Home / Financial Firm (Unknown - Insurer) / Determination 333302

Determination 333302

Sum insured dispute and delay in burst pipe building claim

FirmFinancial Firm (Unknown - Insurer)
Decided2014-03-03
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$225,456
Non-financial loss$3,000
Amount claimed$320,000
SourceAFCA PDF

Summary

The applicant disputed the sum insured on her burst-pipe home building claim and the insurer's handling, and the insurer alleged fraud. AFCA held the sum insured at the date of loss was $214,536, ordered payment with temporary accommodation and interest, awarded $3,000 non-financial loss and ordered the fraud allegations expunged.

The sum insured applying at the time of loss limits the claim, and a later increase does not apply to that loss.

Issues

Subjects and remedies

home or building damagecorrect recordspay claimpay interestpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 333302 Determination Page 1 of 11 Case number: 333302 General Insurance - Domestic Insurance - Home Building - Service - Delay in Claim Handling - Extent of Cover 13 January 2014 Summary Description: Home Building Policy for damage sustained due to a burst pipe under the property. The FSP offered to cash settle the claim for the building sum insured plus temporary accommodation payments. The Applicant disputes the sum insured and seeks payment for interest. Basis of Determination  There is no evidence to state the Applicant has fraudulently exaggerated the claim.  There is no evidence to indicate the Applicant has been guilty of prior fraudulent conduct.  There is no evidence to establish a breach of duty of utmost good faith on behalf of the Applicant.  The evidence establishes that as at the date of loss, namely 20 February 2012, the sum insured was $214,536.  According to the Certificate of Insurance, the sum insured was not increased to $320,000 until 13 March 2012.  The FSP’s delay in determining the cause of loss, determining the extent of damage, making an offer and most recently in making allegations of fraudulent conduct against the Applicant have caused an unusual delay and disturbance of the Applican t’s expectations of enjoyment of life to attract an entitlement to compensation pursuant to paragraph 9.3 of the Terms of Reference. Determination:  The FSP is entitled to rely upon the sum insured of $214,536 to cash settle the Applicant’s claim.  The FSP is to pay the Applicant the sum of $10,920 representing six months accommodation costs and pay the Applicant the reasonable costs of removing and storing the Applicant’s contents and returning them to the Applicant’s home in the event the Applicant is req uired to move out of the home during the repairs. Determination Case No: 333302 Determination Page 2 of 11  The FSP is to pay interest in accordance with Section 57 of the Insurance Contracts Act 1984 (the Act) from 1 February 2013 to date of payment of the claim.  Compensation pursuant to paragraph 9.3 of the Terms of Reference payable in the sum of $3,000. Background 1. The Applicant held a home building insurance policy with the Financial Services Provider (FSP). As at the time of the renewal on 14 January 2012, the policy provided building cover for $214,536. 2. On or about 20 February 2012, the Applicant lodged a claim with the FSP for damage to her home. She had identified cracks in the brickwork, unevenness in the floors and other problems that had caused significant damage and required investigation. 3. The FSP arranged for experts to view the property and it was ultimately discovered that burst pipes under the property had affected the integrity of the structure. The FSP considered that the home could not be repaired for the amount covered under the policy and settled the Applicant for $214,536 plus six months worth of temporary accommodation, plus $5,000 to take account of the delay in finalising the claim. 4. The FSP has since withdrawn the offer of $5,000 and alleges that the Applicant has fraudulently exaggerated the claim and has breached her duty of utmost good faith. 5. The Applicant believes the FSP had accepted an increase in the sum insured to $320,000 prior to the lodgement of the claim. She believes she is therefore entitled to be paid the sum insured. 6. The Applicant considers that the settlement is inadequate and that the home should be demolished and rebuilt. She relies upon a quote for $461,670 (including GST) to maintain that the home should be rebuilt. 7. The Applicant believes the FSP has breached its duty of utmost good faith and sees the allegations of dishonesty slanderous if not defamatory. Summary of Applicant’s position 8. The Applicant says that the FSP handled the claim poorly, failed to properly investigate the cause of the damage and took too long to make an offer for settlement. All through this period, the home continued to deteriorate and this has likely resulted in a worsening of the damage. 9. She increased the building cover under the policy to $320,000 and if the FSP won’t rebuild the home it should at least settle on this basis. Case No: 333302 Determination Page 3 of 11 10. Despite the FSP’s allegations, she rejects any suggestion that she has acted in bad faith and believes that this is what the FSP has done. Summary of FSP’s position 11. The FSP says that it appropriately investigated the cause of the damage to the Applicant’s home and settled her to the full extent of the policy limits. 