Text of the determination
Case No: 333326 Determination Page 1 of 8
Case number: 333326
General Insurance - Small Business/Farm Insurance - Commercial Property -
FSP Decision - Partial Denial of Claim - Inundation Damage
26 May 2014
Summary
Description
A claim under a Business Insurance Policy for damage to the building
following the significant weather event.
Basis of Determination
A consideration of the coverage provided by the policy and the
evidence regarding the loss suffered by the Applicant.
Determination
On the basis of the available information, the Panel determines that the
FSP should attend to the repair of the insured building in accordance
with the scope of works prepared by JD as dated 12 May 2013, subject
to certain excluded items. Noting that the FSP has paid a partial
settlement sum to the Applicant, this amount should be refunded or
contributed to JD‟s repair invoice by the Applicant.
If any part of the Applicant‟s claim is to be cash settled, then the FSP is
to pay interest, in accordance with the Insurance Contracts Act 1984,
on the additional payment, from the date of denial of the claim, to the
date of settlement.
Background
1. The Applicant held a business insurance policy for his office building with the
Financial Services Provider (FSP).
2. On or about 5 March 2012, the insured building was inundated with water as
a result of a significant weather event. He lodged a claim.
3. Whilst initially denying indemnity citing the policy‟s flood exclusion, the FSP
ultimately agreed to cover the Applicant for his loss pursuant to clause 4 of
its Fire and Perils policy coverage, namely „Storm, tempest, rainwater, snow,
sleet, wind, hail‟ a nd in particular characterised the inundation as storm
Determination
Case No: 333326 Determination Page 2 of 8
water runoff; but it limited the scope of this cover to damage it considered
was caused by this event and paid him $11,572.73.
4. The Applicant, however, considers that there was about $50,000 worth of
damage to his property attributable to the inundation and seeks indemnity for
the subfloor and piers of his building, which the FSP has declined to cover.
Summary of Applicant’s position
5. The Applicant says that the building was extensively damaged as a result of
water inundation and considers that the subfloor and the piers of his building
were extensively damaged as a result of the event. He seeks cover for this
loss as part of the claim.
Summary of FSP’s position
6. The FSP says that it has assessed and determined the extent of damage
caused by the inundation event. Based on the reports compiled, it has
settled the Applicant accordingly.
7. It is not obliged to cover the Applicant for damage that pre-dated or was not
related to the specific event claimed for.
8. The policy extends cover to “Fire and Perils” (which includes storm related
claims) and it is under this section of the policy that the Applicant has been
covered. Whilst the policy does cover accidental damage, this is only on the
basis that the “Fire and Perils” provision has not been enlivened.
Accordingly, the onus now rests with the Applicant of proving that the
additional damage claimed arises from the insured peril.
9. The nature of the damage to the base and under the base of the building
was not caused by the insured event and in any event, the policy exclusion
relating to „movement of earth‟ applies.
10. The FSP relies on the following policy provisions:
Pages 12-14 of the Product Disclosure Statement (PDS)
“ Accidental Damage means Damage to Property Insured but does not
include Damage,
(a) caused by, or as a consequence of:
i. Fire and Perils. Anything that is specifically excluded under Fire and
Perils is also excluded from this cover.
...
(8) erosion, subsidence, landslide, collapse or any other movement of
earth.
(13) inherent defect, inherent vice, latent defect, or disease.
...
Case No: 333326 Determination Page 3 of 8
(16) moths, termites, other insects, vermin, rust or oxidation, mould,
mildew, fungus, wet or dry rot, corrosion, change of colour,
dampness, variations in temperature, evaporation, change in
flavour, texture or finish, or stain or smoke from industrial
operations.
...
(18) wear and tear, fading, scratching or marring, gradual deterioration,
developing flaws, normal upkeeping or making good.
...
(20) normal settling, seepage, shrinkage or expansion in Buildings or
foundations, walls, pavements, roads, and other structural
improvements, creeping, heaving, vibration.
...
Fire and Perils means,
...
4. storm, tempest, rainwater, snow, sleet, wind, hail but not Damage
caused:
...
(e) by erosion, subsidence, landslide, collapse or any other
movement of earth.
(f) by or resulting from water seeping, percolating or otherwise
penetrating into the Buildings as a result of structural defects,
faulty design or faulty workmanship in the construction.
... ”
Issue
11. Whether the extent of damage covered by the FSP for the claim was
appropriate in the circumstances.
Reasons for decision
12. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the nature and complexity of the matter. This
dispute has not been the subject of a FOS Recommendation and has
proceeded directly to Determination.
13. This decision has been made by a Panel consisting of an Ombudsman and
two representatives with extensive experience in insurance and consumer
claims.
14. A full exchange of the relevant information has taken place between the
respective parties and each party has had the opportunity of addressing any
issues raised.
