Home / Financial Firm (Unknown - Insurer) / Determination 334516

Determination 334516

Denial of claim

FirmFinancial Firm (Unknown - Insurer)
Decided2014-01-15
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Individual policyholders claimed under their home building policy for wall, pool, paving and laundry damage after a neighbour's excavation and a storm. AFCA found the proximate cause was not an insured event and the firm was entitled to deny the claim.

The proximate cause is the dominant effective cause, here the neighbouring excavation undermining the foundations, and the policy excludes damage from a gradual process and excavation-related undermining.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 334516 Determination Page 1 of 9 Case number: 334516 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim - Exclusion/Condition 15 January 2014 Summary Description  A claim under a home building insurance policy following the collapse of a retaining wall. Basis of Determination  A consideration of whether the policy provides coverage in the specific circumstances of the loss. Determination  The proximate cause of the damage to the Applicants‟ home is an event not covered by the terms of the policy. Background 1. The Applicants held a home building insurance policy with the Financial Services Provider (FSP). The policy was incepted in 2006 and provided defined events coverage over the Applicants‟ home. 2. In early 2008, a neighbour constructed a swimming pool in their yard. The construction included excavation of the ground adjacent to the Applicants‟ boundary fenceline. 3. In May 2011, the wall on the western side of the Applicants' property collapsed after strong winds. They lodged a claim for the damage. 4. The FSP denied the Applicants‟ claim on the basis that the damage was not caused by an event insured under the policy. 5. The Applicants disagree with the FSP‟s decision and seek a review by the Service. Determination Case No: 334516 Determination Page 2 of 9 Summary of Applicants ’ position 6. They say they notified the FSP of the sudden water flow from the neighbour‟s failed plumbing system in February/March 2008 and of the high winds in 2011. 7. The Applicants believe that the original damage occurred in February 2008, when large volumes of water, coming from the direction of the property to the south west, flowed through their backyard towards their back door. 8. They discovered that their neighbours on the western side had dug a large pit in their backyard, as part of the construction of a swimming pool and this pit had filled with water. In addition, a stormwater pit near the boundary of the properties was filled in with soil during the excavation and a large crack had formed in the retaining wall on the boundary of the property to the south west. 9. They attempted to contact the owner of the property to the west and the contractor who performed the excavation but could not get agreement as to who was responsible for the problem. They also tried without success to fill the crack in the retaining wall to divert the water which was coming onto their property. In addition, they contacted the local council about the problem. 10. They subsequently contacted the FSP in March 2008, but were advised to contact their neighbours and the council. 11. Eventually, the source of the water flowing onto their property was identified as being a stormwater pipe which had been disconnected by the builder of the swimming pool in the property to the west, but was only resolved in July 2009. 12. In May 2011 during high winds, their block wall boundary fence collapsed. They are of the view that this occurred because the fence was unsupported and undermined by the pool excavation activ ity on the neighbour‟s property and by the stormwater which flowed uncontrolled until the pipe was replaced in 2009. An engineer‟s report they have obtained , supports this view. 13. Further, the 2.7m wall on their northern boundary remains very unstable and they are concerned of it collapsing into the neighbouring property and causing injury and damage. 14. The Applicants believe that the FSP has a legal obligation to assist them and fix the fence or at least to organise a cross claim against the neighbours. Summary of FSP’s position 15. The FSP says that it has obtained a report by engineering consulting firm “M” , which provides information about the cause of the collapse of the Applicants‟ block wall. Case No: 334516 Determination Page 3 of 9 16. It says that the report by M confirms that while the trigger for the collapse was high winds in May 2011, the cause of the collapsed was the inadequate support and shoring of the wall by the builder of the swimming pool in the adjoining property. 17. M also noted that based on accounts from the Applicants, the free draining stormwater from the disconnected pipe would have undermined the sandy foundation material beneath the wall, giving rise to further instability. This stormwater would also have undermined the sand bedding of the pavers around the Applicants‟ pool and subsidence of their laundry. 18. The FSP denied the claim on the basis that the proximate cause of the damage was not an event covered under the policy. 19. The FSP says that the responsibility to mitigate and ensure no further injury is borne by the Applicants and their neighbours who, in the first instance, have responsibility for the safety of the wall on their properties. It says that if the wall is unsafe it should be made safe urgently, but does not agree with the Applicants‟ contention that it has responsibility in this regard. 20. The FSP relies on the following policy provisions: “ What you are not covered for : There are certain times when this insurance may not provide cover. Some events we may not cover include:  ...  Damage to your home caused by water or another liquid escaping as a result of a gradual process (see Section 1.7). ... Section 1 Insured Events Causing Loss or Damage This policy insures you up to the amount of the sum insured for loss or damage to your home caused by an insured event listed below. ... 1.7 Water Or Other Liquid You are insured for damage to your home caused when water or another liquid suddenly escapes from:  your or your neighbours o plumbing system, o ..., or  the o road guttering or curbing, o water main or pipe. ... We will not pay if the damage is the result of a gradual process. Case No: 334516 Determination Page 4 of 9 ... 