12. Whilst the Applicant did increase the building cover on the policy, this was not done until after the report of this damage and was not in force at the time of the loss. The FSP is entitled to rely upon the limits in force at the time of the loss. 13. It considers that the Applicant has not acted in good faith and that this dispute is “frivolous and vexatious”. 14. The FSP maintains the Applicant has fraudulently exaggerated the claim by her repeated attempts to be paid more than the sum insured. The Applicant has a previous claim history which indicates a willingness to act dishonestly and not truthfully or frank in order to fraudulently exaggerate the quantum of her claim. 15. Insofar as the Applicant’s conduct is concerned, the FSP maintains the Applicant has breached her duty of utmost good faith in her dealings with the FSP and it is entitled to cancel the Applicant’s policy. 16. Insofar as interest is payable under Section 57 of the Act, the FSP maintains that its offer to settle the claim was reasonable and that interest pursuant to Section 57 of the Act is only payable from the date that it was unreasonable for the FSP to withhold payment. The FSP maintains that it has not withheld payment but rather the Applicant has refused to accept payment. 17. Insofar as any compensation is payable under paragraph 9.3 of the Terms of Reference, the FSP maintains it has acted in accordance with good industry practise by conducting a thorough and accurate assessment of the Applicant’s damage, its cause and costs. The FSP maintains, the Applicant has been the author of her own inconvenience by refusing to accept payment of her entitlement, by failing to cooperate and by dishonestly and unsuccessfully attempting to inflate her entitlements under the policy. Issues 18. Whether the dispute is “frivolous or vexatious” and therefore should not be considered by the Service. 19. Whether the Applicant has breached her duty of utmost good faith and/or has acted fraudulently and dishonestly. Case No: 333302 Determination Page 4 of 11 20. Whether the FSP has settled the claim appropriately and in accordance with the terms and conditions of the insurance contract. 21. Whether an award of compensation is appropriate. 22. Whether interest is payable pursuant to Section 57 of the Act. Reasons for decision 23. I am satisfied that a full exchange of the relevant information has taken place between the respective parties and that each party has had the opportunity of addressing any issues raised. 24. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the nature and complexity of the matter. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 25. The parties have made some lengthy submissions in this matter and for the purposes of brevity I shall limit this Determination to only those issues I consider relevant to the outcome of the dispute. 26. It is not in dispute that the Applicant sustained a significant loss or that the FSP has offered to pay her the sum of $214,536 (being the sum insured for the buildings at the time of the last renewal) plus six months worth of temporary accommodation costs, estimated at $10,920. The Applicant has not challenged the amount offered for the temporary accommodation costs. 27. In addition to the above amounts, the FSP further an “ex gratia” amount of $5,000 which the Applicant did not accept. This offer has since been withdrawn by the FSP. Frivolous or vexatious 28. The FSP has alleged that the Applicant’s dispute was “frivolous or vexatious” and therefore should not be considered at all. The basis for this claim is the FSP’s contention that it has settled the Applicant to the extent of the policy. 29. In my view the Applicant has raised issues worthy of consideration, including issues relating to the time taken to consider the claim, the appropriateness of the investigation into the cause of damage, the entitlement to compensation pursuant to paragraph 9.3 of the Terms of Reference and other issues, I am satisfied that these issues of their own, merit consideration of the dispute. 30. I am further concerned that the FSP has now sought to allege that the Applicant has acted in breach of her duty of utmost good faith and that the Applicant’s claim is fraudulent in that she has deliberately exaggerated the quantum of her claim. Case No: 333302 Determination Page 5 of 11 31. Such allegations are most serious allegations by the FSP and have a serious impact on the Applicant’s reputation and her a bility to obtain insurance in the future. To suggest that seeking a review of such allegations is frivolous or vexatious or lacking in substance in my view fails to understand the seriousness of the allegations that have been made. 32. I am not of the view that the dispute is frivolous or vexatious and I am of the view that the issues raised in this matter should be determined on their merits. Whether the claim is fraudulent or there is a breach of duty of utmost good faith 33. The FSP has alleged that the Applica nt’s claim is fraudulent in that the Applicant has deliberately exaggerated the extent of her loss. The FSP makes this allegation b ased on the Application’s attempt to be paid more than the sum insured. 