Text of the determination
Case No: 331463 Determination Page 1 of 19
Case number: 331463
General Insurance - Domestic Insurance - Residential Strata Title - Service –
Extent of Damage – Septemment Method
15 January 2014
Summary
Description:
A claim under a Residential Strata Insurance Plan for loss as a result of water
damage.
Basis of Determination:
A consideration of the evidence regarding the loss arising from the insured
event, the scope of works and the repairs completed.
Determination:
the FSP was entitled to deny liability for damage to the balcony render;
the FSP has provided reasonable and adequate explanations in response to
the Applicant‟s queries relating to the SOW.
the FSP is entitled to cash settle the Applicant for the works allowed for in the
SOWs prepared by BBS, together with the additional amount for painting and
packing, in the total sum of $21,735.57.
if BBS is not prepared to complete the works detailed in the SOW and the
Applicant‟s selected qualified building contractor‟s price exceeds the amount
detailed in the SOW, together with my additional allowance for painting and
packing, then the FSP is to pay the Applicant the difference. This is subject to
the SOW of the Applicant‟s selected building contractor being based upon the
original SOW together with my allowance for painting and packing of personal
items.
the FSP is not required to pay compensation to the Applicant.
Determination
Case No: 331463 Determination Page 2 of 19
the FSP is to pay interest on any cash settlement amount, in accordance with
the Insurance Contracts Act (1984), from the date of SOW prepared by BBS,
to the date of settlement
Background
1. The Applicant is the owner of a unit forming part of a body corporate. The
building and common property is insured under a Residential Strata
Insurance Plan, underwritten by the Financial Services Provider, (FSP).
2. In 2011, the Applicant‟s unit sustained water damage and a claim was made
under the policy. The claim included water damage to eaves over the
Applicant‟s balcony and water damage to the interior of the unit.
3. A dispute arose in relation to the extent of the repairs required to rectify the
damage and was referred to the Financial Ombudsman Service (FOS) and
allocated case number 290139.
4. In that matter FOS, in part, determined:
a . The FSP‟s liability for the internal damage to the Applicant‟s unit is
limited to the kitchen walls and ceiling, bathroom walls and ceiling,
manhole, lounge room ceiling and external eaves as described in the
scope of works prepared by the builder, SG.
b. The FSP is not liable for rectifying damage to the hallway or bedroom
ceiling.
5. On 30 June 2013, the Applicant informed the FSP that water had been
entering the bathroom in the same location as the previous claim. She also
reported damage to a soap holder. The FSP arranged for the contractor
“SG” to investigate and report on the ingress of water to the unit.
6. On 2 July 2013, the Applicant informed FOS of the water problems and that
she did not want SG to be involved as it was engaged in the previous claim
repairs. The Applicant was advised that FOS would not become involved at
this stage as timely contact had been made by the contractor and the
outcome of that inspection would determine the appropriate action required.
FOS agreed to a monitoring role.
7. The FSP appointed a loss adjuster “ DLB ” to i nvestigate the Applicant‟s
complaints. Based on the assessor‟s report , the FSP agreed to pay for
rectification of hair line cracks in ceilings.
8. The Applicant obtained an independent report from wa ter restoration
contactor “ CFS ” . The FSP agreed to the works identified in the CFS report
and appointed a contactor “ BBS ” to prepare a scope of works (SOW). The
SOW included:
Bathroom
Remove and replace 1 damaged soap holder
Case No: 331463 Determination Page 3 of 19
Stain seal and paint ceiling.
Lounge room
Repair solid rendered walls
Remove and replace entire plaster ceiling and ornate cornice
Remove and replace ceiling insulation
Paint.
Externally relocate/reinstate furniture
Kitchen
Fill hairline cracks near wall vent and paint
Central hall
Remove and replace ceiling and ornate cornice
Paint ceiling, cornice and walls
Bedroom 1
Remove and replace ceiling and ornate cornice
Paint ceiling, cornice and walls.
9. The FSP denied that part of the claim for rectification of the balcony, on the
ground the damage was due to wear and tear.
10. The Applicant expressed a number of concerns with the SOW. The FSP
responded that the SOW was wholly adequate for the issues identified by
CFS. These included:
The entire cornice would be replaced.
Storage of furniture is allowed for, as required for repairs.
The entire ornate cornice will be replaced if the e ntire ceiling were
replaced.
BBS provided a quotation which was inclusive of relocation of furniture
and contents.
11. The FSP submitted the SOW did not require an allowance for painting of
items which may be subject to debris or for potential damage to the contents ,
as the builder will be responsible for this. Although the bedroom and corridor
ceilings could be repaired it had accepted the quote to replace these items.
