Home / Financial Firm (Unknown - Insurer) / Determination 329831
Determination 329831
Flood exclusion relied on to decline home building claim; premium refund sought
Summary
A homeowner's claim for storm and flood damage to her house was declined under the policy's flood exclusion. AFCA found the exclusion was clearly disclosed and the flood caused the loss, but ordered the insurer to refund premiums paid after the loss.
The policy covers storm but expressly excludes flood, the exclusion was clearly communicated under section 35 of the Insurance Contracts Act, and the hydrology and expert evidence showed the building was submerged by floodwater.
Issues
- Claim denial primary · not upheld
“The FSP is entitled to rely on the terms of the policy to refuse liability for the claim.”
- Failure to disclose secondary · not upheld
“The FSP clearly informed the Applicant of the flood exclusion as per its obligations under the Act.”
- Misleading conduct secondary · not upheld
“The Panel is not satisfied it would be reasonable to make a finding of misleading conduct on behalf of the FSP.”
- Product terms interpretation secondary · not upheld
“The FSP is to refund any premiums paid from the time of the loss, though no breach of utmost good faith was found.”
Subjects and remedies
home or building damagenatural disasterrefund fees or charges
Text of the determination
Case No: 329831 Determination Page 1 of 11
Case number: 329831
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim-Exclusion/ condition – flood – Ss 13, 14 and 35 Insurance
Contracts Act 1984
14 March 2014
Summary
Description
Claim under Home Building Policy for water inundation following heavy
rain in Queensland in January 2013. The FSP declined the claim
relying on a flood exclusion within the policy.
Basis of Determination
The policy provides cover for storm damage but specifically excludes
flood damage.
The evidence establishes that the Applicant had received the PDS and
the PDS clearly informs of the relevant flood exclusions.
The hydrology evidence supports a finding that flood waters were
responsible for the inundation of the property.
Insofar as the property was a total loss, the FSP should refund the
premium for the remaining cover.
Determination
The FSP is entitled to rely on the terms of the policy to refuse liability
for the claim.
Background
1. The Applicant held a Home Building Insurance Policy (the policy) with the
Financial Services Provider (FSP).
2. A claim was lodged on 30 January 2013 for significant damage to her home
in Mundubbera arising from severe weather events experienced in
Queensland during January 2013.
3. The FSP declined the claim on the basis the damage claimed was due to
“Flood”, an event specifically exclud ed from cover under the policy.
Determination
Case No: 329831 Determination Page 2 of 11
4. The Applicant remains dissatisfied with the FSP‟s decision to decline the
claim and is seeking an independent review by the Service.
Summary of Applicant’s position
5. The Applicant has sought the assistance of legal representatives “IL” in
disputing the FSP‟s decision to decline her claim. In the interest of brevity
reference to “the Applicant” will also include IL for the pu rpose of this
Determination.
6. On 26 and 27 January 2013 the insured property was damaged as a result
of significant stormwater inundation (prior to the arrival of floodwater) caused
by the highest level of rainfall and violent winds experienced in the area
since 1911.
7. The Applicant and her family witnessed the stormwater inundation first hand
prior to evacuating the insured property at around 10.00am on 27 January
2013 and the subsequent arrival of floodwaters.
8. Numerous leaks coming through the ceilings and down the walls were
observed as well as stormwater entering the dwelling from under the doors
from approximately 8.00pm on 26 January 2013.
9. The Applicant maintains the FSP and its agents failed to clearly inform her of
the flood exclusion within the policy and she was under the impression she
was covered for flood. This is also why at lodgement of the claim she did not
specifically raise the initial stormwater inundation damage.
10. Further, not long after the 2010 floods the Applicant spoke with the FSP to
confirm she had flood cover. Whilst the Applicant is unable to recall the
FSP‟s exact response she is certain if it had advised she did not have flood
cover the Applicant would have done something about it.
11. Therefore, the Applicant is of the opinion the FSP should be required to
cover her for the full building sum insured ($214,000) arising from the
damage to her home as it failed to fulfil its obligations under Section 35 of
the Insurance Contracts Act 1984 (the Act).
12. Alternatively, the FSP should cover the i nitial damage to the building due to
the storm and prior to the floodwater arriving. This damage generally
includes:
Damage to walls and ceilings in the lounge room, the children‟s room,
the kitchen and kitchen floor.
Damage to ceiling in the bedroom.
