Text of the determination
Case No: 332777 Determination Page 1 of 8
Case number: 332777
General Insurance - Domestic Insurance - Home Building & Contents - FSP
Decision - Denial of claim - Flood
31 January 2014
Summary
Description
Claim under Home Building and Contents Policy following inundation of
property during January 2011. The FSP declined the claim as flood.
Basis of Determination
The policy excludes damage caused by flood.
The property was inundated above floor by a combination of water
escaping the stormwater drains and overland flow (flood) from the River.
The causes ie stormwater and flood were concurrent and therefore the
exclusion “flood” applies (Wayne Tank principle).
Determination
The FSP is entitled to refuse payment of the claim.
Background
1. The Applicants (JN & SN) held a Home Building and Contents Insurance
Policy (the policy) with the Financial Services Provider (FSP).
2. The insured property in Tennyson, suffered water damage due to the
significant weather events experienced in Queensland (Qld) in January
2011.
3. A claim was lodged under the policy seeking indemnity for the loss however,
the FSP declined indemnity on the basis the loss was due to the excluded
event “Flood”.
4. The Applicants remain dissatisfied with the FSP‟s decision and are seeking
indemnity for their loss under the policy on the basis the property was initially
inundated by stormwater runoff escaping from local drains.
Determination
Case No: 332777 Determination Page 2 of 8
Summary of Applicants ’ position
5. Their property flooded prior to the releases from the Wivenhoe Dam and/or
water rose and overflowed from Oxley Creek (OC) with stormwater rapidly
escaping from the stormwater drainage system which began on the night of
11 January 2011.
6. By 5.00am on 12 January 2011 the level of stormwater runoff in the vicinity
of their home had risen rapidly and by 9.00am they were the last family on
the street to leave.
7. The FSP has declined their claim on the basis the inundation of their home
was due to the excluded event „Flood‟. Specifically floodwater from OC
which is approximately 300m west of their home.
8. The Applicants remain diss atisfied with the FSP‟s decision to decline their
claim and believe it failed in its duty of care as an insurer.
9. The Applicants note that the Brisbane River (the River) flood levels peaked
on 13 January 2011.Photographic evidence shows the vicinity of their home
was flooded with stormwater backflow pouring from the main stormwater
drain on 12 January 2011.
10. They disagree with the FSP‟s experts and maintain that the initial inundation
of their home above habitable floor level was due to storm and rainwater
runoff inundation due to stormwater escaping the stormwater drain some
three houses down from the insured property which also flooded the
surrounding streets and houses on 12 January 2011.
11. The Applicants note that the FSP acknowledges that backflow, alleged to be
floodwater, poured out from the drainage system (in the vicinity of their
property) and did initially inundate their property on 12 January 2011.
Regardless of how much water (0.3m) the Applicants believe this was
prevented from escaping.
12. Therefore, this present water (0.3m) would have had to be a major
contributing factor to the subsequent water level increase and resultant
damage to the insured property.
13. The Applicants maintain that regardless of the FSP‟s position the fact is the
initial back flow from the stormwater drainage infrastructure was not from
floodwater rather it was due to excessive rainfall and stormwater runoff.
14. The Applicant (SN) and their children had to evacuate the property at
approximately 12.00 (midday) on 12 January 2011 as the water levels in
their street were rising at a dangerously rapid rate and at the time were up to
SN‟s waist (her height 149.6cm).
15. The Applicants have also raised concerns with respect to earlier contact
made with the FSP on 30 December 2010 with respect to storm damage to
their home caused by heavy rainfall events during November/December
Case No: 332777 Determination Page 3 of 8
2010. They maintain that the FSP was made aware of this damage and
although they were assured the FSP would get back to them in this regard
no contact was received prior to the further damage occurring in January
2011.
16. The Applicants are seeking compensation for what they are entitled to under
the policy at the bare minimum.
Summary of FSP’s position
17. The policy is a defined events policy, which does not provide cover for all
types of risks and specifically excludes cover for flood damage. The onus
rests with the Applicants to establish, on the balance of probabilities, that he
has suffered from a loss covered under the policy.
18. The policy provides cover for loss or damage arising from storm and
rainwater including stormwater runoff from areas surrounding an insured
property, or water escaping from any water main, drain, pipe, street gutter,
guttering or surface. However, it specifically excludes from cover, indemnity
for loss or damage arising from the event „flood‟.
19. The FSP maintains the policy wording is drafted in a manner that clearly
explains the scope and limitations of cover available under the policy
including the event flood. Further, the Product Disclosure Statement (PDS)
makes use of varying fonts which serve to highlight particular aspects of the
policy, including the fact that flood is not covered.
20. The initial accumulation of stormwater runoff in the vicinity of the property
was not sufficient to cause inundation of the insured property above
habitable floor level. In the instance that the 0.3m stormwater runoff which
accumulated in the area of the home did contribute/mix with the arriving
overland floodwaters to inundate the insured home, this allows the FSP to
decl ine indemnity under the claim in line with the „Wayne Tank Principle‟.
