applicants say the loan application and approval process took too long and
had they known it would take so long, they would have accessed alternate funds
earlier to allow construction to recommence earlier.
The Applicants finally used alternate funds in September 2013 to restart
construction and say they did not proceed with the FSP loan due to the cost for a
relatively small loan.
The FSP did not cause any initial delay in lodging the application
The male Applicant says he was having discussions with the FSP about additional
finance as early as May 2013. The FSP sent the application to the Applicants to
complete on 5 July 2013.
There is no documentation available to me to show what, if anything , was
discussed with the FSP about finance in May 2013. But at that time, the insurance
claim was yet to be approved and the builder and building cost was not finalised
so there was no real ability to progress a finance application at that stage.
Once the insurance claim was approved on 31 May 2013, the records show the
Applicants were seeking access to the final progress payment rather than seeking
finance. In their letter to the FSP on 14 June 2013 the Applicants said they were
waiting on a response to documents sent through, and were:
“talking to o ther builders to complete the works...:
“... we have decided to utilise the remaining payment of the bank first.
If there is an issue and bank does not want to provide the last instalment, then pl do
inform us in writing.
We will close the account and move it [sic] other bank
It was in mid June 2013, that they were referred for finance. At that stage there
were further discussions about the amount and the finalisation of the builder
before the application was sent through to the Applicants in early July 2013.
Given the complexity of the proposal with the need for the Applicants to finalise
the builder and the loan amounts, I do not accept there was any unreasonable
delay in the FSP sending through the application form.
Case No: 335124 Determination Page 6 of 17
The loan assessment process took about 9 weeks
A detailed chronology of the events relevant to this loan approval process is set
out in Section 3.4 of this Determination.
There was a period of 65 days (about 9 weeks) between when the application
was formally lodged with the FSP (8 July 2013) and the loan was approved (11
September 2013).
Of the 65 days to process the loan, the most significant time was spent as follows:
Time frame Process
23 days (10 July to 2
August 2013)
Completing the valuation
34 days (8 August,
approved 11 September
2013).
The Applicant was internally referred to the credit area on 8
August 2013 to assess and approve the loan subsequent to
the valuation being received
Total: 57 days
The loan assessment was not straightforward
Although for a relatively small amount, the loan application raised a number of
substantive issues which the FSP needed to take into account in its assessment
including:
Construction has stopped and a new builder and contract was to be put in
place.
The existing finance was not sufficient to complete construction and initially
the Applicants were asking for substantially more than appeared to be
required. The Applicants’ emails indicate they were discussing various lending
amounts of between $55,000 and $90,000
A new valuation was required to assess where the construction was at and to
confirm the amount required to complete the construction.
When the application was initially processed in July 2013 for an amount of
$24,000, this did not correspond to the FSP’s c alculation of a shortfall of
$9,000 based on a contract of $95,265.
The loan was in arrears and the Applicants had entered into an arrangement
to catch up the arrears in April 2013 with repayments of $2,000 per month but
this reduced to $500 per month under a subsequent hardship arrangement in
July 2013.
The time taken to complete the valuation was not unreasonable
When a valuer is valuing the property for mortgage purposes and the valuation
will be used to determine the loan amount, it is important that the valuation is
carefully completed.
Given the property was incomplete and a new builder and building contract was
involved, I do not accept that 23 days to complete the valuation and submit it to
the FSP was unreasonable.
Case No: 335124 Determination Page 7 of 17
The FSP unreasonably delayed the credit assessment and decision process
by 19 days
It was reasonable for the FSP to wait on the valuation before completing its credit
assessment because this was a primary determinant of the amount the FSP
would be prepared to lend.
Based on the FSP’s records, the FSP banker received the valuation on 2 August
2013 (a Friday) and referred the file for assessment and approval to its credit area
on 8 August 2013 (a Thursday). I do not consider this time frame unreasonable.
Subsequently and according to the FSP’s notes:
The application was originally auto declined by the FSP’s system and declined
for lenders mortgage insurance.
The valuation came in below the initial valuation completed in 2010.
The FSP questioned the serviceability position as the Applican ts’ income did
not indicate an inability to service the loan and it raised questions about
whether all liabilities had been disclosed.