Damage to the lower section of the house, an area that includes a
bathroom, a laundry and a toilet. The damage includes sinking of the
bathroom floor, cracked tiles on the wall and floor.
Damage to the roof.
Case No: 329831 Determination Page 3 of 11
13. The FSP‟s hydrological evidence does not address the Applicant‟s evidence
that the initial damage to the roof and subsequent stormwater inundation
was due to the storm created opening(s). The hydrology report does not
establish what time and on what date the Burnett River (the river) broke its
banks. In line with previous determinations issued by the Service, the Panel
should consider whether (amongst other things) the time a watercourse
overflowed has been established.
14. The FSP failed to consider whether or not rainfall (before it reached the
ground) could have caused damage to the insured property prior to the
arrival of floodwater. It has limited its consideration only to its position that
supports the damage in its entirety was due to the event flood.
15. The FSP has not made available any expert evidence to substantiate the
condition of the ceilings prior to the inundation.
16. Hydrological data from Mundubbera, Malanda and Glenrock stations/gauges
are more relevant than those relied upon by the FSP. These stations are
closer to the insured property and confirm three consecutive days of rainfall
as opposed to the FSP‟s contention that rainfall in the vicinity of the insured
property was “not particularly severe.”
17. The Wayne Tank principle only applies where the damage claimed occurred
by stormwater and floodwaters simultaneously. In this instance the
stormwater damage occurred prior to the arrival of floodwaters and therefore
the Applicant has an entitlement to indemnity for the initial damage caused
independently of the flood.
18. Since lodgement of the claim the FSP was reasonably aware the insured
building was beyond economical repair. Therefore, the Applicant maintains
having regard to Sections 13 and 14 of the Act, the FSP with the utmost
good faith should reimburse her for all policy premium payments taken after
lodgement of the claim.
19. The Applicant acknowledges that she is not able to provide the FSP with any
further details (dates, phone numbers etc) with respect to the requested call
recording of contact between the parties over the years prior to the current
claim.
20. The FSP has failed in its onus to establish that a significant portion of the
damage claimed was caused by floodwater. The Applicant is seeking
indemnity under the claim for:
Damage to the insured building;
Interest in line with Section 57 of the Act; and
Payment of $3,000 in the form of compensation for non-financial loss in
line with the Service‟s Terms of Reference (ToR).
Case No: 329831 Determination Page 4 of 11
Summary of FSP’s position
21. On the basis of the site specific hydrology evidence the FSP maintains the
damage claimed is due to an event excluded from cover and therefore it is
entitled to decline indemnity to the Applicant. Even if there was, as alleged,
some initial stormwater inundation into the insured building this would be
minor in terms of damage.
22. The Applicant has not expressly claimed to not have received the Product
Disclosure Statement (PDS) and her reliance on Section 35 of the Act is
entirely speculative.
23. Regardless, the available evidence in the form of contemporaneous notes
submitted by its representative “H” responsibl e for inception of the policy as
well as policy documentation signed and returned by the Applicant,
establishes, on balance, the Applicant was informed of the flood exclusion as
well as provided with the PDS.
24. Although it attempted to locate the alleged telephone call records referred to
by the Applicant, in the absence of the details requested from the Applicant
(which she has not been able to provide), unfortunately it has been unable to
retrieve any recordings.
25. With respect to the Applicant‟s expectation to be refunded premium
payments made post lodgement of the claim the FSP maintains the policy is
quite clear in this respect. The FSP notes as the claim had not been paid out
and/or the policy cover exhausted it would not automatically come to an end.
It was for the Applicant to notify the FSP of her intention to end the policy.
The FSP has not breached its statutory duty of good faith in relying upon the
express terms of the contract.
26. It is difficult to accept, with respect to the Applicant‟s alleged conta ct in 2010,
that having recently escaped flood damage to the property the Applicant
would not have asked the question “Do I have coverage in the event of
flood?” The FSP maintains the answer to the question would have clearly
been “No” as the policy clearl y excludes flood cover. Further, the FSP
reiterates the Applicant was provided with this information at inception of the
policy.
27. The FSP relies on the following policy provisions etc:
“What you are insured against and what you are NOT
You are insured against loss or damage
…
(b) Storm (including cyclone or hurricane) and/or rain which may be
accompanied by snow, sleet or hail.
