Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - Service - Delay in claim
handling
Determination
Case No: 333539 Determination Page 1 of 11
Case number : 333 3 539 19 June 2014
1 Overview
1.1 Dispute
The Applicant‟s property was damaged by a storm and mudslide in March 2013
and the subsequent claim was accepted by the Financial Services Provider
(FSP).
the FSP cleaned the property and after several reviews offered to cash
settle $55,263.28 for repairs, noting some of the building issues were
maintenance related.
the Applicant says the FSP failed to clean the building properly and seeks
settlement of over $230,000 for repairs, loss of rent payments and
associated costs.
1.2 Issues and key findings
Did the FSP’s contractor clean the property appropriately after the loss ?
The available evidence indicates the building was not cleared of mud and debris
by the FSP‟s c ontractor.
Accordingly, the FSP will be liable for further cleaning and treatment for mould.
Is the FSP entitled to refuse to cover parts of the building on the basis of
maintenance issues?
The FSP has established that some aspects of the building, including the roof and
ceilings were suffering from pre-existing issues.
However, with the failure to properly clean and dry the property causing further
damage, the FSP has further liability towards repairs.
Is the Applicant entitled to loss of rent payments under the terms and
conditions of the policy?
The policy does not cover loss of rent. Accordingly, the Applicant is not entitled to
be indemnified for any loss of rent that has occurred.
Is the Applicant entitled to costs associated with expert reports and legal
fees?
The Applicant has used the services of a legal expert and a number of contractors
in disputing the FSP‟s decision.
Case No: 333539 Determination Page 2 of 11
The Applicant is entitled to costs totalling $3,000.
Is the Applicant entitled to compensation?
The Applicant is entitled to compensation of $1,500 for non-financial loss.
1.3 Determination
This Determination is partly in favour of the Applicant.
The FSP is liable for the following:
$30,140 for cleaning and treating the property.
$100,000 for repairs, being a further $44,736.72 above the FSP‟s offer of
$55,263.28.
$5,965.30 for replacement of blinds and furnishings
$3,000 for assessments, legal costs and testing.
$1,500 compensation for non-financial loss.
The FSP is also to pay interest at the statutory rate on the $100,000 repair
figure only, from 1 June 2013.
The FSP is not liable for loss of rent or other costs.
On acceptance of this Determination by the Applicant and on payment of these
amounts by the FSP, this will fully discharge the FSP‟s liability w ith respect to the
Applicant‟s claim.
Case No: 333539 Determination Page 3 of 11
2 Reasons for Determination
2.1 Did the FSP’s contractor clean the property appropriately after
the loss?
Mud, debris and mould remain in the building
Despite the FSP appointing „R‟ to clean and dry the property in the w eeks after
the storm and mudslide event, in December 2013, when the Applicant‟s contractor
„BG‟ attended the property , there was still clear evidence of mud and debris in the
building.
BG provides a number of photographs showing mud and debris. BG also
conducted tests and took samples for testing which showed elevated levels of
moisture and „High‟ to „Very High‟ levels of mould concentrations (summary of
BG‟s report at section 3.4 of thi s Determination).
The Applicant‟s builder also reported that there was a bad stench in the property
from the mud and debris.
While it is noted that there is some drainage issues with the sub-floor of the
property, the available evidence clearly indicates that the FSP‟s restorer R , did
not fully clean or dry the property.
The FSP‟s engineer „C‟ stated in an email of 12 March 2014 , that it recommended
adequately drying the sub-floor area in its scope of works in June 2013 and had
this happened further damage may have been prevented.
Further, given the home is estimated to be over 70 years old and in the absence
of any material from the FSP and its experts to indicate the home was not built to
the relevant standards at the time of its construction, the Panel is unable to
consider issues that might lie outside modern day Building Code of Australia
(BCA) requirements, with regards to ventilation.
On the basis of the available evidence, the Panel finds that the building will need
to be cleaned and treated for potentially hazardous mould growth.
