Determination 333326

Partial denial of claim - storm inundation damage to building

FirmFinancial Firm (Unknown - Insurer)
Decided2014-06-18
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed$50,000
SourceAFCA PDF

Summary

A business owner claimed about $50,000 for storm-related inundation damage to his office building, and the FSP had paid $11,572.73 and denied the subfloor and piers. AFCA ordered repairs per the applicant's scope of works, excluding items such as fences, with interest on any cash settlement.

The FSP bore the onus of establishing the rising damp and movement of earth exclusions and did not show that the subfloor and piers damage was unrelated to the insured inundation event.

Issues

Subjects and remedies

natural disastersmall businesspay interestrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 333326 Determination Page 1 of 8 Case number: 333326 General Insurance - Small Business/Farm Insurance - Commercial Property - FSP Decision - Partial Denial of Claim - Inundation Damage 26 May 2014 Summary Description  A claim under a Business Insurance Policy for damage to the building following the significant weather event. Basis of Determination  A consideration of the coverage provided by the policy and the evidence regarding the loss suffered by the Applicant. Determination  On the basis of the available information, the Panel determines that the FSP should attend to the repair of the insured building in accordance with the scope of works prepared by JD as dated 12 May 2013, subject to certain excluded items. Noting that the FSP has paid a partial settlement sum to the Applicant, this amount should be refunded or contributed to JD‟s repair invoice by the Applicant.  If any part of the Applicant‟s claim is to be cash settled, then the FSP is to pay interest, in accordance with the Insurance Contracts Act 1984, on the additional payment, from the date of denial of the claim, to the date of settlement. Background 1. The Applicant held a business insurance policy for his office building with the Financial Services Provider (FSP). 2. On or about 5 March 2012, the insured building was inundated with water as a result of a significant weather event. He lodged a claim. 3. Whilst initially denying indemnity citing the policy‟s flood exclusion, the FSP ultimately agreed to cover the Applicant for his loss pursuant to clause 4 of its Fire and Perils policy coverage, namely „Storm, tempest, rainwater, snow, sleet, wind, hail‟ a nd in particular characterised the inundation as storm Determination Case No: 333326 Determination Page 2 of 8 water runoff; but it limited the scope of this cover to damage it considered was caused by this event and paid him $11,572.73. 4. The Applicant, however, considers that there was about $50,000 worth of damage to his property attributable to the inundation and seeks indemnity for the subfloor and piers of his building, which the FSP has declined to cover. Summary of Applicant’s position 5. The Applicant says that the building was extensively damaged as a result of water inundation and considers that the subfloor and the piers of his building were extensively damaged as a result of the event. He seeks cover for this loss as part of the claim. Summary of FSP’s position 6. The FSP says that it has assessed and determined the extent of damage caused by the inundation event. Based on the reports compiled, it has settled the Applicant accordingly. 7. It is not obliged to cover the Applicant for damage that pre-dated or was not related to the specific event claimed for. 8. The policy extends cover to “Fire and Perils” (which includes storm related claims) and it is under this section of the policy that the Applicant has been covered. Whilst the policy does cover accidental damage, this is only on the basis that the “Fire and Perils” provision has not been enlivened. Accordingly, the onus now rests with the Applicant of proving that the additional damage claimed arises from the insured peril. 9. The nature of the damage to the base and under the base of the building was not caused by the insured event and in any event, the policy exclusion relating to „movement of earth‟ applies. 10. The FSP relies on the following policy provisions: Pages 12-14 of the Product Disclosure Statement (PDS) “ Accidental Damage means Damage to Property Insured but does not include Damage, (a) caused by, or as a consequence of: i. Fire and Perils. Anything that is specifically excluded under Fire and Perils is also excluded from this cover. ... (8) erosion, subsidence, landslide, collapse or any other movement of earth. (13) inherent defect, inherent vice, latent defect, or disease. ... Case No: 333326 Determination Page 3 of 8 (16) moths, termites, other insects, vermin, rust or oxidation, mould, mildew, fungus, wet or dry rot, corrosion, change of colour, dampness, variations in temperature, evaporation, change in flavour, texture or finish, or stain or smoke from industrial operations. ... (18) wear and tear, fading, scratching or marring, gradual deterioration, developing flaws, normal upkeeping or making good. ... (20) normal settling, seepage, shrinkage or expansion in Buildings or foundations, walls, pavements, roads, and other structural improvements, creeping, heaving, vibration. ... Fire and Perils means, ... 4. storm, tempest, rainwater, snow, sleet, wind, hail but not Damage caused: ... (e) by erosion, subsidence, landslide, collapse or any other movement of earth. (f) by or resulting from water seeping, percolating or otherwise penetrating into the Buildings as a result of structural defects, faulty design or faulty workmanship in the construction. ... ” Issue 11. Whether the extent of damage covered by the FSP for the claim was appropriate in the circumstances. Reasons for decision 12. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the nature and complexity of the matter. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 13. This decision has been made by a Panel consisting of an Ombudsman and two representatives with extensive experience in insurance and consumer claims. 