On 14 August 2013, the FSP declined the loan application of $24,000 stating
the maximum assistance would be the shortfall which it estimated at $9,000
but that this would only be approved if arrears of $2,128 were cleared.
The FSP requested updated payslips on 4 September 2013.
The FSP advised the banker the loan was declined on 10 September 2013
and the banker responded restating his support for the approval.
On 11 September 2013, the FSP approved finance of $9,167 as a policy
exception given the risk for the FSP if the property was not completed.
The time to approve this loan exceeded what one would normally expect but the
circumstances in this case were not standard and it is apparent to me that one of
the primary causes of the delay in approval was the arrears position.
At the time, the FSP was assessing the loan application, however, there were
arrangements in place to manage the arrears and until the payment due 2
September 2013, the Applicants had broadly complied with the repayment
arrangement.
Even so, it appears, according to the FSP note of 14 August 2013 that the arrears
position had stalled the application for about 2 weeks.
I do not, however, accept that this was unreasonable. Even if an arrangement
was in place, the issue of arrears and hardship were clearly relevant to the loan
assessment.
The FSP did not mislead the Applicants about the loan process
The Applicants say the FSP banker continually intimated that an approval was
imminent, and they relied on this to hold off accessing alternate available funds to
allow construction to recommence.
The approval time frame was extended in this case and the banker had initially
indicated it was not straightforward as shown by the following emails:
In an email to the Applicants dated 20 June 2013, the banker said:
Case No: 335124 Determination Page 8 of 17
“...we will be confirming what the process for facilitating this increase will be, there
are a couple of questions to be answered surrounding the new builder and
contract and what our requirements will be ...”
In an email to the Applicants dated 10 July 2013, that this would be a
“complex process to deal with unfortunately. We have to consult with our credit
t eam, our progress claims team and our insurer…”
There is no documentation which establishes the FSP was misrepresenting to the
Applicants earlier in the process that the loan would shortly be approved.
So in summary, the process was extended and there was limited information
provided to the Applicants about how long the FSP expected the process to take.
A financial services provider may be liable for damage caused by withholding
information where there is an obligation to speak – described as misleading
conduct by omission.
In general terms, given the complexity of the application and the outcome
uncertain, the approval time frame was difficult to predict. So I do not accept there
was meaningful information for the FSP to provide to the Applicants other t han
that the loan was not yet approved. In other words, the FSP was not under an
obligation to have told the Applicants how loan the process would take as it was
not reasonable to expect it to have been aware of it beforehand.
On the issue of the arrears, however, the Applicants say they were never told that
the arrears was causing issues for their application and, given the Applicants
were in regular contact with their banker as well as the collections area at the
time, it seems reasonable to expect they would be so informed. Even if so,
however, it is not evident to me that this would have accelerated the process.
The Applicants, however, say they would have sourced funds from elsewhere
earlier. This may be so, but if this option was available to them earlier than
September 2013 then it was open to them to do so and it was their decision to
wait on the approval or use these available funds.
The FSP is not, therefore, liable to compensate them in this regard.
2.3 Did the FSP engage in inappropriate collection action?
The Debt Collection Guidelines set the standard
When assessing whether collection action is inappropriate, FOS will have regard
to the Debt Collection Guidelines (the Guideline) issued in 2005 by the Australian
Competition & Consumer Commission (ACCC) and the Australian Securities &
Investments Commission (ASIC).
Broadly, the Guideline seeks to protect consumers from harassment by providing
recommendations for frequency and nature of contact and provides for remedies
against financials services providers who breach the guideline and engage in
inappropriate contact.
Case No: 335124 Determination Page 9 of 17
Further information is set out in Section 3.5 of this Determination and a link to the
Guideline is available on the ACCC and ASIC websites at www.asic.gov.au and
www.accc.gov.au .
The FSP’s collection contact did not breach the Guideline
A chronology of the Applicants’ contact with the FSP’s collection area from August
2012 through to November 2013 when the loan returned to regular order is set out
in Section 3.6. Prior to August 2012, there was some collection contact but it is
not the subject of this dispute and was not substantive.
From early 2013, the FSP collections area was in semi-regular contact with
collections about repayment arrears. The number of contacts is set out below
and, in terms of the Guideline, the frequency of contact would not be excessive.
