Home / Financial Firm (Unknown - Insurer) / Determination 330584

Determination 330584

Denial of swimming pool damage claim under exclusions and repairer conduct

FirmFinancial Firm (Unknown - Insurer)
Decided2014-05-29
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant claimed for swimming pool damage after a 2005 storm claim, and the FSP denied liability under exclusions. AFCA found the pool was left empty for about 12 months during the FSP's authorised repairs, causing hydrostatic pressure damage, so the FSP must pay for the repairs with interest.

The insurer is responsible for its appointed repairer's conduct, and the dominant cause was the prolonged emptying during repairs rather than the excluded hydrostatic pressure.

Issues

Subjects and remedies

home or building damagepay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 330584 Determination Page 1 of 8 Case number: 330584 General Insurance - Domestic Insurance - Home Building - Storm - Service - Delay in Complaint Handling - FSP Decision - Claim Amount - Proximate Cause 28 May 2014 Summary Description  Claim under a Home Building Policy for storm damage to the swimming pool and subsequent damage due to poor repairs. The FSP has relied on policy exclusions to deny the claim. Basis of Determination  The pool was damaged during a storm in March 2005. During the repair process, the pool was emptied and remained empty for a significant period.  As a result of the repair process and delays, the pool was subjected to hydrostatic pressure which most likely caused the pool to lift and the subsequent damage.  The proximate cause of the damage was the failure to carry out the repairs appropriately. Determination  The FSP is to meet its liability to cover the costs of the repairs to the swimming pool in accordance with the terms of the policy. Background 1. The Applicant held a home building insurance policy with the Financial Services Provider (FSP), which covered against accidental damage. 2. In March 2005, the Applicant lodged a claim for storm damage due to lightning strike to a retaining wall, a septic tank and the water filtering system of a swimming pool. The FSP accepted the claim and authorised the repairs. 3. Later, in 2007 and 2008, the Applicant advised the FSP the pool appeared to be leaking and then it had “popped a bit”. Determination Case No: 330584 Determination Page 2 of 8 4. In 2013, the FSP denied liability on the basis there was no damage to the pool that was attributable to the original claim or alternatively any damage to the pool was due to causes excluded from cover under the policy. 5. The Applicant disagrees with this decision and wants the FSP to pay for the repair or replacement of the pool. S ummary of Applicant’s position 6. The Applicant says:  The pool was damaged either by lightning during the 2005 storm or by the FSP’s repairer (R). When tending the original claim’s repairs, the pool was emptied for safety reasons and it was then discovered a large area of pebblecrete at the deep end had detached from the pool shell.  The pebblecrete was repaired but the pool remained empty for a long time until the retaining wall was finished. Sometime after the pool being refilled, he used it and noticed it had lifted in one corner.  For rust to appear in the area where the repairs were carried out, the pool must have lifted recently. As lifting can cause cracks, these must be present and affecting the pool’s metal reinforcement.  He has found a leak in the spa, which leads him to believe there is an issue with the plumbing, which may have suffered damage at the same time the pool lifted.  He should not be denied indemnity when it was R who emptied the pool without testing the hydrostatic relief valve (the valve). The FSP’s obligation is to reinstate the pool to its former state. Summary of FSP’s position 7. The FSP says:  In 2008, when the Applicant reported the lifting issue of the pool, it arranged its loss assessor (C) to attend and engaged R to report on the cause of the leaking. R retained a leak detector (AL) to test the pool.  It also engaged an environmental engineer (AA) to test the soil around the pool for salt water contamination and a building consultant (H) to conduct a site inspection.  Further, it engaged a structural engineer (D) to provide three reports on the damage, one of which was done at claims review. It also reviewed the reports from the Applicant’s structural engineers (RH and GH) and a pool consulting company (AP).  In light of all this information, the FSP concludes there is no outstanding damage from the original 2005 claim or alternatively the Case No: 330584 Determination Page 3 of 8 damage was due to movement of foundations, wear and tear, inherent defects and/or hydrostatic pressure, which are all excluded from cover. 8. The FSP relies on the following policy provisions contained within the Product Disclosure Statement: “ What you are insured against, and what you are NOT You are insured against malicious damage, accidental loss or damage (including the Specified Events listed below) to your home, contents or both at the site during the period of insurance. … Specified Events ‘Specified Events’ means loss or damage directly caused by the following events (a) to (r): … (b) lightning … Additional exclusions applying to this Policy These additional exclusions apply to cover for your home, contents, additional benefits and valuables (if you have chosen that option). This Policy does not cover: … (b) loss or damage resulting from or caused by:  …  erosion, subsidence, landslide or earth movement other than as a direct result of: − storm − earthquake − explosion − escaping liquid and occurring no more than 72 hours after the event  …  inherent defects, structural defects, faulty workmanship or faulty design  wear, tear, rust, corrosion, depreciation or gradual deterioration  …  settling, shrinkage, or expansion in buildings, foundations, walls or pavements  …  damage to swimming pools or similar structures caused by hydrostatic pressure ” . Case No: 330584 Determination Page 4 of 8 Issue 9. Whether the FSP is liable for the damage to the pool either as part of the original claim or as a result of R’s actions. Reasons for decision 10. As advised to the parties, due to the nature of the dispute, the Financial Ombudsman Service (FOS) has considered it appropriate to expedite the dispute to Determination in accordance with the Operational Guidelines to the FOS Terms of Reference. 