21. The FSP maintains in the absence of evidence to the contrary it is entitled to
rely upon the information available to it to determine liability under the claim.
Further, the available evidence indicates that the insured property was
inundated by floodwaters from OC which overflowed its banks due to the
backwater flooding from Brisbane River. Accordingly, its decision to decline
the claim is accurate under the policy.
22. The FSP relies on the following contract provisions:
“ Home Building Insurance Policy
Page 8-13 What we cover – insured events
You are covered for damage or loss to your home building occurring during
the period of cover and caused by the following events:
Yes
Case No: 332777 Determination Page 4 of 8
Storm and rainwater including stormwater runoff from areas surrounding the
site, or water escaping from any water main, drain, pipe, street gutter,
guttering or surface.
No
Damage or loss caused by flood. Flood means the inundation or covering of
normally dry land by water which:
escapes or overflows from, or
cannot enter, because it is full or has overflowed, or
is prevented from entering, because other water has already escaped or been
released from it,
the normal confines of any watercourse or lake, including any that may have
been modified by human intervention, or reservoir, canal, dam or stormwater
channel.
Page 14 What we do not cover – general exclusions
You are not covered under any section of the policy for damage, loss, cost or
liability caused by or arising from or involving:
flood,
Home Contents Insurance Policy
Page 16-21 What we cover – insured events
You are covered for damage or loss to your contents while they are in your
home or at the site, occurring during the period of cover, caused by the
following events:
Yes
Storm and rainwater including stormwater runoff from areas surrounding the
site, or water escaping from any water main, drain, pipe, street gutter,
guttering or surface.
No
Damage or loss caused by flood. Flood means the inundation or covering of
normally dry land by water which:
escapes or overflows from, or
cannot enter, because it is full or has overflowed, or
is prevented from entering, because other water has already escaped or been
released from it,
the normal confines of any watercourse or lake, including any that may have
been modified by human intervention, or reservoir, canal, dam or stormwater
channel.
Page 22 What we do not cover – general exclusions
You are not covered under any section of the policy for damage, loss, cost or
liability caused by or arising from or involving:
flood ”
Case No: 332777 Determination Page 5 of 8
Issue
23. Whether the FSP was entitled to decline indemnity to the Applicants in line
with the provisions of the policy.
Reasons for decision
24. Due to the nature and complexity of the dispute, it has been directly referred
to the Panel for Determination in accordance with the Operational Guidelines
to the Financial Ombudsman Service‟s (FOS) Terms of Reference.
25. The Panel consists of an Ombudsman and two Panel members with
extensive experience in the insurance industry and consumer claims.
26. The material has been exchanged and the parties have had the opportunity
to respond to the issues raised.
27. Having considered the available evidence, the Panel is satisfied the parties
do not dispute the following:
The Applicants held a current home building and contents insurance
policy with the FSP at the time of loss.
The policy provides cover for loss or damage arising from the listed
insured events and specifically excludes from cover loss or damage
caused by the event „Flood‟.
The policy provides cover for stormwater runoff and/or the inundation of
the property by water escaping from any water main, drain, pipe, street
gutter, guttering or surface.
The FSP provided and the Applicants received the relevant policy
documentation including the PDS prior to the loss.
The insured dwelling is a two story home with the inundation of the
home limited to the lower level.
The home is located in close proximity to the Oxley Creek (OC),
Moolabin Creek (MC) and the Brisbane River.
28. The Panel notes the Case Manager contacted the parties with respect to
storm damage from an earlier incident on 30 December 2010. The
Applicants confirmed there was some damage to the rear patio window
frames. A claim was not lodged and the damage only reported with the
FSP‟s representative advising someone would get in contact with them in
this regard, however, no contact was made between December 2010 and
January 2011 significant weather event. The FSP have agreed to contact SN
and attempt to establish the cause and extent of the loss claimed to have
occurred in December 2010. This will be dealt with under a separate claim
and subject to a separate excess payment of $1,100 as per the policy.
Case No: 332777 Determination Page 6 of 8
Proximate Cause for the loss
29. The Panel has been provided with multiple reports commissioned by the
FSP and reference has been made to the relevant ICA hydrology reports
and a site specific report. As there has been an exchange of material
between the parties with both having had the opportunity to comment,
information from the various reports relied on will only be reiterated, where
considered relevant.
Loss Adjuster, “C’s” Report dated 18 May 2011
Met the Applicants on 6 May 2011.
The Applicant (SN) advised on 11 January 2011 when she returned from
Melbourne she found that most roads between the airport and their home
were blocked due to water inundation.
The next morning (12 January) she awoke at 5.00am to move their
possessions upstairs and at this time the water level was at their garage
door (due to back flowing the stormwater drain(s)) three houses down the
street.
C noted extensive damage (building) and was informed that the Applicants
were unable to move the majority of the contents upstairs due to lack of
time and having to evacuate.
C recommended the FSP appoint a hydrologist to confirm the events and
cause of inundation as the exact cause (flood or stormwater runoff) was
unknown and C was unable to comment.