Case No: 333326 Determination Page 4 of 8
15. It is not in dispute that:
The Applicant has a claim under the policy;
The policy specifies that the Accidental Damage clause relates to
damage that is not covered under some other aspects of the policy
(including Fire and Perils, which is relevant to the Applicant‟s loss as
this extends to storm damage as well). On this basis, the loss is
properly classified under “Fire and Perils” and not “Accidental
Damage”;
The FSP has agreed to cover damage valued at $12,730 (inclusive of
GST), for which the Applicant has been settled the GST-exclusive
amount; and
The Applicant‟s business entity is registered for GST purposes and
eligible for an Imputation Tax Credit (ITC) rebate. Therefore the FSP is
entitled to settle any claim net of GST as the Applicant will be eligible to
obtain a Government refund at a later date.
16. The primary issue of contention between the parties is an expert report from
“XP” on behalf of the FSP. XP is an engineer w ho was retained to review the
damage and to comment on the extent of what was event related and what
was not.
17. The Applicant has indicated that he is prepared to accept $50,000 to repair
the building, though this differs markedly from the FSP‟s payment for
$11,572.73. The primary reason for this difference is the relevant weight to
be attributed to the opinion of the FSP‟s engineering expert.
18. XP‟s report of 19 February 2013, suggested that numerous areas of the
building had damage that was not related to the insured event. These
included:
cracks to various walls in the building;
moisture damage along the western wall consistent with “long term
rising damp”;
dampness damage to the northern wall considered “long term
damage”;
evidence of previous repairs to the brickwork on the eastern wall, due
to moisture and dampness adjacent to the entrance steps; and
pre-existing damage in the storeroom, dampness in the walls and
external wall rising damp, all of which is not related to the event.
19. XP concluded that:
“The b uilding has the subfloor flooded during the March 2012 storms. This
has had very little effect on the building and has not caused any particular
structural movement or damage.
There are some silt stains in the outer buildings however flood waters did not
enter the main post office floor. The bubbling paint around the lower wall of
Case No: 333326 Determination Page 5 of 8
the main building is not considered to be due to a one off event and is due
however to long term rising damp and takes many years to develop.
The floor is in good condition and has not been damaged by the flood. There
is some slight mould under and in the subfloor area that can be seen from the
manhole and this is recommended to be treated however the floor is not to be
removed. The floor or the floor coverings are not required to be removed.
There is some minor new cracking in the front part of the building in the
narrow PO Box area and all that is required to fix this is to repaint this area.
All other significant cracking is considered to be pre-existing as noted in the
report...”
20. It is cle ar from XP‟s report that the expert considers that there is significant
damage to the building that is not related to the reported event.
21. The Applicant disagrees with the conclusions reached by XP. He relies upon
a submitted scope of works and two reports from “JD”, to attest to the extent
of damage present to the building.
22. JD provided an initial quote dated 12 November 2012, to repair the damaged
areas, valued at $67,500. The quote noted the likely presence of asbestos in
the building, although suggested that it might not need to be disturbed as
part of the repair work to be done. The original quote noted:
“Consideration has been taken that some piers may need to be replaced due
to damaged bricks from excessive existing moisture.”
23. Whilst not specifically commenting on the cause of this moisture damage, it
might be inferred that this damage was pre-existing. No comment is
rendered by XP either way and the Panel notes that this report is dated
around 11 months after the actual loss had been incurred.
24. In a later report from JD dated 12 May 2013, it was noted that since the
previous inspection:
“... further damage on most internal walls is eminent, suspended floor bearers
have now come to rest on their piers, and the distortion on the top surface of
floor coverings, has increased, creating a hazardous environment for the
constant traffic of public use of the facility.
Brick walls appear to be dry now, especially around the rear door way, where
dark & dampened sections of walls remained, in October 2012, impacting on
the rendered walls.
The excess moisture in the lower structure of the building and in the sub floor
ground has created circumstances, impacting dynamically on the building,
internally, externally and on its environment, over the past fourteen months.
External render has reacted to the chemicals that the stagnant flood water
carried from several nearby, up-stream agricultural chemicals & fertilizers
storage facilities.
There is no doubt that there may have been some pre-existing minor damage
to the buildings, as they are of considerable age, and signs of previous repairs
over time are evident. There is also no doubt that the long period of
submersion and slow drying conditions, have impacted in amplifying existing
possible damage and created new deteriorations.
Case No: 333326 Determination Page 6 of 8
Pre-existing damage would include small hair line cracks, render blisters,
peeling paint...” (Sic)
25. JD confirms the presence of some pre-existing damage at the property,
although differentiates this from most of the damage that he has considered
relevant to the insured event. JD provided a second scope of works for what
would be required to repair the building. This second scope of works was not
costed.
26. In consideration of the second JD report, the FSP again returned the matter
to its engineering expert, XP.
