Text of the determination
Case No: 334516 Determination Page 1 of 9
Case number: 334516
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim - Exclusion/Condition
15 January 2014
Summary
Description
A claim under a home building insurance policy following the collapse
of a retaining wall.
Basis of Determination
A consideration of whether the policy provides coverage in the specific
circumstances of the loss.
Determination
The proximate cause of the damage to the Applicants‟ home is an
event not covered by the terms of the policy.
Background
1. The Applicants held a home building insurance policy with the Financial
Services Provider (FSP). The policy was incepted in 2006 and provided
defined events coverage over the Applicants‟ home.
2. In early 2008, a neighbour constructed a swimming pool in their yard. The
construction included excavation of the ground adjacent to the Applicants‟
boundary fenceline.
3. In May 2011, the wall on the western side of the Applicants' property
collapsed after strong winds. They lodged a claim for the damage.
4. The FSP denied the Applicants‟ claim on the basis that the damage was not
caused by an event insured under the policy.
5. The Applicants disagree with the FSP‟s decision and seek a review by the
Service.
Determination
Case No: 334516 Determination Page 2 of 9
Summary of Applicants ’ position
6. They say they notified the FSP of the sudden water flow from the
neighbour‟s failed plumbing system in February/March 2008 and of the high
winds in 2011.
7. The Applicants believe that the original damage occurred in February 2008,
when large volumes of water, coming from the direction of the property to the
south west, flowed through their backyard towards their back door.
8. They discovered that their neighbours on the western side had dug a large
pit in their backyard, as part of the construction of a swimming pool and this
pit had filled with water. In addition, a stormwater pit near the boundary of
the properties was filled in with soil during the excavation and a large crack
had formed in the retaining wall on the boundary of the property to the south
west.
9. They attempted to contact the owner of the property to the west and the
contractor who performed the excavation but could not get agreement as to
who was responsible for the problem. They also tried without success to fill
the crack in the retaining wall to divert the water which was coming onto their
property. In addition, they contacted the local council about the problem.
10. They subsequently contacted the FSP in March 2008, but were advised to
contact their neighbours and the council.
11. Eventually, the source of the water flowing onto their property was identified
as being a stormwater pipe which had been disconnected by the builder of
the swimming pool in the property to the west, but was only resolved in July
2009.
12. In May 2011 during high winds, their block wall boundary fence collapsed.
They are of the view that this occurred because the fence was unsupported
and undermined by the pool excavation activ ity on the neighbour‟s property
and by the stormwater which flowed uncontrolled until the pipe was replaced
in 2009. An engineer‟s report they have obtained , supports this view.
13. Further, the 2.7m wall on their northern boundary remains very unstable and
they are concerned of it collapsing into the neighbouring property and
causing injury and damage.
14. The Applicants believe that the FSP has a legal obligation to assist them and
fix the fence or at least to organise a cross claim against the neighbours.
Summary of FSP’s position
15. The FSP says that it has obtained a report by engineering consulting firm
“M” , which provides information about the cause of the collapse of the
Applicants‟ block wall.
Case No: 334516 Determination Page 3 of 9
16. It says that the report by M confirms that while the trigger for the collapse
was high winds in May 2011, the cause of the collapsed was the inadequate
support and shoring of the wall by the builder of the swimming pool in the
adjoining property.
17. M also noted that based on accounts from the Applicants, the free draining
stormwater from the disconnected pipe would have undermined the sandy
foundation material beneath the wall, giving rise to further instability. This
stormwater would also have undermined the sand bedding of the pavers
around the Applicants‟ pool and subsidence of their laundry.
18. The FSP denied the claim on the basis that the proximate cause of the
damage was not an event covered under the policy.
19. The FSP says that the responsibility to mitigate and ensure no further injury
is borne by the Applicants and their neighbours who, in the first instance,
have responsibility for the safety of the wall on their properties. It says that if
the wall is unsafe it should be made safe urgently, but does not agree with
the Applicants‟ contention that it has responsibility in this regard.
