Applicant claimed for water damage to her balcony, which she attributed to a June 2012 storm. The FSP denied the claim under exclusions for water entering without a storm-created opening and for structural defects, and AFCA agreed, also declining the $440 report fee.
The insured's prima facie claim was accepted, but water entered without a storm-created opening and did not fall within run-off, so the policy exclusions apply.
Issues
- Claim denial primary · not upheld
“The FSP is entitled to deny liability for the claim; water did not enter through a storm created opening.”
- Inadequate claim investigation secondary · not upheld
“I accept the reports support the FSP's contentions that the damage occurred through structural defects and faulty workmanship.”
- Product terms interpretation secondary · not upheld
“The exclusions are clear in their meaning and apply to the available evidence.”
Subjects and remedies
home or building damageno remedy
Text of the determination
Case No: 329866 Determination Page 1 of 13
Case number: 329866
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim - Exclusion/Condition
26 March 2014
Summary
Description:
This dispute concerns a claim by the Applicant under a home building and
contents insurance policy for storm damage to a balcony.
Basis for Determination:
The FSP is entitled to deny the claim as it is accepted on the information
provided that it can rely on an exclusion that the damage was not caused by
water entering the balcony through a storm created opening.
Determination:
The FSP is entitled to deny liability for the claim.
The FSP is not required to reimburse a report fee.
Background
1. I have reviewed all the material submitted by the parties and save where I
make note specifically, I am satisfied the Background as set out in the
Recommendation is accurate and is as follows.
2. The Applicant held a home building and contents insurance policy with the
Financial Services Provider (FSP) from 3 October 2010 and the policy was
current at the time of the loss.
3. On 20 March 2013, the Applicant lodged a claim with the FSP for water
damage sustained to the all steel barn style balcony structure of the property
in June 2012.
4. The FSP declined liability for the claim on the grounds the policy excludes
cover for a loss caused by water entering or seeping into the building as a
result of structural issues and/or when the water did not enter the building via
a storm created opening.
Determination
Case No: 329866 Determination Page 2 of 13
5. The Applicant expects the FSP to honour the claim and as she did not agree
with the FSP‟s decision, the dispute was the subject of a Recommendation.
The Recommendation was in favour of the FSP and was not accepted by the
Applicant. The FSP accepted the Recommendation. In the circumstances,
the matter has been referred to me for Determination.
Summary of Applicant’s p osition
6. I have reviewed all the material submitted by the parties and save where I
make note specifically, I am satisfied the Applicant‟s position as set out in
the Recommendation is accurate and is as follows.
7. The Applicant is represented by an insurance broker and for ease of
reference the Applicant and the broker will hereinafter be referred to as
„Applicant‟.
8. The Applicant disputes the FSP‟s findings the loss had occurred over a
period of time and says the damage was caused by a torrential storm.
9. There had been no previous damage to the property prior to the loss event
or any new damage thereafter.
10. The Applicant is satisfied the property was constructed in line with the
building regulations current at the time of construction in 2003.
11. The Applicant says the images of a balcony from the manufacturer (E)
captured by the FSP‟s building consultant (G) are not similar.
12. She says E‟s structure was built in 1989 and not in the last few years as
recorded by G.
13. The Applicant says the balcony should be considered a dry ground and as
such the rainwater that flowed over dry ground should be considered as
runoff and the claim accepted under the policy.
14. The Applicant rejected the Recommendation and p rovided two further letters
in support of her position. In her letter she essentially restates her position
and says as follows:
She challenges discrepancies in the G report;
She says her expert CTC is not biased. CTC has prior knowledge of
the building and has knowledge of the history of the building. CTC was
paid by the Applicant in the same way that G was paid by the FSP;
The relevant surface has a fall – she disputes G‟s findings in this
regard. She was with G at the inspection and says he did not measure
the fall. Further there was no access as it is under the floor boards and
there is a rail in front. Rather this is an assumption by G based on his
simply looking at it through the boards;
Case No: 329866 Determination Page 3 of 13
the building had no issues in the previous 9 years and the E building in
T still has no issues in the area where I had a problem after 14 years;
the submitted photos of the E building show the areas where the
subject property had damage were in fact not showing any damage at
all in the E building;
the FSP bases its arguments on reports that have in many respects
been shown to contain false information. There has been no
acknowledgement when the information has been disputed and counter
information given; and
the damage was a result of torrential rain in 2012 and run off from an
area that would not normally build up water. The house gutters
overflowed at this time, paddocks flooded and roads were cut off. This
was not a normal rain occurrence.
