Home / Financial Firm (Unknown - Insurer) / Determination 333005
Determination 333005
Claim denial - earth movement exclusion
Summary
The applicant claimed for damage to an investment property allegedly caused by a 3.4 magnitude earthquake. The FSP denied the claim, relying on the policy exclusion for earth movement over time, based on an engineer's report.
The engineering evidence established that the damage was caused by long-term differential soil movement from nearby trees, which the policy excludes, rather than earthquake damage within 72 hours.
Issues
- Claim denial primary · not upheld“The FSP is entitled to refuse payment of the claim in accordance of the terms and conditions of the policy.”
Subjects and remedies
home or building damagenatural disasterno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 333005 Determination Page 1 of 4
Case number: 333005
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
22 May 2014
Summary
Description
Claim under a House and Contents Insurance policy for damage
sustained to the Applicant‟s investment property on or about
13 January 2013 following an earthquake in the area.
The FSP has denied the claim relying upon the terms and conditions of
the Policy.
Basis of Determination
Damage was first identified at the property following a property
inspection after the earthquake in January 2013.
An e ngineer‟s report obtained from „ C ‟ and relying upon information
from the Geoscience Australia website identified an earthquake of a 3.4
magnitude occurred in the area on 12 January 2013.
The Applicant‟s property is 41kms from the epicentre of the earthquake
which is outside the estimated 34km radius from the epicentre that a
tremor would be felt.
The evidence on the balance of probabilities establishes that the
movement of the house is more likely related to movement over time
and not the earthquake.
Determination
The FSP is entitled to rely upon the terms and conditions of the policy
to refuse payment of the claim.
Background
1. Th e House and Contents Insurance policy covered the Applicant‟s
investment property in Ulverstone, Tasmania for a series of defined benefits
including earthquake.
Determination
Case No: 333005 Determination Page 2 of 4
2. At approximately 20:21 on Saturday 12 January 2013 an earthquake of a
magnitude 3.4 occurred in the area with the epicentre approximately 10kms
north-west of Wynyard.
3. Following the lodgement of a claim the FSP arranged for an e ngineer „C‟ to
conduct an inspection of the Applicant‟s property. Following an inspection of
the property on 18 April 2013 the engineer concluded that the recent
earthquake event did not cause or contribute to damage observed at the
Applicant‟s residen ce.
4. The engineer concluded that the observed damage was caused by long term
differential movement of the foundation soil supporting the Applicant‟s
property due to the close proximity of the group of trees located at the north-
west corner of the residence.
5. The FSP has relied upon the engineering report to decline payment of the
claim.
Conclusions in Recommendation
6. A Recommendation was issued by the service in this matter on 21 February
2014 with the case manager recommending with the FSP being entitled to
deny indemnity for the Applicant‟s claim in accordance with the terms of the
policy. A copy of the Recommendation has been attached.
7. Whilst the FSP has accepted the Recommendation, the Applicant has
requested the matter be referred to a Determination.
Further submissions
8. In rejecting the Recommendation, the Applicant maintains:
9. He has suffered loss caused by a risk insured under the policy and has
relied upon statutory declarations from himself, the property manager,
previous tenant and current tenant to establish that there was no pre-existing
damage to the property prior to the earthquake.
10. In so far as the „Wayne Tank‟ principle may apply the Applicant maintains
the FSP has not established that the damage to the property was due to soil
movement but have only indicated that it was soil movement combined with
the tremor.
11. As the damage to the property was not visible to the property prior to the
tremor and as there has been no further damage since the tremor it is
reasonable to conclude that the tremor alone has caused the damage.
12. If there was damage due to soil movement this would most likely occur to the
foundation of the house. As no damage to the foundation to the house, most
likely the house has been moved off the studs due to the tremor.
Case No: 333005 Determination Page 3 of 4
13. In so far as observations of dirt and debris indicating pre-existing damage,
the Applicant maintains that dirt and debris can come and go in a day.
