Home / Financial Firm (Unknown - Insurer) / Determination 331304

Determination 331304

Refusal to pay to re-level front section of floor after water escape repairs

FirmFinancial Firm (Unknown - Insurer)
Decided2014-04-30
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant's building claim for water escape damage was accepted and repaired, but the FSP declined to pay to re-level the front section of the house. AFCA found the front fall resulted from long-term timber decay and earth movement, so the FSP was entitled to decline that part.

The policy excludes gradual deterioration and earth movement, and the front section had a fall before the remedial works began.

Issues

Subjects and remedies

no remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 331304 Determination Page 1 of 6 Case number: 331304 General Insurance - Domestic Insurance - Home Building - Service - Service quality 30 April 2014 Summary Description  A claim under a Building policy for damage to the building following discovery of water escaping from an external wall. Basis of Determination  A consideration of the evidence regarding the cause of the loss and the cover provided by the policy. Determination  I determine the FSP was entitled to deny liability for the cost to level the flooring to the front section of the Applicant’s home. Background 1. On 10 January 2011, the Applicant lodged a claim under her Premier Care Building Policy, underwritten by the Financial Services Provider (FSP), for damage to her home. The Applicant had observed movement in the home some months earlier and had discovered water escaping from an external wall. 2. The FSP accepted liability for the claim and following investigation including appointment of an engineer, authorised repairs. The repairs included re- levelling the flooring in the affected area and internal and external work. 3. The Applicant states the flooring in the remainder of her home is now substantially out of level and considers the FSP is responsible to level the flooring of the remaining area. 4. The FSP denied that part of the claim on the ground the stumps in the front of the house had not been affected by the water leak and had settled due to timber decay. Determination Case No: 331304 Determination Page 2 of 6 Summary of Applicant’s position 5. The FSP lifted the back of her house from 30mm to 200mm and left the front of the house. 6. This has caused the house to be out of level. The front of the house is almost on the ground while the back of the house was lifted between 30mm to 200mm. 7. Since the work was completed, the house has developed problems with overflows from guttering in front of the lounge room corner and the asbestos wall adjoining the porch is breaking up. 8. A large amount of pooled water was seen from the manhole in the bedroom corner which was probably from the bathroom leak. The pool of water had run further than expected from the bathroom so that it was possible the stumps had been affected by this water. Summary of FSP’s position 9. The FSP relies substantially on reports provided by a consultant engineer, commissioned by it. 10. The engineer reported the damage had arisen as a result of multiple causes such as long term deterioration, decay and rotting of the sub floor timber piers located beneath the lounge room part of the property. 11. The engineer pointed out the stumps along the front wall had not been affected by the water leak but had settled due to timber decay. The engineer confirmed the pattern and location of the unevenness to the lounge room floor was consistent with settlement of the footings due to long term timber decay and rotting. 12. The FSP argues damage to the lounge room area of the home was not caused by the escape of water but instead arose from long term rotting and deterioration of the timber piers. 13. The FSP relies on the following policy terms: “ 2. General exclusions … We do not insure you for any loss or damage that is caused by or arises from: ….  wear and tear, gradual deterioration, or fading … Case No: 331304 Determination Page 3 of 6  failure to keep the property insured in good condition …  settling, expansion, shrinkage or any earth movement other than earthquake” Issue 14. Whether the FSP is liable for the cost of levelling the front section of the Applicant’s home. Reasons for decision 15. I have reviewed all the material submitted by the parties in order to reach my decision. 16. It is established law that when making a claim under an insurance policy, the responsibility rests with the policyholder to establish on the balance of probabilities that the cause for the loss claimed, falls within the cover provided by the policy. 17. When this has been established, the burden then falls on an FSP relying on a clause in the contract to deny the claim, to show on the balance of probabilities that the terms of the relevant clause applies to defeat the claim. Has the Applicant established a prima facie claim under the policy? 18. It is common ground between the parties that following investigation by a plumber, a blockage was located in a drain beneath the home which was causing backflow out of the plumbing located beneath the house. Further investigations found leaks from a concrete encased junction, taking discharge from the bath and basin under the bathroom floor and overflow from the gully trap outside the bathroom, which flowed back under the house. 