12. The FSP accepted the quotation in the sum of $18,735.57, for the works and
offered settlement by cash payment of this sum to the Applicant.
13. The Applicant states her initial claim for faulty workmanship compromised of:
Ongoing water ingress into her bathroom from the same location as
previously reported.
Case No: 331463 Determination Page 4 of 19
Reappearance of rainwater damage to the bathroom ceiling and wall in
the same location as previously reported.
A cracked soap holder.
Reappearance of the same cracks in the kitchen wall which was
repaired in February/March 2013.
Reappearance of the same cracks in the lounge room ceiling and walls
which was repaired in February/March 2013.
14. The Applicant states in addition to the above, her current claim now includes:
Replacement of the corridor ceiling.
Replacement of the bedroom ceiling.
Rainwater damage to her balcony render.
15. Further, the Applicant maintains the FSP has breached the General
Insurance Code of Practice and is claiming compensation.
16. The Applicant does not accept that the FSP is entitled to cash settle her
claim.
Summary of Applicant’s position
17. The Applicant‟s dispute comprises of:
Concerns and queries in relation to BBS SOW
Concerns in relation to the FSP‟s denial of her rainwater balcony claim
The FSP's breaches of the General Insurance Code of Practice.
18. The App licant alleges the current damage is a direct result of the FSP‟s
contractor, SG‟s , faulty workmanship and resultant rainwater damage to the
render of her balcony following the initial storm damage to eaves above her
balcony and blocked gutters.
19. She was not confident SG would admit to faulty workmanship so she
engaged water restoration expert CFS to provide an independent
assessment and report at a cost to her of $400. CFS confirmed damage to
the bathroom, kitchen and lounge which SG repaired in February/March
2013, was a direct result of faulty workmanship. The FSP accepted
responsibility for the damage.
20. Her initial claim for faulty workmanship compromised of:
Ongoing water ingress to the bathroom coming from the same location
as previously reported
Reappearance of resultant rainwater damage to the bathroom ceiling
and wall
A cracked soap holder damaged during the works carried out by SG
Case No: 331463 Determination Page 5 of 19
Reappearance of the same cracks in the kitchen wall, lounge room
ceiling and wall which SG repaired in February/March 2013.
21. In addition to the above, her current claim now includes:
Replacement of the corridor ceiling
Replacement of the bedroom ceiling
Rainwater damage to the balcony render.
Concerns with BBS SOW
Venetian blinds
22. The FSP has not addressed her concern in relation to the venetian blinds
which need to be removed and replaced before and after completion of the
works. The venetian blinds will collect dust during the works and she should
not be left with dirty blinds.
Waterproof membrane
23. The FSP has not responded to her query in relation to the contractor‟s
notation that it is not responsible for damaging waterproofing membrane.
Paint
24. The FSP has not responded to her query relating to how many coats of paint
and primer are to be applied. This is not stated in the SOW.
25. The FSP has not responded to her query as to whether the BBS SOW
includes skirting boards as these will also be subject to ceiling debris.
Packing contents
26. The quote makes no allowance for packing her contents. The contractor
informed her they would wrap her furniture in plastic and store it off site and
put down adequate drop sheets. She needs to know if this is still to happen.
Full builder’s clean up
27. The FSP has not responded to her query as to what this item entails.
Balcony
28. The policy is an accidental damage cover policy which means it covers all
perils except those specifically excluded. The Applicant states rainwater is
not excluded and balcony structures are not excluded.
29. The Applicant refers to the policy definition of „Event, Events‟ which states:
Case No: 331463 Determination Page 6 of 19
“means a happening or an incident not intended to happen which occurs
during a particular interval of time and causes or results in loss or damage, or
series of loss or damage happening from one event that is claimable under
this policy”.
30. The Applicant argues the policy is intended to cover fortuitous/accidental
losses as opposed to intentional losses. She says the damage to her
balcony was not intentional.
31. The Applicant notes the FSP relies on a general exclusion which refers to
various excluded causes. She argues the FSP failed to nominate any one
cause and failed to provide supporting evidence for its denial.
32. The Applicant argues the FSP has not adequately satisfied its onus to prove
the proximate cause of the bubbled and peeling render was not caused by
rainwater. Three renderers have informed her rainwater was the only cause
of the bubbling and peeling. This view was supported by an independent
renderer „FIE‟ whom she engaged to report on the condition of the balcony.
