Home / Financial Firm (Unknown - Insurer) / Determination 333209
Determination 333209
Inadequate roof repairs and water damage claim
Summary
A landlord claimed $35,840 for water damage to a rental property, blaming the insurer's inadequate 2008 hail roof repairs and failure to advise of an insufficient roof pitch. AFCA found the insurer liable for the rectification of the earlier repairs and related damage, but not the pre-existing pitch defect or damage from the landlord's delay, and ordered a $14,000 contribution with no interest.
The insurer is responsible for its repairer's failure to advise of the roof pitch and resulting damage, but the pre-existing pitch defect and the applicant's failure to mitigate limit its liability to a partial contribution.
Issues
- Claim denial primary · upheld
“the FSP is responsible for the rectification of the earlier repairs and for the additional damage which has arisen as a result of its failure to advise the Applicant about the insufficient pitch of the roof”
- Repairs or contractors secondary · upheld
“The FSP has acknowledged that there were issues with the earlier repairs which required rectification”
Subjects and remedies
home or building damagepay claim
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - Service - Service quality
Determination
Case No 123456 Report type Page 2 of 2
Case number: 333209 11 September 2014
1 Overview
1.1 Dispute
In 2012, the Applicant lodged a claim under his home insurance policy with the
Financial Services Provider (FSP) for water damage to his rental property. The
Applicant said that the damage occurred because the FSP failed to properly
repair his roof following an earlier claim relating to a hailstorm in December 2007.
The Applicant wants the FSP to pay for the costs of replacing the roof and
repairing all of the internal damage to his property, which he estimates to be
$35,840.
1.2 Issues and key findings
Were the earlier repairs undertaken by the FSP sufficient?
The FSP has acknowledged that there were issues with the earlier repairs which
required rectification. In addition, the FSP and its repairer failed to advise the
Applicant of the insufficient pitch of the roof when the replacement roofing tiles
were installed in 2008.
Is the FSP responsible for the repair costs?
The FSP is not responsible for the costs of addressing the insufficient pitch of the
roof, as this was caused by faulty workmanship and pre -existed the hail storm.
However, the FSP is responsible for the rectification of the earlier repairs and for
the additional damage which has arisen as a result of its failure to advise the
Applicant about the insufficient pitch of the roof. However, the Applicant is
responsible for the additional damage caused by his failure to appropriately
progress his claim and/or take action to mitigate any further damage.
1.3 Determination
This Determination is partly in favour of the Applicant.
The FSP is pay the Applicant an amount of $14,000 as its contribution to the
repair costs. No interest is payable on this amount.
Case No: 333209 Determination Page 2 of 6
2 Reasons for Determination
2.1 Were the earlier repairs undertaken by the FSP sufficient?
Repairs undertaken in 2008 were inadequate
The Applicant says that the FSP’s repairer (R) failed to properly repair his ro of
following hail damage in 2008. In particular, he says that R did not replace the
damaged sarking (foil insulation material) which has resulted in the roof leaking
constantly since 2008, causing further internal damage.
It is not clear from the available information whether sarking was present prior to
the repairs in 2008 and/or whether the FSP’s repairer (R) installed new sarking
during the repair process. In this respect, I note that:
the repair of the hail damage in 2008 involved the replaceme nt of
approximately 150 roof tiles and the repointing of the ridge capping. The
itemised quote for the repairs does not include any reference to sarking;
the roofer (RR), who was appointed by the FSP to inspect the property in
2012, considered that the absence of sarking under most of the tiles at the
back of the house had exacerbated the current issues with the roof (but was
not the primary cause);
the builder (S), who was appointed by the FSP to inspect the property in 2013,
confirmed that sarking was present and provided a photograph showing
sarking under one roof tile; and
the Applicant’s builder (MB) has advised that the FSP’s repairer installed the
replacement tiles over the existing sarking but that this was not done correctly.
MB also says that the 2008 repairs did not comply with applicable building
requirements because the repairer did not install an anti-ponding device.
Accordingly, it is difficult to establish with any certainty whether the 2008 repairs
were inadequate in relation to sarking and to what extent the possible lack of
sarking has contributed to the current issues with the roof.
