Home / Financial Firm (Unknown - Insurer) / Determination 333723

Determination 333723

Extent of storm damage to roof and cash settlement offer

FirmFinancial Firm (Unknown - Insurer)
Decided2014-04-01
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$56,890
SourceAFCA PDF

Summary

The Applicant claimed about $56,890 plus GST to replace his storm-damaged roof and ceiling. AFCA found the storm damage was limited and that the FSP could cash settle $378 after the $500 excess, and made no order against the FSP.

An insurer may rely on policy exclusions for wear and tear and previous unrepaired damage, and may elect to pay the reasonable cost of repair rather than replace the whole roof.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 333723 Determination Page 1 of 3 DETERMINATION INCORPORATING A RECOMMENDATION Case number: 333723 General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim amount 31 March 2014 Summary Description:  This matter concerns a dispute about the extent of damage to the Applicant‟s roof after a storm. Basis for Determination:  The FSP is entitled to offer the amount of $878 (less the policy excess) to the Applicant, as the material provided demonstrates that this represents the extent of storm damage to the roof. Determination:  The FSP is entitled to cash settlement the Applicant‟s claim for $378. Background 1. This disp ute is about the extent of storm damage to the Applicant‟s home and the liability of the FSP for that storm damage. Conclusions in Recommendation 2. The Case Manager provided the parties with a Recommendation on the issues in dispute. The Recommendation was in favour of the FSP. A copy of the Recommendation is attached to this Determination. 3. The FSP accepted the Recommendation but it was not accepted by the Applicant. Determination Case No: 333723 Determination Page 2 of 3 Further submissions 4. After the Recommendation was rejected, the FSP made no further submissions. 5. The Applicant provided no new material and essentially restated his position. He said he had to fix the roof himself which ended up costing him more than the offer made by the FSP. Ombudsman’s consideration 6. I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties, both before and after the Recommendation. I am satisfied that the documentation I have relied on has been provided to both parties. 7. I have carefully considered the Case Manager ‟s Recommendation, together with the Applicant‟s further submissions. 8. I am satisfied that the Case M anager‟s Recommendation contains an accurate summary of the background to this dispute, the parties‟ positions, the issues to be determined, any applicable paragraphs of the Terms of Reference and any relevant law. 9. I agree with the Case M anager‟s reasons for the Recommendation and the recommended outcome. 10. I have also considered what the Applicant contended after the Recommendation but it does not advance his case or affect the outcome and it does not change my view that the Case M anager‟s Recommendation was correct. 11. The Applicant has the onus to establish that the roof was damaged in the storm and that the extent of the damage is $56,890 plus GST as claimed by him. I am satisfied that the roof was damaged in a storm and that the FSP accepts this. However, I am not satisfied that the extent of the damage caused by the storm is as claimed by the Applicant. 12. Rather, I accept that the FSP can rely on its policy exclusions and has satisfied me that on the balance of probabilities the damage to the roof is previous damage that has not been repaired or wear and tear and other deterioration. I am satisfied the roof was damaged in 2007 and that the extent of the damage to the roof on this occasion was very limited. 13. I accept that the roof may cost a substantial amount to repair but the FSP is only obliged to pay for the damage that was caused by an insured event – in this case a storm. The Applicant has merely provided information about the cost of repairs to the whole roof. He has not provided any independent Case No: 333723 Determination Page 3 of 3 information from his repairer or any other expert about the cost of repairs as a result of the storm . 14. Further, the policy allows the FSP to choose to repair the roof or pay the reasonable cost to repair the roof. In the circumstances of this matter where the repairer would not warrant the repairs, I accept that it was fair in all the circumstances that the FSP did not repair the roof but offered a cash settlement of $378, after deducting the excess and that this represents the amount of damage caused by the storm. 15. I note the following relevant policy term about the FSP‟s option to make a cash settlement: “ How we settle your buildings claim We will choose t o settle your claim for loss or damage to your home or „other cover‟ in one of the following ways: 1. Arrange for repairers, builders or suppliers to repair or rebuild your home. ... 