20. The FSP relies on the following policy provisions:
“ What you are not covered for :
There are certain times when this insurance may not provide cover.
Some events we may not cover include:
...
Damage to your home caused by water or another liquid escaping as
a result of a gradual process (see Section 1.7).
...
Section 1
Insured Events Causing Loss or Damage
This policy insures you up to the amount of the sum insured for loss or
damage to your home caused by an insured event listed below.
...
1.7 Water Or Other Liquid
You are insured for damage to your home caused when water or another
liquid suddenly escapes from:
your or your neighbours
o plumbing system,
o ..., or
the
o road guttering or curbing,
o water main or pipe.
...
We will not pay if the damage is the result of a gradual process.
Case No: 334516 Determination Page 4 of 9
...
1.12 Storm, Rain Or Flash Flood
You are insured for damage to your home caused by storm, rain or flash
flood .
We will not pay for water damage caused by storm, rain or flash flood to:
gates, fences or retaining walls;
...”
Issue
21. Whether the FSP is liable for the damage to the A pplicants‟ home building.
Reasons for decision
22. Due to the nature of the dispute, the FOS has considered it appropriate to
expedite the dispute in accordance with the Operational Guidelines to the
FOS Terms of Reference. Thus, this dispute has not been the subject of a
FOS Recommendation and has proceeded directly to Determination. The
parties have been previously advised that a Determination will be issued in
this case.
23. There has been an exchange of information between the parties and I am
satisfied that each party has had the opportunity to respond to any issues
raised by the other.
24. It is an accepted principle of general insurance law that an insured bears the
onus to establish, on the face of the facts, that they have suffered a loss
caused by an event to which the policy responds. This is known as a prima
facie claim. Once so established, the onus shifts to the insurer to prove that
an exclusion applies if it wishes to deny or limit its liability for the loss.
Submissions from the parties
25. The Applicants say that they originally submitted a claim to the FSP in March
2008 when large cracks appeared in the retaining wall.
26. They say that they were advised by the FSP to contact their local council as
it was a building problem caused by the building on the adjoining property.
However, even after many inspections and much correspondence, they were
not able to obtain any satisfaction from the council or their neighbour.
27. They say they took all reasonable precautions to stem the flow of water from
the crack in the boundary wall, including filling the crack with expandable
liquid adhesive and approaching the neighbours to the west and to the
south-west to stop the water flow and/or to identify its source.
Case No: 334516 Determination Page 5 of 9
28. According to the Applicants, the cause of the water flowing through their
property was eventually identified as being an issue with the stormwater
system to the rear of their property, where a stormwater pipe had been
disconnected and the stormwater pit had filled with debris.
29. After the boundary fence on their property collapsed on 30 May 2011, the
Applicants contacted the FSP. The FSP‟s assessor “C” , attended the
property on 1 June 2011 and reported the following:
The Applicants advised that they believed that the damage was due to
the neighbour‟s negligence.
The Applicants showed the attending assessor:
i. Extensive correspondence between the Applicants and their
neighbour to the west, in which it was claimed that the foundation of
the retaining wall underneath the fence has been compromised as a
result of excavation wor k for the neighbour‟s pool installation
ii. Photos showing that in 2008, there was a heavy lean to the
wall/fence and a report commissioned by the Applicants‟ neighbour
from an engineering firm which stated that the wall‟s lean was not
caused by the excavation but due to the wall containing no steel
reinforcement.
The Applicants advised that they had not taken any precautionary
measures to prevent the damage because they were pursuing the
neighbour for damages.
30. The FSP advised the Applicants in a letter dated 9 August 2011, that the
claim was denied.
31. The Applicants subsequently provided a report from structural engineer
“AW”, as to the cause of the damage to their property. AW inspected the
property on 7 June 2011 and in a report dated September 2011, provided
the following information with respect to the damage:
The boundary fence between the Applicants‟ property and the property
to the west had collapsed and debris was in the pool.