14. The trees are not substantial in size and as there is no similar damage on
two other areas of the property with trees, then the damage is not consistent
with the damage related to the tree roots.
Ombudsman’s consideration
15. The FSP having received the Applicant‟s further submissions relies upon the
submissions made earlier in the dispute.
16. I have decided this case on its merits, having regard to the relevant law,
good industry practice, codes of practice and previous FOS decisions. I have
taken into account all the material submitted by the parties, both before and
after the Recommendation. I am satisfied that the documentation I have
relied on has been provided to both parties.
17. I have carefully considered the case manager‟s Recommendation, and I am
satisfied that it contains an accurate summary of the background to this
dispute, the parties‟ positions, the issues to be determined, any applicable
paragraphs of the Terms of Reference and any relevant law.
18. Whilst the Applicant has provided detailed statutory declarations, the
Applicant has not provided any expert evidence to dispute the findings of the
FSP‟s Engineer.
19. Although I have no reason to dispute the comments of the Property
Manager, the Engineering report is based on a full inspection of the
Applicant‟s property . With the benefit of access to the Geoscience Australia
website the engineer can identify the relative impact of the particular
earthquake.
20. Photographs supplied with the Engineering report identify the nature of the
damage. It is clear from the report that the engineer conducted a thorough
inspection of both the internal and external areas of the home.
21. The Engineer has identified the location of the majority of the observed
damage was in the north-west corner of the residence where there are a
group of trees approximately 5 metres tall. The area in which the home is
located comprised of “Reactive” clay soils which will expand when moisture
is added and shrink when moisture is absent. The Engineer has reasonably
concluded the close proximity to the trees has caused the soils to shrink and
settle which has in turn caused the observed damage.
22. The Policy covers damage caused by earth movement which occurs within
72 hours as a result of an earthquake. The policy otherwise specifically
excluded damage by way of subsidence, landslip, landslide, mudslide,
collapse, shrinkage or any other earth movement.
Case No: 333005 Determination Page 4 of 4
23. As there is no evidence to challenge the expert‟s opinion and the majority of
the damage is in the vicinity of the trees, ref erred to in the expert‟s report, I
am satisfied the FSP has established on the balance of probabilities that the
damage sustained was not damage sustained within 72 hours of an
earthquake due to earth movement but was damage due to earth movement
over an extended period of time and therefore excluded under the terms of
the policy.
24. I accept the reasoning contained in the case manager‟s Recommendation
and accept that the FSP is entitled to refuse payment of the claim reliant
upon the terms and conditions of the policy. Whilst I acknowledge the further
submissions made by the Applicant, those submissions do not add
substantially to the arguments already put.
Determination
25. I determine the FSP is entitled to refuse payment of the claim in accordance
of the terms and conditions of the policy.
Case No: 333005 Recommendation Page 1 of 3
Case number: 333005
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim
21 February 2014
Background
1. The Applicant held a home and contents insurance policy with the Financial
Services Provider (FSP) which was current when he lodged a claim for
damage sustained to the insured property as a result of an earth tremor (the
tremor).
2. The FSP denied indemnity on the basis the Applicant was unable to
establish the damage claimed occurred within 72 hours of the tremor on 13
January 2013 as required under the policy and further, the damage was
caused by other factors excluded from cover under the policy.
Issue
3. The only issue in this dispute is whether the FSP was entitled to deny
indemnity for the Applicant‟s claim.
Reasons for Recommendation
4. I have reviewed the submissions of the parties in relation to the terms and
conditions of the policy and will only refer to the relevant submissions and
materials raised.
5. I am required to consider what is fair in all the circumstances having regard
to the law, good industry practice and relevant codes of practice.
6. The onus is on the Applicant to establish, on the balance of probabilities, he
has suffered a loss caused by a risk insured against under the policy. If such
a claim is established, the onus shifts to the FSP to show, on the balance of
probabilities, the claim falls within an exclusion under the policy.
7. I have had the opportunity of discussing this dispute in detail with the
Applicant including an explanation of the „Wayne Tank‟ principle. On this
basis, I will summarise those discussions where appropriate in this
Recommendation.