2. Pay you the reasonable cost to repair or rebuild your home. ...” Determination 16. I determine in favour of the FSP. Case No: 333723 Recommendation Page 1 of 5 Case number: 333723 General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim Amount – Whether Policy Exclusions Apply 07 February 2014 Background 17. The Applicant holds a Home Building insurance policy with the Financial Services Provider (FSP) for a sum insured of $330,750 and a basic excess of $500. 18. The Applicant lodged a claim under his policy saying the roof of his home suffered storm damage on 19 June 2013. Water penetrated the damaged areas of the roof and caused damage to the interior of the Applicant‟s home. 19. The FSP assessed the damage and concluded only a small portion of the roof had suffered storm related damage. The FSP said the rest of the roof had been poorly maintained and therefore there was no cover for a roof in its condition under the policy. 20. The FSP offered to cash settle the Applicant the amount of $378, after deducting the policy excess of $500. The Applicant has rejected this offer. Instead, he is seeking $56,000 which is the cost to replace the Applicant‟s roof. Summary of Applicant’s p osition 21. The Applicant said his roof tiles were damaged and this allowed water to leak into the home. The Applicant wants the roof repaired. He obtained a quote of $56,000 for the repair work and he wants the FSP‟s builder to repair the roof for that amount. Summary of FSP’ s position 22. The Applicant‟s building policy is a listed events policy. The Applicant does not hold a contents policy with the FSP. 23. The builders who assessed the damage concluded they could not complete the repairs and offer warranty for the work due to the roof‟s overall poor condition. Recommendation Case No: 333723 Recommendation Page 2 of 5 24. As a result, the FSP offered the Applicant a cash settlement of $378 after deducting the policy excess of $500. The FSP says this represents the amount of damage resulting from the storm. 25. The FSP says the roof is exhibiting signs of wear and tear and therefore there is no justification for replacing the entire roof as the Applicant is seeking. 26. The FSP is relying on the following policy provisions: “ Exclusions for all cover These exclusions apply to all cover under your policy. What we don’t cover Loss, damage, injury or death arising from: ► rust, corrosion, gradual deterioration, depreciation, wear or tear … Maintaining and occupying your home We don‟t cover loss, damage, injury or death arising from: ► faulty design or workmanship ► previous damage that has not been repaired … ► you not maintaining your home in good repair and condition. This means your home must be watertight, structurally sound, secure and well maintained …” Issue 27. Whether the FSP‟s offer to settle the Applicant‟s claim is fair in all the circumstances. Reasons for Recommendation 28. I am satisfied there has been a full exchange of information between the parties and each party has had the opportunity to comment on the other‟s submissions. 29. The Applicant lodged a claim with the FSP on 19 June 2013. The FSP‟s file note stated: “Water has come dripping through the ceiling in the bedroom dri pping on to the bed. Possible damage to the roof.” [sic] 30. The FSP arranged for a builder to carry out an inspection of the Applicant‟s damaged property. The builder (“R” from building company “ECR”) attended the property on 20 June 2013 and provided a report which stated: Case No: 333723 Recommendation Page 3 of 5 “I had a roofer attend and the following was found: inspected the roof and I found 2 x freshly broken tiles, unknown cause of the damage, maybe from tree bench as I do not believe it was from foot traffic as it is in an area you would not walk. However I did notice the valley has been replaced in the last year or so which would explain the other areas of damage to bedroom 1 ceiling.” [sic] 31. R indicated the scope of work required was: “ROOF Remove and replace approx 2 x broken tiles BEDROOM 1 Scrape back loose and flaking paint, skimcoat them sand ready for painting x 0.5 sqm Seal stains and prepare and paint ceiling and cornice x 16 sqm Remove trade waste and leave clean.” 32. R estimated the cost of repairs would total $878 and recommended the FSP accept the claim, however R stated: “Cannot warrant the work” 33. R also provided photographs of the roof and front of the house. R indicated ECR could not provide a warranty for any repair work carried out. 34. A FSP file note dated 24 June 2013 indicated an employee from ECR contacted the FSP to ask why the latter had approved the report as ECR had advised it was unable to warrant the work. The FSP staff member stated an assessor had approved the claim, however that employee was unsure as to why and said they would follow up with the assessor. 