There were a number or cracks around the pool.
The boundary fence between the Applicants‟ property and the property
to the north (alongside the Applicants‟ pool) has similarly been
damaged by the collapse of the adjoining wall.
Settlement and scouring had occurred around the pool due to water
concentration.
Cracking had occurred to the external wall to the house and the internal
wall of the dining room.
The large crack in the existing wall at the corner of the boundaries of
the three properties.
The boundary masonry fence (between the Applicants‟ property and
the property to the west) had been replaced by a timber paling fence:
Case No: 334516 Determination Page 6 of 9
i. AW observed that it appeared that it was on the property to the
west and was advised that it was erected by the owner of that
property.
ii. There was no attempt to remove the collapsed wall or to discuss
with the Applicant what replacement fence he required.
The laundry shed appeared to have dropped although it was in poor
condition
At the time of his inspection, he was provided with three videos of the
work at the property to the west, taken in 2008. He stated that the
videos clearly showed the unshored excavation adjacent to the
boundary the Applicants‟ property.
32. AW also opined that there were three influences affecting the Applicants‟
property:
The unshored excavation adjacent to the Applicants‟ boundary has
caused damage to their pool, its surrounds and the adjacent laundry
i. It is standard practice to accept a minimum zone of influence on
adjacent structures for sand (of which the strata of the site is
composed) of 2 horizontal to 1 vertical.
ii. That is, structures within 2.4m to 3m from the boundary would be
influenced by the excavation (in the neighbouring property) causing
sand movement resulting in settlement and damage.
iii. The pool, its surrounds and the adjacent laundry are all within the
excavation‟s zone of influence.
The uncontrolled water discharge as a result of the disconnection of the
pipe in the easement further destabilised the unshored excavation face,
resulting in additional disturbance to the strata in the area of the pool
and associated structures and the Applicants‟ property.
i. The volume of water collected on the property to the south-west,
which is ultimately discharged through the easement, is significant.
ii. The disconnection of the easement pipe without adequate diversion
methods concentrated significant water onto the unshored
excavation.
There is continued ingress of water through the significant separation
crack in the adjacent retaining wall. The gap in this wall is resulting in
run off in the Applicants‟ property and this runoff is entering the cracks
around the pool and causing increased settlement in the adjacent path.
i. This retaining wall forms the boundary of the properties to the
south- west and to the west of the Applicants‟, as well as between
the Applicants‟ property and the property to their south -west.
ii. The retaining wall between the two other properties (to the south-
west and to the west) has settled and rotated towards the property
to the west as a result of the foundation being within the zone of
influence of the excavation. The destabilisation in the foundation
Case No: 334516 Determination Page 7 of 9
has caused the separation in the retaining wall between the
Applicants‟ property and the p roperty to the south-west.
33. The FSP appointed engineer M to provide a report as to the cause of the
damage. M reviewed the report by AW and inspected the property on 15
January 2013 and in a report dated 16 January 2013 confirmed that the
cause of the damage to the wall could be attributed to:
Inadequate support and shoring of the wall by the builder of the
neighbour‟s swimming pool.
Free flowing stormwater, as the result of a disconnected stormwater
pipe, undermined the sandy foundation beneath the wall gi ving rise to
further instability.
34. In its report, M acknowledged that the failure of the boundary wall was
ultimately the high wind loading to which it was subjected, after the pool
excavation works.
35. However, M also stated that the catalyst for the failure was the weakened
structural integrity due to inadequate support and shoring during the pool
excavation, further exacerbated by free flowing stormwater effluent
undermining and weakening the footing and stability.
36. M ascribed percentages to the causes of the failure as follows:
Wind loading - %100 of failure
Inadequate shoring and support by builder of neighbour‟s pool – 80%
cause
Stormwater effluent – 20% cause
37. M stated that the consequential damage resulting from the disconnected
stormwater pipe would have been progressive over a period of time relative
to the flow of stormwater effluent undermining the supportive sand
foundation materials. M added that in its opinion, this may occur immediately
or over a period of months relative to the rainfall and stormwater flow.