The Applicant has provided a quotation from BG for this work.
The Panel notes that there are areas of overlap in the quotes between BG and
RBS, notably “Cost Asbestos Removal” and “Cost of Exterior House Works”
There are p ossibly other areas of overlap such as “Cost of Rubbish and Asbestos
Removal and Disposal” , however, there is insufficient detail to clarify this. In the
absence of any evidence to indicate BG‟s quotation (excluding the first two items
noted above) is not fair and reasonable, the Panel determines the FSP is liable for
these adjusted costs that are $30,140.
Case No: 333539 Determination Page 4 of 11
2.2 Is the FSP entitled to refuse to cover parts of the building on the
basis of maintenance issues
Some of the building issues were not caused by the storm and mudslide
event
The FSP‟s loss adjustor „JL‟ and engineer „C‟ and the Applicant‟s builder „RBS‟ ,
report that the building is suffering from pre -existing maintenance issues and
defects, unrelated to the storm and mudslide event.
Issues identified include:
Rusted roof with sheets that have exceeded their intended life-span.
Staining on the ceiling.
Cracked tiles to kitchen stove.
Timber decay at various wall frames.
Termite damage to timber framing.
15mm gap in the external cladding at the north-west corner.
In the Panel‟s opinion the building was clearly suffering from wear and tear issues
before the storm and mudslide event.
The Product Disclosure Statement (PDS) or policy wording, clearly states that
loss or damage caused by or related to wear and tear or a lack of maintenance is
excluded.
However, the evidence also indicates that the moisture that has remained in the
property has exacerbated the damage.
This leaves the Panel in the difficult position of determining what repairs are now
required due to the long-term moisture that has remained in the property following
R‟s restoration and what damage existed prior to the storm and mudslide event.
The FSP and its engineer C, acknowledge there are elevated moisture levels in
the property. C also reports in an email of 12 March 2014, that the wall cladding
and asbestos had reached its usable life and required replacement prior to the
storm and mudslide event.
However, given the ongoing moisture and debris, the Panel is not persuaded that
the Applicant should be denied cover for some of these building elements,
particularly given that the FSP‟s experts and assessors have provided quotations
for repairs when there appears to be relatively clear evidence the building
required further cleaning and drying, after R had finished its restoration work in
May 2013.
The FSP acknowledges there is ongoing moisture and mould in the building,
however, it makes no further offer of rectification or settlement.
C believes that moisture issues would have been an issue before the event due to
ventilation issues, however, given the building was not properly cleaned and dried
after the event, the Panel is unable to determine to what extent that R‟s failure
has exacerbated the damage.
Case No: 333539 Determination Page 5 of 11
Again, the FSP‟s experts failed to outl ine if the reported defects have always been
an issue (noting the building is reportedly 70 years old) or whether the defects are
only now a BCA consideration, because of code changes after construction.
The Panel notes that the policy specifically covers the upgrade of damaged
building elements to meet current building codes, in certain circumstances.
The Panel accepts that some items including the roof are not repairable under the
claim. However, due to the limited cleaning and drying restoration by the FSP‟s
contractor and the fact its assessors and experts have provided quotations
despite the ongoing debris and moisture, coupled with very limited explanation
and analysis of the BCA issues, the Panel is persuaded the Applicant is entitled to
further indemnity for repairs.
Given the limited detail as to what extent the damage has arisen from the storm
and mudslide event and what was pre-existing the Panel is of the view that each
party should contribute to the total cost of works as quoted by RBS.
The FSP has offered $55,263.28 and the Applicant‟s quote is for $153,360.10,
therefore in the circumstances, the Panel determines that the FSP is to pay the
Applicant $100,000, towards the repair of the property.
The Panel makes this decision in recognising that it is the ongoing moisture
issues at the property which have exacerbated the damage.
The Panel also acknowledges the more significant repairs provided in RBS‟s
quotation will present a substantial upgrade to the property, given some elements
of the building were reportedly in a worn state and therefore an award of the full
quotation would not be a fair outcome in the circumstances.