It is also not clear whether the installation of the replacement roofing tiles was
carried out correctly. While the FSP’s roofer (RR) noted certain potentia l issues
with the manner in which the tiles were installed, its builder (S) confirmed that
they have been installed in accordance with industry standards.
Having said that, the FSP has acknowledged during discussions with the FOS
Case Manager that there were issues with the repairs which required rectification.
Nevertheless, the expert reports obtained by the FSP indicate that the absence of
sarking (and/or the way in which the replacement tiles were installed) was not the
primary cause of the current damage.
Both the FSP’s builder (S) and roofer (RR) concluded that the current issues with
the roof were primarily due to the fact that the roof did not meet the minimum pitch
requirements for terracotta roofing tiles. The insufficient pitch of the roof allowed
storm water to build up on the terracotta tiles and back over into the roof cavity
Case No: 333209 Determination Page 3 of 6
below, causing internal damage. The Applicant’s builder (MB) agrees with S and
RR that the pitch of the roof was insufficient.
The 2008 repairs did not involve any repairs to the timber roof frame supporting
the tiles and therefore there is no information to suggest that the insufficient pitch
of the roof was caused by these repairs. On this basis, the FSP says that it is not
responsible for any issues caused by the insufficient pitch, as this was a design
fault which existed prior to the hail damage in 2008.
I accept that the FSP was not required to rectify the insufficient pitch when it
carried out the repairs in 2008. This issue was not caused by the hailstorm and
also falls within the policy exclusion for faulty workmanship.
However, I consider that good industry practice required the FSP’s repairer to
advise the Applicant that the roof had insufficient pitch at the time he replaced the
roof tiles, so that the Applicant could take appropriate steps to rectify the issue at
his own expense. In my view, it is reasonable to expect the FSP’s repairer to have
identified this issue given that:
each of the builders (S, RR and MB) who has subsequently inspected the roof
has clearly identified the insufficient pitch as a significant issue; and
the relatively flat pitch of the lower part of the roof is obvious to the naked eye
and could quickly and easily be verified with a digital level.
The FSP is generally responsible for the actions of its contractors. The failure of
the FSP and its repairer to advise the Applicant of the insufficient pitch of the roof
(possibly exacerbated by inadequate installation of the sarking and roof tiles) has
caused further leaks and water damage to th e Applicant’s property. In these
circumstances, the FSP is responsible for any further damage which has occurred
as a result.
2.2 Is the FSP responsible for the repair costs?
FSP is not responsible for entire cost of roof repairs
The available information establishes that the insufficient pitch of the roof was an
issue which pre-existed the hailstorm in 2008. Accordingly, even if the FSP had
advised the Applicant of this issue at the time, he would still have been
responsible for bearing the costs of rectifying this issue. The FSP’s liability (then
and now) would be limited to addressing any issues with the replacement of the
hail-damaged roof tiles and related items.
FSP is not responsible for entire cost of repairing internal damage
The Applicant says that he first became aware of the leaking roof when he was
advised by his tenant of the problem approximately six months after the repairs
were completed. He says that the FSP failed to take any action to address the
issue, until he followed up again in 2012.
The FSP has confirmed that it has no record of the Applicant raising any concerns
about the roof repairs before 14 September 2012, when it commenced
Case No: 333209 Determination Page 4 of 6
investigating the issue. The FSP says that it should not be held responsible for
the additional water damage to the property caused by the delay of several years
in the Applicant reporting the issue.
Even I were to accept that the Applicant first notified the FSP of the leaking roof in
2008/09, I consider that he has failed to act reasonably to follow up his claim
and/or mitigate his loss during the intervening period of more than three years.
Given the nature of the issue, it was to be expected that a failure to take action
would result in further internal damage to the property during periods of heavy
rainfall.
Accordingly, the FSP should not be required to pay for the entire cost of repairing
the internal damage to the property. Nevertheless, the FSP has denied liability for
all of the repair costs in circumstances where it should be liable for at least some
of these costs and did not offer the Applicant a cash settlement until after he
lodged his dispute with FOS. In these circumstances, the FSP should be
responsible for some of the additional damage to the property which has occurred
during this period.
FSP is responsible for part of the repair costs only
The Applicant seeks payment of $35,840 based on a quote provided by his
builder (MB). However, in addition to the repair of the internal water damage, this
quote includes the complete replacement of the existing terracotta roof with a
metal roof (for which the FSP is not liable).
