Home / Financial Firm (Unknown - Insurer) / Determination 330950

Determination 330950

Cyclone roof replacement refused and contents cash settlement

FirmFinancial Firm (Unknown - Insurer)
Decided2014-09-01
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$10,404
Non-financial loss—
Amount claimed$16,600
SourceAFCA PDF

Summary

The applicant's cyclone damage claim for full roof replacement and $13,600 of contents was partly resolved. AFCA allowed roof fixings of $3,604 and 50% of contents ($6,800), refused full roof replacement and the $3,000 delay compensation.

The onus is on the insured to prove loss from a risk insured against, and expert evidence showed roof damage from the cyclone was limited while the wider roof damage resulted from wear, tear and lack of maintenance.

Issues

Subjects and remedies

natural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Small Business/Farm Insurance - Commercial Property - FSP Decision - Claim amount Determination Case No: 330950 Determination Page 1 of 4 Case number : 330950 12 August 2014 1 Overview 1.1 Dispute The Applicant insured his home and contents under a farm property insurance policy for $265,200 and $65,000 respectively. In January 2013, the house and contents were damaged during Cyclone Oswald. The Applicant submitted a claim for damage to the roof and contents; he also submitted a consequential loss claim for $3,000, due to the length of time taken in processing his claim. The Financial Services Provide r (FSP) refused the Applicant’s claim to replace the roof, offered a cash settlement for the loss or damage to the contents and rejected the Applicant’s claim for compensation. 1.2 Issues and key findings To what extent was the Applicant’s home building and contents damaged by the storm?  The Applicant contends that the entire roof was damaged by the storm and should be replaced. The FSP’s building consultant found that the roof was in a poor condition and was of the opinion that only some iron sheets were lifted during the storm. The Applicant has not submitted any evidence to support his contention that the entire roof requires replacing because of storm damage. The FSP has offered to replace the roof fixings for the amount of $3,604.  The Applicant has submitted a claim for the loss or damage to his contents in the amount of $13,600. The FSP submits that when the Applicant reported the damage to his home building he stated that there was no damage to his contents. The Applicant contends that he did report the damage to his contents.  The Applicant is not entitled to be paid compensation. 1.3 Determination The FSP is entitled to cash settle the claim for:  replacing the roof fixings for the amount of $3,604  loss or damage to the contents for the amount of 50% of $13,600, that is, $6,800  The Applicant is not entitled to payment of compensation for non-financial loss. Case No: 330950 Determination Page 2 of 4 2 Reasons for Determination To what extent was the Applicant’s home building and contents damaged by the storm? 2.1 The onus of proof is on the Applicant to establish, on the balance of probabilities, that he has suffered a loss caused by a risk insured against. Building The Applicant submits that the entire roof of the house was lifted and damaged during the cyclone. However, he has not submitted any evidence in support of his contention. The FSP appointed builder, P, to inspect and report on the damage. P inspected the property on 18 February 2013 and reported that there were water ingress marks on the ceilings of bedroom 1, 2 and 3 and lounge room. However, he also reported there was a large amount of mould present on all ceilings that had been present for some time and was not the direct result of the cyclone storm event. The FSP also appointed a building consultant, S, to inspect and report on the condition of the roof. In a report dated 8 April 2013, S stated:  ceiling linings showed mould and water staining to such an extent that they indicated water ingress into the ceiling over an extended period of time  there were multiple water stains to the hardwood roof structure and evidence of water ingress to the insulation to the top side of the ceiling linings  the metal roof sheets and associated flashings were in an advanced process of deterioration  the metal roof sheets and associated flashings were loose fitti ng as a result of the decayed metal roofing no longer providing solid material for anchorage by the fixings  the torrential rain has contributed to the water ingress into the ceiling cavity of the residence  storm water has entered the ceiling cavity through gaps in the roof cover over an extended period of time due to lack of maintenance to the metal roof cover. Based upon the evidence submitted, the damage to the roof caused by the cyclonic storm was limited to raising a small section of the roof above a bedroom. The evident damage to the entire roof is the result of wear and tear and lack of maintenance. The FSP offered to replace the roof fixings for the amount of $3,604. Photographic evidence supports the FSP’s contention. Contents The Applicant has stated that carpets, five bed mattresses and bases, two wardrobes, clothes, books and a television were damaged by the storm water entering the house through the roof, from under the doors and through the louvre windows. Case No: 330950 Determination Page 3 of 4 The FSP has stated that the Applicant initially did not report his contents had been damaged during the storm nor did he report the damage to builders P or S. The Applicant contends that he did report the damage to his contents when he reported the damage to the roof. On 19 June 2013, the Applicant emailed photographs of the damage to his property and quotations to replace some contents for the amount of $12,795. The FSP reviewed the claim and in letter dated 17 July 2013 it offered to cash settle the claim for 50% of $12,795, that is, $6,398. The Applicant rejected the offers and in July 2013 referred the dispute to FOS. The Applicant submitted revised quotations to replace bedding and the TV in November 2013 and increased the claim amount to $13,600. Although the Applicant has submitted quotations for replacement of some of his contents, he has not submitted any evidence that the contents were damaged by the cyclone storm water. However, given that there is no dispute regarding the intensity of the weather event and the fact the F SP’s experts agree the roof was impacted to some extent, it is reasonable for the FSP to contribute to part of the loss suffered by the Applicant in regard to his contents. Compensation The Applicant is seeking payment of consequential non-financial compensation for the amount of $3,000 on the ground that he considers the FSP was slow in processing his claim. Clause 9.3 b)(i) of the FSP Terms of Reference details that the FSP may compensate the Applicant for non-financial loss where an unusual degree or extent of physical inconvenience or time taken to resolve the situation has occurred. The chronology of events does not support the Applicant’s submission that the FSP unduly delayed the processing of his claim. In view of the circumstances of this claim there is no evidence that the FSP did not process the claim in a timely manner. Case No: 330950 Determination Page 4 of 4 3 Supporting information 3.1 FOS approach for this dispute This dispute has not been the subject of a FOS Recommendation. Due to its nature, it was appropriate to proceed directly to Determination in line with the Operational Guidelines to the FOS Terms of Reference. There has been a full exchange of material between the parties, and each party has had the chance to address any issues raised by the other. 3.2 Information relied upon  reports from builder P and building consultant S  submissions of the Applicant and FSP  Clause 9.3 b)(i) of the FOS Terms of Reference.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.