33. The Applicant refers to Bridgeman and Others v Allied Mutual Insurance
Limited (1990) 10 ANZ Insurance Cases 67-448 to support her case that
rainwater was the proximate case for the damage to her balcony. The
Applicant argues that bubbling of the render would not have occurred but for
the rainwater and the peeling was most likely contributed to by other weather
conditions such as heat and cold. The balcony had been subject to repeated
flooding as it took the FSP 15 months to repair the damaged eaves above
the balcony. The gutter above the balcony has been blocked in two areas
with bits of mortar from valley irons.
34. In addition CC of BBS agreed that the proximate cause of the bubbling and
peeling was rainwater.
General Insurance Code breaches
35. The FSP failed to respond to her queries/concerns emailed on 27
September 2013 and 27 October 2012 and made no genuine attempt to
address any of her concerns relating to the SOW and denial of the balcony
claim.
36. Her claim was unduly delayed when the FSP arranged for SG to investigate
its own work. The FSP had not provided a response to a number of her
requests.
Chronology
37. The Applicant has provided a chronology of the events leading to her
dispute. The chronology is detailed and includes a commentary of the
issues.
Case No: 331463 Determination Page 7 of 19
Cash settlement
38. The Applicant states the offer to settle the claim by cash payment to her is
unacceptable. She had made it clear she did not want a cash settlement and
that it was agreed to have BBS do the works. For her to source reputable
tradesmen would put immense pressure on her and only further delay the
works. She required BBS to attend to the works.
39. The Applicant states that the settlement method was not part of her dispute.
She had already agreed to have BBS undertake the works. She had made it
clear that she wanted the FSP‟s pre ferred contractor to do the works so that
the FSP could warrant the workmanship according to the Code.
40. The Applicant disagrees with the FSP‟s proposed settlement method. This
would also have the effect of further delaying the works to be undertaken
and she would be left with the difficult task of obtaining quotes.
Compensation
41. The Applicant is seeking the maximum damages permissible under the FOS
regulations for the undue delays by the FSP in managing her claim.
Summary of FSP’s position
42. Following Determination of case number 290139, SG was engaged to attend
to the repairs. The repairs were completed and signed off by the Applicant.
43. The FSP submits it has attended to the claim lodged by the Applicant in
2013 and appointed BBS to provide a SOW in accordance with the CFS
report. Liability was accepted to settle the claim based on the
recommendations in the CFS report.
44. The SOW provided by BBS was complete and encompassed all required
items for rectification of the Applicant‟s property.
45. The FSP argues, in accordance with the terms of the policy, it is entitled to
cash settle the claim to the value of $18,735.57, based on BBS SOW.
46. The FSP submits it was entitled to deny the claim for damage to the balcony
as the damage fails to fall within the insuring clause of the policy or is
otherwise excluded.
47. The FSP submits it has acted appropriately in complying with the previous
determination and conducting this claim and has not breached the General
Insurance Code of Practice.
48. The FSP submits it has approached the claim with the utmost good faith and
with a view to resolving the matter as far as possible in favour of the
Applicant in all aspects where reasonable, even where there has been doubt
as to the policy application to some damage claimed.
Case No: 331463 Determination Page 8 of 19
49. The FSP denies the Applicant is entitled to any compensation pursuant to
the FOS Terms of Reference.
50. The FSP refers to and relies on the following policy terms:
“ What we insure
We insure You up to the Sum Insured shown for Policy 1 on the Schedule,
against ACCIDENTAL LOSS OR DAMAGE to Your Insured Property which
occurs during the Period of Insurance.
...
Exclusions – what we do not insure
We will not pay for loss or damage:
...
c caused by lack of maintenance, rust, oxidation, corrosion, Wear, Tear,
fading, gradual corrosion or deterioration, concrete or brick cancer,
developing flaws, wet or dry rot, or failure to maintain Your Insured
Property in a reasonable good state of repair.
...
Claims – how we will settle your claim
REPLACEMENT
If Your Insured Property is damaged, We may chose to rebuild, replace, repair
or pay the amount it would cost to rebuild, replace or repair. The amount We
undertake to pay under Policy 1 will be the cost of Replacement at the time of
Replacement subject to the following provisions: ... ”
Issues
51. Whether:
damage to the balcony falls within the cover provided by the policy;
the SOW includes all insured damage;
the Applicant is entitled to compensation?
Reasons for decision
52. Prior to arriving at my Determination in this matter I have read and
considered all the material exchanged between the parties. As the material
has been exchanged the parties are aware of the issues and have had the
opportunity to respond.
