Home / Financial Firm (Unknown - Insurer) / Determination 333539

Determination 333539

Delay in claim handling

FirmFinancial Firm (Unknown - Insurer)
Decided2014-06-25
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$139,105
Non-financial loss$1,500
Amount claimed$233,492
SourceAFCA PDF

Summary

Owner claimed for storm and mudslide damage to a home after the insurer's restorer failed to fully clean and dry the property, leading to mould and further damage. AFCA found the insurer liable for further cleaning, repairs and blinds and furnishings, but rejected the loss of rent claim.

The insurer's restorer did not properly clean or dry the property, so further damage flowed from the insurer's failure, though pre-existing maintenance defects were shared between the parties.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationpay interestpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - Service - Delay in claim handling Determination Case No: 333539 Determination Page 1 of 11 Case number : 333 3 539 19 June 2014 1 Overview 1.1 Dispute The Applicant‟s property was damaged by a storm and mudslide in March 2013 and the subsequent claim was accepted by the Financial Services Provider (FSP).  the FSP cleaned the property and after several reviews offered to cash settle $55,263.28 for repairs, noting some of the building issues were maintenance related.  the Applicant says the FSP failed to clean the building properly and seeks settlement of over $230,000 for repairs, loss of rent payments and associated costs. 1.2 Issues and key findings Did the FSP’s contractor clean the property appropriately after the loss ? The available evidence indicates the building was not cleared of mud and debris by the FSP‟s c ontractor. Accordingly, the FSP will be liable for further cleaning and treatment for mould. Is the FSP entitled to refuse to cover parts of the building on the basis of maintenance issues? The FSP has established that some aspects of the building, including the roof and ceilings were suffering from pre-existing issues. However, with the failure to properly clean and dry the property causing further damage, the FSP has further liability towards repairs. Is the Applicant entitled to loss of rent payments under the terms and conditions of the policy? The policy does not cover loss of rent. Accordingly, the Applicant is not entitled to be indemnified for any loss of rent that has occurred. Is the Applicant entitled to costs associated with expert reports and legal fees? The Applicant has used the services of a legal expert and a number of contractors in disputing the FSP‟s decision. Case No: 333539 Determination Page 2 of 11 The Applicant is entitled to costs totalling $3,000. Is the Applicant entitled to compensation? The Applicant is entitled to compensation of $1,500 for non-financial loss. 1.3 Determination This Determination is partly in favour of the Applicant. The FSP is liable for the following:  $30,140 for cleaning and treating the property.  $100,000 for repairs, being a further $44,736.72 above the FSP‟s offer of $55,263.28.  $5,965.30 for replacement of blinds and furnishings  $3,000 for assessments, legal costs and testing.  $1,500 compensation for non-financial loss. The FSP is also to pay interest at the statutory rate on the $100,000 repair figure only, from 1 June 2013. The FSP is not liable for loss of rent or other costs. On acceptance of this Determination by the Applicant and on payment of these amounts by the FSP, this will fully discharge the FSP‟s liability w ith respect to the Applicant‟s claim. Case No: 333539 Determination Page 3 of 11 2 Reasons for Determination 2.1 Did the FSP’s contractor clean the property appropriately after the loss? Mud, debris and mould remain in the building Despite the FSP appointing „R‟ to clean and dry the property in the w eeks after the storm and mudslide event, in December 2013, when the Applicant‟s contractor „BG‟ attended the property , there was still clear evidence of mud and debris in the building. BG provides a number of photographs showing mud and debris. BG also conducted tests and took samples for testing which showed elevated levels of moisture and „High‟ to „Very High‟ levels of mould concentrations (summary of BG‟s report at section 3.4 of thi s Determination). The Applicant‟s builder also reported that there was a bad stench in the property from the mud and debris. While it is noted that there is some drainage issues with the sub-floor of the property, the available evidence clearly indicates that the FSP‟s restorer R , did not fully clean or dry the property. The FSP‟s engineer „C‟ stated in an email of 12 March 2014 , that it recommended adequately drying the sub-floor area in its scope of works in