Month Number of contacts
January 2013 1
February 5
March 3
April 4
June 1
July 1
September 4
In April 2013, the FSP and the Applicants reached agreement on a $2,000 per
month repayment arrangement for 3 months to clear the arrears. There was
contact with the Applicants during this period but the June payment was overdue.
In July 2013, the FSP notes record further contact with the Applicants and an
agreement for a repayment arrangement at 50% of “MMR” [minimum monthly
repayment] for four months. At that stage according to the loan statements, the
minimum monthly repayment was $1,126.17.
On 3 July 2013, the FSP wrote to the Applicant approving a repayment
arrangement of $500 payable on the 2 nd of each month from August to November
2013.
At the end of July 2013, there was a net payment of $500 (the August payment)
but there was no further payment until the arrears were cleared on 25 September
2013.
Based on the information available to me, the FSP’s collection contact did not
breach the Guideline.
Case No: 335124 Determination Page 10 of 17
2.4 Is the FSP liable to compensate the Applicants?
The FSP is liable to compensate the Applicants for financial loss based on
18 days of delay
The appropriate compensation for the delay relating to the lost title is 18 days’
worth of rental based on $360 per week less the $119.32 monthly management
fee (so net $1,440.68 per month). This would correspond to compensation of
$853 rounded up to $950 for interest/lack of use of the funds for 12 months.
The loss of the title caused the Applicants additional stress and anxiety and
the FSP is liable to pay non-financial loss compensation
When the Applicants became aware of the loss of the title and the fact that the
transfer of land had not been registered in mid-December 2012, it is reasonable to
conclude that this knowledge would have exacerbated an already considerable
degree of stress and concern the Applicants were suffering as a result of the
failure of the builder and the financial consequences they were facing.
Although the FSP moved to arrange the replacement documents in December
2012, the matter was not finalised until the new title issued in August 2013, a
period of 7.5 months.
It would be reasonable to accept that this stress and worry would be substantial
including because:
The Applicants were not the registered legal owner of the property.
The property was sold as a house and land package and there may be a
reasonable concern about the status of the ownership of the property given
the failure of the builder.
Whilst I am not satisfied that the Applicants would have sold or refinanced but
for the loss of the title, I do accept that this would have added complication to
any assessment of their options.
For the reasons given above, and the 7.5 months the stress persisted, the FSP is
liable to pay the Applicants the maximum non-financial loss compensation amount
FOS can award of $3,000.
Case No: 335124 Determination Page 11 of 17
3 Supporting information
3.1 FOS Approach
Expedited Determination
This dispute has not been the subject of a FOS Recommendation. Due to its
nature, it was appropriate to proceed directly to a Determination in line with the
Operational Guidelines to the FOS Terms of References.
There has been a full exchange of material between the parties, and each party
has had the chance to address any issues raised by the other.
Documents relevant to this decision
In considering this dispute, I have taken into account all relevant information from
the FSP and the Applicant, including the:
FSP’s notes
loan documentation, and
account statements.
3.2 FOS’s approach to assessment of loss
In circumstances when a financial services provider has made an error, FOS will
assess loss and damage which arose directly as a consequence of that error.
If an error resulted in no financial loss or damage, FOS will not award
compensation. FOS has no power to award punitive damages.
When assessing what damage flowed directly from an error, FOS will decide what
is more likely than not to have occurred having had regard to all the information
supplied by the parties, but having placed most weight on contemporaneous
documentation.
FOS is not a court so cannot take sworn evidence. This means if the claim is not
supported by documentary evidence, then an applicant’s claim may not be
established. If the matter turns on sworn evidence then the matter may be more
appropriately dealt with in a court.
3.3 Background to the Dispute
In 2010 the Applicant entered into a house and land package for a property in
regional NSW after attending an investment conference in Perth, Western
Australia. The FSP provided the finance through a loan of $276,800 (loan account
number ending **60200) drawn in February 2011.
Building commenced but on 11 November 2012, an Administrator was appointed
to the Applicant’s builder and building, which had been spasmodic prior to this,
finally stopped. At that stage, the property had been paid up to fixing stage and
Case No: 335124 Determination Page 12 of 17
there was a final progress payment of about $36,000 available in the Applicants’
loan.
