Determination 330833
Quality of repairs to brickwork after vehicle impact, and delay in claim handling
Summary
The insured's home was damaged by a vehicle and the insurer repaired the brickwork with a mismatched colour, with a 20-month delay. AFCA found the repairs non-compliant, directed the insurer to rectify the mismatch by toothing out and pay $3,000 for non-financial loss.
The policy requires the closest possible match to existing materials, and the insurer may rectify faulty repairs; the delay and conduct caused unusual inconvenience and stress.
Issues
- Repairs or contractors primary · upheld
“The FSP has not repaired the damaged brickwork in accordance with the terms of the policy; the repairs as completed do not achieve the closest match.”
- Delay secondary · upheld
“delay of approximately 20 months is unacceptable and the delay has been exacerbated by the FSP's conduct.”
Subjects and remedies
home or building damagemotor vehicle collisionpay non financial lossrepair or rectify
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - Service - Delay in Claim
Handling - Quality of Repairs
Determination
Case No: 330833 Determination Page 1 of 6
Case number : 330833 2 6 June 2014
1 Overview
1.1 Dispute
The Applicant lodged a claim under a Home Building Policy for damage sustained
to the property when a motor vehicle was driven into the front of the building on or
about 20 July 2012.
Dispute has arisen as to the quality of repairs and in particular whether the
repaired brickwork achieves a suitable match with the remaining brickwork.
1.2 Issues and key findings
The FSP is liable to repair, replace of the damaged brickwork
The policy is an insured events policy and provides cover for named insured
events including impact from motor vehicle.
The FSP has the option under the policy to agree to repair or rebuild new for old
or to pay the cost of what it would cost to repair or rebuild.
The FSP chose as its option to repair the damaged section of the property.
The brickwork has not been repaired in accordance with the terms of the
policy
The policy provides that the FSP is to use the materials available to achieve
the closest possible match to existing material
In repairing the brickwork, the FSP have used darker bricks in sections
inconsistent with the original brickwork.
The repairs as completed do not achieve the closest match.
The FSP is entitled to rectify any faulty repairs
There is no evidence that the Applicant’s preferred outcome (the replacement
of the repaired section of the wall with bricks she has sourced) will address
the colour mismatch.
The FSP has proposed two reasonable options for the rectification of the
mismatch
The mismatch is likely to be rectified if the FSP is allowed to clean the relevant
damaged walls and “tooth out” the mismatching bricks.
Is the Applicant entitled to compensation?
The Applicant is entitled to compensation pursuant to paragraph 9.3 of the Terms
of Reference because:
Case No: 330833 Determination Page 2 of 6
The original damage occurred in July 2012
The FSP’s representative did not attend the property until March 2014 to view
the colour mismatch.
The delays have caused an unusual degree of inconvenience and have
caused considerable stress and anxiety to the Applicant.
1.3 Determination
The Applicant is to allow the FSP the opportunity of cleaning the brickwork in both
the repaired and undamaged sections of the wall and to rectify the colour
m ismatch by using the “toothing out” option as offered to the Applicant.
In attending to the “toothing out” option, the FSP is to replace the repaired
brickwork with bricks sourced by the Applicant.
The Applicant is to allow the FSP to clean the brickwork in both the repaired and
undamaged sections of the wall and to address any outstanding issues with the
mortar and perpendicular joints in the brickwork.
In the event that the Applicant is not prepared to allow the FSP to complete the
repairs, the FSP is entitled to settle the Applicant for the cost of the remaining
work subject to obtaining an independent Scope of Works and quotation.
Further, the FSP is to pay the Applicant compensation pursuant to paragraph 9.3
of the Terms of Reference in the sum of $3,000 for non-financial loss.
Case No: 330833 Determination Page 3 of 6
2 Reasons for Determination
2.1 Is the FSP entitled to replace or repair the damaged brickwork?
The Applicant’s policy is a Home and Contents Insurance Policy that covers the
Applicant’s property for damage sustained in a series of de fined or insured
events.
Included within the insured events is the event of impact from a motor vehicle.