1.12 Storm, Rain Or Flash Flood You are insured for damage to your home caused by storm, rain or flash flood . We will not pay for water damage caused by storm, rain or flash flood to:  gates, fences or retaining walls;  ...” Issue 21. Whether the FSP is liable for the damage to the A pplicants‟ home building. Reasons for decision 22. Due to the nature of the dispute, the FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. Thus, this dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. The parties have been previously advised that a Determination will be issued in this case. 23. There has been an exchange of information between the parties and I am satisfied that each party has had the opportunity to respond to any issues raised by the other. 24. It is an accepted principle of general insurance law that an insured bears the onus to establish, on the face of the facts, that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove that an exclusion applies if it wishes to deny or limit its liability for the loss. Submissions from the parties 25. The Applicants say that they originally submitted a claim to the FSP in March 2008 when large cracks appeared in the retaining wall. 26. They say that they were advised by the FSP to contact their local council as it was a building problem caused by the building on the adjoining property. However, even after many inspections and much correspondence, they were not able to obtain any satisfaction from the council or their neighbour. 27. They say they took all reasonable precautions to stem the flow of water from the crack in the boundary wall, including filling the crack with expandable liquid adhesive and approaching the neighbours to the west and to the south-west to stop the water flow and/or to identify its source. Case No: 334516 Determination Page 5 of 9 28. According to the Applicants, the cause of the water flowing through their property was eventually identified as being an issue with the stormwater system to the rear of their property, where a stormwater pipe had been disconnected and the stormwater pit had filled with debris. 29. After the boundary fence on their property collapsed on 30 May 2011, the Applicants contacted the FSP. The FSP‟s assessor “C” , attended the property on 1 June 2011 and reported the following:  The Applicants advised that they believed that the damage was due to the neighbour‟s negligence.  The Applicants showed the attending assessor: i. Extensive correspondence between the Applicants and their neighbour to the west, in which it was claimed that the foundation of the retaining wall underneath the fence has been compromised as a result of excavation wor k for the neighbour‟s pool installation ii. Photos showing that in 2008, there was a heavy lean to the wall/fence and a report commissioned by the Applicants‟ neighbour from an engineering firm which stated that the wall‟s lean was not caused by the excavation but due to the wall containing no steel reinforcement.  The Applicants advised that they had not taken any precautionary measures to prevent the damage because they were pursuing the neighbour for damages. 30. The FSP advised the Applicants in a letter dated 9 August 2011, that the claim was denied. 31. The Applicants subsequently provided a report from structural engineer “AW”, as to the cause of the damage to their property. AW inspected the property on 7 June 2011 and in a report dated September 2011, provided the following information with respect to the damage:  The boundary fence between the Applicants‟ property and the property to the west had collapsed and debris was in the pool.  There were a number or cracks around the pool.  The boundary fence between the Applicants‟ property and the property to the north (alongside the Applicants‟ pool) has similarly been damaged by the collapse of the adjoining wall.  Settlement and scouring had occurred around the pool due to water concentration.  Cracking had occurred to the external wall to the house and the internal wall of the dining room.  The large crack in the existing wall at the corner of the boundaries of the three properties.  The boundary masonry fence (between the Applicants‟ property and the property to the west) had been replaced by a timber paling fence: Case No: 334516 Determination Page 6 of 9 i. AW observed that it appeared that it was on the property to the west and was advised that it was erected by the owner of that property. ii. There was no attempt to remove the collapsed wall or to discuss with the Applicant what replacement fence he required.  The laundry shed appeared to have dropped although it was in poor condition  At the time of his inspection, he was provided with three videos of the work at the property to the west, taken in 2008. He stated that the videos clearly showed the unshored excavation adjacent to the boundary the Applicants‟ property. 32. AW also opined that there were three influences affecting the Applicants‟ property:  The unshored excavation adjacent to the Applicants‟ boundary has caused damage to their pool, its surrounds and the adjacent laundry i. It is standard practice to accept a minimum zone of influence on adjacent structures for sand (of which the strata of the site is composed) of 2 horizontal to 1 vertical. ii. That is, structures within 2.4m to 3m from the boundary would be influenced by the excavation (in the neighbouring property) causing sand movement resulting in settlement and damage. iii. The pool, its surrounds and the adjacent laundry are all within the excavation‟s zone of influence.  The uncontrolled water discharge as a result of the disconnection of the pipe in the easement further destabilised the unshored excavation face, resulting in additional disturbance to the strata in the area of the pool and associated structures and the Applicants‟ property. i. The volume of water collected on the property to the south-west, which is ultimately discharged through the easement, is significant. ii. The disconnection of the easement pipe without adequate diversion methods concentrated significant water onto the unshored excavation.  