The Applicant lodged an insurance warranty claim and arranged for a
replacement builder. The insurer approved a payment of $48,949 (representing
20% of the original contract less the policy excess).
The cost to complete the building through new builder was $101,888 leaving the
Applicant with approximately $53,000 to fund.
Construction recommenced in September 2011 and was completed in December
2013. The Applicants finally funded the construction from the insurance payment,
the amount available in the existing loan and funds from their own resources.
3.4 Chronology of events relevant to the dispute
Date Action
October 10 The Applicants purchased the land
2 February 11 Loan was advanced
11 Nov 12 Administrator appointed to the Applicants’ builder
21 Nov 12 The Applicants contacted the insurer and the insurer wrote back
with a list of requirements.
3 Dec 12 The Applicants wrote to the FSP asking for a copy of the title
documents to submit with the builder insurance warranty claim.
5 Dec 12 FSP note says it advised the Applicants it did not hold the title and
for the Applicants to contact their solicitor.
17 Dec 12 Letter from Applicant to the FSP complaining about the loss of the
title a nd asking for it to be provided to allow him to lodged his
insurance claim.
18 Dec 12 The FSP ask the Applicant’s solicitor to prepare replacement
documents.
28 Dec 12 Letter from insurer to the Applicant acknowledged receipt of
documents on 24 December 2012 and said:
“We are currently reviewing the documentation you have submitted,
specifically in relation to your contract, which is not with the builder
[name of original builder] named on the certificate of insuranc e. We
expect to provide you with a fur ther response within 10 business days.”
30 Jan 13 Date of email from the Applicants’ solicitors to the FSP setting out
its quote for the work required to replace the missing documents
($1,208.90). Requested an urgent response and a deposit of
$1,000 to al low it to commence work.
3 Mar 13 The FSP pays the Applicants’ solicitor costs of $1,208.90.
31 May 13 Date of letter from insurer accepting liability for claim but capped
at 20% of contract price. Claim amount approved $48,948.80
Case No: 335124 Determination Page 13 of 17
5 June 13 Date of email from Applicant to FSP attaching a copy of the
approved insurance claim and asked for the final
instalment/progress payment.
20 June 13 Date of email from Applicant to FSP enclosing builder’s quote and
asking for a loan increase
1 July 13 Date of e mail from Applicant to the FSP seeking finance of “$85 -
90K”
5 July 13 Date of email from Applicant to FSP advising insurance approved,
two building quotes received and they wanted to apply for “$ 50 -
5 5 K ” increase to complete the home.
Date of email from FS P to Applicant enclosing loan application
form.
8 July 13 The Applicants submitted their formal written application to the
FSP.
10 July 13 The FSP emailed the Applicant saying the application had been
received, that the matter was complex and a fresh valuation would
be required.
18 July 13 Applicants followed up the application with the FSP
29 July 13 Applicants emailed the FSP complaining about the delay in the
valuation.
2 August 13 According to the FSP notes, the valuation was completed
8 Augus t 13 According to the FSP notes, the application was referred to FSP’s
credit area.
9 August 13 The FSP receives the replacement documents including the title.
14 August 13 According to the FSP notes the FSP banker provided further
information to the FSP credit area to support the application.
2 Sept 13 According to FSP notes, the Applicants lodged a complaint about
the application time frame with the FSP hardship area.
4 Sept 13 The FSP emailed the Applicants asking for updated payslips
11 Sept 13 The FSP approved a loan of $9,167 and advised the Applicants
by email that documents would issue shortly.
16 Sept 13 The Applicants emailed the FSP following the matter up.
21 Sept 13 The Applicants emailed the FSP following the matter up.
3.5 Debt Collection Guideline
The Debt Collection Guidelines for Collectors and Creditors (the Guideline)
provides guidance for suggested contact by creditors. The Guideline was issued
in 2005 by the Australian Competition & Consumer Commission (ACCC) and the
Australian Securities & Investments Commission (ASIC). A link to the Guideline is
available on their websites at www.asic.gov.au and www.accc.gov.au .