15. The Applicant‟s broker added the following:
The Policy provides cover for accidental loss or damage as detailed in
the policy. Accidental loss or damage is not „defined‟ under this section
but the Policy uses the same term within another section and makes
reference to Accidental loss or damage as „caused by sudden,
unexpected or unfor eseen occurrence‟;
“Occurrence‟ is not used in the relevant part of the policy but it is
defined and stated to mean “any event or events (broker‟s emphasis)
resulting in Property Damage (also undefined) which is / are neither
expected nor intended. Any series of events consequent or attributable
to one source or originating cause including continuous or repeated
exposure to one source or originating cause which result in Property
Damage, are deemed to be one occurrence. The circumstances
bringing about the accidental loss or damage was caused by a sudden,
unexpected or unforeseen occurrence;
Any ambiguity or lack of clarity to the cover provided must be construed
against the FSP;
The onus is on the FSP to demonstrate the application of the
exclusions relied on;
the „occurrence‟ is not water percolating or seeping or penetrating as
that implies a gradual event. The weather records show an extreme
event at the time the damage occurred;
the builder‟s evidence is that the exclusions do not apply;
Further reliance on the exclusions contravenes Section 46 (2) of the
Insurance Contracts Act as the Applicant would or could not be aware
of any alleged defect or imperfection yet the FSP is seeking to exclude
liability by reference to such a condition at a time before the contract
was entered into. The purpose of Section 46 was to avoid disputes
such as this;
Case No: 329866 Determination Page 4 of 13
The FSP is seeking to rely on exclusions inherent defects and wear
and tear. The FSP is cherry picking as each of these exc lusions are
mutually exclusive;
Reliance on these exclusions also contravenes section 46 of the
Insurance Contracts Act; and
“Wear and tear‟ has been construed by the Courts to mean „ordinary
and normal use‟. The claimed damage is not „ordinary and normal use‟.
Summary of FSP’ s position
16. I have reviewed all the material submitted by the parties and save where I
make note specifically, I am satisfied the FSP‟s position as set out in the
Recommendation is accurate and is as follows.
17. The FSP relies on its loss assessor‟s (C) and building consultant‟s (G)
findings the loss had occurred as a result of inherent structural issues and
poor workmanship and not via a storm created opening.
18. The FSP maintains denial of the claim and relies on the following policy
provisions:
“ If You have
Buildings cover
The cover
We will cover You if You suffer accidental loss or damage
to Buildings listed on Your Schedule
...
When We will not pay a claim under
Part A – Buildings and/or Contents
...
This Policy does not cover loss, liability, injury or
damage:
...
8. caused by or arising from wind, Rainwater, hail or
snow entering the Buildings through an open
window or door or any opening not made by the
Storm, unless the loss or damage is caused by
Run-off;
...
11. caused by or arising from Water percolating, seeping
or otherwise penetrating into Your Buildings as a
result of:
Case No: 329866 Determination Page 5 of 13
a. structural defects,
b. faulty design of the Buildings,
c. faulty workmanship in the construction of the
Building(s), or
d. Your failure to adequately maintain the
Buildings;
...
General exclusions applicable to all
Sections of this Policy
1. The Policy does not cover loss, destruction, liability,
Injury or Sickness (as defined in Section Five –
Personal Accident and Sickness), or damage:
...
e. Inherent defects
caused directly or indirectly through inherent
defects, faulty design, structural defects or
poor workmanship;
...
g. Wear and tear
arising out of depreciation, fading, scratching or
marring, gradual deterioration or developing
flaws, wear and tear;
...
“ Run-off ” means Rainwater that has collected on or
has flowed across normally dry ground or has
overflowed from:
• swimming pools or spas, or
• normally dry storm water gutters and normally dry
drains, which have been built or approved by a
government or public authority.”
19. The FSP accepted the Recommendation and did not provide any further
documentary information in support of its position save to rebut the
Applicant‟s contentions as follows:
The policy does cover the Applicant for accidental loss but it is subject
to exclusions;
The policy needs to be read as a whole and in particular the exclusions
need to be taken into account when making a decision about policy
response;
Case No: 329866 Determination Page 6 of 13
The exclusions are clear in their meaning and apply to the available
evidence;
Section 46 of the Act has no application to contracts listed in
Regulation 30 of the Regulations. That is, the section does not apply to
broad form contracts such as this one;
Case law provides that excluding liability for a particular event without
reference to when it occurs does not transgress the section as the
section is only concerned with exclusions which operate by reference to
a pre-existing condition. All of the exclusions relied on by the FSP
operate by reference to a particular event and therefore none
contravene section 46 of the Act.