53. The material in this dispute includes an extensive number of emails. As the
parties have copies of these emails I do not intend reciting the content of that
material in the Determination, save where it is considered appropriate.
Case No: 331463 Determination Page 9 of 19
54. It is established law that when making a claim under an insurance policy, the
responsibility rests with the policy holder to establish, on the balance of
probabilities, that the loss claimed falls within the cover provided by the
policy.
55. An FSP seeking to rely on clauses in the contract to deny liability for the
claim, has the burden of establishing, on the balance of probabilities, that the
terms of the relevant clauses apply to defeat the claim.
Balcony
56. The Applicant claims that the bubbling and peeling of the render to the
balcony was caused by rainwater and contributed to by external weather
conditions. The Applicant relies on a report obtained by her from FIE. She
says her view was supported by CC, from contractor BBS who examined the
damage.
57. FIE specialises in the repair of render to both modern and heritage listed
buildings and provides this service to new jobs. The FIE report dated 25
September 2013, stated in part:
“As requested from the own er I have conducted a visual inspection of the
damaged render on the property, from my experience I would determine the
damage to the render shown in the pictures below, has been caused by rain
water seeping into the render and cyclical temperature changes through the
last couple of months. Which has caused the top coat of the render to start
lifting, peel and to bubble. If this problem is not addressed soon from my
experience I would say that the structure of the wall will eventually became
damaged.
[FIE] estimates the cost to repair the damaged render, from $1880.00 -
$3,700.00. this prices excludes GST, the hire of a boom lift and any council
permits needed on the day (sic).”
58. The FSP contends the cause for the damage does not fall within the terms of
cover provided by the policy or alternatively is otherwise excluded by
application of the relevant clause excluding damage caused by gradual
deterioration.
59. The FSP relies on a report by BBS dated 19 September 2013, which in part
states:
“We have discovered that the external rendered side of the balcony has
begun to blister and flake away. The damage to the render has occurred to all
areas of the balcony wall. In our opinion this damage is not consistent with a
roof leak, we believe the flaking render is consistent with general wear and
tear. Over time general weather elements such as rain, hail, wind sun etc
have contributed to the render flaking away and the balcony has absorbed
water.
When we inspected the balcony from ground level we can confirm that similar
damage to the render and underside of balconies has also occurred.”
Case No: 331463 Determination Page 10 of 19
60. While the Applicant refers to a conversation with CC from BBS, in which she
says CC agreed the proximate cause for the damage was rainwater, I must
have regard to the written evidence submitted by BBS. Although the BBS
report notes that the balcony has absorbed water, which is largely co nsistent
with FIE, BBS also confirmed that general weather elements over time have
impacted on the integrity of the render.
61. FIE, a specialist in renderer noted that rainwater was seeping into the
render. However, FIE did not offer an explanation as to why the render
allowed the water to seep into it.
62. Render is generally applied to external surfaces and as such is intended to
withstand the elements, including rainfall. Further, the ultimate cause for the
damage, that is rainwater seeping into the render, is indicative that the
render had deteriorated to such an extent that it was capable of absorbing
water and in doing so defeating its intended purpose.
63. From my analysis of the evidence, I am persuaded on balance that the
condition of the balcony render has been caused by a combination of
exposure to the elements over its 70 year life, leading to deterioration which
in turn has allowed rain water to seep into the render.
64. The question arises as to the policy‟s respo nse to these circumstances. That
is, whether damage arising from these causes falls within the insuring
provisions of the contract or is excluded by application of the clause
excluding loss or damage caused by gradual deterioration.
65. In considering the Appl icant‟s arguments in relation to proximate cause and
that the proximate cause for the damage was rainwater which is not
specifically excluded from the cover provided, there are a number of matters
to consider.
66. The policy insures the property against accidental loss or damage. The word
„accidental‟ is not defined by the policy and as such takes on its ordinary
meaning.
67. „Accidental‟ as defined by Macquarie Dictionary means „happening by
chance or accident, or unexpectedly ...‟
68. The courts have determined that in order to decide whether the damage is
covered by the policy, the proximate cause of the damage must be
established. The proximate cause is not necessarily an occurrence which is
last in the point of time but rather the dominant factor in the damage. See
Professor Sutton publication “Insurance Law in Australia” notes at 15.8
“In National & General Insurance Co Ltd v Chick Samuels JA said that by
proximate cause was not meant the latest, but the direct, real or
commonsense, dominant, operative or efficient one. A loss might be the
combined effect of a whole number of causes, but for the purpose of
insurance law, one direct or dominant cause must in each case be singled
out. Hence, if various operating factors are concurrent in producing the loss,
Case No: 331463 Determination Page 11 of 19
that which is the real, predominate or efficient cause is the one to which
attention must be paid.”