There is continued ingress of water through the significant separation crack in the adjacent retaining wall. The gap in this wall is resulting in run off in the Applicants‟ property and this runoff is entering the cracks around the pool and causing increased settlement in the adjacent path. i. This retaining wall forms the boundary of the properties to the south- west and to the west of the Applicants‟, as well as between the Applicants‟ property and the property to their south -west. ii. The retaining wall between the two other properties (to the south- west and to the west) has settled and rotated towards the property to the west as a result of the foundation being within the zone of influence of the excavation. The destabilisation in the foundation Case No: 334516 Determination Page 7 of 9 has caused the separation in the retaining wall between the Applicants‟ property and the p roperty to the south-west. 33. The FSP appointed engineer M to provide a report as to the cause of the damage. M reviewed the report by AW and inspected the property on 15 January 2013 and in a report dated 16 January 2013 confirmed that the cause of the damage to the wall could be attributed to:  Inadequate support and shoring of the wall by the builder of the neighbour‟s swimming pool.  Free flowing stormwater, as the result of a disconnected stormwater pipe, undermined the sandy foundation beneath the wall gi ving rise to further instability. 34. In its report, M acknowledged that the failure of the boundary wall was ultimately the high wind loading to which it was subjected, after the pool excavation works. 35. However, M also stated that the catalyst for the failure was the weakened structural integrity due to inadequate support and shoring during the pool excavation, further exacerbated by free flowing stormwater effluent undermining and weakening the footing and stability. 36. M ascribed percentages to the causes of the failure as follows:  Wind loading - %100 of failure  Inadequate shoring and support by builder of neighbour‟s pool – 80% cause  Stormwater effluent – 20% cause 37. M stated that the consequential damage resulting from the disconnected stormwater pipe would have been progressive over a period of time relative to the flow of stormwater effluent undermining the supportive sand foundation materials. M added that in its opinion, this may occur immediately or over a period of months relative to the rainfall and stormwater flow. 38. Further, M stated that had the wall been adequately addressed post excavation works, it is unlikely the wall would have collapsed. Consideration of the evidence Damage to wall 39. I have reviewed the policy and note that “Storm” is defined as meanin g violent weather and high winds, sometimes accompanied by rain, hail or snow including a cyclone, tornado or willy willy”. 40. I accept that high wind, which M stated was 100% cause of the failure of the wall, is covered under the policy event of storm. Case No: 334516 Determination Page 8 of 9 41. However, a question arises as to what was the proximate cause of the damage to the wall. In determining the proximate cause of the damage, it is necessary to look at the effective or dominant cause of the damage. I am satisfied that the proximate cause is determined by a common sense evaluation of the relevant facts. 42. However, case law also provides that the proximate cause is not determined by identifying the last event or final trigger, but by determining what is the dominant or effective or operative cause, whether or not the last in time or the sole cause. 43. In my view, at the time of the loss, three “causes” were in play; the high wind loading; the excavation works in 2008 that undermined the foundations of the wall; the free flowing stormwater effluent that further undermined the foundations of the wall. 44. The report by M confirmed that had the wall been adequately addressed after the excavation works were completed in the neighbour‟s property, it is unlikely that the wall would have collapsed. 45. I note that C, in its report of 9 June 2011, recorded that during the inspection of the property, the Applicant showed the assessor photographs from 2008, in which the wall had a “heavy lean”. 46. I further note that the report by AW indicated that in March 2008, the foundations of the back wall had several large cracks and had dropped extensively. 47. After considering the matter, I accept that on the balance of probabilities, the proximate cause for the damage to the wall was the excavation works conducted by the builder of the neighbour‟s pool in 2008. 48. A review of the policy wording shows that undermining of the foundations as a result of excavations in the neighbouring property is not an event to which the policy responds. 49. I note that M attributes 20% of the cause of the failure of the wall to the stormwater effluent which flowed freely through the Applicants‟ property until the stormwater pipe was reconnected in 2009. 50. The policy provides cover for damage to the home caused when water suddenly escapes from the Applicants ‟ (or the Applicants‟ neighbour‟s) plumbing system, or from the water main or pipe. 51. The evidence is that the water from the neighbours disconnected storm water pipe, has impacted upon the Applicants ‟ property over a lengthy period of time. 52. In my view the damage arising from the impact of this water is not damage from water that has „suddenly‟ escaped, but rather it is damage which is a result of a gradual process. Case No: 334516 Determination Page 9 of 9 53. I note that damage as a result of a gradual process is specifically excluded from coverage under the terms of the policy. 54. However, even if I am mistaken in the view that that water has not suddenly escaped, I am satisfied that if it were not for the excavation of the ground in the neighbours‟ property, on the balance of probabilities , the damage to the Applicants‟ wall would not have occurred. 55. Accordingly, I find that the FSP is entitled to deny liability for the damage to the Applicants‟ wall. Damage to pool, paving and laundry shed 56. The Applicants have also stated that their pool and the paving around the pool has cracked and the laundry shed has dropped. 57. Based on the evidence before me, I accept that these parts of the Applicants‟ home were within the zone of influence of the 2008 excavations to the neighbour‟s property. 58. I accept therefore that the proximate cause for the damage to these parts of the Applicants‟ home was the undermining of the sandy soil foundations caused by the excavation, for which no cover is provided under the policy. 59. Accordingly, I find that the FSP is entitled to deny liability for the damage to the Applicants‟ pool, pool paving and laundry shed. Determination 60. On the basis of the available information I determine that the FSP is entitled to deny liability for damage to the Applicants‟ home building.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.