Issue
20. Whether the FSP is entitled to deny the Applicant‟s claim.
Reasons for Decision
21. There has been an exchange of material between each party, and I am
satisfied each party has had an opportunity to reply to the issues raised.
22. Each FOS case is decided on its merits, taking into account the facts of the
case. I have reviewed all the material submitted by the parties both before
and after the Recommendation was issued, in order to reach my decision. I
will only refer to the relevant submissions and materials raised.
The materials provided
23. I have reviewed all the material submitted by the parties and save where I
make note specifically, I am satisfied a summary of the material provided is
set out in the Recommendation and is accurate.
The claim form 19 March 2013
24. The Applicant made the claim indicating storm water damage on 15
November 2012. In response to queries from the FSP, she clarified that:
The damage was “first noticed in winter last year and initially looked like
a water stain, however it developed mould and when pushed with a
broom I realised that the boards were rotting”.
The water damage was caused by heavy rain due to an exceptionally
wet year.
A builder was consulted and a quote provided to rectify damage and
make minor alterations to avoid this reoccurring.
The delay in claiming was explained as her builder was contacted in
October 2012 but couldn‟t inspect the property until recently.
Case No: 329866 Determination Page 7 of 13
Quote 21 February 2013
25. The Applicant obtained a quote to repair the damage in the amount of
$2,654.64. The quote shows works were also required to alter the fall of the
balcony as below:
“ Quote to repair water damage..
Replace Flooring and Hardwood
Provide additions floor joist
repack Hiclad to Fall
forwards
Seal and Flash correctly
Reisntal Deck & H and Rail” (sic)
Emails from repairer 7 November 2013 and from the Applicant 1 November 2013
26. An email from the repairer states:
“I [Repairer] who repaired leaking deck area at above address, spoke with
owner [Applicant] and she stating that water would not enter the verandah as
it faces away from the weather i.e. north and the damage was result of
extraordinary weather i.e. torrential rain that occurred over a 24 hour period in
June 2012.
That the amendment to the fall of the verandah was at owners request to
elevate possibility of any reoccurrence of water entering a normally dry area in
the unlikely reoccurrence of torrential rain as occurred in June 2012.” (sic)
27. In an email dated 1 November 2013 the Applicant says that the repairs have
been carried out and the Applicant was not charged extra for making fall
amendments as they were not significant in the repairs in terms of material
or time. She says this is not an admission of a design fault but a prudent
measure.
Undated letter from E
28. In support of her claim the Applicant provided a letter from E who provided
the balcony kit to the Applicant in 2002. E states:
“Ou r lofty barn design that [Applicant] chose for her home at [Address] has
been used by many of our clients over the 15 years as a dwelling.
...
We have provided the balcony kit to most of our owners over this period and
to my knowledge none of them have ever leaked water. My office here at [T]
was built in 1998 with a balcony kit and faces south and has never leaked.
There is a colourbond steel deck provided beneath the timber decking and
flashings to ensure that water is directed away from the living quarters, this
design h as not been changed since we introduced it in 1998.”
Case No: 329866 Determination Page 8 of 13
CTC report 15 October 2013
29. The Applicant appointed a builder inspector CTC to investigate the cause of
the loss. He was the building inspector who conducted all inspections during
construction. He notes he was asked to inspect storm water damage that
occurred in early June 2012. He writes:
CTC issued a building permit in December 2002 to construct a
residence and shed;
The occupancy permit was issued on 3 October 2003;
The plumbing work was certified and completed 1 September 2003;
E has built the barn dwellings for the last 15 years and 3 to 4 per year
have the balcony; and
The Applicant noticed the water damage to the underside of the
balcony in October 2012.
30. He inspected the water damage to the underside of the balcony with the
Applicant on 1 August 2013. She described to him the direction of the driving
rain in June 2012 was such that the rain drove into the north west corner of
the balcony and some of the rain penetrated the substructure of the balcony.
He concluded the damage was related to a particular storm event and says:
the flashing between the metal deck installed under the decking
material and the external metal clad walls was installed by a registered
plumber correctly;
the flashing complied with the Building Code of Australia 1996 Vol 2
amendment 11;
“I feel that the flashing was correctly installed by a plumber and due to
an extreme weather condition June 2012; storm water damage to the
substructure of the balcony occurred” (sic) ; and
He ruled out the cause of the damage was related to construction.