69. I am satisfied the evidence leads to the conclusion that the render had
deteriorated over time to such an extent that it was vulnerable to rainwater
penetration, which in turn caused the top layer to start lifting and to peel and
bubble. It is arguable that had the render not failed then rainwater would not
have been able to seep into it.
70. As such, I consider the dominant or proximate cause for the damage was the
deteriorated condition of the render, as a result of exposure to the elements
over its lifetime.
71. Even if I accept the argument that rainwater penetration was an equal
contributing factor to the damage claimed, in circumstances where there are
two efficient causes for the damage and one cause is covered by the policy
and the other cause is excluded, the excluding cause is dominant and the
claim fails. Wayne Tank and Pump Co Ltd v Employers Liability Assurance
Corporation Ltd (1974) QB 57.
72. While the policy provides cover for accidental loss or damage, the policy also
contains a clause which excludes cover when the loss or damage is caused
by gradual deterioration. In these circumstances, the clause excluding
damage caused by gradual deterioration applies and the claim does not
succeed.
73. For these reasons, I consider the FSP has discharged the onus that rests
with it to show on balance, the cause for the damage claimed does not fall
within the cover provided by the policy.
74. Accordingly, I determine the FSP is not liable for the damage to the balcony
render.
BBS SOW
75. The Applicant states she has not been provided with a response to her
queries relating to:
Venetian blinds – cleaning.
Waterproofing membrane in relation to repairing the soap holder.
Paint – number of coats and primer to be applied.
Skirting boards – re-painting.
Allowance for packing of contents.
Full builder‟s clean. What does this entail?
76. By email dated 1 October 2013, to the FSP, the Applicant also expressed
concern in relation to damage by falling debris and painting of the following:
All window seals and frames need painting.
Case No: 331463 Determination Page 12 of 19
All built-in structures such as fire place and mantle piece, wardrobes
and corridor.
All external exposed doors and door frames.
77. In its Notice of Response, the FSP advised:
I n relation to the Applicant‟s concerns about damage to internal
structures, any builder would be required to rectify any damage caused
to the property. As such, it is not necessary to include these issues in
the SOW.
In relation to the venetian blinds, the FSP states the SOW allowed for
„full builder‟s clean‟ which would include cleaning the venetian blinds
should they accumulate dirt during the works. As such, this need not be
specified in the SOW.
In relation to the water membrane, should the builder cause damage, it
will be required to repair that damage. The builder‟s notation relates to
replacing the entire membrane if a small area of membrane behind the
soap holder were damaged. The builder would be required to repair
that portion as a matter of course.
In relation to the paint, the SOW includes the cost of painting at the
property. If the painting requires coats of paint and primer to be applied
in a certain fashion, the builder would attend to it. There is no need for
this notation to be included in the SOW.
In relation to the skirting boards, if the item is damaged the builder will
be required to rectify that damage. There is no need to include this in
the SOW.
In relation to packing of contents, the FSP states one quote was
specifically for removal and storage of furniture. The Applicant will be
required to pack small items and personal effects.
The term „full seal up‟ is the builder‟s assurance that they will take due
care not to cause damage including use of covers, drop sheets and
removal of items if necessary. The builder will clean up appropriately
and leave the property in the same state of cleanliness as when they
first entered.
In relation to objects subject to falling debris to be painted, should this
occur, it is incumbent on the builder to rectify that damage including
painting. The SOW does not need to reflect this.
78. Following her report of damage to the FSP on 30 June 2013, the damage to
the Applicant‟s property was inspected by a loss adjuster „DBB‟ on 23 July
2013. The adjuster concluded (in part):
“We advise in our opinion that the damage that has occurred to the bathroom
should be considered under this claim and not be considered a new claim.
We note that the minor cracking shown to our office would not bother or be
even noticed by most people as our photographs illustrate.
We do not believe works completed by „SG‟ are in any way substandard.
Case No: 331463 Determination Page 13 of 19
The minor hairline cracks have most likely occurred due to building movement
in our opinion but we believe that it may be wise to give the benefit of the
doubt to the Unit owner and have her complete any rectification works and
then she or her builder can be accountable for any further cracking issues in
the affec ted areas.”
79. The Applicant commissioned a water damage assessment report from CFS.
CFS report of August 2013, contained the following information of relevance:
Bathroom
The bathroom west wall was saturated with water. The damage was in
the same location as that observed in August 2012. In their opinion, the
ingress of water from the roof had not been appropriately addressed by
the restorers and has continued to cause damage to the bathroom wall.