But NOT
…
Flood
Case No: 329831 Determination Page 5 of 11
“flood” means the inundation of normally dry land by water from any
watercourse, lake, canal, dam or reservoir. ”
Issues
28. Whether the Applicant was clearly informed as to the flood exclusion
contained in the policy.
29. Whether damage to the Applicant‟s property was completely caused by flood
water as defined by the policy and/or there was some level of damage
arising from stormwater inundation.
30. Whether the FSP was entitled to decline complete indemnity to the Applicant
under the claim.
Reasons for decision
31. Due to the nature and complexity of the dispute, it has been directly referred
to the Panel for Determination in accordance with the Operational Guidelines
to the Financial Ombudsman Service‟s (FOS) Terms of Reference.
32. The Panel consists of an Ombudsman and two Panel members with
extensive experience in the insurance industry and consumer claims.
33. The Panel is satisfied that the material has been exchanged and the parties
have had the opportunity to respond to the issues raised.
34. The Panel having reviewed the submissions of the parties is satisfied the
parties do not dispute the following:
The Applicant held a home building policy of insurance for loss or
damage arising from the listed insured events at the time of loss.
The policy was arranged by the Applicant via an agent (BK) acting for
the FSP.
The insured property suffered significant damage during the severe
weather event experienced in Queensland during January 2013.
The Applicant and her family were required to evacuate the insured
property at approximately 10.00am on 27 January 2013 at which point
the insured building had not been inundated above floor level.
The policy excludes from cover loss or damage to the insured property
arising from the event „flood‟.
The insured property was slightly affected during the 2010 flood event
and for which a claim was not lodged under the policy.
The insured building is situated in close proximity to the river as well as
an unnamed tributary which runs into the river.
Case No: 329831 Determination Page 6 of 11
The insured property was for the most part completely submerged
under the peak level flood water levels that occurred in the area.
Clearly inform
Provision of the PDS
35. The Applicant has not specifically alleged she was not provided with a PDS
at inception of the policy and/or subsequently. Rather, the Applicant claims
the FSP had failed in its duty to “Clearly Inform” her of the absence of flood
cover within her policy.
36. The FSP has produced evidence in the form of contemporaneous notes
recorded by H of her dealings with the Applicant, general reference to the
information exchanged between the parties and documentation posted to the
Applicant on 12 October 2007 (at inception of the policy). The Panel notes
the evidence provides:
“ 12-10-2007
[Applicant] RANG REQ [FSP] INS QUOTE. DISCUSSED [FSP] 2 POLICY
DIFFERENCES. INS EVENTS & ACC DAMAGE. ADVISED. [Applicant] RE
INS EVENTS COVER BUT NO FLOOD COVER. SHE REQ BUILDING ONLY
COVER QUOTE. GAVE QUOTE FOR BOTH POLICIES. [Applicant]
REQUESTED INSURED EVENTS POLICY FOR BUILDING ONLY POLICY
BE PLACED.
I ASKED D of D QUESTIONS. HER ANSWERS OK. I ADVISED OF FSG
SOA & PDS. I ASKED IF SHE WAS PREPAIRED TO ACCEPT THE POLICY
ON THE BASIS OF MY ADVICE RE TYPE OF COVER POLICY OFFERED
PRIOR TO RECEIVING PDS. SHE ACCEPTED.
INSURED EVENTS BUILDING COVER POLICY PLACED & AS PER HER
REQUEST [FSP] PREMIUM DRAWN FROM LOAN SETTLEMENT.
ALL DOCUMENTS POSTED TO CLIENT 12-10-2007. ”
37. The Panel notes the copy of the insurance documentation including the
quote form sent to the Applicant was returned by the Applicant bearing her
signature dated 17 October 2007. This documentation includes a cover letter
as well as an insured quote. The information within this policy documentation
provides in part:
Cover letter dated 12 October 2007
“…
Please find enclosed your [FSP] Quotation for Building policy. Enclosed is
your policy wording booklet, Financial Services Guide (version:7.1),
Statement of Advice and Policy Sche dule. As per our discussion…Please sign
and return the Quotation Letter in the enclosed stamped/addressed envelope.
…
We have entered details of your property to be insured and the sum insured
amount…Please confirm its accuracy by signing and dating the en closed
quotation form and returning to us. Please read carefully all attached
documents. …”
Case No: 329831 Determination Page 7 of 11
38. In the absence of evidence to the contrary, the Panel is satisfied, on the
balance of probabilities, that the Applicant was both verbally informed of the
absence of flood cover as well as provided with the PDS as part of the
exchange of information between the parties at the time of arranging the
policy.
