Text of the determination
Case No: 332094 Determination Page 1 of 10
Case number: 332094
General Insurance - Domestic Insurance - Home Contents - Storm - FSP
Decision - Denial of claim - Claim Amount - Flood
14 May 2014
Summary
Description
A claim under a home contents insurance policy following damage to
the Applicant‟s home contents as a result of weather events.
Basis of Determination
A consideration of the cover provided by the policy and the evidence
regarding the circumstances of the Applicant‟s loss.
Determination
The Panel determines the FSP is entitled to deny liability for damage to
any contents that were located above 0.05m from the ground level, on
the basis they would have been inundated by floodwater (or a mix of
floodwater and stormwater), which is excluded from cover under the
policy.
Background
1. The Applicant held a home contents insurance policy with the Financial
Services Provider (FSP), which provided cover against listed insured events
and was current at the time of the loss.
2. On 26 January 2013, the Applicant lodged a claim for water damage to her
contents following a severe weather event over Rockhampton, Queensland.
3. The FSP accepted part of the claim as “damage by stormwater runoff”, but
denied cover for contents stored in storage containers on the basis they
were damaged by floodwaters. The Applicant disputes this decision and
wants all of her contents covered.
Determination
Case No: 332094 Determination Page 2 of 10
Summary of Applicant’s position
4. The Applicant is represented. For the sake of brevity, the Panel will hereafter
refer to the Applicant and her representative as “the Applicant”.
5. The Applicant argues the stormwater runoff was the proximate cause of the
initial inundation on 25 January 2013. She says whether or not floodwater
later mixed with the stormwater and further damaged the property is
immaterial where the loss is seen to have been initially caused by the rain.
6. Further, she disagrees the damage was caused by “flood”. She says the
FSP‟s hydrologist (W) reported there was an extraordinary rain event in the
vicinity of the property and the FSP subsequently accepted that water levels
up to 0.05m at the site would have been caused by stormwater runoff.
7. She disagrees with 0.05m being classified as “stormwater”, as the FSP relies
on a report which has inaccuracies/approximations in its data and relies on
incomplete rainfall and water level data.
8. She suggests the FSP would have to prove that the water that entered the
containers and damaged the contents first was flood water and that it was
the proximate cause of damage.
9. She notes for this to be established, the timing of inundation has to be
identified with adequate precision as well as the amount of rain that fell at
the site and the water levels at Gavial Creek.
10. She contends the timeframe provided (between 12.30am and 3.15am of 25
January) suggests the timing of inundation is uncertain and so is the source
of inundation. For this reason, the Applicant considers the FSP should not
conclude the cause of damage was “flood”.
11. She wants the FSP to pay for the repair or replacement of all her contents,
plus interest.
Summary of FSP’s position
12. The FSP appointed a loss assessor (C) to report on the cause of loss. Upon
review of C‟s report, the FSP denied the claim on the basis the damage was
caused by flood, which is not covered by the policy. At claims review, the
FSP appointed W. In a report dated 28 March 2013 , W confirmed C‟s
findings in respect of water inundation of the shipping container.
Subsequently, W issued another report dated 20 March 2014, responding to
the Applicant‟s criticisms of its report of March 2013.
13. Regarding the Applicant‟s most recent submissions, the FSP says W
provided the following relevant comments:
Rainfall records for the period between 12.30am and 3.15am on 25
January 2013 at the Rockhampton AWS rainfall gauge had a maximum
Case No: 332094 Determination Page 3 of 10
intensity of 27mm/h, which is less than a one-year Average Recurrence
Interval (ARI) event.
Other rainfall stations recorded an amount of rainfall consistent with the
amount of cumulative total recorded by the Rockhampton AWS rainfall
station for the 20-hours up to 10am on 26 January 2013.
14. The FSP notes as the property is on higher ground than the surrounding
land, any stormwater runoff would have drained away from the property.
15. The FSP notes the local catchment area draining directly to the site was not
large enough to allow stormwater to rise high enough to cause damage to
the contents in the containers, it would simply have drained away.
16. For these reasons, the FSP says the damage to the contents is attributed to
floodwaters and therefore they are excluded from cover.
17. That said the FSP considers there could have been stormwater runoff of up
to 0.05m and any items sitting at ground level in the open air would be
covered as being damaged by stormwater runoff, prior to the flood event.
18. The FSP says there is a policy limit of $1,000 for items out in the open air.
As the Applicant‟s loss exceeds this limit, it has offered to remove the excess
and settle the claim for items out in the open air for $1,100 (which includes
GST).