Kitchen wall above window
The re-emergence of the crack suggests that during repair process the
repairer did not effectively seal the cracks prior to priming and painting.
Lounge room cornice and ceiling
They consider bowing of the ceiling was the result of water ingress.
The wall next to the balcony door continues to show signs of water
damage.
80. The FSP accepted the findings made by CFS and arranged for the loss
adjuster to obtain a SOW relevant to that report. The FSP also authorised
the loss adjuster to have the bathroom wall dried and to ensure the roof
repairs completed by the Owners Corporation, were completed properly.
81. The contractor BBS was appointed and submitted SO W‟s for the following
works (summarised):
a. Bathroom
- Replace soap holder
- Waterproof behind soap holder
- Paint ceiling
- BBS takes no responsibility for damaging waterproofing membrane to
the affected wall, as we have only been requested to replace one
soap holder.
b. Lounge room
- Repair wall, architrave
- Replace ceiling and ornate cornice. Paint
- Relocate all contents including large bedroom and store off site.
c. Kitchen
Case No: 331463 Determination Page 14 of 19
- Repair hairline cracks and paint.
d. Central hall
- Replace ceiling and ornate cornices and paint.
e. Bedroom 1
- Replace ceiling, ornate cornices and paint.
f. Seal up unaffected rooms. Carry out builders clean up.
82. The total cost of the quotations for the SOWs, is the sum of $18,735.57.
83. It follows that the FSP accepted responsibility for the damage complained of
by the Applicant in June 2013 and subsequent to that date. In doing so , the
FSP had a qualified contractor prepare a SOW consistent with that damage
and a costing to carry out those works. The total cost of these works was
quoted at $18,735.57.
84. The Applicant‟s concerns relate to issues involved in carrying out those
works. While I understand the Applicant‟s concern, they are all issues which
are ancillary to the works as set in the agreed SOW.
85. There has been some discussion in relation to whether the ceilings are
repairable or should be replaced. For the sake of good order I note the SOW
includes removal and replacing ceilings in the lounge room, ce ntral hall and
bedroom 1. In addition, the SOW includes removal and replacement of
ornate cornices in the lounge room, central hall and bedroom 1.
86. The SOW included cleaning the site and clean up on completion of the
works. In this case, any adverse impact on the venetian blinds, skirting
boards, window seals and frames, built-in structures doors and door frames
caused during the process of carrying out the works, are encompassed in
the SOW. I concur with the FSP that it is not necessary for the contractor to
contemplate specific issues such as these and make reference to them in
the SOW.
87. Having stated this, I consider the contractor must have regard to the state of
cleanliness and condition of these items prior to commencing the works and
ensure that they are left in that same condition on completion of the works.
88. In relation to the painting, I consider the Applicant is entitled to know the
number of surface coats to be applied and whether primer is required. There
is no evidence to show whether the areas to be painted will require more
than one surface coat or application of primer. As this is a specific item on
the SOW, I consider the SOW should make reference to the number of coats
allowed for in the quote.
89. The Applicant‟s concern in relation to packing of contents is addressed in the
SOW and quotation in the sum of $7,416.19. This SOW specifically refers to
„externally relocate furniture from 3 rd level unit‟ and to „reinstate contents‟.
Case No: 331463 Determination Page 15 of 19
The quotations make no allowance for packing contents. Accordingly, the
Applicant is required to pack those items that require packing prior to
removal of the contents.
90. As only furniture items will need to be moved from the rooms, it would
appear that it will not be necessary to pack the Applicant‟s personal items. If
removal of the furnishings requires packing of a large quantity of the
personal items, then I accept that the FSP is liable for the cost of having this
function carried out professionally.
91. Further, the SOW includes waterproofing behind the soap holder only. It
follows that the contractor has accepted that waterproofing is required but
only to the area involved in replacing the soap holder. In the event that
further damage occurs to the area beyond the soap holder, then the
contractor is required to waterproof any such areas as part of the rectification
of the overall damage. However, as further damage is simply conjecture at
this stage, in my view, the contractor was entitled to restrict his responsibility
to the agreed works.
92. In view of the additional information provided by the FSP to FOS, apart from
the matters relating to the number of coats of paint to be applied and packing
of personal items, I am satisfied that the concerns expressed by the
Applicant in relation to the SOW have been adequately explained and
resolved.
93. I propose to deal with the question of the number of coats of paint and the
packing of personal items, below.