31. Attached to the report is an Appendix regarding the applicable standards
which included the BCA 1996 Volume Two amendment 11 adopted in
Victoria 11 July 2002.It includes the definition of a flash ing which is “a strip
...fitted to provide a barrier to moisture movement...or to cover a joint where
water would otherwise penetrate to the interior of a building...” and the
details of metal sheet roofing as required by 3.5.1.3.
32. An email from CTC dated 15 October 2013 states:
“[Applicant] the draft that you read this morning has been altered and
improved by [V].
Emails 27 August 2013, 1 November and 13 November 2013
33. The Applicant or the broker says;
G‟s report is misleading as the photos of E‟s building taken by G show
a different area of the E building;
Case No: 329866 Determination Page 9 of 13
E‟s building was built in 1999 and is not just a few years old;
G assumes there was not a fall as he didn‟t measure it;
She first noticed the stain on the floor after the rain in June 2012;
Damage was mai nly to the right hand corner which would indicate run
off to some degree;
There was no breakdown of the chipboard which negates water ingress
over a long period; and
There are mistakes in G‟s reports which undermine his credibility
especially that the permit was issued on 18 December 2002 and so the
legislation relied on G is inapplicable.
C‟s reports
34. The FSP appointed C to investigate the circumstances surrounding the loss
and to assess the claim. C attended the property on 11 April 2013. His
findings are as follows:
The property is a steel formed barn style supplied in kit form by E;
At the front of the house is a balcony which is accessed from the main
bedroom. It has chipboard flooring onto which is attached tray deck
sheeting and the decking boards;
C saw mould and swelling to the chipboard particularly at the right hand
rear of the balcony;
C said the decking etc had to be removed and the chipboard replaced.
The quote to repair also included modifications to prevent further
damage;
C suspected the function of the roof sheeting between the chipboard
flooring and the decking planks was to drain any rainwater off the
balcony to the outside; and
There was minimal fall on the roof sheets and the ends were not turned
up sufficiently which may have allowed wind driven rain entering the
balcony to force its way over the ends of the sheeting onto the
chipboard flooring beneath it; and
C arranged for G to inspect and report.
G‟s report 18 April 2013
35. The FSP appointed a building consultant G who attended the Applic ant‟s
property on 16 April 2013 and took photographs. His findings are set out
below:
The Applicant had built the house about 10 years ago as an owner
builder using the kit home of E;
There was no separation between the internal flooring and the external
deck which was non-complaint with building regulations;
Case No: 329866 Determination Page 10 of 13
Waterproofing by installation of colorbond sheeting directly over the
chipboard is not considered as standard building practice according to
the Building Code of Australia as this will not completely seal between
the decking material and chipboard;
The chipboard flooring had lost its structural integrity and there was
water staining on the floor of the bedroom;
Flashing inspection revealed an attempt to waterproof the chipboard by
covering it with colorbond sheeting but this had failed;
There was zero fall built into the flashing over the chipboard;
The balcony was not constructed to conform with Building Regulations
and manufacturer‟s recommendations;
Incorrect construction method and material resulted in water damage to
the balcony and bedroom flooring;
The water damage to the chipboard has occurred over a long period of
time since original construction; and
G referred to material from Carter Holt, the Building Code of Australia
and 2007 Guides.
G‟s email to the FSP 31 May 2013
36. At the FSP‟s request, G visited E‟s premises to investigate the structure of a
similar balcony installed in the premises and found the same problem of
water ingress occurring. G noted that E‟s building is only a few years old so
the particle board has not deteriorated to the same extent as the Applicant‟s
building.
Photographs taken by G at the Applicant‟s property and at E‟s property
37. G says that the photographs he took of E‟s premises show that it will be just
as bad over time. Photographs which are dated 30 May 2013 show water
damage.
38. Photographs also accompanied his report. The FSP notes:
Photos 6 and 10 show no sealer to stop water between the flashing and
the chipboard; and
Photos 11-16 of the E building also show that the chipboard is exposed
to water.
G‟s email 19 June 2013
39. G says the Standard that he quotes are from 2007 Standards but the
Uniform Building Regulations are from about 1970 and the more recent BCA
both cover the water proofing of decks and balconies.
40. He clarified that it was E who told G the building was only a few years old.
Case No: 329866 Determination Page 11 of 13
G‟s clarification 7 November 2013
41. During the dispute, G clarified his findings as follows:
The veranda deck had been constructed over the chipboard with zero
fall whereas the drawing provided by E (which would have been part of
the building permit) required a fall and a break flashing over the edge of
the chipboard. The break flashing is missing;
The drawing from E is provided and annotated showing the flashing
break and fall;
Water ingress had occurred over a long period of time via:
i. Capillary action of the water between the chipboard and metal
sheet flashing; and
ii. Rain driving into the unsealed edges of the flashing.