14. A full exchange of the relevant information has taken place between the respective parties and each party has had the opportunity of addressing any issues raised. Case No: 333326 Determination Page 4 of 8 15. It is not in dispute that:  The Applicant has a claim under the policy;  The policy specifies that the Accidental Damage clause relates to damage that is not covered under some other aspects of the policy (including Fire and Perils, which is relevant to the Applicant‟s loss as this extends to storm damage as well). On this basis, the loss is properly classified under “Fire and Perils” and not “Accidental Damage”;  The FSP has agreed to cover damage valued at $12,730 (inclusive of GST), for which the Applicant has been settled the GST-exclusive amount; and  The Applicant‟s business entity is registered for GST purposes and eligible for an Imputation Tax Credit (ITC) rebate. Therefore the FSP is entitled to settle any claim net of GST as the Applicant will be eligible to obtain a Government refund at a later date. 16. The primary issue of contention between the parties is an expert report from “XP” on behalf of the FSP. XP is an engineer w ho was retained to review the damage and to comment on the extent of what was event related and what was not. 17. The Applicant has indicated that he is prepared to accept $50,000 to repair the building, though this differs markedly from the FSP‟s payment for $11,572.73. The primary reason for this difference is the relevant weight to be attributed to the opinion of the FSP‟s engineering expert. 18. XP‟s report of 19 February 2013, suggested that numerous areas of the building had damage that was not related to the insured event. These included:  cracks to various walls in the building;  moisture damage along the western wall consistent with “long term rising damp”;  dampness damage to the northern wall considered “long term damage”;  evidence of previous repairs to the brickwork on the eastern wall, due to moisture and dampness adjacent to the entrance steps; and  pre-existing damage in the storeroom, dampness in the walls and external wall rising damp, all of which is not related to the event. 19. XP concluded that: “The b uilding has the subfloor flooded during the March 2012 storms. This has had very little effect on the building and has not caused any particular structural movement or damage. There are some silt stains in the outer buildings however flood waters did not enter the main post office floor. The bubbling paint around the lower wall of Case No: 333326 Determination Page 5 of 8 the main building is not considered to be due to a one off event and is due however to long term rising damp and takes many years to develop. The floor is in good condition and has not been damaged by the flood. There is some slight mould under and in the subfloor area that can be seen from the manhole and this is recommended to be treated however the floor is not to be removed. The floor or the floor coverings are not required to be removed. There is some minor new cracking in the front part of the building in the narrow PO Box area and all that is required to fix this is to repaint this area. All other significant cracking is considered to be pre-existing as noted in the report...” 20. It is cle ar from XP‟s report that the expert considers that there is significant damage to the building that is not related to the reported event. 21. The Applicant disagrees with the conclusions reached by XP. He relies upon a submitted scope of works and two reports from “JD”, to attest to the extent of damage present to the building. 22. JD provided an initial quote dated 12 November 2012, to repair the damaged areas, valued at $67,500. The quote noted the likely presence of asbestos in the building, although suggested that it might not need to be disturbed as part of the repair work to be done. The original quote noted: “Consideration has been taken that some piers may need to be replaced due to damaged bricks from excessive existing moisture.” 23. Whilst not specifically commenting on the cause of this moisture damage, it might be inferred that this damage was pre-existing. No comment is rendered by XP either way and the Panel notes that this report is dated around 11 months after the actual loss had been incurred. 24. In a later report from JD dated 12 May 2013, it was noted that since the previous inspection: “... further damage on most internal walls is eminent, suspended floor bearers have now come to rest on their piers, and the distortion on the top surface of floor coverings, has increased, creating a hazardous environment for the constant traffic of public use of the facility. Brick walls appear to be dry now, especially around the rear door way, where dark & dampened sections of walls remained, in October 2012, impacting on the rendered walls. The excess moisture in the lower structure of the building and in the sub floor ground has created circumstances, impacting dynamically on the building, internally, externally and on its environment, over the past fourteen months. External render has reacted to the chemicals that the stagnant flood water carried from several nearby, up-stream agricultural chemicals & fertilizers storage facilities. There is no doubt that there may have been some pre-existing minor damage to the buildings, as they are of considerable age, and signs of previous repairs over time are evident. There is also no doubt that the long period of submersion and slow drying conditions, have impacted in amplifying existing possible damage and created new deteriorations. Case No: 333326 Determination Page 6 of 8 Pre-existing damage would include small hair line cracks, render blisters, peeling paint...” (Sic) 25. JD confirms the presence of some pre-existing damage at the property, although differentiates this from most of the damage that he has considered relevant to the insured event. JD provided a second scope of works for what would be required to repair the building. This second scope of works was not costed. 