June 2013 and had this happened further damage may have been prevented. Further, given the home is estimated to be over 70 years old and in the absence of any material from the FSP and its experts to indicate the home was not built to the relevant standards at the time of its construction, the Panel is unable to consider issues that might lie outside modern day Building Code of Australia (BCA) requirements, with regards to ventilation. On the basis of the available evidence, the Panel finds that the building will need to be cleaned and treated for potentially hazardous mould growth. The Applicant has provided a quotation from BG for this work. The Panel notes that there are areas of overlap in the quotes between BG and RBS, notably “Cost Asbestos Removal” and “Cost of Exterior House Works” There are p ossibly other areas of overlap such as “Cost of Rubbish and Asbestos Removal and Disposal” , however, there is insufficient detail to clarify this. In the absence of any evidence to indicate BG‟s quotation (excluding the first two items noted above) is not fair and reasonable, the Panel determines the FSP is liable for these adjusted costs that are $30,140. Case No: 333539 Determination Page 4 of 11 2.2 Is the FSP entitled to refuse to cover parts of the building on the basis of maintenance issues Some of the building issues were not caused by the storm and mudslide event The FSP‟s loss adjustor „JL‟ and engineer „C‟ and the Applicant‟s builder „RBS‟ , report that the building is suffering from pre -existing maintenance issues and defects, unrelated to the storm and mudslide event. Issues identified include:  Rusted roof with sheets that have exceeded their intended life-span.  Staining on the ceiling.  Cracked tiles to kitchen stove.  Timber decay at various wall frames.  Termite damage to timber framing.  15mm gap in the external cladding at the north-west corner. In the Panel‟s opinion the building was clearly suffering from wear and tear issues before the storm and mudslide event. The Product Disclosure Statement (PDS) or policy wording, clearly states that loss or damage caused by or related to wear and tear or a lack of maintenance is excluded. However, the evidence also indicates that the moisture that has remained in the property has exacerbated the damage. This leaves the Panel in the difficult position of determining what repairs are now required due to the long-term moisture that has remained in the property following R‟s restoration and what damage existed prior to the storm and mudslide event. The FSP and its engineer C, acknowledge there are elevated moisture levels in the property. C also reports in an email of 12 March 2014, that the wall cladding and asbestos had reached its usable life and required replacement prior to the storm and mudslide event. However, given the ongoing moisture and debris, the Panel is not persuaded that the Applicant should be denied cover for some of these building elements, particularly given that the FSP‟s experts and assessors have provided quotations for repairs when there appears to be relatively clear evidence the building required further cleaning and drying, after R had finished its restoration work in May 2013. The FSP acknowledges there is ongoing moisture and mould in the building, however, it makes no further offer of rectification or settlement. C believes that moisture issues would have been an issue before the event due to ventilation issues, however, given the building was not properly cleaned and dried after the event, the Panel is unable to determine to what extent that R‟s failure has exacerbated the damage. Case No: 333539 Determination Page 5 of 11 Again, the FSP‟s experts failed to outl ine if the reported defects have always been an issue (noting the building is reportedly 70 years old) or whether the defects are only now a BCA consideration, because of code changes after construction. The Panel notes that the policy specifically covers the upgrade of damaged building elements to meet current building codes, in certain circumstances. The Panel accepts that some items including the roof are not repairable under the claim. However, due to the limited cleaning and drying restoration by the FSP‟s contractor and the fact its assessors and experts have provided quotations despite the ongoing debris and moisture, coupled with very limited explanation and analysis of the BCA issues, the Panel is persuaded the Applicant is entitled to further indemnity for repairs. Given the limited detail as to what extent the damage has arisen from the storm and mudslide event and what was pre-existing the Panel is of the view that each party should contribute to the total cost of works as quoted by RBS. The FSP has offered $55,263.28 and