Cash settlement of the claim
94. The FSP elected to settle the claim by cash payment to the Applicant in the
sum of $18,735.57, being the sum of the quotations for the works expressed
in the SOWs prepared by BBS.
95. The FSP relies on terms in the policy setting out the manner in which it will
settle claims. This wording provides the FSP with the option to choose to
either rebuild, replace or pay the amount it would cost to rebuild, replace or
repair the insured damage.
96. The Applicant has rejected the FSP‟s offer and argues she is entitled to have
the works carried out by a contractor appointed by the FSP.
97. I accept the FSP has an obligation to pay for the cost of making good
insured damage. The FSP also has a responsibility to pay for the cost of
rectifying any repairs authorised by it, for making good insured damage, from
any previous claim which may have been unsatisfactory.
98. The Applicant has lodged a previous claim for water damage to her unit with
the FSP. The claim fell into dispute which was referred to FOS for
determination. As a result of the determination, the FSP appointed
Case No: 331463 Determination Page 16 of 19
contractors to make good the water damage considered b y FOS to fall within
the cover provided by the policy.
99. The water restoration contractor CFS considered damage to the bathroom
wall may have been due to the failure to repair the roof which was the cause
for the ingress of water. The consultant also reported it was not possible to
determine if the restoration work was done on a wet or dry wall. He did
consider it was possible the pattern of damage appeared if the work was
completed on a wet wall. CFS further reported the emergency of the crack in
the kitchen wall, suggested the repairer did not effectively seal the cracks
prior to priming and painting.
100. There is therefore the possibility that some of the damage may be linked to
the previous claim, made by the Applicant under this policy in 2011.
101. However, the damage identified by CFS which may be linked to the same
cause as the 2011 claim, has been included in the SOW on which the
quotations in the sum of $18,735.57, has been calculated.
102. Further, the FSP states that it has not authorised the contractor BBS to
complete any rectification works at the property. The FSP explained that
BBS were engaged to oversee the provision of the SOW and perform tests
to determine if any leakage was still occurring. This testing included drying
the bathroom walls to determine if the damage was still occurring.
103. Based on this information, I accept that the FSP has not authorised the
contractor BBS to commence any of the rectification works included in the
agreed SOW.
104. In considering the manner of settlement of the claim, I must have regard to
the terms of the policy and what is fair in all the circumstances.
105. The policy is a binding contract between the Applicant and the FSP. The
contract clearly and unambiguously provides the FSP with the option to
settle the claim by either rebuilding, repairing or pay the amount it would cost
to rebuild, replace or repair the damage.
106. I am satisfied the SOW prepared by BBS and agreed to by the Applicant
includes rectification of any unsatisfactory works related to her previous
claim. As such, the FSP has accepted responsibility for any potential
unsatisfactory repairs arising from her previous claim.
107. The FSP states during the course of the claim the Applicant has
demonstrated an interest in overseeing the works to be carried out to her
premises. It is therefore preferable that the Applicant be provided with the
cost of repairs, so that she be allowed to seek her own builder to attend to
the repairs.
108. In these circumstances and having regard to what is fair in all the
circumstances, I consider the FSP is entitled to rely on the terms of the
Case No: 331463 Determination Page 17 of 19
policy providing it with the option to choose to pay the amount it would cost
to repair the agreed damage.
109. However, as I have previously stated the SOW does not make adequate
allowance in respect to either the applicable number of coats of paint or the
packing of the Applicant‟s personal items .
110. There is no information upon which I can precisely state the dollar amount of
this additional cost. However, considering what I regard as fair in the
circumstances I determine that the FSP is entitled to cash settle the
Applicant in respect of the SOW, plus painting and packing of personal
items, in the total amount of $21,735.57.
111. I have also given consideration to the possibility that the qualified building
contractor who prepared the SOW may not agree to carry out the works
specified in the SOW.
112. If this were to occur and the Applicant‟s selected qualified building
contractor‟s price varied from that stated in the original contractors SOW,
plus the additional allowance for painting and packing, then the FSP would
be responsible for reimbursing the Applicant with any difference in the cost
of the works.
113. However, this is subject to the selected builder‟s price being based on the
work as set out in the agreed SOW, together with the allowance for painting
and packing of personal items.
Compensation
114. The Applicant is seeking payment of compensation. Her claim is based on
her argument that there were undue delays in relation to the FSP ‟s
management of her claim. The Applicant submits the FSP chose not to
respond to any of her concerns relating to the SOW; the FSP refused to give
her access to the BBS balcony report leaving her no option but to obtain an
independent report; the FSP refused to comment further on its denial of the
balcony claim and reneged on its word to have BBS undertake the works.