Finally, it is noted that RBS has included an allowance for „blinds and furnishings‟
which appear to be covered only under th e contents section of the FSP‟s policy,
for which the Applicant did not elect cover. However, whilst the evidence
regarding the damage to the blinds and furnishings is limited, the Panel is
satisfied that it is likely that the blinds and furnishings were damaged due to the
FSP‟s failure to properly rectify the inundation. The FSP is therefore required to
indemnify the Applicant for this loss.
For the sake of completeness, the Panel confirms that any claim the Applicant
may have to contents, which is to be met by the FSP, is limited to the allowance
for blinds and furnishings.
2.3 Is the Applicant entitled to loss of rent payments under the terms
and conditions of the policy?
The policy does not cover loss of rent
The Applicant reports that she rents the building out during the ski season and
due to the loss, she has lost rental income.
The FSP says the policy is for a private building and there is no cover for loss of
rent.
Case No: 333539 Determination Page 6 of 11
The policy is not a landlord product with loss of rent benefits. However, the policy
does cover accommodation costs for a policyholder if they cannot live in their own
home due to a loss from an insured event.
As the policy does not cover loss of rent, the Panel is satisfied that the FSP has
no liability towards any rental loss the Applicant ma y have incurred due to the
event.
2.4 Is the Applicant entitled to costs associated with expert reports
and legal fees
The Applicant is entitled to some costs for assessment reports and testing
The Applicant claims $9,657, for loss adjustor‟s fees, inspection s, microbial
testing, assessment fees and quotations.
The Applicant also claims $2,500, for legal fees.
The Panel accepts some of these costs have been reasonably incurred in the
Applicant bringing the case before FOS, with the reports of BG and the microbial
testing being a significant f actor in the Panel‟s decision.
9.4 of the Terms of Reference under which the Service operates, outlines that
FOS may only award up to $3,000 for costs associated with bringing a claim to
FOS, unless exceptional circumstances apply.
In the Panel‟s view the award of $3,000 for costs , is sufficient in this instance.
2.5 Is the Applicant entitled to compensation?
The Applicant is entitled to some compensation for delays
The building still had moisture and debris when tested in December 2013, being
some months after R had reportedly cleaned and dried the building.
The FSP in its Notice of Response to the Service acknowledged delays had
occurred and apologised for them, however, it offered no compensation in that
regard.
In light of t his fact and the ongoing dispute as to the FSP‟s liability which has
resulted in delays, the Panel is satisfied an award of $1,500 compensation is
payable under 9.3 of the Terms of Reference, on the basis the Applicant has been
inconvenienced and her expectations not met during the carriage of the claim.
3 Supporting information
3.1 Applicant & FSP submissions
The Applicant’s Submissions
The Applicant is legally represented. All references to submissions by the
Applicant and her representative are referred to as those of “the Applicant”.
Case No: 333539 Determination Page 7 of 11
The Applicant says the building was damaged by the ins ured events of
storm and flood.
The FSP did not clean and dry the building until 53 days after the event,
resulting in further damage.
The building still has elevated moisture issues and potentially hazardous
mould growth due to the FSP‟s failure to clean the property to the required
standard.
Her restoration quotation (BG) and repair quotation (RBS) are for work
required as the result of the flood event and not for pre-existing issues.
The Applicant claims the following costs:
$209,334.55 cleaning, restoration and repairs. (note this figure
appears to include an incorrect GST addition for the
restoration works) .
$5,000 + loss of rent.
$7,000 emotional stress.
$6,225 loss adjustor‟s fees.
$2,420 inspections, sampling and mycologist testing.
$1,012 assessment fee of RBS.
$2,500 legal fees.
Interest at the statutory rate from 1 June 2013.
The FSP’s Submissions
The FSP says it assessed the claim in a timely manner and noted pre-
existing maintenance issues at the first assessment.
It appointed an engineer to assess the extent of loss from the flood event.