the Applicant‟s quote is for $153,360.10, therefore in the circumstances, the Panel determines that the FSP is to pay the Applicant $100,000, towards the repair of the property. The Panel makes this decision in recognising that it is the ongoing moisture issues at the property which have exacerbated the damage. The Panel also acknowledges the more significant repairs provided in RBS‟s quotation will present a substantial upgrade to the property, given some elements of the building were reportedly in a worn state and therefore an award of the full quotation would not be a fair outcome in the circumstances. Finally, it is noted that RBS has included an allowance for „blinds and furnishings‟ which appear to be covered only under th e contents section of the FSP‟s policy, for which the Applicant did not elect cover. However, whilst the evidence regarding the damage to the blinds and furnishings is limited, the Panel is satisfied that it is likely that the blinds and furnishings were damaged due to the FSP‟s failure to properly rectify the inundation. The FSP is therefore required to indemnify the Applicant for this loss. For the sake of completeness, the Panel confirms that any claim the Applicant may have to contents, which is to be met by the FSP, is limited to the allowance for blinds and furnishings. 2.3 Is the Applicant entitled to loss of rent payments under the terms and conditions of the policy? The policy does not cover loss of rent The Applicant reports that she rents the building out during the ski season and due to the loss, she has lost rental income. The FSP says the policy is for a private building and there is no cover for loss of rent. Case No: 333539 Determination Page 6 of 11 The policy is not a landlord product with loss of rent benefits. However, the policy does cover accommodation costs for a policyholder if they cannot live in their own home due to a loss from an insured event. As the policy does not cover loss of rent, the Panel is satisfied that the FSP has no liability towards any rental loss the Applicant ma y have incurred due to the event. 2.4 Is the Applicant entitled to costs associated with expert reports and legal fees The Applicant is entitled to some costs for assessment reports and testing The Applicant claims $9,657, for loss adjustor‟s fees, inspection s, microbial testing, assessment fees and quotations. The Applicant also claims $2,500, for legal fees. The Panel accepts some of these costs have been reasonably incurred in the Applicant bringing the case before FOS, with the reports of BG and the microbial testing being a significant f actor in the Panel‟s decision. 9.4 of the Terms of Reference under which the Service operates, outlines that FOS may only award up to $3,000 for costs associated with bringing a claim to FOS, unless exceptional circumstances apply. In the Panel‟s view the award of $3,000 for costs , is sufficient in this instance. 2.5 Is the Applicant entitled to compensation? The Applicant is entitled to some compensation for delays The building still had moisture and debris when tested in December 2013, being some months after R had reportedly cleaned and dried the building. The FSP in its Notice of Response to the Service acknowledged delays had occurred and apologised for them, however, it offered no compensation in that regard. In light of t his fact and the ongoing dispute as to the FSP‟s liability which has resulted in delays, the Panel is satisfied an award of $1,500 compensation is payable under 9.3 of the Terms of Reference, on the basis the Applicant has been inconvenienced and her expectations not met during the carriage of the claim. 3 Supporting information 3.1 Applicant & FSP submissions The Applicant’s Submissions The Applicant is legally represented. All references to submissions by the Applicant and her representative are referred to as those of “the Applicant”. Case No: 333539 Determination Page 7 of 11  The Applicant says the building was damaged by the ins ured events of storm and flood.  The FSP did not clean and dry the building until 53 days after the event, resulting in further damage.  The building still has elevated moisture issues and potentially hazardous mould growth due to the FSP‟s failure to clean the property to the required standard.  Her restoration quotation (BG) and repair quotation (RBS) are for work required as the result of the flood event and not for pre-existing issues.  The Applicant claims the following costs:  $209,334.55 cleaning, restoration and repairs. (note this figure appears to include an incorrect GST addition for the restoration works) .  $5,000 + loss of rent.  $7,000 emotional stress.  $6,225 loss adjustor‟s fees.  $2,420 inspections, sampling and mycologist testing.  $1,012 assessment fee of RBS.  $2,500 legal fees.  Interest at the statutory rate from 1 June 2013. The FSP’s Submissions  The FSP says it assessed the claim in a timely manner and noted pre- existing maintenance issues at the first assessment.  It appointed an engineer to assess the extent of loss from the flood event.  Under the policy it is not liable for pre -existing maintenance issues.  The Applicant had an onus under the policy to maintain the home.  After the Applicant raised issues with its first offer it reassessed the claim and made a final offer of $55,263.28 (inclusive of $1,900 for soil removal) and this remains open to the Applicant.  The policy is for a private residence and does not cover loss of rent.  It believes the claim has been correctly assessed and its offer meets its liability to the Applicant under the policy. 3.2 Relevant terms and conditions of the policy “ Your responsibilities (page 14) You must:  Keep the building well maintained and in good condition…” “ Additional features (page 26) … Other Repair/Rebuilding Costs We cover …  To make the damaged parts of the building comply with the current home building regulations and laws” Case No: 333539 Determination Page 8 of 11 What we do not cover – general exclusions cont’d (page 36) You are not covered under any section of your policy for damage, loss, cost or legal liability that is caused by, arises from or involves: … Wear, tear and gradual deterioration Wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot, action of light or gradual deterioration such as, but not limited to:  tiles and their adhesive or grouting breaking down;  weathering of roof tiles or roof ridge capping;  gradual weathering and breakdown of bricks, mortar or concrete.” 3.3 Timeline Timeline Key points 22 March 2013  Applicant lodges claim 2 April 2013  FSP‟s building consultant „JL‟ provides an interim report to FSP estimating repairs at $35,193.93.  FSP appoints restoration company, „R‟ to clean and dry the property. 18 April 2013  R attends property and begins cleanup and drying of property. 14 May 2013  R reports the cleanup is completed and mould treatment to property will begin. 4 June 2013  Engineer „C‟ is appointed by FSP to provide report on the building and damage. June 2013  FSP receives report from engineer „C‟ and requests quotations for repair. August 2013  Dispute lodged with FOS. 21 & 22 August 2013  FSP accepts JL‟s repair quotation and offers cash settlement of $38,442.71 to the Applicant. 2 September 2013  FSP receives Applicant‟s quotation of $134,800 for repairs from builder „CBB‟. September 2013  FSP‟s assessor and builder reassess building and on the basis of a revised quotation, the FSP offers the Applicant a cash settlement of $55,263.28 (including $1,900 for soil removal). 3.4 Expert reports and evidence Case No: 333539 Determination Page 9 of 11 Expert Key points FSP building consultant ( JL ) First assessment 22 March 2013  Heavy rain caused flood and debris to inundate the building.  Rain also entered through the roof.  Possible maintenance issues include staining of the ceiling lining in several areas which appears relatively old, deflection in the ceiling framework in the laundry, crac ked hearth tiles to kitchen stove, front corrugated iron roofing is rusty ( as observed from the ground).  Home approximately 70 years old.  Initial repair estimate $35,193.93.  Attached photographs reveal water still pooling in building . FSP’s engineer ( C ) 13 June 2013  Property inspected on 11 June 2013.  The western rear section of the building has suffered the most severe flood damage (report refers to this section as both the east and west section).  Areas of the building suffer from long - term lack of mai nten ance.  The internal wall frame was still dirty and the base of various sections was still saturated with flood water.  Advanced timber decay was found to the base of numerous wall frames, which is a long - term issue and was not caused by the recent flood.  Sections of the bottom plate had deteriorated to the point that it was completely void.  There was extensive timber dec ay to the wall frame of the north wall of the laundry.  There was a 15mm gap in the external cladding at the north - west corner which allows stormwater to enter. The gap is caused by the faulty installation of the external cladding.  A section of the kitchen ceiling is water damaged.  The roof was inspected and extensively corroded metal roof cladding was found. The roof sheets have exceeded their intended life span.  A number of fasteners that secure the cladding to the roof frame are missing.  It appears stor mwater has been entering the roof space for a long period of time due to maintenance issues.  