Home / Financial Firm (Unknown - Insurer) / Determination 330320
Determination 330320
Claim amount - earthquake damage
Summary
A strata body corporate claimed for earthquake damage to four units after the June 2012 Moe earthquake. AFCA found the damage was mainly caused by settlement, so the FSP need not pay more than its 20% offer for internal surface damage.
The proximate cause of the internal and external damage was structural stress from foundation soil movement, and the earthquake at most exacerbated some internal cracking.
Issues
- Claim denial primary · not upheld“The FSP was entitled to rely upon the associated exclusion clauses in its partial denial of the claim.”
- Claim amount dispute secondary · not upheld“The FSP's offer of settlement of the internal damage for $1,866.80 representing 20% is fair and reasonable.”
- Delay secondary · unclear“The Applicant submitted that the delay in admitting liability contributed to the repairs required.”
Subjects and remedies
home or building damagenatural disasterno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 330320 Determination Page 1 of 7
Case number: 330320
General Insurance - Domestic Insurance - Residential Strata Title - FSP
Decision - Claim amount
08 January 2014
Summary
Description:
A claim under a residential strata insurance policy for damage sustained to a
number of units following the Moe earthquake on 19 June 2012. The FSP
have offered to pay 20% of the cost of rectifying the internal surface damage
but otherwise have denied indemnity on the basis that the identified damage
was not attributable to earthquake.
Basis of Determination:
On 19 June 2012 a 5.4 magnitude earthquake occurred with an epicentre
approximately 10kms south west of Moe.
Tremors were felt up to 252kms from the earthquake tremor and felt in
Elwood where the units, subject of the claim are located.
Internal and external damage was observed to units 1, 2, 3 and 4.
Although the loss adjustor identified a possible relationship between some of
the internal damage and the earthquake, the report from the building
practitioner, JM, and engineer, RB, identified the majority of the damage was
not due to earthquake.
The Applicant has offered no independent evidence to establish a relationship
between the damage sustained and the earthquake.
Determination:
The FSP is entitled to rely upon the exclusion contained within the terms of
the policy to deny the balance of the claim.
Determination
Case No: 330320 Determination Page 2 of 7
Background
1. The Applicant held a residential strata insurance policy with the Financial
Services Provider (FSP) which was current at the time of the loss.
2. On 25 June 2012, the Applicant lodged a claim for internal and external
property damage following an earthquake that occurred on 19 June 2012.
3. The FSP engaged a loss adjustor (PI), a building practitioner (JM) and an
engineer (RB) to assess the damage claimed.
4. Upon receipt of the associated reports, the FSP denied indemnity for the
majority of the damage claimed on the basis it was not attributable to the
earthquake, but did offer 20% of the cost to rectify internal surface damage
on the basis the earthquake may have exacerbated same.
5. The Applicant disagrees with the FSP’s decision and expects it to honour the
entire claim.
Summary of Applicant’s position
6. The Applicant is the Secretary of the relevant Body Corporate Strata Plan
and acts in his capacity as an authorised representative of the respective
unit owners.
7. The Applicant submits:
the FSP is admitting a partial contribution to the claim which directly
implies the earthquake did cause damage to the property;
three of the four units had recently had repairs undertaken and it was
only after the earthquake that new cracks and the re -emergence of old
damage appeared. But for the earthquake, this would have been an
unlikely outcome;
there are a number of witnesses who were present at the time of the
earthquake who can testify the cracks appearing immediately after
same;
workmanship and building practices during the 1960s, when the units
were constructed, were not consummate with today’s building code;
the FSP’s expert reports focus on trees surrounding the property,
drainage and foundation soils as opposed to the earthquake which
shook the properties in question; and
the delay in the FSP admitting liability for the damage has further
contributed to the repairs required.
Case No: 330320 Determination Page 3 of 7
Summary of FSP’s position
8. Its experts have concluded the earthquake did not cause the damage
claimed but it has provided indemnity in the amount of $1,866.20 on the
basis of RB’s opinion that some internal surface damage may have been
exacerbated by the earthquake.
9. The FSP relies on the following policy provisions:
“ General definitions - the meaning of some words
...
Earth Movement
means heavage, landslide, land-slippage, mudslide, settling, shrinkage,
subsidence or collapse.
...
Exclusions - what we do not insure
1. We will not pay for loss or damage:
...
c) caused by a lack of maintenance, rust, oxidation, corrosion, Wear,
Tear, fading, gradual corrosion or gradual deterioration, concrete or
brick cancer, developing flaws, wet or dry rot, or failure to maintain
Your Insured Property in a reasonably good state of repair.
...
g) caused by vibration or from the removal or weakening of or
interference with the support of land or buildings or any other property,
Erosion or Earth Movement.
However We will pay if loss or damage is due to:
i. earthquake or seismological disturbance
...
i) caused by the invasion of tree or plant roots nor for the cost of clearing
pipes or drains blocked by such invasion.
...
m) due to normal settling, creeping, heaving, seepage, shrinkage, or
expansion in buildings, foundations / footings, walls, bridges,
roadways, kerbing, driveways, paths, garden borders and other
structural improvements.
...
2. We will not pay for:
...
b) the cost of rectifying faulty or defective materials or faulty or defective
workmanship” .
Case No: 330320 Determination Page 4 of 7
Issue
10. Whether the FSP has correctly indemnified the Applicant for the damage
claimed.
Reasons for decision
11. As advised to the parties, the Service has considered it appropriate to
expedite this dispute in accordance with the Operational Guidelines to the
Service’s Terms of Reference , due to the circumstances of the dispute.