19. The FSP relies on the following policy provisions:
Product Disclosure Statement (PDS)
“ Words with special meanings …
‘contents in the open air’ means contents at your risk address which are
located:
in the open air, or
under an open sided structure or carport, or
on a patio or verandah, or
in or on a motor vehicle, caravan, trailer or watercraft, or
…
Types of loss or damage your contents are covered for
We will cover your contents, when contained in the buildings, against loss or
damage caused by one or more of the insured events occurring during the
period of insurance. We will also cover you for the other benefits listed below
…
Insured events we will pay
…
9. Storm, rainwater or run-off
(Applicable whether you have buildings and/or contents cover)
We will pay for loss or damage caused by storm, rainwater or run-off.
Case No: 332094 Determination Page 4 of 10
‘storm’ means violent wind (including cyclones and tornadoes),
thunderstorms and hail which may be accompanied by rain or snow.
‘rainwater’ means rain falling naturally from the sky onto the buildings
and/or ground.
‘run - off’ means rainwater that has collected on or has flowed across
normally dry ground or has overflowed from swimming pools or spas.
We will not pay for loss or damage:
a. caused by:
flood, or
flood water combined with run-off and/or rainwater;
…
Other benefits we will provide
…
6. Contents in the open air at your risk address
(Applicable only when you have contents cover)
We will cover your contents when they are in the open air at your risk
address.
We will pay:
a. for loss or damage caused by theft, storm, rainwater or run-off, up to a
total amount of:
$500 for bicycles, and
$1,000 for all other contents,
…
When we will not pay a claim under your policy
…
2. Unless we state differently in your policy, we will not pay for:
a. flood as defined on page 5;
b. any loss or damage which is not caused directly by one of the insured
events;”
Supplementary Product Disclosure Statement of 4 October 2011 (SPDS)
“The PDS is also amended as follows:
…
(1) In the Words with special meanings section on page 5 of the PDS and
The Insured events we will pay section Insured Event Storm, rainwater or
run-off on page 18 of the PDS, the definition of flood and any accompanying
notes are deleted and replaced with:
“flood” means the covering of normally dry land by water that has
escaped or been released from the normal confines of:
any lake, or any river, creek or other natural watercourse, whether or
not altered or modified; or
Case No: 332094 Determination Page 5 of 10
any reservoir, canal, dam or other form of water channel or waterway,
whether altered, modified or purpose built.”
Policy Amendment Schedule
“ Flood
Flood Cover Not Included
You have chosen not to take up the optional benefit for Flood. As a result you
will not be covered for loss, liability, injury or damage caused by or arising
from flood to buildings and/or contents for the risk specified. If you would like
to add flood cover to your policy you can still do so, subject to our eligibility
criteria. An additional premium is payable. If you would like to add flood cover
to your current policy, please call [telephone number]. ”
Issue
20. Whether the FSP is entitled to partially deny the claim on the basis that part
of the damage was caused by flood which is excluded from cover by the
policy.
Reasons for decision
21. As advised to the parties, due to the nature of the dispute, the Financial
Ombudsman Service (FOS) has considered it appropriate to expedite the
dispute to Determination in accordance with the Operational Guidelines to
the FOS Terms of Reference.
22. This decision has been made by a Panel consisting of an Ombudsman and
two Panel members with extensive experience in insurance industry matters
and consumer claims.
23. A full exchange of information has taken place between the parties and each
party has had the opportunity to address the issues raised.
24. In making this Determination, the Panel has considered the entire file,
including all communications with and between the parties, some of which
will not be individually mentioned in this decision.
25. There is no dispute that there was a severe rainfall event which resulted in
stormwater runoff causing damage to contents in the open air, at the subject
property. The issue in dispute is whether the contents in containers were
damaged by stormwater runoff or flood.
26. The FSP says stormwater runoff would have affected items sitting at ground
level (in the open air) and that a $1,000 policy limit applies to them. It argues
any other contents in the containers (which were higher than 0.05m) would
have been damaged by floodwaters and therefore are excluded from cover.
27. The Applicant argues all her contents (both in the open air and inside the
containers) were damaged by stormwater runoff. She has not provided any
Case No: 332094 Determination Page 6 of 10
expert evidence to support her position. However, as the FSP has effectively
conceded that stormwater runoff affected contents outside the contai ners at
ground level, the onus of proof rests with the FSP to demonstrate that the
higher level of water damage (as in that occurring inside the containers) was
attributable to flood.
28. To support its position, the FSP has provided two reports by C and two
r eport by W. C‟s reports say in summary:
The Applicant says she had to move at short notice. On 24 January
2013, her friend (WF) helped her store her contents in containers at the
site where they were damaged the following day.