11. I am satisfied a full exchange of information has taken place between the parties and each party has had the opportunity to address the issues raised. 12. It is not in dispute a retaining wall, a septic tank and a pool’s water filtering system were damaged by lightning during a storm in 2005 and the FSP accepted liability. The central issue in dispute is whether further damage to the pool’s structure was caused by the storm or as a result of R’s repairs. Damage related to the previous 2005 claim  There seems not to have been any indication of damage to the pool when assessing and repairing the claimed damage in 2005. This is support ed by C’s first report of April 2005 and C and R’s advice to D.  In brief, C did not identify any pool damage in its first report, R noticed the pebblecrete was drummy when the pool was emptied but did not notice cracking to the lining or the concrete slab below it. C allowed the repair of the lining, but never accepted it as part of the claim. Rust stains on the pool floor and walls  D considers some stains are away from the claimed lightning strike area and thus could not have been caused by it. D also says they may have been caused by pre-existing cracks being reopened by hydrostatic pressure build-up due to infiltration of sub-surface water.  AP says one possible cause could be the fact the pool was left empty for approximately 12 months, the pebblecrete becoming drummy and allowing water penetration under the pebble interior.  AP explains if water has penetration through cracking in the original pool shell, this could have led to water penetrating the steel, causing the rust marks.  GH considers the pool lifted, causing delamination of the base adjacent to the northeast corner and causing the reinforcement exposed within cracks in the pool base to rust. Difference in water level against the coping of the pool  H and RH agree the difference is 15mm. H considers this does not mean the pool has lifted but it means the pool was originally built that Case No: 330584 Determination Page 5 of 8 way. RH argues it means the pool has risen by 15mm, without causing other consequential damage.  D, after engaging a surveyor, says there is no observed change in the levels of the pool and it has not undergone settlement within a three- week period of surveys. H, RH and D agree the difference is within current trade tolerance standards.  AP and GH say the difference is of 25mm. AP says the pool being out of level is consistent with the fact it was left empty for a prolonged period of time.  GH says there is no evidence to support the pool was built out of alignment, thus the pool would have suffered lifting damage as a result of ground water pressure and this could only have happened when the pool was left empty without having released the valve. Cracking damage  H notes no damage.  There seems to be a contradiction in D’s evidence. First D notes there is no observable damage to the pool coping and lining and concludes the pool structure is undamaged and sound and later D says the pool floor and walls have cracking damage.  D says the cracking must have been due to initial shrinkage following construction, temperature effects, the effect of construction joints or general foundation movement and the cracks must have self-healed, but subsequent infiltration of sub-surface water leading to hydrostatic pressure build-up over a period could have caused the cracks to reopen. Cavities in the perimeter behind the pool coping  H says subsidence of backfill soils under the paving slab is common and likely to continue to occur.  AP explains in the deep end area of the pool, water can become trapped and now large voids are evident down behind the coping. AP notes one of these voids measures 2.7m and they relate to water penetrating down behind the pool in the cavity areas.  GH says the pool was left in a vulnerable state when it was emptied due to not releasing the valve and demolishing the retaining wall.  The removal of lateral support to the ground immediately behind the pool’s northeast corner caused voids to form where the soil loosened behind the pool wall. Drumminess of the pebblecrete lining  D considers the drumminess of the lining is due either to wear and tear and lack of maintenance or a potential fault in the valve, which in turn would have caused slow leakage of pool water, destabilising the pool. Case No: 330584 Determination Page 6 of 8  AP says during repairs in 2005, the pool was emptied and remained so for close to 12 months, during which time the pebblecrete interior around the deep end became drummy and had to be replaced. Overall cause of damage  D and H consider the pool has not lifted or moved and RH, AP and GH are of the view it has lifted.  RH considers the lightning could have been sufficient to cause delamination of the render and this could have moved the pool and there is clear evidence of movement due to the voids on the outside of the coping.  On that point, D notes lightning would have a caused more severe damage and there was no evidence of same back in 2005.  RH says otherwise, the lifting of the pool would have been caused by hydrostatic pressure during the process of repair when the pool was temporarily drained.  