35. R from ECR also provided comment during the telephone call. He said there was “no way they want this job as the insured needs to lower the ceiling so they would not be able to warrant the repairs”. 36. The file note then indicates the “cash settlement figure would be $878 - $500 excess = $378”. 37. The file note continued with the FSP recording the contents of its telephone call to the Applicant‟s wife later during the day: “I have explained the builder‟s findings and that we are able to cover the tiles to the roof and also the internal repairs. I advised that as the builder cannot warrant the work as there is maintenance work to be completed to the ceiling, we would need to cash settle the repairs.” 38. A subsequent file note indicates the FSP contacted the Applicant to relay an offer of settlement of $378. The file note states the Applicant referred to a quote he had sent to the FSP and said he wanted the FSP‟s builder to complete the repair work. The note further states the FSP advised the Applicant its builder is unable to warrant the repair work and therefore the claim is to be cash settled. Case No: 333723 Recommendation Page 4 of 5 39. The Applicant had obtained a quote from a builder dated 28 June 2013 for a total of $56,890 plus GST. The quote provided for the removing of all the old tiles, all eves, all gutter and fascia, all damaged Gyprock and replacing these with new materials. In addition, the roof was to be restrengthened and a new ceiling installed and painted. New lighting was to be fitted. 40. The FSP attempted to ascertain from the Applicant why the quote was for the replacement of the entire roof. When the FSP eventually managed to make contact with the Applicant (19 July 2013), the FSP said the roof is not covered and the settlement offer is $378, after the deduction of the $500 policy excess. The file note dated 19 July 2013 stated: “The [Applicant] quote is for non storm related damage which isn‟t covered under this claim.” 41. The FSP asked R to provide additional comment on the claim. R‟s email was copied into the FSP‟s file notes dated 30 July 2013: “… I have reviewed my photos from my original inspection and there was quite a bit of existing damage to ceiling prior to event in my opinion it was due for replacement prior to incident that is why I would have recommended cash settlement for this claim plus the peeling paint…” [sic] 42. A further note under that date indicates the FSP employee contacted the Applicant: “… Informed [Applicant] that the damages are pre existing. Also informed him that I found a 2007 claim and photos were taken in the bedroom. Comparing the photos it is evident [from] that the damages that [Applicant] is trying to get covered now actually dates back as far as 2007. [Applicant] said to leave everything. Asked [Applicant] if he would like to proceed with the cash settlement offered so far but [Applicant] said he is going to his solicitors and he doesn‟t want me to touch anything.” [sic] 43. The information provided to the Service indicates the FSP has accepted the Applicant has a valid claim for storm related damage. However, the dispute is about the extent of the damage resulting from the storm. The FSP has assessed this storm damage as being confined to a relatively small area of the roof. 44. A building company provided the Applicant with a quote for a complete roof replacement, commencing with the comment: “Regrading to repair the roof leaking at the above address our company will carry all the necessary repairs as …” The quote then listed the work outlined in paragraph 23 above. 45. There is no explanation why a complete roof replacement is considered necessary. In particular, the Applicant has provided no information which establishes the roof replacement and other repairs are related to storm damage. 46. However, the FSP has obtained an opinion from a builder who examined the damage after the Applicant lodged a claim. He concluded there was only a Case No: 333723 Recommendation Page 5 of 5 small area of the roof relating to storm damage. The builder subsequently added further comment which concluded there was existing damage to the ceiling prior to the event giving rise to the claim. 47. The FSP also referred to an earlier claim in 2007 involving similar damage to the bedroom which the Applicant is currently claiming. 48. The Applicant has not refuted the FSP‟s comments and, as such, I accept the FSP‟s submissions which indicate the storm related damage was limited to the area of the roof as identified by R on 20 June 2013. 49. The FSP‟s assessment provides for a total cost of repairs of $878 with respect to the storm related damage. A $500 policy excess is to be deducted from this total, which means the FSP‟s offer to settle the claim is $378. Recommendation 50. On the basis of the available information I recommend the FSP‟s offer to settle the Applicant‟s claim was fair in all the circumstance s.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.