Under the policy it is not liable for pre -existing maintenance issues.
The Applicant had an onus under the policy to maintain the home.
After the Applicant raised issues with its first offer it reassessed the claim
and made a final offer of $55,263.28 (inclusive of $1,900 for soil removal)
and this remains open to the Applicant.
The policy is for a private residence and does not cover loss of rent.
It believes the claim has been correctly assessed and its offer meets its
liability to the Applicant under the policy.
3.2 Relevant terms and conditions of the policy
“ Your responsibilities (page 14)
You must:
Keep the building well maintained and in good condition…”
“ Additional features (page 26)
…
Other Repair/Rebuilding Costs
We cover
…
To make the damaged parts of the building comply with the current home
building regulations and laws”
Case No: 333539 Determination Page 8 of 11
What we do not cover – general exclusions cont’d (page 36)
You are not covered under any section of your policy for damage, loss, cost or legal
liability that is caused by, arises from or involves:
…
Wear, tear and gradual deterioration
Wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot, action of light or
gradual deterioration such as, but not limited to:
tiles and their adhesive or grouting breaking down;
weathering of roof tiles or roof ridge capping;
gradual weathering and breakdown of bricks, mortar or concrete.”
3.3 Timeline
Timeline Key points
22 March 2013 Applicant lodges claim
2 April 2013 FSP‟s building consultant „JL‟ provides an interim report to
FSP estimating repairs at $35,193.93.
FSP appoints restoration company, „R‟ to clean and dry the
property.
18 April 2013 R attends property and begins cleanup and drying of
property.
14 May 2013 R reports the cleanup is completed and mould treatment to
property will begin.
4 June 2013 Engineer „C‟ is appointed by FSP to provide report on the
building and damage.
June 2013 FSP receives report from engineer „C‟ and requests
quotations for repair.
August 2013 Dispute lodged with FOS.
21 & 22 August 2013 FSP accepts JL‟s repair quotation and offers cash
settlement of $38,442.71 to the Applicant.
2 September 2013 FSP receives Applicant‟s quotation of $134,800 for repairs
from builder „CBB‟.
September 2013 FSP‟s assessor and builder reassess building and on the
basis of a revised quotation, the FSP offers the Applicant a
cash settlement of $55,263.28 (including $1,900 for soil
removal).
3.4 Expert reports and evidence
Case No: 333539 Determination Page 9 of 11
Expert Key points
FSP building
consultant ( JL )
First assessment
22 March 2013
Heavy rain caused flood and debris to inundate the
building.
Rain also entered through the roof.
Possible maintenance issues include staining of the ceiling
lining in several areas which appears relatively old,
deflection in the ceiling framework in the laundry, crac ked
hearth tiles to kitchen stove, front corrugated iron roofing is
rusty ( as observed from the ground).
Home approximately 70 years old.
Initial repair estimate $35,193.93.
Attached photographs reveal water still pooling in building
.
FSP’s engineer ( C )
13 June 2013
Property inspected on 11 June 2013.
The western rear section of the building has suffered the
most severe flood damage (report refers to this section as
both the east and west section).
Areas of the building suffer from long - term lack of
mai nten ance.
The internal wall frame was still dirty and the base of
various sections was still saturated with flood water.
Advanced timber decay was found to the base of
numerous wall frames, which is a long - term issue and was
not caused by the recent flood.
Sections of the bottom plate had deteriorated to the point
that it was completely void.
There was extensive timber dec ay to the wall frame of the
north wall of the laundry.
There was a 15mm gap in the external cladding at the
north - west corner which allows stormwater to enter. The
gap is caused by the faulty installation of the external
cladding.
A section of the kitchen ceiling is water damaged.
The roof was inspected and extensively corroded metal
roof cladding was found. The roof sheets have exceeded
their intended life span.
A number of fasteners that secure the cladding to the roof
frame are missing.
It appears stor mwater has been entering the roof space for
a long period of time due to maintenance issues.