Case No: 335124 Determination Page 14 of 17
The Guideline states that the hours of contact must be reasonable and the
frequency should be no more than is necessary. The Guideline recommends that
collectors do not contact a debtor more than three times per week, or 10 times per
month at most. The contact includes phone calls, emails, letters and faxes.
The Guideline is intended to provide protection for consumers against undue
harassment. At section 4(a), the Guideline says:
“Debtors and third parties are entitled to be free from excessive communications
from collectors. Communications must always be for a reasonable purpose, and
should only occur to the extent necessary: see part 2, section 1 of this guideline.
The guidance on frequency of communications that follows (section 4) should be
r ead subject to this general principle.”
Section 4(c) includes:
“Unnecessary or unduly frequent contacts may amount to undue harassment of a
debtor.”
The Guideline provides for remedies against debt collectors who engage in the
use of physical force, undue harassment or coercion, misleading or deceptive
conduct and/or unconscionable conduct.
The Guideline also, however, recognises that debtors are legally responsible for
paying the debts they legitimately owe, and they should not deliberately try to
avoid their obligations.
Further information about our approach to disputes involving debt collection and
this Guideline can be found in our Bulletin 47, which is available through our
website under "Publications".
3.6 History of the FSP’s collection action
The Appl icants’ loan was first handled by the FSP Collections in early 2011
shortly after the loan was drawn. There was some sporadic contact through to
July 2011 with arrears at relatively low levels, on the face of it, in relation to how
the direct debit was operating rather than any serviceability issue.
There was a missed payment on 2 August 2012 but the loan was regularised
shortly thereafter and the loan was in and out of order through to January 2013.
The relevant history from this point is set out below:
Date FSP collection notes
29 Jan 13 “Advise about account status, amount due $1144.19, customer said
that the bank lost his land title, customer said that he already sent us
a written document, customer wants to communciate with other
department, customer ended the call.”
1 Feb 13 “Advised account status which is behind by $1144.19, cust 2 said to
call cust1 because she doesn’t know anything and it is cust1 who
makes the payment, cust 2 hung up”
7 Feb 13 “Adv bwr of rd call and arrs. Action: Brw adv in a meeting adv brw
Case No: 335124 Determination Page 15 of 17
urgent matter, tried to adv bwr of contact number. Brw refused to call
number unless specific person to speak with adv bwr he needs to
speak with one of my colleagues as I can provide my name but will
be unable to take the call. The bwr ad v he refused to call the
number. Adv bwr it is an urgent matter and well will call in 3 days,
call ended.”
10 Feb 13 “Cust adv has taken in letters etc to branch to have investigated loss
of title. Custopmer wld like to sell property. After long discussion
including advising customer has not made payment on loan since
December customer to call CRU [customer resolutions unit] to
attempt to locate “lost” title.”
19 Feb 13 “”Brw adv that he is trying to sell his prop but unable to b/c his name
is no t on the title, I adv that he needs to go to WA land title office &
he adv he has, Brw adv that he been to branch and branch manager
adv him that he would follow it up, brw demanded that I follow it up
for him, I adv that I can trans him thru to existing h ome loan but I
can’t follow it up for him as he needs to take control of his own
circumstances, Brw terminated call.”
26 Feb 13 “M advi unable to talk now”
3 March 13 “M adv unable to talk at a party will call us tomorrow and HU”
6 March 13 FSP called Applicant
“Adv cust arrs. Cust adv is v frustrated as he is trying to sell pprty
about the bank has lost his title. He adv has been passed down to
many departments to try and resolve the issue and has got no
where. Adv cust that notes from requistion team in LIS noted that
they contacted his solicitors and cc’d him into emails regarding a
new title. Cust Adv never received this information and will not pay
his oustanding pympts for future MMP until matter is resolved. Adv
cust would loan a complaint through CRU who will follow up with
customer…”
16 March 13 FSP called Applicant
“Adv cust of ac status. Cust Adv is not happy stil receiving collections
calls as he had been promiosed that there will be no calls going out
to him due to complaint in place. Cust a dv he has sent his complaint
letter via branch in December and has not recd any correspondence
from the bank at all and has not heard from customer relations. Cust
adv is not willing to speak to collections until his complaint gets
resolved. Adv cust will pass the account onto my team leader to
follow up and pass onto customer relations…”
2 April 13 FSP sent App txt msg
10 Apr 13 “Spoke to customer and advised requsition is working on replacing
title and registering the mortgage. I advised customer that l oan
repayments are req as account is going further into arrears and
default notices will be issued if not fxed asap. Customer has agreed
to pay $2000 by 8/4/13 and then pay $2000 for the next three
months to clear the arrears. Will keep account in customer relations
until arrears are cleared. Customer happy with arrangement.”