26. In consideration of the second JD report, the FSP again returned the matter to its engineering expert, XP. 27. XP provided a further consideration of the damaged property, which was rendered without a second inspection. This report, dated 9 December 2013, relevantly noted:  It was possible with the passage of time that further deterioration- related damage could have occurred;  The deterioration related damage could have affected the floors of the building but not the walls;  Several doors (both internal and external) may require replacement and this was not accounted for in XP‟s original scope of works;  It was “unlikely” that water had damaged the vinyl floors as they were water proof. The underlay may have expanded, although this was not evident at the time of the inspection in February 2013;  There should be no damage to the architraves or skirting boards as no water entered the building. As rising damp had been present, this may have accounted for this damage;  Internal wall render damage was due to rising damp and not claim damage;  Whilst JD suggested that a “Jack and Pack” was necessary for the floor to realig n it, XP noted that at the time of its original inspection “there was no evidence that the floor had moved to any significant degree”;  XP was unaware of front fence damage and agreed that this should be part of any scope of works to reinstate the building and property;  Mould treatment under the floors should be applied and this was recommended originally;  Damage to the toilet block should be covered;  Some walls which were slated for cleaning may require repainting; and  The floor lining should not require replacement. 28. It is evident from XP‟s second report that several further items required further assessment and consideration for probable additional cover, although the extent of any further damage that might fall within the ambit of the policy was not considered by the FSP, as it did not arrange a further inspection or payment to the Applicant. Case No: 333326 Determination Page 7 of 8 29. The Panel is of the view that the FSP should have attended to this. It is clear that there is damage to the building that was not considered or adequately accounted for within the scope of the original settlement amount. 30. Primarily, the consideration before the Panel is whether the subfloor and the piers should be covered under the terms of the policy or not. 31. Clearly, XP is of the view that this damage (or a significant portion of it) was caused prior to the insured event and that the building was subject to the effects of rising damp. 32. The Panel notes that the origin of this rising damp and the period of time for which it had affected the building were not identified by XP. It is further noted that the loss occurred in March 2012 and XP‟s first and only inspection of the property was not until February 2013. This is nearly a full year after the loss and it is conceivable that the effects of the original loss may have had an impact on the building over this time, consistent with the symptoms of rising damp. Further, the Panel notes the Applicant‟s annotation to XP‟s February 2013 report, wherein he states: „5 days under water‟; this annotation has not been refuted by either XP or the FSP. 33. In addition, the Panel has viewed that photograph that confirms a significant amount of water encircled the building and up to almost the top of the steps at the front of the building. 34. The result is that the Panel is not satisfied that the FSP has identified that this “rising damp” damage was not related to or caused as a result of the original loss. Given that it is conceded that the inundation event occurred, the Panel considers that the FSP has failed to properly establish its exclusion to avoid payment of the claim. 35. To this end, the Panel accepts that the damage to the subfloor may well have been related to the inundation event and should be covered. 36. This would not necessarily require that the subfloor/piers area has to be replaced, as JD suggested only that a “Jack and Pack” of the floor bearers was needed, together with mould treatment of the affected areas. XP agreed that the mould treatment was necessary. 37. Ultimately, the Panel is satisfied that the building should be repaired in accordance with the scope of works prepared by JD on 12 May 2013. Whilst it appears that some pre-existing damage was evident, it is also apparent that the building was functional and there is no evidence of it being severely affected by rising damp or any other serious concerns which predated the insured event. 38. The scope of works suggested by JD has focused on the incident related damage and the Panel is satisfied that the parties should rely upon this scope of works to attend to the relevant damage. Case No: 333326 Determination Page 8 of 8 39. However, the Panel notes that the policy does have further limitations on the items that are covered, for example, there is no coverage for fences. 40. The Panel is satisfied that the FSP‟s obligations only extend to those parts of the building that are afforded coverage under the policy. 41. For the sake of completeness, the Panel has also considered the FSP‟s reliance on the policy exclusion for movement of earth. 42. In the Panel‟s view, any movement of earth, as referred to in any of the reports is as a consequence of the proximate cause of the loss being the inundation of the building as a result of storm. 43. Consistent with earlier Determinations of the Service, as the movement of earth is a consequence of the proximate cause of the loss, rather than the movement of earth being the proximate cause itself, the FSP cannot rely upon this exclusion to defeat the Applicant‟s claim. Determination 44. On the basis of the available information, the Panel determines that the FSP should attend to the repair of the insured building in accordance with the scope of works prepared by JD as dated 12 May 2013 and the terms of the policy. Noting that the FSP has paid a partial settlement sum to the Applicant, this amount should be refunded or contributed to JD‟s repair invoice by the Applicant, and also noting cover is not provided for certain items such as fences. 45. If any part of the Applicant‟s claim is to be cash settled, then the FSP is to pay interest, in accordance with the Insurance Contracts Act 1984, on the additional payment, from the date of denial of the claim, to the date of settlement.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.