34. There is no evidence that the Applicant has sought to mislead the FSP. The Applicant has consistently maintained her position that the sum insured was increased to $320,000. The FSP accepted the increased sum insured despite the fact that it had not at that time determined the extent of its liability under her claim. 35. Some confusion arose as a result of an email by the FSP’s assessor to the Applicant indicating the sum insured amount was increased on 13 February 2012 to $320,000 that is, prior to the claim. The Applicant, confused by this, has correctly asked the FSP to provide particulars of call recordings or other information to establish the date and time at which the policy sum was increased. 36. No call recordings were available and only recently in a supplementary Notice of Response dated 21 October 2013 has the FSP provided a screen shot identifying a payment was made at 2.58pm on 13 March 2012 for the policy. It is difficult to determine from the screen shot what the sum insured is. A Certificate of Insurance exchanged shows the amendment as valid from 2.58pm 13 March 2012. The amended sum insured is $320,000. 37. There is no other evidence to prove the Applicant contacted the FSP on 13 February 2012 or prior to 13 March 2012. The Applicant’s query with respect to the date of the amendment to the sum insured arises because of the misrepresentation, albeit innocently, by the FSP’s assessor that the amendment occurred on 13 February 2012. The Applicant quite reasonably had requested further information to satisfy herself as to the sum insured. 38. I accept that the Applicant is entitled to make a claim for cover under the terms of the policy up to the limit provided under the policy as at the date of the incident. Although the cause of damage had not been determined nor any offer made by the FSP prior to the increase in the sum insured on 13 March 2012, the relevant sum insured for the total loss is the sum insured as at the time of the loss. Case No: 333302 Determination Page 6 of 11 39. In accepting the claim was lodged on 20 February 2013, then the sum insured is $214,536. The fact that the Ap plicant’s damage may well exceed this based on the quotation provided by the Applicant’s builder, does not give her an entitlement to a greater sum. The fact that the Applicant has claimed for the actual damage sustained does not render the claim fraudulent. 40. The FSP has also referred to the Applicant’s prior claims history and in particular a Determination of the Service to argue that the Applicant has previously indicated a willingness to act dishonestly and not truthfully or frank in order to fraudulently exaggerate the quantum of her claim. 41. There is no reasonable basis for this allegation. The prior Determination does not make any such finding. In the prior Determination, the Panel accepted the Applicant had a valid claim but was not satisfied there was sufficient evidence to establish the damage due to the vandalism was equal to the total sum insured. There is no suggestion in the Determination that the Applicant had not been truthful and frank, that the Applicant had acted dishonestly or that the Applicant was fraudulent. Breach of duty of utmost good faith 42. The FSP alleges the Applicant has breached her duty of utmost good faith by failing to cooperate with the FSP and deliberately exaggerating the extent of her claim. As I have indicated earlier in this Determination, there is no evidence that the Applicant has deliberately exaggerated the extent of her claim. There is dispute as to the sum insured but no exaggeration as to the extent of the damage sustained. The Applicant has relied upon her own builder to assess the extent of quantum whilst the FSP have provided their own assessments. 43. There is no evidence that the Applicant has failed to cooperate. Based on the information exchanged the Applicant had been seeking information from the FSP following inspection of the property on 23 March 2012. The Applicant was dealing with the FSP and its assessor and the relationship only appears to have broken down when the dispute arose as to the sum insured. 44. On 23 October 2013 after the Applicant lodged her dispute with the Financial Ombudsman Service and after considerable exchange of information, the FSP sent the Applicant a request to arrange an appointment for an interview. This is 20 months after the claim was lodged. 45. The FSP has met with the Applicant on site, had the property inspected on a number of occasions, had discussions directly with the Applicant and the benefit of the Applicant’s submissions which were quite detailed. 46. In the FSP’s letter of 25 October 2013 the FSP maintains the interview is to confirm the circumstances surrounding this incident. Such a suggestion simply ignores the history of this dispute and the detailed exchange of information provided. To suggest to the Applicant that a decision cannot be Case No: 333302 Determination Page 7 of 11 made until the investigation is complete, in these circumstances is in my view farcical. 47. On 30 October 2013 the FSP notified the Applicant of her duty to cooperate and of her obligations pursuant to Section 13 of the Act. The correspondence does not refer to or identify the very detailed history involved in this claim nor the various pieces of information exchanged. It does not acknowledge the dispute before the Service. 