Accordingly, this dispute has not been the subject of a Recommendation and
has proceeded directly to Determination.
12. I am satisfied there has been a full exchange of material between the parties
and that each party has had the opportunity of clarifying the issues that arise
from the material.
13. I have reviewed the submissions of the parties in relation to the terms and
conditions of the policy and will only refer to the relevant submissions and
materials raised.
14. There is no dispute between the parties that on 19 June 2012 a 5.4
magnitude earthquake with an epicentre approximately 10kms south west of
Moe caused earth tremors affecting the areas surrounding the Applicant’s
property.
15. A copy of the Geosciences report identifies that the earthquake could have
been felt by people up to 252kms from the epicentre and that could have
caused damage up to 20kms. The report does not identify how it defines
damage or whether the tremors would have been sufficient to cause minor
s tructural cracking of the Applicant’s property.
16. Following lodgement of the Applicant’s claim, the FSP arranged for (PI) an
independent loss adjustor and assessor to attend the property. PI attended
the property on 28 June 2012 and in a report dated 27 July 2012, identified
that the nature and location of the cracking of units 1, 2 and 3 may be
consistent with earthquake damage sustained to internal areas, whilst
inspection of unit 4 identified the damage consistent with long term
deterioration and inadequate maintenance. Insofar as external damage was
concerned, the report identifies the external damage to unit 2 as being long
term pre-existing and external damage to unit 4 also being long term pre-
existing.
17. Following this report, (TBS) was appointed to quote on the damage. In a
report dated 23 August 2012, TBS offered the opinion that all of the damage
was pre-existing.
18. The FSP subsequently appointed (JM) a building contractor to inspect the
property and provide a more detailed report. In a report dated 16 October
2012, JM reported as follows:
Case No: 330320 Determination Page 5 of 7
JM had been involved in a wide range of building foundation problems
in Elwood over many years. The main reason for this had been the
unsuitable footing construction of buildings on heavily filled land which
was formall y a swamp. JM considered the Applicant’s property was no
exception.
Based on the Geo science report and in particular, the damage could
not occur at greater than 20kms radius. JM considered the alleged
damage as indicated in the current claim would be most likely due to
other causes.
Drainage around the unit is generally poor.
Minor floor movement is consistent with unsuitable external strip wall
footings as well as stump footing construction.
The ceiling plaster was in generally poor condition and had been poorly
fixed.
The very large Playne trees in the street outside would have
contributed to some slight footing rotation and associated wall
misalignment.
Having investigated the underlying causes of each problem, JM was of
the opinion that the earth tremor had not been responsible but that
other unrelated causes were the main reasons for the damage.
19. As the Applicant disputed these findings, the FSP appointed (RB) a
consultant and engineer, to provide an engineering report. Following
inspection of each of the units, both internally and externally on 3 January
2013, RB concluded as follows:
The damage in each of the units is practically identical with units
exhibiting:
Cracking in external brick walls
Roof settlement
Cracking in internal walls and ceilings
The primary cause of the damage is settlement of the footings under
the building due to the fluctuation in the moisture contents of the soil
over many years.
The damage has been exacerbated by poor workmanship around the
window sills and lack of articulation joints.
The damage to the property had not been directly caused by the
earthquake event of 19 June 2012.
Case No: 330320 Determination Page 6 of 7
Some of the cracking to the internal walls and ceilings may have been
exacerbated by the earthquake event. It is possible the earthquake
event may have opened up some cracks and created new ones that he
would estimate the amount of damage to the internal surfaces only
caused by the earthquake would be no more than 20%.
20. Although the Applicant disputes these findings and maintains the comments
of the structural engineer are in direct conflict with verbal comments made to
the Applicant and owner of unit 1, the Applicant has not provided any
statements from witnesses or any appropriately qualified expert to dispute
the findings.
21. On the basis of the information exchanged, I am satisfied that the
earthquake tremor was not the proximate cause of the external damage to
the units and I am satisfied based on the findings of the structural engineer
that at best, the earthquake may have exacerbated some internal cracking.
T he FSP’s assessment that the extent the internal damage may have been
exacerbated would be no more than 20% is reasonable in the
circumstances. T he FSP’s offer of settlement of the internal damage for
$1,866.80 representing 20% of the damage to the internal surfaces is fair
and reasonable.
22. In reaching this finding, I am mindful of the further report provided by RB
dated 10 January 2013 in which he states:
“Images 1.8 to 1.11 show views of damage to some of the internal walls of
Unit 1. These show a variety of cracking types including separation, tearing
and folding in the plasterboard. The same sort of damage can be seen to the
walls and ceilings in the other units in Images 2.10 to 2.13, 3.9 and 3.10 and
4.4 to 4.7.
Most of these are symptomatic of settlement, expansion and shrinkage over a
number of years. It is possible however that the earthquake may have caused
the building to relieve some built-up tensions that were originally caused by
settlement. This does not mean the prime cause event was the earthquake
but that the earthquake may have precipitated and quickened some damage
that was already taking place.”
23. From the evidence available, I am satisfied the proximate cause of the
internal damage, as with the external damage, has been structural stresses
resulting from differential movement of the foundation soils.
24. On this basis, I am satisfied the FSP was entitled to rely upon the associated
exclusion clauses referred to above in its partial denial of this aspect of the
claim and acted reasonably in providing cash settlement for the remainder in
the event the earthquake did exacerbate same.
Case No: 330320 Determination Page 7 of 7
Determination
25. On the basis of the available information, I determine the FSP is not required
to provide additional indemnity in relation to the Applicant’s claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.