Home / Financial Firm (Unknown - Insurer) / Determination 330950
Determination 330950
Cyclone roof replacement refused and contents cash settlement
Summary
The applicant's cyclone damage claim for full roof replacement and $13,600 of contents was partly resolved. AFCA allowed roof fixings of $3,604 and 50% of contents ($6,800), refused full roof replacement and the $3,000 delay compensation.
The onus is on the insured to prove loss from a risk insured against, and expert evidence showed roof damage from the cyclone was limited while the wider roof damage resulted from wear, tear and lack of maintenance.
Issues
- Claim denial primary · not upheld
“The FSP offered to replace the roof fixings for the amount of $3,604; the applicant has not submitted evidence the entire roof required replacing.”
- Claim amount dispute secondary · upheld
“it is reasonable for the FSP to contribute to part of the loss suffered by the Applicant in regard to his contents.”
- Delay secondary · not upheld
“The chronology of events does not support the Applicant's submission that the FSP unduly delayed the processing of his claim.”
Subjects and remedies
natural disasterpay claim
Text of the determination
Determination
General Insurance - Small Business/Farm Insurance - Commercial Property - FSP
Decision - Claim amount
Determination
Case No: 330950 Determination Page 1 of 4
Case number : 330950 12 August 2014
1 Overview
1.1 Dispute
The Applicant insured his home and contents under a farm property insurance
policy for $265,200 and $65,000 respectively. In January 2013, the house and
contents were damaged during Cyclone Oswald. The Applicant submitted a claim
for damage to the roof and contents; he also submitted a consequential loss claim
for $3,000, due to the length of time taken in processing his claim.
The Financial Services Provide r (FSP) refused the Applicant’s claim to replace the
roof, offered a cash settlement for the loss or damage to the contents and
rejected the Applicant’s claim for compensation.
1.2 Issues and key findings
To what extent was the Applicant’s home building and contents damaged by
the storm?
The Applicant contends that the entire roof was damaged by the storm and
should be replaced. The FSP’s building consultant found that the roof was in a
poor condition and was of the opinion that only some iron sheets were lifted
during the storm.
The Applicant has not submitted any evidence to support his contention that
the entire roof requires replacing because of storm damage.
The FSP has offered to replace the roof fixings for the amount of $3,604.
The Applicant has submitted a claim for the loss or damage to his contents in
the amount of $13,600. The FSP submits that when the Applicant reported the
damage to his home building he stated that there was no damage to his
contents. The Applicant contends that he did report the damage to his
contents.
The Applicant is not entitled to be paid compensation.
1.3 Determination
The FSP is entitled to cash settle the claim for:
replacing the roof fixings for the amount of $3,604
loss or damage to the contents for the amount of 50% of $13,600, that is,
$6,800
The Applicant is not entitled to payment of compensation for non-financial
loss.
Case No: 330950 Determination Page 2 of 4
2 Reasons for Determination
To what extent was the Applicant’s home building and contents damaged by
the storm?
2.1
The onus of proof is on the Applicant to establish, on the balance of probabilities,
that he has suffered a loss caused by a risk insured against.
Building
The Applicant submits that the entire roof of the house was lifted and damaged
during the cyclone. However, he has not submitted any evidence in support of his
contention.
The FSP appointed builder, P, to inspect and report on the damage. P inspected
the property on 18 February 2013 and reported that there were water ingress
marks on the ceilings of bedroom 1, 2 and 3 and lounge room. However, he also
reported there was a large amount of mould present on all ceilings that had been
present for some time and was not the direct result of the cyclone storm event.
The FSP also appointed a building consultant, S, to inspect and report on the
condition of the roof. In a report dated 8 April 2013, S stated:
ceiling linings showed mould and water staining to such an extent that they
indicated water ingress into the ceiling over an extended period of time
there were multiple water stains to the hardwood roof structure and evidence
of water ingress to the insulation to the top side of the ceiling linings
the metal roof sheets and associated flashings were in an advanced process
of deterioration
the metal roof sheets and associated flashings were loose fitti ng as a result of
the decayed metal roofing no longer providing solid material for anchorage by
the fixings
the torrential rain has contributed to the water ingress into the ceiling cavity of
the residence
storm water has entered the ceiling cavity through gaps in the roof cover over
an extended period of time due to lack of maintenance to the metal roof cover.
Based upon the evidence submitted, the damage to the roof caused by the
cyclonic storm was limited to raising a small section of the roof above a bedroom.
The evident damage to the entire roof is the result of wear and tear and lack of
maintenance.
The FSP offered to replace the roof fixings for the amount of $3,604.
Photographic evidence supports the FSP’s contention.
Contents
The Applicant has stated that carpets, five bed mattresses and bases, two
wardrobes, clothes, books and a television were damaged by the storm water
entering the house through the roof, from under the doors and through the louvre
windows.
Case No: 330950 Determination Page 3 of 4
The FSP has stated that the Applicant initially did not report his contents had
been damaged during the storm nor did he report the damage to builders P or S.
The Applicant contends that he did report the damage to his contents when he
reported the damage to the roof.
On 19 June 2013, the Applicant emailed photographs of the damage to his
property and quotations to replace some contents for the amount of $12,795. The
FSP reviewed the claim and in letter dated 17 July 2013 it offered to cash settle
the claim for 50% of $12,795, that is, $6,398. The Applicant rejected the offers
and in July 2013 referred the dispute to FOS.
The Applicant submitted revised quotations to replace bedding and the TV in
November 2013 and increased the claim amount to $13,600.
Although the Applicant has submitted quotations for replacement of some of his
contents, he has not submitted any evidence that the contents were damaged by
the cyclone storm water.
However, given that there is no dispute regarding the intensity of the weather
event and the fact the F SP’s experts agree the roof was impacted to some extent,
it is reasonable for the FSP to contribute to part of the loss suffered by the
Applicant in regard to his contents.
Compensation
The Applicant is seeking payment of consequential non-financial compensation
for the amount of $3,000 on the ground that he considers the FSP was slow in
processing his claim.
Clause 9.3 b)(i) of the FSP Terms of Reference details that the FSP may
compensate the Applicant for non-financial loss where an unusual degree or
extent of physical inconvenience or time taken to resolve the situation has
occurred.
The chronology of events does not support the Applicant’s submission that the
FSP unduly delayed the processing of his claim.
In view of the circumstances of this claim there is no evidence that the FSP did
not process the claim in a timely manner.
Case No: 330950 Determination Page 4 of 4
3 Supporting information
3.1 FOS approach for this dispute
This dispute has not been the subject of a FOS Recommendation. Due to its
nature, it was appropriate to proceed directly to Determination in line with the
Operational Guidelines to the FOS Terms of Reference.
There has been a full exchange of material between the parties, and each party
has had the chance to address any issues raised by the other.
3.2 Information relied upon
reports from builder P and building consultant S
submissions of the Applicant and FSP
Clause 9.3 b)(i) of the FOS Terms of Reference.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.