48. The obligation under Section 13 of the Act to act with utmost good faith is an obligation that applies to both parties. It is well established that where a party seeks to make an allegation of breach of duty of utmost good faith, it must come to the table with clean hands. 49. The term embraces notions of fairness, reasonableness and community standards of decency and fair dealing. In my view, the FSP in seeking to conduct the interviews referred to in its letter of 25 October 2013 and in referring to breach of duty of utmost good faith in its letter of 30 October 2013 has not acted fairly or reasonably having regard to the history of this claim. 50. I am not satisfied the FSP in making the allegation of breach of duty of utmost good faith makes that allegation with “clean hands”. I am not satisfied that the allegation of breach of duty of utmost good faith or failure to cooperate is established. Extent of Cover 51. As indicated earlier, I am satisfied that as at the time of the claim namely 20 February 2012, the sum insured to cover the Applicant’s home is $214,536. The offer to settle the building claim for the sum insured is reasonable. 52. The policy also provides for temporary accommodation. Temporary accommodation is payable when a person cannot live in the property and needs to move out so it can be repaired or rebuilt. Temporary accommodation includes:  Costs for temporary accommodation that is reasonable and appropriate to the Applicant, family and pets  Additional living expenses  Costs to remove and store contents and must return them to your home. 53. The maximum period for which temporary accommodation benefits payable is 12 months. 54. The FSP has offered to pay $10,920 representing six months accommodation. The offer is based on the FSP’s assessment that it will take four months to repair the property with a two months allowance for demolition and removal. Case No: 333302 Determination Page 8 of 11 55. Despite the Applicant’s claim the property may need to be demolished, I am satisfied based on the expert reports from CCS dated 4 April 2013 and BBS dated 7 May 2013 that the property can be repaired and in the absence of any alternative information that a six months allowance for temporar y accommodation whilst the repairs are being undertaken is reasonable. I am satisfied in these circumstances the offer to pay $10,920 representing six months temporary accommodation is reasonable. 56. The FSP has offered the Applicant $214,536 representing the total sum insured plus $10,920 representing the temporary accommodation costs. I am satisfied this is a reasonable offer. 57. The offer however does not include other costs payable under the cover for temporary accommodation for home owners. The offer does not include any additional living expenses that may be appropriate nor the cost to remove and store contents and then return them to the Applicant’s home. 58. There is no way, at the current time of determining what a reasonable figure for those costs would be. The Applicant has been able to continue to reside at her home. Once the repairs commence, it is likely she will have to move out of the home and in order to insure safety of the contents, move the contents into the rented premises or into security. It is reasonable that the FSP meets such costs. 59. In the circumstances the FSP should obtain a quotation for the costs of removing and storing the Applicant’s contents and the costs of then returning those contents to the Applicant’s home on completion of the repairs. Upon receipt of the appropriate quotation, the FSP is to cash settle the Applicant for the amount of the quotation. Interest 60. Section 57 of the Act provides that interest is payable from when it was unreasonable for the insurer to withhold payment of the amount, and any on which the date the payment is made, the date on which the payment is sent. 61. The FSP’s submission is that it should not pay interest as it had not unreasonably withheld payment but had in fact conducted a thorough investigation of the claim to determine the cause of damage, the extent of damage and cost of repairs. It had then made its offer and any delays since making the original offer is not due to the FSP but due to the conduct of the Applicant. 62. The claim was first lodged on 20 February 2012. The FSP first attended the Applicant’s property on 23 March 2012. The first report was obtained on 3 April 2012. The second report was obtained on 7 June 2012 and after the Applicant had provided further information, it appears a decision was made by the assessor on 29 June 2012. 63. Although there is evidence of the Applicant having contacted the assessor after that date, very little appears to have occurred on the claim until 2013. Case No: 333302 Determination Page 9 of 11 BBS provided a revised quotation on 7 May 2013. CCS provided a proposed rectification of works on 4 April 2013. 64. It is unclear why no Scope of Works or assessment was conducted earlier. The indication on file is that the assessment should have occurred approximately six months after the June 2012 meeting. It is likely that had the damage been assessed, it would have been assessed beyond the sum insured and for the very reasons that the FSP is determined to cash settle the claim rather than repair the dwelling, the FSP would have determined to cash settle the matter. 