Recommendation
Case No: 333005 Determination Page 2 of 3
8. It is not disputed the property was being rented out at the relevant time and
the damage claimed was not identified until a routine inspection was carried
out during February 2013.
9. The Applicant acknowledges it is „nigh impossible in the circumstances‟ to
obtain absolute proof the tremor was, or was not, responsible for the
damage claimed, but submits he has a strong circumstantial case.
10. The Applicant has provided statutory declarations from himself, the current
tenant, the property portfolio manager (also a previous tenant of the
property) and the property management assistant in support of his assertion
the damage claimed was not present prior to the tremor.
11. With regards to whether the tremor was likely felt at the location of the
property some 41kms away from the epicentre when Geoscience Australia
estimate a „felt radius‟ of 34kms, I accept this is an estimate and not an exact
science. I also note the web discussion print out provided as part of the
Applicant‟s submission with one comment stating:
“Yes we felt it in [town], thought it was rolling thunder”
12. As discussed with the Applicant, even if I accept the tremor was felt at the
property, I am not persuaded the tremor alone would be sufficient to cause
the damage claimed.
13. I note the Geoscience Australia website states:
“In Australia, earthquakes with magn itudes of less than 3.5 seldom cause
damage.”
(http://www.ga.gov.au/hazards/earthquakes/earthquake-basics/what.html)
14. I also note the damage claimed does not align with Modified Mercalli
intensity scale of likely effects during a magnitude 3.4 tremor, further noting
the property was located at the outer reaches of any such tremor effects and
described by the web user referenced above as „rolling thunder‟.
15. The FSP‟s appointed engineer also made the following comment:
“Furthermore, the Insured‟s residence is approximately 41km away from the
epicentre of the earthquake. Based on our experience of damage caused by
earthquake Events, it is our opinion that the lateral acceleration at the
Insured‟s property during the earthquake was not sufficient to cause the
obs erved damage.”
16. I also have no expert evidence to support the Applicant‟s „circumstantial
evidence‟ which establishes the damage claimed was, on balance, caused
by the tremor alone.
17. For these reasons, I cannot be satisfied the Applicant is able to meet the
onus of establishing an insured event, that being the damage claimed was
solely caused by the tremor.
Case No: 333005 Determination Page 3 of 3
18. For the sake of completeness, even if I were of a different view on this point,
I note the following damage assessment comments by the FSP appointed
engineer:
“The observed separation gaps were weathered and there was evidence of
dirt, debris and spider webs within the gap, which indicated that the gaps were
pre-existing and had occurred over an extended period of time.
...
We also noted a group of trees, approximately 5m tall, located in close
proximity to the north-west corner of the residence. This coincides with the
location of the majority of the observed damage to the residence.
...
The close proximity of the group of trees to the foundation zone has caused
the soils to shrink and settle, which in-turn has caused the observed damage
to the residence.
CONCLUSIONS:
We are of the opinion that the observed damage has been caused by long-
term differential movement of the foundation soils supporting the Insu red‟s
residence due to the close proximity of the group of trees located at the north-
west corner of the residence.”
19. Whilst I acknowledge the Applicant disagrees the trees had any effect on the
foundation soils, I have no expert evidence to challenge the e ngineer‟s
opinion on this point and note the majority of damage identified is in the
vicinity of those trees.
20. As discussed with the Applicant, I accept the tremor may have acted as a
„trigger mechanism‟ to reveal or accentuate such pre -existing damage.
How ever, the „Wayne Tank‟ principle would then come into effect whereby,
as one cause of the damage (earth movement over an extended period of
time and/or loss or damage caused by tree roots) is excluded from cover, the
FSP is entitled to refuse the claim in its entirety.
21. For these reasons and all the evidence available to me, I am satisfied the
FSP was entitled to refuse the claim.
Recommendation
22. On the basis of the available information, I recommend the FSP was entitled
to deny indemnity for the Applicant‟s claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.