The extent of deterioration indicates a long period of ingress (prior to
October 2012);
The veranda construction in the E building has the same design fault
as the Applicant‟s building;
The flashing provides no resistance to a rainstorm and allowed clear
flow of water onto the bedroom floor and with no fall, the veranda had
no protection from water inundation; and
He clarifies that the dates of construction and discovery were gained
from the onsite interview with the Applicant.
Email MBAV 30 October 2013
42. BCA 1996 applies to buildings constructed in 2003. Chipboard flooring clad
with sheet metal is not a “deemed to satisfy” construction method and so
must be assessed as an alternative roof cladding and must comply with
AS1562.1.
43. The FSP says the insured property did not comply and the defects allowed
water to enter over time causing the damage.
Carter Holt Harvey Installation Manual
44. Particleboard flooring is not to be used in weather exposed applications.
Bureau of Meteorology records
45. BOM records show heavy rainfall on 4 June 2012 and the Applicant claims it
was this event that resulted in water ingress to the insured property.
46. The FSP notes in its letter to the Service dated 4 November 2103 that there
were many months from November 2010 with significant rainfalls and 4 other
days in May and June 2012 with significant rainfall.
Case No: 329866 Determination Page 12 of 13
Analysis
47. It is an accepted principle of general insurance law that an insured bears the
onus to establish on the balance of probabilities that they have suffered a
loss caused by an event to which the policy responds. This is known as a
prima facie claim. Once so established, the onus shifts to the insurer to
prove on the balance of probabilities that an exclusion applies if it seeks to
deny or limit its liability for the loss.
48. Accordingly in this matter the Applicant must prove on the balance of
probabilities that the loss was caused by an insured event such as
accidental damage or a storm and if that is established, the onus shifts to the
FSP to prove on the balance of probabilities the loss was caused by an
exclusion such as inherent defects or water penetrating the home as a result
of a structural defect.
49. I am satisfied the Applicant has established a prima facie claim under the
policy as the property sustained accidental damage.
50. The onus therefore shifts to the FSP to establish the exclusions it relies on
and listed above in denying liability for the claim.
51. The FSP relies on the opinion of C and G and other additional and
supplementary material including photographs to establish its case. I have
considered the reports carefully and I accept the reports support the FSP‟s
contentions. They both contend that the damage occurred as:
There was not enough fall on the surfaces for the water to fall away and
The chipboard flooring was not sufficiently protected or sealed so that
rain was able to enter to that area.
52. Supporting their contentions are:
The photographs taken of the Applicant‟s balcony which show there
was no seal on the edge of the flashing and the ineffective use of the
colorbond sheeting to cover the chipboard flooring;
The drawing provided by E which does show the two necessary but
missing requirements – the fall and a break flashing over the edge of
the chipboard.
53. If accepted, C and G establish the damage is caused by water penetrating
the building as a result of structural defects or faulty workmanship in the
construction of the building and the claim is excluded from cover.
54. Even if the opinions from C and G were not accepted because of a
preference for the opinions of E and CTC, and acceptance of the
discrepancies in G‟s opinion as set out by the Applican t, I am nonetheless
not satisfied that the Applicant is entitled to be indemnified.
55. This is because there is another relevant exclusion which I accept defeats
the claim. This is that there is no evidence that the damage was caused by
Case No: 329866 Determination Page 13 of 13
water entering the building through an opening made by the storm. Rather
there is an acceptance by the parties as to how the water entered the
building just disagreement as to whether the manner of ingress was because
of a structural defect or not.
56. And I am not satisfied that the damage is caused by Run-off as defined. I do
not accept that the rainwater has collected on or had flowed across normally
dry ground. A balcony is not dry ground but a floor in a building. Dry ground
and the common purpose of the insurance clause infer a flow across the
earth‟s surface. I also accept that the other part of the definition of Run -off is
also inapplicable as the water that caused the damage has not overflowed
from a pool, spa, or storm water gutters or drains.
57. In the circumstances it is not necessary to address the further submissions
about the policy response and section 46 of the Act.
58. As for the claim for the cost of the report from CTC in the amount of $440, I
did not rely on that report in the making of my decision and I am not satisfied
that the report cost should be paid by the FSP in all the circumstances of the
matter.
Determination
59. On the basis of the available information and for the reasons stated, I
determine:
the FSP is entitled to deny liability for the claim; and
the FSP is not required to reimburse CTC‟s report fee.