There is no dispute that the Applicant’s property was damaged when a motor
vehicle lost control colliding with the front of the property in July 2012. The
damage falls within the terms of the policy.
The policy specifically provides an option to the FSP as to the method of
settlement of any claim.
At the FSP’s option, the FSP can chose whether to repair damage new for old , or
rebuild a home new for old or pay what it would cost to repair or rebuild.
There is no dispute in the current matter that the FSP chose to repair the
Applicant’s home.
In doing so, the FSP’s obligation under the terms of the policy is to do their best to
obtain new materials that are of the same type, standard and specification as
when new. If those materials are not available, the FSP is to use new materials of
the similar type, standard and specification and where it cannot find new materials
to match undamaged parts is to use the closest match available to it.
The FSP is entitled to repair the damaged brickwork in accordance with the terms
of the policy.
Has the FSP repaired the damaged brickwork in accordance with the terms
of the policy?
The FSP has not repaired the damaged brickwork in accordance with the terms of
the policy.
Various reports have been provided by both parties as to the original repairs
conducted to the Applicant’s property after lodgement of the claim on or about 20
July 2012.
Photographs exchanged and taken by the FSP’s assessor at the time of the
original assessment reveal the damage sustained to the brickwork and the nature
of the matching brickwork. The photographs identify the use of darker bricks in
part of the repaired brickwork.
The FSP’s original builder B maintains that they agreed to the brickwork repair in
consultation with the Applicant. The Applicant strongly disputes this. I find it
unlikely that the Applicant would have agreed to the use of the darker bricks.
In view of the dispute as to the quality of the repair work, I conducted a site
inspection of the property in the presence of the Applicant, her brickwork advisor
and the FSP on 20 March 2014.
Case No: 330833 Determination Page 4 of 6
It was apparent from the site inspection that the repaired brickwork did not
achieve a match with the existing brickwork due largely to the use of the darker
bricks within the repaired brickwork pattern.
During the site inspection, the FSP ’s representative admitted he had not been to
the Applicant’s property previously bu t agreed that the bricks did not appear to be
the closest possible match.
The issues with the repaired brickwork are not limited to the colour mismatch; in
particular, there appears to be a significant difference the size and the colour of
the mortar in the perpendicular joints of the repaired and the undamaged sections
of wall.
Is the FSP entitled to attempt to rectify the repairs?
The FSP is entitled to attempt to rectify the repairs.
The FSP proposed two options for the rectification of the colour mismatch in the
repaired brickwork:
The FSP clean the damaged brickwork and mortar to rectify the mismatch in
mortar colour and perpendicular joints
the bricks in the repaired brickwork would then be chemically colour-matched
and an anti-graffiti membrane would be applied to the surface of the entire
wall or
the individual darker bricks in the repaired brickwork would be “toothed out”
and replaced with bricks of the Applicant’s choice .
The Applicant has rejected the chemical treatment option, maintaining her
investigations show that the application of an anti-graffiti coating to the wall would
affect the colouring of the bricks . Further, a “non - sacrificial” coating would have a
gloss finish while a “sacrificial” type coating it would need to be reapplied each
time graffiti was cleaned from the wall, making it costly to maintain.
The “toothing out” option has also been rejected by the Applicant, on the basis
that the mismatch is more extensive than the darker bricks and there are other
issues with the repaired brickwork.
Consistent with discussions at the 20 March 2014 meeting:
the Applicant should allow the FSP to totally clean the repaired and the
undamaged sections of the brick wall. This will reveal the true extent of the
issues with the perpendicular joints
the Applicant should allow the FSP to address any remaining issues with the
perpendicular joints to the brickwork.
Providing the FSP is able to address the issues with the perpendicular joints (and
if disputed the FSP should obtain a report from an independent brick specialist,
produced at the FSP’s expense), and in recognition of the Applicant’s concerns
with the anti-graffiti coating, I am satisfied that the most appropriate method of
rectification is the “toothing out” of the darker bricks and use of replacement with
bricks sourced by the Applicant to achieve the closest match.