19. Hence water had been escaping or overflowing from a water apparatus which ponded beneath the floor of the Applicant’s home. 20. According to the engineer commissioned by the FSP, the soil on which the house was founded was highly reactive, which when wet from leaking service pipes, will heave. 21. The policy provides cover for loss or damage caused by the escape of liquid from fixed pipes and any fixed item that is used to hold liquid. 22. Based on this information, I accept the Applicant has established a prima facie claim under the policy for damage to her home. Case No: 331304 Determination Page 4 of 6 Was the leaking water responsible for all the damage claimed by the Applicant? 23. It is not in dispute that the flooring at the front section of the Applicant’s house, is out of level with the rear section of the house. 24. The Applicant’s property was examined by a consultant engineer commissioned by the FSP. I am satisfied the engineer was appropriately qualified to determine the extent of damage to a dwelling caused by leaking water and any other probable cause for damage claimed. 25. The engineer’s investigatio ns included comprehensive testing for water leaks and testing of the qualities of the foundation soils on which the house was constructed. He came to the conclusion; a. The leaks and overflows from the bathroom water pipes caused local saturation of the soil and differential footing settlement. b. The affected area was the bathroom and immediate adjacent rooms. c. Footing settlement south of the chimney and in the lounge , was not due to either plumbing leaks or the December 2010 rainfall. d. Rectification work will require re-levelling of the bathroom slab and timber floors in adjacent rooms and a complete refit of the bathroom. 26. In support of these conclusions the engineer observed from an underfloor inspection, the soil in both areas where manholes had been cut in bedroom 2 and the southwest corner of the lounge , were completely dry. He reported the area affected by the leaking bathroom waste pipe and gully trap overflow, was limited to the bathroom and lobby area at the entrance, the northern half of bedroom 3 and the meals area up to the chimney. 27. Site drawings of the Applicant’s home prepared by the engineer show the affected area being localised around the bathroom. 28. Further, a site drawing prepared by the plumber showing the location of the leaks clearly illustrate the leaks were in the bathroom and immediately adjacent to the bathroom. 29. The evidence has therefore clearly localised the leaks to the area of the building considered by the engineer to have been affected by the leaks. 30. A further site drawing prepared by the engineer displays the floor levels in the house. It can be seen from the drawing, the flooring had significant variations in levels with particular prominence in the area surrounding the bathroom. Case No: 331304 Determination Page 5 of 6 31. A scope of works (SOW) prepared by the engineer included floor re-levelling. The SOW observed the levels around the bathroom were significantly lower with the level of the bathroom slab, the north end of the meals area and adjacent areas to be raised. 32. In response to concerns expressed by the Applicant, the engineer visited the site and met with the Applicant and the building contractor. In discussing the lounge room floor levels, the engineer pointed out that the floor had a considerable slope towards the front before the remedial works commenced. The Applicant’s partner was reported as acknowledging there had been practically no change since the jacking. 33. The engineer advised stumps along the front wall had not been affected by the water leak but had settled due to timber decay. Summary 34. The evidence has established, to my satisfaction, damage to the home caused by the escaping water was localised to the bathroom and immediate adjacent area. 35. Water had been found escaping from water apparatus in the region of the bathroom. There is no evidence to show the lounge room area of the building was inundated by the escaping water. 36. An appropriately qualified engineer determined the area of the building affected by the escape of water, was located to the bathroom and immediate adjacent rooms. Remedial works were carried out to this area , which included re-levelling the flooring. 37. The remedial work caused an excessive slope in the laundry floor. This was to be rectified by jacking and re-stumping the laundry. 38. The fall of the house to the front was considered the result of timber decay of the stumps along the front wall. There is evidence the front section of the house had a fall prior to the remedial works commencing. 39. Moreover, it is reasonable to accept that re-levelling of the flooring in the vicinity of the bathroom may have amplified the fall to the front of the house. 40. No expert evidence has been provided which contradicts the findings made by the engineer commissioned by the FSP. 41. The policy does not cover damage arising from any earth movement or gradual deterioration. 42. For these reasons I consider the FSP has established it is not responsible for rectifying the slope of flooring to the front of the house. Case No: 331304 Determination Page 6 of 6 Determination 43. On the basis of the available information, I determine the FSP was entitled to deny liability for the cost to level the flooring to the front section of the Applicant’s home.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.