The kitchen cupboards and skirtings were damaged by the
flood.
A limited inspection of the sub - floor revealed the soil and
timbers were still saturated.
The finished ground level below the building is lower than
the external perimeter ground level allowing water to pond
below the building. The BCA requires the ground below
suspended floors to be graded above the surrounding
external ground to prevent water poo ling under buildings.
The sub - floor has no ventilati on, as required under the
Case No: 333539 Determination Page 10 of 11
BCA.
Water inundation to the sub - floor has been a long term
issue and timber decay is not limited to the flood event.
Due to the age of the building, asbestos products are likel y
to be present.
Conclusions
To clean all dirt and debris from the rear of the building, all
wall linings at the rear will need to be replaced.
The internal face of the external cladding will require
cleaning to a height of 300mm and cladding is likely t o
contain asbestos products.
Sections of the wall frame throughout the building are
suffering from delay unrelated to the flood event and will
require replacement.
Water damage to ceilings has been caused by a lack of
maintenance and will continue if cladd ing is not replaced.
Soil below the building remains saturated and foundation
movement may occur over the next year. Floor should be
re - levelled at the completion of the one year drying period.
If 50% of the volume of a building has been damaged, the
current BCA requires statutory upgrades for the energy
and bushfire attack rating. C believes this should not be
required in this instance.
The report includes a detailed Scope of Works.
FSP’s assessment (DG)
5 September 2013
Additional items to cover i nclude ceiling in kitchen, floor in
dining room, cladding to lounge wall, laundry ceiling,
$1,900 allowance to remove external soil on site.
30mm gap to front door architrave and rotten exterior wall
plates not covered as these are pre - existing issues.
Applicant’s restoration
company (BG)
17 December 2013
Mud and debris has made its way into the wall cavities and
beneath the cabinetry of the lower level and into the sub -
floor area of the buildings upper level.
While some cleaning has been undertaken mud and debris
still remains in the above areas.
Visible micro - contamination was noted.
Moisture readings indicate there are unacceptably high
levels of moisture in the sub - floor timber framing, the base
of timber framing and timber flooring and the areas hav e
been provided nil ventilation and no means of adequately
drying since the event.
Pre - existing issues with the building include rot at the base
of the lower level external timber framing, termite damage
to timber framing, external finished ground level i s the
same height as lower level concrete floor which does not
comply with current building codes and “check outs” made
to exposed sections of Bedroom 2 south timber wall
framing exceed maximum allowances which is
compromising the wall‟s structural integri ty.
Case No: 333539 Determination Page 11 of 11
Applicant’s restoration
company (BG)
24 December 2013
Microbial testing reveal there is „High‟ to „Very High‟ mould
concentrations in the building, indicating there is active
mould growth in the building which constitutes a potential
health hazard.
Microbial remediation works should be conducted at the
property.
BG quotes $56,441 (including GST) to clean the property,
remove debris including asbestos and address mould
issue.
Applicant’s builder
(RBS) quotation
28 January 2014
RBS quotes $153,360.10 for building works, including new
flooring, plastering, new kitchen, tiling an d replacing
external cladding.
Applicant’s insurance
investigation report
(IDI)
6 February 2014
The quotation from RBS of $153,360.10 does not cover
items deemed to be pre - existing issues.
FSP engineer
comments (C)
12 March 2014 (email)
In response to the Applicant‟s quotation for removal of mud
and debris, when C originally inspected the property
access to the sub - floor was not available and further
cleaning is requ ired.
Had further drying been completed as recommended,
further damage may not have occurred.
The building has sub - floor ventilation defects that
contravene the BCA and this has caused previous damage
and has contributed towards the inadequate drying.
In response to the Applicant‟s repair quotation of
$153,360.10 (RBS), C is of the opinion that this far
exceeds the work reasonably required and had the sub -
floor ventilation been addressed, the timber floors would
only require sanding and a re - polish.
The kitchen does not require full replacement.
The external cladding required repla cement before the
flood event.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.