I f the Applicant does not agree to the “toothing out” rectification, the FSP is
entitled to cash settle the Applicant based on what it would cost to perform the
rectification, subject to obtaining an independent Scope of Works and quotation.
Case No: 330833 Determination Page 5 of 6
In the event that the FSP is not able to address the issues with the perpendicular
joints, it is required to replace the repaired section of the wall with bricks sourced
by the Applicant. In these circumstances, the FSP would not be required to
address any colour mismatch which results from the replacement.
Completion of Internal Repairs
The internal repairs of the Applicant’s property , which do not form part of this
dispute, are yet to be completed and are pending the resolution of the dispute
with respect to the colour mismatch:
if the FSP replaces the repaired brick wall (as a result of being unable to
address the issues with the perpendicular joints), or performs the “toothing
out” rectification, it is required to subsequently complete the internal repairs
if the Applicant opts for cash settlement, the FSP is to allow for the internal
repairs in the settlement amount, as part of the independent Scope of Works
and quotation.
2.2 Is the Applicant entitled to compensation?
The Applicant is entitled to compensation for non-financial loss pursuant to
paragraph 9.3 of the Terms of Reference.
Paragraph 9.3 of the Terms of Reference provides compensation of up to $3,000
may be paid to an Applicant for non-financial loss where there has been an
unusual degree of inconvenience or time taken to resolve the dispute that has
impacted on the Applicant’s enjoyment of life.
The Applicant’s dispute arises from an incident on 20 July 2012.
Since that time, the Applicant has raised numerous issues with the FSP and in
including issues with the first builder whose building work it is now conceded was
inadequate.
Many of the issues raised by the Applicant ha ve been resolved, however, the
major issue relating to the quality of the repairs of the external brickwork remains
a significant concern.
It is apparent from the site inspection on 20 March 2014 that this was the first time
senior personnel from the FSP had arranged to a ttend the Applicant’s property to
deal with her concerns.
If the FSP had looked closely at the photographs of the repaired building it had on
file it would have been able to identify the Applicant’s concerns as reasonable
concerns much earlier in the process.
It is likely that in the event of the FSP senior personnel attending at an earlier
time, the issues and options for settlement of those issues would have been
identified.
The FSP has acknowledged that the Applicant has been inconvenienced and
stressed by its delay and offered the Applicant the sum of $1,500 which has been
rejected.
In my view, the inconvenience, delay and stress in this matter has been
considerable. Not only has the Applicant been stressed by the FSP’s apparent
Case No: 330833 Determination Page 6 of 6
failure to acknowledge the seriousness of her complaint, but she has been left in
a position with the internal repairs of the property uncompleted whilst the issue
with the external brickwork is resolved.
In my view, delay of approximately 20 months is unacceptable and the delay has
been exacerbated by the FSP’s conduct . In the circumstances, it is appropriate
that the Applicant be awarded the sum of $3,000 compensation for non-financial
loss.
3 Supporting information
There has been a full exchange of material between the parties and each party
has had the opportunity of addressing the issues that arise from the material
exchanged.
I have had the opportunity of reviewing all of the material as well as conducting an
inspection of the Applicant’s property prior to making this Determina tion.
Key Information
Site inspection 20 March 2014
Engineers report 6 May 2013
Structural report on cracking to the Applicant’s property
Brick Specialist report A Bricks 28 November 2013
Site visit and report
Statement from BW
A brick report 8 February 2014
Applicant’s statutory declaration 18 February 2014
A brick report 19 February 2014
Various submissions from the Applicant
Engineering reports DK dated 30 July 2012, 5 March 2013, 12 April 2013, 24
June 2013
Assessors’ reports 23 July 2012, 19 Septembe r 2012, 27 November 2012, 11
December 2012, 4 February 2013, 18 April 2013, 20 May 2013
CS reports 2 October 2012, 1 March 2013, 17 October 2013
Building reports 30 October 2013, 29 October 2013, 6 November 2013
C quotation for repairs 7 April 2014.