The kitchen cupboards and skirtings were damaged by the flood.  A limited inspection of the sub - floor revealed the soil and timbers were still saturated.  The finished ground level below the building is lower than the external perimeter ground level allowing water to pond below the building. The BCA requires the ground below suspended floors to be graded above the surrounding external ground to prevent water poo ling under buildings.  The sub - floor has no ventilati on, as required under the Case No: 333539 Determination Page 10 of 11 BCA.  Water inundation to the sub - floor has been a long term issue and timber decay is not limited to the flood event.  Due to the age of the building, asbestos products are likel y to be present. Conclusions  To clean all dirt and debris from the rear of the building, all wall linings at the rear will need to be replaced.  The internal face of the external cladding will require cleaning to a height of 300mm and cladding is likely t o contain asbestos products.  Sections of the wall frame throughout the building are suffering from delay unrelated to the flood event and will require replacement.  Water damage to ceilings has been caused by a lack of maintenance and will continue if cladd ing is not replaced.  Soil below the building remains saturated and foundation movement may occur over the next year. Floor should be re - levelled at the completion of the one year drying period.  If 50% of the volume of a building has been damaged, the current BCA requires statutory upgrades for the energy and bushfire attack rating. C believes this should not be required in this instance.  The report includes a detailed Scope of Works. FSP’s assessment (DG) 5 September 2013  Additional items to cover i nclude ceiling in kitchen, floor in dining room, cladding to lounge wall, laundry ceiling, $1,900 allowance to remove external soil on site.  30mm gap to front door architrave and rotten exterior wall plates not covered as these are pre - existing issues. Applicant’s restoration company (BG) 17 December 2013  Mud and debris has made its way into the wall cavities and beneath the cabinetry of the lower level and into the sub - floor area of the buildings upper level.  While some cleaning has been undertaken mud and debris still remains in the above areas.  Visible micro - contamination was noted.  Moisture readings indicate there are unacceptably high levels of moisture in the sub - floor timber framing, the base of timber framing and timber flooring and the areas hav e been provided nil ventilation and no means of adequately drying since the event.  Pre - existing issues with the building include rot at the base of the lower level external timber framing, termite damage to timber framing, external finished ground level i s the same height as lower level concrete floor which does not comply with current building codes and “check outs” made to exposed sections of Bedroom 2 south timber wall framing exceed maximum allowances which is compromising the wall‟s structural integri ty. Case No: 333539 Determination Page 11 of 11 Applicant’s restoration company (BG) 24 December 2013  Microbial testing reveal there is „High‟ to „Very High‟ mould concentrations in the building, indicating there is active mould growth in the building which constitutes a potential health hazard.  Microbial remediation works should be conducted at the property.  BG quotes $56,441 (including GST) to clean the property, remove debris including asbestos and address mould issue. Applicant’s builder (RBS) quotation 28 January 2014  RBS quotes $153,360.10 for building works, including new flooring, plastering, new kitchen, tiling an d replacing external cladding. Applicant’s insurance investigation report (IDI) 6 February 2014  The quotation from RBS of $153,360.10 does not cover items deemed to be pre - existing issues. FSP engineer comments (C) 12 March 2014 (email)  In response to the Applicant‟s quotation for removal of mud and debris, when C originally inspected the property access to the sub - floor was not available and further cleaning is requ ired.  Had further drying been completed as recommended, further damage may not have occurred.  The building has sub - floor ventilation defects that contravene the BCA and this has caused previous damage and has contributed towards the inadequate drying.  In response to the Applicant‟s repair quotation of $153,360.10 (RBS), C is of the opinion that this far exceeds the work reasonably required and had the sub - floor ventilation been addressed, the timber floors would only require sanding and a re - polish.  The kitchen does not require full replacement.  The external cladding required repla cement before the flood event.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.