AP says the voids allow water ingress behind the deep end of the pool, all of which can cause hydrostatic pressure build-up and cause the pool to lift. AP also notes the movement behind the pool coping, indicates the pool may have slightly risen in relation to the ground level.  GH says the pebblecrete floor was delaminated from the structural concrete at the deep end of the pool in the area of the rust stains .  GH says the pool was empty for 12 months while the retaining wall was repaired. GH notes during this time, no attempt was made to release the valve at the base of the pool so as to guard it against build-up of ground water pressure under the pool.  GH says the voids were caused by the lack of support when the retaining wall was demolished and notes the pool is embedded in clay soil, which is prone to shrinki ng and swelling due to moisture.  GH concludes an increase in groundwater, exacerbated by inflows of surface water into these voids has caused the ground to swell under the pool, water pressure to build up and the pool base to lift. 13. The FSP in its last submission says that its experts indicate the pool did not lift and that even if the Applicant’s experts indicate the pool lif ted due to hydrostatic pressure, this is excluded under the policy. The FSP concludes there is no pool damage but in the alternative there is, it is excluded. 14. Neither the FSP nor R deny having had the pool empty for close to 12 months while repairs where done. There is also no evidence whether during this time R used the valve to ensure any water pressure under the pool was released or employed any other pre-emptive measure to avoid potential damage to the pool. 15. The FSP, through its experts has presented several potential exclusions such as inherent or structural defects, faulty workmanship or design, Case No: 330584 Determination Page 7 of 8 hydrostatic pressure and for the lining drumminess, wear and tear, lack of maintenance or a faulty valve. 16. Having reviewed the parties’ material, I am not satisfied any of these exclusions are established, as the FSP’s expert material strongly suggests the inspections were visual (save for the evaporation test and measuring of water levels) and presents the excluded causes as hypothetical causes without further explanation. This is a similar scenario in RH ’s findings . 17. In that sense, I consider the FSP’s experts provide no satisfactory explanation or sufficiently identify what the defect, faulty workmanship or design or lack of maintenance is or provide confirmation the valve was faulty. 18. Similarly, I am not convinced RH has provided a satisfactory explanation as to how the levels of the pool indicate movement having occurred in a particular corner of the pool. 19. On the other hand, I consider AP and GH’s evidence provide a reasonable explanation as to the cause of damage. 20. Following AP and GH’s evidence, I understand the cause of damage was the pool being left empty for a prolonged time while the retaining wall was demolished, which in turn caused movement of loosened soil around the pool, creating voids. This combined with hydrostatic pressure build-up and surface water going into the voids resulted in the pool lifting and the damage to the pool reinforcement. 21. The FSP or its experts have not addressed or contested this explanation. Instead the FSP has limited itself to explaining that if hydrostatic pressure is the cause, then this is excluded. 22. In the absence of evidence or an argument to the contrary, I accept the cause of damage was on the balance of probabilities, hydrostatic pressure build-up, which occurred due to the fact the pool was left empty for close to 12 months during repairs. 23. The FSP seems to consider it can rely on its hydrostatic pressure exclusion in that case. However, I am not satisfied one can conclude the hydrostatic pressure was the proximate cause of damage and rely on the exclusion. 24. Case law provides the proximate cause is not determined by identifying the last event or final trigger, but by determining what is the dominant or effective or operative cause, whether or not the last in time or the sole cause. 25. In my view, the proximate cause of damage in this case would not have been the hydrostatic pressure, but leaving the pool empty for almost 12 months, allegedly without any preventative measures . 26. I am satisfied there is no dispute the repairs, including leaving the pool empty, were the responsibility of R, a repairer authorised by the FSP. That is the FSP was responsible through its agent for the repairs and to ensure all Case No: 330584 Determination Page 8 of 8 appropriate steps were taken during the repair process to protect against further damage. 27. In ordinary circumstances, an insurer is responsible for the actio ns of contractors it appoints to attend to insured damage. Therefore, I am satisfied the FSP is responsible for the actions of R. As I accept on the balance of probabilities, the proximate cause of the subsequent damage was the repair process, then the FSP is liable of the loss. 28. Accordingly, I am satisfied the FSP is liable for the damage to the pool on the basis it was caused by the actions of R. Determination 29. On the basis of the available information, I determine the FSP is to pay for the repair of the damage to the pool, namely the lifting damage and the rust stains in accordance with the terms and conditions of the policy. 30. Insofar as the FSP determines to cash settle the claim, the FSP is to pay interest on the settlement amount in accordance with section 57 of the Insurance Contracts Act 1984 from 30 August 2013, being the date of the FSP’s final decision, to the date of payment of the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.