On 25 January at 3.30am, WF went out of his caravan at the site and
stepped into water. He put everything he could into the containers and
left the site.
After the first inundation, WF had the containers lifted onto concrete
plinths of approximately 60cm high. On 30 January, further floodwaters
came through.
The heaviest rain occurred between 24-25 January and stopped on 26
January. The containers were inundated on 25 January by dirty water.
The water peaked in the night of 26 January at about 1m. The following
day the water started going down.
The event appears to be flood from Yeppen Creek.
The Applicant has lost all her contents at an estimated value of
$46,530.
The Applicant has provided a list of items outside the container which
would have been damaged as a result of stormwater runoff. The $1,000
policy limit for items in the open air should apply to these items.
29. W‟s report relevantly says:
The Applicant had two containers on site, which she used for storage.
There were also items stored at ground level, outside the containers.
The site was inundated on two occasions, on 25 and 30 January 2013.
The level of the first inundation was higher than the second.
During the first inundation, the storage containers were on the ground.
Their floor level was approximately 0.17m above ground level. They
were raised onto concrete blocks before the second event.
During the first event, the items stored outside were damaged and the
containers were inundated to an approximate depth of 0.33m above the
container‟s floor level. During the second even t, the containers were
not inundated above floor level.
The site is located approximately 0.5km north of Woolwash Lagoon and
2.2km west of Gavial Creek (the creek), which is a tributary of the
Fitzroy River (the River). The ground level at the site is approximately
6.4-6.9m AHD.
Case No: 332094 Determination Page 7 of 10
The River is the major drainage feature in the area, with an
approximate catchment of 140,500km 2 upstream. The drainage
features also include a series of lagoons connected to the creek and
several other adjacent lagoons.
Topographic information shows the site is located on a high stretch of
ground which runs along Port Curtis Road between Woolwash Lagoon
and the creek‟s western floodplain. The local catchment area draining
to the site is small, being approximately 0.4ha (including the site).
Rockhampton AWS and Upper Dee TM rainfall stations are located
6.3km northwest and 22.1km south of the property, respectively. These
stations recorded 546.6-1,095mm of rain in the period 23-27 January.
Rockhampton AWS rainfall station has no rainfall data between 1pm on
25 January and 9am on 26 January.
At Rockhampton AWS station, the peak hourly rainfall intensity of
34.6mm/h was recorded in the hour to 8.15pm on 24 January. Upper
Dee TM station recorded its peak hourly rainfall intensity of 63.5mm/h
in the hour to 10.50am on 25 January.
Rainfall effectively ceased at about 3am and 11pm on 26 January at
the Upper Dee TM and Rockhampton AWS stations, respectively. The
peak stormwater runoff at the site would have occurred within 60
minutes of the peak rainfall intensity.
As to the ARI data, both stations recorded moderately severe
intensities for short and medium durations. For storm durations
between 24 and 48 hours, both stations recorded rainfall intensities of
greater than 100 year ARIs.
WF (the Applicant‟s friend on site) relevantly said:
i. It had been raining heavily on 23 and 24 January 2013. At about
9.30am on 24 January, it was still raining heavily.
ii. He went to bed at about 12.30am on 25 January, at the time there
was approximately 0.1m of water at the property. At about 3.15am
that day the water level was above the step of the caravan but
lower than floor level, which is 0.3m above ground level.
iii. On the morning of 25 January, the water level was still rising,
peaking at some time on the night of 27 January. The water was
flowing quickly from the direction of the road through the subject
property towards the northeast.
iv. On 28 January, the water level started dropping and on 29 January,
the water level had dropped below the level of the road.
v. On 30 January, the water level began to rise again. There was no
rain during this second inundation event and the water was lower
than the first event.
WF‟s version of events is generally consistent with the recorded rainfall
and water level data for the Rockhampton region.
Case No: 332094 Determination Page 8 of 10
The initial above floor inundation of the containers occurred between
12.30-3.15am on 25 January 2013. The initial inundation of the items
on the ground would have occurred before 12.30am on 25 January.
It is possible stormwater runoff caused initial inundation of the items on
the ground. However, due to the size of the local catchment draining to
the site, this is not likely to have reached a depth greater than 0.05m.
As the creek has a much smaller catchment than the River, its
response time to the rainfall would have been shorter. The creek and
its lagoons near the property would have experienced flooding before
the arrival of floodwaters from the River on 30 January.
The reported timing of the initial inundation of the property during the
first flood and its peak correspond well to the expected timing of the
arrival of floodwaters from the creek‟s catchment.