The Applicant was asked to obtain a breakdown showing the cost of each item
included in MB’s quote but has been unable to do so.
The FSP has acknowledged that the need for rectification of the repairs to the roof
tiles and has estimated the cost of these works as $10,164. The FSP has also
offered to pay the Applicant an additional amount of $2,018 (presumably for the
repair of internal water damage resulting from the issues with the roof).
Given the limited information available, it is difficult to determine the appropriate
apportionment of costs between the Applicant and the FSP. In the circumstances,
I consider that it is fair that the FSP be required to contribute $14,000 to the cost
of the repairs. In arriving at this figure, I have had regard to the extent of internal
damage to the property which is likely to have been sustained prior to the
Applicant becoming aware of the problem in 2008/2009 (and which should be
borne by the FSP). The FSP’s contribution also takes into account any interest to
which the Applicant may be entitled.
Case No: 333209 Determination Page 5 of 6
3 Supporting information
3.1 Experts’ reports
Report Key points
FSP’s builder (S B )
Report – 24
September 2012
(incorporates roofer’s
comments)
There was water damage to the plaster ceiling and the cove
cornice in the rear bedroom, which would need to be
completely replaced.
The tenant confirmed that this damage was already present
when she moved into the property approximately three yea rs
earlier.
Based on RR’s report (see below), the water entry has occurred
because the back skillion is under pitched, as a result of faulty
workmanship.
FSP’s roofer (RR)
Report – 22
September 2012
Terracotta roof tiles (brand W) had been used to replace
damaged tiles (C brand) throughout the roof following the hail
storm several years earlier.
The large tiled roof area at the rear of the property had a long
rafter below the minimum pitch required f or terracotta roof tiles.
Due to the pitch being too flat on most of the back of the house,
storm water is building up on the terracotta tiles and backing
over into the roof cavity below, causing the leak.
There is no sarking on the majority of the back of the house,
thus accentuating the problem of the flat pitch.
In a couple of area on the eastern side of the roof, the gap
between the roof tiles had been pointed over in an attempt to
stop stormwater entry.
A possible cause of the problem is that the roof tiles have
slipped off the tile batten.
The back skillion roof needs to be sheeted with an appropriate
metal roof and the terracotta tiles removed as they are not
designed to handle storm water unde r a minimum of 17
degrees pitch (as compared to the curre nt pitch of 12.7
degrees).
FSP’s builder (S)
Report and s cope of
works – 5 March
2013
The damage to the rear bedroom ceiling is consistent with
water entry through the roof cavity.
The terracotta roof tiles were in fair condition (with no cracks
apparent) , although sections of the roof were loosely fitted and
cracks were apparent in the roof capping tile mortar bedding.
The tiles were a mixture of old and newer tiles. There was
sarking to the underside of the tiles.
The pitch of the roof above the rear be droom was between 13.7
and 13.2 degrees, which did not comply with the manufacturer’s
minimum pitch requirement of 15º for tiled roofs with sarking.
The damage to the rear bedroom ceiling lining is the result of
the under pitched roof which allowed water to seep through the
gaps between the roof tiles .
Case No: 333209 Determination Page 6 of 6
Report Key points
Although the roof does not comply with minimum pitch
requirements, the replacement terracotta roof tiles had been
installed in accordance with current industry standards and
practices.
T he repair of the roof would require the removal and disposal of
the terracotta roofing tiles on the southern end of the roof area
and the removal and disposal of the timber roofing frame.
A new timber roofing frame would need to be installed with
rafters allowing for a minimum pitch of 15 degrees in
accordance with the applicable Australian Standard , and new
terracotta tiles installed .
Applicant’s builder
(MB)
Report – 9 June 2014
Australian Standard 2050 (Installation of roof tiles) applies to
roof pitches of 15 de grees or greater.
Therefore, roof tiles should not have been installed to a pitch
lower than 15 degrees. The Applicant should have received
some consultation on how to remedy the situation at the time of
the damage to his roof.
In 2008, the Building Code r equired an anti - ponding device /
board to be used on roofs with a pitch of less than 20 degrees
where sarking is installed.
The FSP’s failure to replace the sarking in 2008 breached the
Building Code.