27. XP provided a further consideration of the damaged property, which was
rendered without a second inspection. This report, dated 9 December 2013,
relevantly noted:
It was possible with the passage of time that further deterioration-
related damage could have occurred;
The deterioration related damage could have affected the floors of the
building but not the walls;
Several doors (both internal and external) may require replacement and
this was not accounted for in XP‟s original scope of works;
It was “unlikely” that water had damaged the vinyl floors as they were
water proof. The underlay may have expanded, although this was not
evident at the time of the inspection in February 2013;
There should be no damage to the architraves or skirting boards as no
water entered the building. As rising damp had been present, this may
have accounted for this damage;
Internal wall render damage was due to rising damp and not claim
damage;
Whilst JD suggested that a “Jack and Pack” was necessary for the floor
to realig n it, XP noted that at the time of its original inspection “there
was no evidence that the floor had moved to any significant degree”;
XP was unaware of front fence damage and agreed that this should be
part of any scope of works to reinstate the building and property;
Mould treatment under the floors should be applied and this was
recommended originally;
Damage to the toilet block should be covered;
Some walls which were slated for cleaning may require repainting; and
The floor lining should not require replacement.
28. It is evident from XP‟s second report that several further items required
further assessment and consideration for probable additional cover, although
the extent of any further damage that might fall within the ambit of the policy
was not considered by the FSP, as it did not arrange a further inspection or
payment to the Applicant.
Case No: 333326 Determination Page 7 of 8
29. The Panel is of the view that the FSP should have attended to this. It is clear
that there is damage to the building that was not considered or adequately
accounted for within the scope of the original settlement amount.
30. Primarily, the consideration before the Panel is whether the subfloor and the
piers should be covered under the terms of the policy or not.
31. Clearly, XP is of the view that this damage (or a significant portion of it) was
caused prior to the insured event and that the building was subject to the
effects of rising damp.
32. The Panel notes that the origin of this rising damp and the period of time for
which it had affected the building were not identified by XP. It is further noted
that the loss occurred in March 2012 and XP‟s first and only inspection of the
property was not until February 2013. This is nearly a full year after the loss
and it is conceivable that the effects of the original loss may have had an
impact on the building over this time, consistent with the symptoms of rising
damp. Further, the Panel notes the Applicant‟s annotation to XP‟s February
2013 report, wherein he states: „5 days under water‟; this annotation has not
been refuted by either XP or the FSP.
33. In addition, the Panel has viewed that photograph that confirms a significant
amount of water encircled the building and up to almost the top of the steps
at the front of the building.
34. The result is that the Panel is not satisfied that the FSP has identified that
this “rising damp” damage was not related to or caused as a result of the
original loss. Given that it is conceded that the inundation event occurred,
the Panel considers that the FSP has failed to properly establish its
exclusion to avoid payment of the claim.
35. To this end, the Panel accepts that the damage to the subfloor may well
have been related to the inundation event and should be covered.
36. This would not necessarily require that the subfloor/piers area has to be
replaced, as JD suggested only that a “Jack and Pack” of the floor bearers
was needed, together with mould treatment of the affected areas. XP agreed
that the mould treatment was necessary.
37. Ultimately, the Panel is satisfied that the building should be repaired in
accordance with the scope of works prepared by JD on 12 May 2013. Whilst
it appears that some pre-existing damage was evident, it is also apparent
that the building was functional and there is no evidence of it being severely
affected by rising damp or any other serious concerns which predated the
insured event.
38. The scope of works suggested by JD has focused on the incident related
damage and the Panel is satisfied that the parties should rely upon this
scope of works to attend to the relevant damage.
Case No: 333326 Determination Page 8 of 8
39. However, the Panel notes that the policy does have further limitations on the
items that are covered, for example, there is no coverage for fences.
40. The Panel is satisfied that the FSP‟s obligations only extend to those parts of
the building that are afforded coverage under the policy.
41. For the sake of completeness, the Panel has also considered the FSP‟s
reliance on the policy exclusion for movement of earth.
42. In the Panel‟s view, any movement of earth, as referred to in any of the
reports is as a consequence of the proximate cause of the loss being the
inundation of the building as a result of storm.
43. Consistent with earlier Determinations of the Service, as the movement of
earth is a consequence of the proximate cause of the loss, rather than the
movement of earth being the proximate cause itself, the FSP cannot rely
upon this exclusion to defeat the Applicant‟s claim.
Determination
44. On the basis of the available information, the Panel determines that the FSP
should attend to the repair of the insured building in accordance with the
scope of works prepared by JD as dated 12 May 2013 and the terms of the
policy. Noting that the FSP has paid a partial settlement sum to the
Applicant, this amount should be refunded or contributed to JD‟s repair
invoice by the Applicant, and also noting cover is not provided for certain
items such as fences.
45. If any part of the Applicant‟s claim is to be cash settled, then the FSP is to
pay interest, in accordance with the Insurance Contracts Act 1984, on the
additional payment, from the date of denial of the claim, to the date of
settlement.