115. According to the evidence, the Applicant first lodged her claim with the FSP
on 30 June 2013. On 2 July 2013, the FSP appointed a contractor SG to
inspect the damage. The Applicant objected to this appointment as SG was
responsible for the works carried out in her pervious claim. Further
communications took place between the Applicant and the FSP resulting in
the FSP withdrawing the services of SG and the loss adjuster and appointing
an alternate loss adjuster.
116. On 23 August 2013, the Applicant submitted a report by CFS relating to the
damage claimed.
117. On 28 August 2013, the FSP informed the Applicant it accepted the CFS
report and would appoint a builder to provide a SOW. The FSP also
arranged for drying of the bathroom wall.
Case No: 331463 Determination Page 18 of 19
118. On 3 September 2013, the appointed contractor BBS carried out an
inspection of the damage. There followed a number of exchanges between
the Applicant and the FSP, including further damage identified by the
Applicant.
119. On 18 September 2013, BBS provided SOW‟s and quotations for the
damage. These were sent to the Applicant on 27 September 2013. The FSP
also denied the claim for the balcony at this time.
120. On 27 October 2013, the Applicant formally lodged her dispute with the FSP.
121. On 28 October 2013, the FSP issued its Internal Disputes Resolution letter
informing the Applicant of its final decision in relation to the balcony claim
and responding to the Applic ant‟s queries relating to the SO W.
122. The Applicant formally lodged her dispute with the FSP, with FOS, on 11
November 2013.
123. FOS has been involved in this matter since July 2013, in a monitoring
capacity only. During that time, FOS has been copied in with the emails
exchanged between the Applicant, the FSP and the contractors. The number
of emails is extensive and is indicative that the Applicant, the FSP and the
contractor were in regular communication during the claim process.
124. The Operational Guidelines to the FOS Terms of Reference provide that
FOS takes a conservative approach to compensation for non-financial loss.
FOS considers compensation should not be provided where an Applicant
merely suffers inconvenience that is a normal part of an insurance claim.
FOS expects an Applicant to be moderately robust and bear the normal
degree of inconvenience experienced when a problem occurs and take
reasonable steps to reduce the inconvenience.
125. Although management of this claim continued over a period of about four
months until the FSP issued its final decision, there was ongoing and regular
communication between the parties involved. As evidenced by the material
submitted to FOS the email chain was extensive. While the Applicant raised
a number of queries with the FSP, she did not formally lodge a dispute with
the FSP until about October 2013, with the FSP‟s IDR issued on 28 October
2013.
126. Further, the FSP arranged a contractor promptly to report on the damage
claimed, acceded to the Applicant‟s request to appoint a different loss
adjuster and cancelled the arrangements with the contractor, SG.
127. The FSP accepted the damage based on the report obtained by the
Applicant and a contractor was appointed to provide a SOW and quotation
for the agreed damage. The FSP agreed to reimburse the Applicant for the
cost of the two reports obtained by her. The Applicant raised a number of
queries in relation to the SOW, which had the effect of slowing the progress
of the claim. These eventually formed part of her dispute with the FSP which
was referred to FOS.
Case No: 331463 Determination Page 19 of 19
128. After analysis of the material and having regard to the ongoing
communications shared between the parties, I consider that the
circumstances giving rise to the dispute do not qualify for an award for
compensation.
General Insurance Code of Conduct
129. The Applicant‟s assertion the FSP has breached the Gener al Insurance
Code of Conduct have been referred to the Code Compliance Manager for
review.
Determination
130. On the basis of the available information I determine:
a. the FSP was entitled to deny liability for damage to the balcony render;
b. the FSP has provided reasonable and adequate explanations in
response to the Applic ant‟s queries relating to the SO W.
c. The FSP is entitled to cash settle the Applicant for the works allowed
for in the SOWs prepared by BBS, together with the additional amount
for painting and packing, in the total sum of $21,735.57.
d. if BBS is not prepared to complete the works detailed in the SOW and
the Applicant‟s selected qualified building contractor‟s price exceeds
the amount detailed in the SOW, together with my additional allowance
for painting and packing, then the FSP is to pay the Applicant the
difference. This is subject to the SOW of the Applicant‟s selected
building contractor being based upon the original SOW together with
my allowance for painting and packing of personal items.
e. the FSP is not required to pay compensation to the Applicant.
f. the FSP is to pay interest on any cash settlement amount, in
accordance with the Insurance Contracts Act (1984), from the date of
SOW prepared by BBS, to the date of settlement.