38. Further, M stated that had the wall been adequately addressed post
excavation works, it is unlikely the wall would have collapsed.
Consideration of the evidence
Damage to wall
39. I have reviewed the policy and note that “Storm” is defined as meanin g
violent weather and high winds, sometimes accompanied by rain, hail or
snow including a cyclone, tornado or willy willy”.
40. I accept that high wind, which M stated was 100% cause of the failure of the
wall, is covered under the policy event of storm.
Case No: 334516 Determination Page 8 of 9
41. However, a question arises as to what was the proximate cause of the
damage to the wall. In determining the proximate cause of the damage, it is
necessary to look at the effective or dominant cause of the damage. I am
satisfied that the proximate cause is determined by a common sense
evaluation of the relevant facts.
42. However, case law also provides that the proximate cause is not determined
by identifying the last event or final trigger, but by determining what is the
dominant or effective or operative cause, whether or not the last in time or
the sole cause.
43. In my view, at the time of the loss, three “causes” were in play; the high wind
loading; the excavation works in 2008 that undermined the foundations of
the wall; the free flowing stormwater effluent that further undermined the
foundations of the wall.
44. The report by M confirmed that had the wall been adequately addressed
after the excavation works were completed in the neighbour‟s property, it is
unlikely that the wall would have collapsed.
45. I note that C, in its report of 9 June 2011, recorded that during the inspection
of the property, the Applicant showed the assessor photographs from 2008,
in which the wall had a “heavy lean”.
46. I further note that the report by AW indicated that in March 2008, the
foundations of the back wall had several large cracks and had dropped
extensively.
47. After considering the matter, I accept that on the balance of probabilities, the
proximate cause for the damage to the wall was the excavation works
conducted by the builder of the neighbour‟s pool in 2008.
48. A review of the policy wording shows that undermining of the foundations as
a result of excavations in the neighbouring property is not an event to which
the policy responds.
49. I note that M attributes 20% of the cause of the failure of the wall to the
stormwater effluent which flowed freely through the Applicants‟ property until
the stormwater pipe was reconnected in 2009.
50. The policy provides cover for damage to the home caused when water
suddenly escapes from the Applicants ‟ (or the Applicants‟ neighbour‟s)
plumbing system, or from the water main or pipe.
51. The evidence is that the water from the neighbours disconnected storm
water pipe, has impacted upon the Applicants ‟ property over a lengthy period
of time.
52. In my view the damage arising from the impact of this water is not damage
from water that has „suddenly‟ escaped, but rather it is damage which is a
result of a gradual process.
Case No: 334516 Determination Page 9 of 9
53. I note that damage as a result of a gradual process is specifically excluded
from coverage under the terms of the policy.
54. However, even if I am mistaken in the view that that water has not suddenly
escaped, I am satisfied that if it were not for the excavation of the ground in
the neighbours‟ property, on the balance of probabilities , the damage to the
Applicants‟ wall would not have occurred.
55. Accordingly, I find that the FSP is entitled to deny liability for the damage to
the Applicants‟ wall.
Damage to pool, paving and laundry shed
56. The Applicants have also stated that their pool and the paving around the
pool has cracked and the laundry shed has dropped.
57. Based on the evidence before me, I accept that these parts of the
Applicants‟ home were within the zone of influence of the 2008 excavations
to the neighbour‟s property.
58. I accept therefore that the proximate cause for the damage to these parts of
the Applicants‟ home was the undermining of the sandy soil foundations
caused by the excavation, for which no cover is provided under the policy.
59. Accordingly, I find that the FSP is entitled to deny liability for the damage to
the Applicants‟ pool, pool paving and laundry shed.
Determination
60. On the basis of the available information I determine that the FSP is entitled
to deny liability for damage to the Applicants‟ home building.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.