65. In my view, taking into account the original assessment by the FSP’s assessor on 29 June 2012, it would be reasonable for the FSP to have obtained a Scope of Works to cover the damage by 1 February 2013. It would have been reasonable to make a decision at that stage to settle the claim for the total sum insured. 66. In accordance with Section 57 of the Act, interest should be paid on the sum insured from 1 February 2013. No interest is payable on the temporary accommodation as these costs have not been occurred nor is interest payable on the removal and storage costs. Compensation pursuant to paragraph 9.3 of the Terms of Reference 67. Paragraph 9.3 of the Terms of Reference provides a compensation of up to $3,000 may be paid for non-financial loss in circumstances where an Applicant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the Applicant’s expectations of enjoyment or peace of mind. 68. There is no dispute that it had taken the FSP over 15 months to make an offer to the Applicant in this dispute and 20 months to make its final offer. 69. There is no dispute that the FSP was required to undertake extensive investigation as to the cause of the damage although it would appear that those investigations were completed by 29 June 2012. 70. According to the report, it was reasonable for the FSP to allow up to six months for the soil to settle after the stormwater drain damage had been repaired. Only at that time, was it appropriate for the FSP to have arranged the Scope of Works and if appropriate the damage to be repaired. 71. The FSP did not arrange for a Scope of Works until April 2013 approximately 10 months after the assessment. It sought a revised quotation from BBS on 7 May 2013. An offer of settlement was made on 3 June 2013 and the final offer of settlement made after its IDR on 16 August 2013. This final offer was withdrawn with the FSP removing its offer to make an ex-gratia payment of $5,000 to the Applicant alleging lack of good faith and failure to cooperate. 72. I accept in a claim such as the current claim, there will inevitably be delays in the settlement, given the time needed to allow the land to settle and Case No: 333302 Determination Page 10 of 11 determine the extent of damage. This cannot be avoided. In my view it would be reasonable to have expected the FSP to assess and determine the Scope of Works within approximately 12 months of the claim being lodged or to have at least kept the Applicant clearly informed as to the events as they occurred. 73. The Applicant’s circumstances were exacerbated by the opinion of IL which noted in its first report of 3 April 2012 that the damage to the home had compromised the structural integrity of the dwelling. This would add to the Applicant’s stress. 74. The delay in settling the Scope of Works and in communications with the Applicant after February 2013 has in my view been unreasonable and contributed to the unusual stress on the Applicant. 75. The FSP, in crafting its latest allegations, in particular its allegations of breach of duty of utmost good faith, of fraudulent exaggeration and that the Applicant’s prior conduct indicat ed a willingness to behave fraudulently, are most serious allegations and have caused further stress and interference with the Applicant’s expectation, enjoyment and peace of mind. It has further exacerbated the situation in October 2013 by requesting an interview and then suggesting a failure to cooperate. 76. Having considered the information as a whole, I am satisfied given the delays and subsequent allegations are such that the Applicant is entitled to non-financial compensation pursuant to paragraph 9.3 of the Terms of Reference in the sum of $3,000. Mortgage 77. The FSP raised an issue in relation to the mortgage on the property, suggesting that this would affect payment. It considered that the Applicant still clearly had a mortgage and refused to provide details of it. 78. From the material submitted by the Applicant, it appears that whilst the mortgage is still registered on the property, it has been discharged and I do not see this as a relevant issue to impede settlement. Determination 79. Accordingly I determine that the FSP settle the Applicant’s claim in accordance with the terms of the policy as in force at 20 February 2013 and pay the following:  $214,536 representing the sum insured at the time of the claimed event.  $10,920 representing six months temporary accommodation. Case No: 333302 Determination Page 11 of 11  The sum assessed as per the quotation or Scope of Works to be obtained by the FSP within 30 days of the date of this Determination with respect to the costs to remove and store and then return the Applicant’s contents to the property.  Interest pursuant to Section 57 of the Insurance Contracts Act 1984 on the total sum insured of $214,536 from 1 February 2013 to date of payment of the claim.  Compensation for non-financial loss pursuant to paragraph 9.3 of the Terms of Reference in the sum of $3,000. 80. Further, the FSP must cause to be expunged from its records and the records of any organisation with whom it has communicated any reference to fraudulent conduct of breach of duty of utmost good faith or failure to cooperate on behalf of the Applicant.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.