“W’s” Site Specific Inundation Assessment Report dated 22 August 2013
The insured dwelling is a two story home with a habitable floor level
slightly higher than the surrounding ground level.
The property is located approximately 250m south of the Brisbane River
about 350m east of OC and about 400m north of MC. OC is a tributary of
the River which it joins approximately 0.6km north west of the insured
property.
Minimum ground level at the insured property is 7.2m AHD (to front in the
vicinity of the driveway). The lowest point above which direct overland flow
of floodwater from the River via OC towards the insured property would
occur is approximately 7.5m AHD.
Urban drainage surrounding the property is well defined and includes
underground pipe networks and street/kerb drains and channels that
collect stormwater runoff and direct it away from the property.
The actual catchment that would direct stormwater runoff on to the
property would be minimal, including only a few adjoining allotments to the
north and northwest.
A total of 127.3mm rainfall was recorded at Corinda High Alert Gauge
(approx. 2.7km south west of the insured property) in the period between
Case No: 332777 Determination Page 7 of 8
0000hrs on 9 January and 1700hrs on 11 January (2011). No significant
rainfall was recorded at this gauge after about 1700hrs on 11 January.
Peak hourly rainfall intensity of 14.8mm/hr was recorded in the hour to
1100hrs on 11 January, with peak stormwater runoff occurring in the
vicinity of the insured property within about 15 minutes of peak rainfall
intensity.
For durations up to 72 hours the recorded rainfalls had ARI‟s of less t han
one year.
The estimated time of initial inundation of the insured property‟s yard from
the River floodwaters was noted as approximately 5.00am on 12 January.
This being approximately six hours after rainfall in the area had effectively
ceased.
Floodwater from the river would have backed up the stormwater drainage
network via OC and MC before surcharging from stormwater inlet pits in
the vicinity of the property.
Once above a level of 7.5m AHD (the lowest point in the overland flow
path from the river via OC) direct overland flow of floodwater towards the
property would occur. Direct overland flow of floodwater towards the
property would have occurred at approximately 0700hrs on 12 January.
The minimum ground level at the property 7.2m AHD is located adjacent to
the driveway. The driveway slopes steeply up towards the house with
ground level adjacent to the front of the home and garage measuring
approximately 7.9m AHD.
The estimated ground level at the front of the house and garage is higher
than the lowest point in the direct overland floodwater flow path of the river
via OC.
W found that the initial and maximum inundation above floor level of the
lower level and garage at the insured property was caused by direct
overland floodwater flows from the river which flowed back up OC before
overflowing into the Applicants‟ street.
Initial inundation of the lowest point of the allotment, to a depth of 0.3m,
was caused by backflow of floodwater through the pipe drainage system.
However, direct overland flow of floodwater occurred prior to the initial
inundation of the property above floor level.
30. The inundation of the property is not consistent with stormwater runoff
inundating the property, as this would be expected to occur within a short
period after peak rainfall in an area, which on this occasion was
approximately at 11.00am on 11 January 2011. The hydrology is consistent
with the Applicants observation of water escaping from the stormwater inlet
pits at 5.00am on 12 January 2011. This would have been sufficient to
inundate the minimum ground level of the property at 7.2m AHD. Once the
water level reached a height of 7.5m AHD it would have combined with the
overland flood water from the river. At this point the combined water would
be properly classified as flood. The evidence which is not disputed is that the
minimum above floor level of the property is the garage at 7.9m AHD. It
Case No: 332777 Determination Page 8 of 8
follows that the inundation at that level would most likely be flood. The
evidence establishes the inundation of the property, on the balance of
probabilities, was caused by overland flow from Oxley Creek due to backflow
of flood water from the Brisbane River. Although water may have escaped
from the stormwater inlet pits in the vicinity of the property, the available
evidence provides that this alone would not have been to a height sufficient
to cause any damage prior to the floodwaters inundating the lower level of
the home.
31. The Panel notes the Applicants‟ reference to the existing 0.3m of stormwater
runoff in the vicinity of their home prior to the arrival of floodwater would
have been a significant contributory factor for the above floor level
inundation. This may well be the case, however, it is accepted that when
inundation of an insured building occurs as a result of the combination of
floodwater (excluded) with stormwater runoff (included), this is properly
regarded as floodwater inundation (Wayne Tank Principle) and excluded
from cover under the flood exclusion provision.
32. As the policy does not cover loss or damage caused by flood it follows that
the Applicants‟ claim does not succeed.
33. The Panel is satisfied that it is appropriate for this to be dealt with as a
separate claim and encourages the parties to come to an acceptable
agreement in this regard. Any claimed damage for the 2010 event will need
to be assessed and considered under a separate claim and subject to the
relevant policy excess.
Determination
34. On the basis of the available information and the above reasons the Panel
determines that:
the Applicants were clearly informed of the policy exclusion of flood;
the damage to the Applicants‟ property was caused by flood;
the FSP is entitled to deny the Applicants‟ claim.
the additional damage referred to by the Applicants which is claimed
to have occurred in December 2010 is to be considered by the FSP
under a separate claim and subject to the relevant policy excess.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.