Case No: 335124 Determination Page 16 of 17
16 Apr 13 “Customer advised payment was made via online banking on
Sunday 14/04 so payment may not enter account until Wednesday
17/04. Reloaded promise of $2K to paid by 19/04/13.”
22 April 13 FSP agreed to hardship arrangement
“customer has agreed to pay $2,000 per month on the 2 nd of every
month until arrears are cleared. Customers first payment is due
2/5/13. Registration of title is being investigated and completed by
requisitio n team.”
30 June 13 FSP notes – FSP contacted Applicant
“Adv brw of arrs and broken arngmnt. Bwr adv rfa due to
encountering financial issues even since he had taken out the loan.
Bwr adv the building company that was building his property had
went into liquidation (bankrupt) and this had hindered his ability to
continue building whilst also loosing unfrontal pymts. Bwr adv he has
someone else continuing with the building process now and is aiming
to have it finalised within the next 3 months. Bwr adv onc e that
occurs, he will be seeking tenants and the rental income will just
about cover the MMP’s moving forward. Bwr adv he made the June
required $2,000 Pymt yesterday via external bank. Adv bwr it will
take up to 3 days to come through and will be the pym t required for
the previous arrangmnt. Adv Bwr once it has come through, will call
him back to to seek possible assist hardship while he is in this
situation. Adv Bwr assist # if I can not get in touch with him by the
end of the wk. Adv brw possible charges, MMP and confmd dtls
3 July 13 FSP notes – FSP contacted Applicant
“Adv brw of arrs and acc status. Adv brw following up from the
previous call to proceed with seeking hardship assustrance. Bwr adv
rfa due to previous notes(financial strain). Bwr adv he can commit to
paying approx 50% of the MMP with no issues and will require 4
months to have his situation sorted. Adv brw have received TL
approval … to proceed with applying this hardship arrngmnt. Adv brw
the arrnmt is in place and have explained how to keep it without
breaking it. Adv brw possible charges, MMP and confmd dtils
30 July 13 FSP note says:
Inbound call
App “adv that wanted to confirm the pymt had been made adv that
can see that $1000 has been made, adv brw that DDR is still coming
ou t adv that will reverse $500 as brw adv that the other $500 was for
sept payment adv brw that will put thru ef adv that it will not mess up
the assitance adv brw that have changed ddr to sweeping acc and
will need to pay manually.”
Case No: 335124 Determination Page 17 of 17
11 Sep 13
12 Sept 13 FSP note says “removal of assistance” and “Decline letter issued on
05/09/13”
:Customer did not keep to arrangement”
21 Sept 13 FSP contacted Applicant
“”Adv cust of status. Cust adv does not agree with arrears and does
not want to continue to receive th e calls from collections as he is
dealing with branch manager michael who is currently on holdiays
but will contact him on Monday to further discuss. Adv cust he will
continue to receive calls from collections if cust refused to provide
details of the pers on he’s dealing with. Adv cust to ask them to
contact colelctions.”
24 Sep13 Applicant contacted FSP in response to FSP call:
“Cust adv had thought had assist in place. Adv cust he did not make
payments. Cust adv he made payments. Adv cust they went to
savings and he should have made them to home loan. Cust adv
wants to pay arrears so he can refinance. Cust adv he wanted to pay
an amount by credit card. Adv cust we cannot pay credit with credit.
Adv cst to make manual payment at branch tmr and also trf t he
$2700 stitting in his savings into his home loan. Cust adv he will do
so and then he will refinance.”
12 Nov 13 FSP cont acted Applicant
“thought account is on DDR set up since they have it set up a month
ago. Adv they can verify and set it up once mor e at the branch.
Customer give permission to transfer funds from [transaction acount]
…”