The inundation of the storage containers was most likely caused by
direct overland flow of water from the creek and nearby lagoons.
Although it was still raining heavily at the time of initial inundation, any
stormwater runoff at the time would have mixed with overflows of the
creek and lagoons.
30. The Panel acknowledges W‟s report is based on incomplete data and it
relies on some estimations. The Panel has also carefully considered the
Applicant‟s critique of W‟s report in its submission to the Service dated 4
March 2014, specifically point 6.6:
„It is noted in the assessment of the claim the Respondent has adopted the
findings of [name of hydrology company] in their report dated 28 March 2013.
It has been noted by [name of hydrology company], and is not disputed by the
Complainant that the floor level of the storage containers was approximately
17cm above ground level. [Name of hydrology company] asserts that
stormwater levels at the subject property only reached 5cm. The Complainant
disputes this, and notes that the difference between the height asserted by
[name of hydrology company] and the floor level of the Storage (sic)
containers is only 12 cm. The Complainant asserts that the water that first
entered the storage container (sic) was stormwater/rainwater/runoff.‟
31. To which the FSP, in a supplementary submission to the Service dated 26
March 2014, quoted from W‟s response (da ted 20 March 2014) to the above
critique as follows:
„ As stated in the response to point 5, there is no external catchment draining
to the subject property. The maximum depth of 5cm of stormwater runoff
estimated is conservative and takes into account any localised ponding on the
property itself.‟
32. Point 5 asserted:
„ The local catchment area draining directly to the subject property is small
(0.4ha), which consists of the subject property itself, and as stated earlier
there is no external catchment draining to the subject property.
Case No: 332094 Determination Page 9 of 10
A cross section of the subject property is shown in Figure 4. Figure 3 shows
the location of the cross section. The subject property is located on a higher
stretch of ground than the surrounding land. Stormwater would drain away
from the property to the north or the south. Stormwater runoff draining along
the northern side of Port Curtis Road would overflow to the south towards
Woolwash Lagoon at a depth of approximately 0.6m lower than the ground
level at the subject property.‟
33. Further, despite the incomplete rainfall data from one rainfall station, the
data from other rainfall stations and the topography of the site as a whole,
strongly suggest that W‟s estimations are likely to have been appropriate.
34. In the absence of an alternative explanation, the Panel accepts on the
balance of probabilities there was an initial inundation due to stormwater
runoff, but the maximum inundation would have been caused by floodwaters.
35. As to the depth of stormwater runoff inundation, in the Panel‟s e xperience,
runoff due to severe weather events is capable of reaching heights of up to
100mm when on a flat surface.
36. However, as illustrated in paragraph 32 above, W has explained that the site
is a slightly elevated area when compared with the nearby floodplain and
does not cover a large catchment area for runoff to flow through.
37. Further, W considers the information about ARI events does not indicate the
intensity of rainfall during short durations of rainfall was sufficiently intense to
cause a considerable accumulation of stormwater runoff in an elevated
place, such as the subject property.
38. In the absence of evidence to the contrary, the Panel is persuaded this is an
acceptable and reasonable explanation as to why the maximum level of
stormwater runoff would be limited to 0.05m (50mm).
39. Therefore, the Panel accepts any items which were located below a height of
0.05m from the ground level would be covered as damaged by stormwater
runoff and any items which were located higher than 0.05m from ground
level would have been damaged by floodwaters and are thus excluded from
cover under the policy.
40. Even if the Panel were to consider the scenario where both stormwater
runoff and overflows from the creek and lagoons concurrently caused
damage to any contents located higher than 0.05m from ground level, the
Wayne Tank principle would operate to defeat this part of the claim.
41. Under the Wayne Tank principle, if there are two concurrent causes of a loss
where one is subject to cover (stormwater runoff) and the other is not (flood),
an insurer is not liable for the loss.
42. As to the policy limit for contents in the open air, the Panel agrees it is
applicable to this claim as the items on the ground that were damaged by
stormwater runoff fit into the policy definition of “ con tents in the open air”.
Case No: 332094 Determination Page 10 of 10
43. It would appear from the material on file that the FSP has already issued the
Applicant a cheque for $1,100 in discharge of its policy obligations in respect
of the contents damaged in the open air and so the Panel is not required to
determine further in that regard.
Determination
44. The Panel determines the FSP is entitled to deny liability for damage to any
contents that were located above 0.05m from the ground level, on the basis
they would have been inundated by floodwater (or a mix of floodwater and
stormwater), which is excluded from cover under the policy.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.