39. The Panel has considered the wording of the policy relevant to this dispute.
The policy covers loss or damage caused by Storm (including cyclone or
hurricane and/or rain, which may be accompanied by snow, sleet or hail) but
specifically excludes loss from flood.
40. The Panel is satisfied the definitions and exclusions are clear and meet the
requirements to clearly inform, as per Section 35 of the Act.
Misleading Conduct and Breach of Utmost Good Faith
41. The Panel has considered the Applicant‟s utmost good faith argument in
relation to the FSP‟s alleged failure to draw her attention to the policy
limitations and the fact that the policy did not suit her needs, especially when
noting its close proximity to the river. The Applicant essentially argues it
would be good insurance practice for the FSP to have notified her of the
additional cover needed.
42. It is well established law that the onus is on an insured person(s) to identify
the cover they require and to ensure the cover offered by an FSP suits their
needs. In the absence of information in the form of call recordings and/or
contemporaneous notes taken by the Applicant, there is insufficient evidence
to refute the FSP‟s submission.
43. In these circumstances, the Panel is satisfied there has been no breach of
the duty of utmost good faith on behalf of the FSP.
44. Also, as it has been established, on balance, that the PDS was provided to
the Applicant and H also verbally advised her of the absence of flood cover,
the Panel is not satisfied it would be reasonable to make a finding of
misleading conduct on behalf of the FSP and/or its representatives.
Proximate Cause for the Loss
45. In considering the positions of the parties in respect to the cause of the
inundation the Panel has reviewed the various expert reports which provide,
the following information:
“C’s” (Loss Adjuster) First Report dated 6 February 2013
The risk sight is located within 800m of the River.
The river caused flooding in 2010 and flood waters did reach the
insured dwelling, however, only minimal damage sustained and no
claim was lodged.
Case No: 329831 Determination Page 8 of 11
The Applicant on returning to the property subsequent to the flooding
noted a tide line approximately 6 inches (approximately 150mm) from
the peak of the roof of the insured dwelling.
The inspection confirmed that the entire dwelling including the rear
shed had sustained significant water damage by the flooding.
Given the extent of damage, it is likely that the entire dwelling might
need to be demolished and rebuilt.
“W’s” (Hydrology) Site Specific Inundation Assessment Report dated 14/03/13
The dwelling has a floor level approximately 1m above surrounding
ground levels and was completely inundated during the 2013 flood
event.
Ground levels in the vicinity of the property slope towards the unnamed
tributary which has defined bed and banks in the vicinity of the property
and would be considered a watercourse.
Highest daily rainfall of 314.9mm was recorded in the 24 hours to
0900hrs on 27 January 2013. Cooranga and Gayndah stations are the
closest sub-daily rainfall stations to the subject property.
No significant rainfall was recorded after 1200hr on 27 January 2013.
Peak hourly intensity of 41mm/hr at Cooranga station was reached in
the hour prior to 2330hr on 26 January 2013. 33.2mm/hr recorded at
Gayndah in hours prior to 0200hrs on 27 January 2013.
Stormwater runoff would have occurred within about 30 minutes of
peak rainfall intensity.
Mundubbera gauging station 0.75km south of the property data
provides that the water levels in the river reached peak level of 23mGH
on 28 January 2013 at 1.00am.
The river flood levels exceeded the „major‟ flood trigger level at
Mundubbera for approximately 36 hours from 1200hrs on 27 January
2013.
The Applicant advised W that a small leak developed in the roof inside
the house and they had to capture water with a bucket. Further, at
2.40am on 27 January the Applicant was advised by the authorities to
be prepared to evacuate as the water was inundating the low lying
regions of Mundubbera.
W concluded that the initial and maximum above floor level inundation
of the dwelling was caused by floodwater from the river which initially
back flowed up the unnamed tributary before overflowing into the
dwelling.
W’s Site Specific Inundation Supplementary Report dated 30/01/2014
Calculations provide that the maximum stormwater runoff depth at the
property would have been in order of 100mm and it would not be
Case No: 329831 Determination Page 9 of 11
possible for the property to have been inundated above floor level by
runoff from local catchment.
The level of the house was measured to be approximately 1m above
surrounding ground level of 120.4m AHD. The river water levels at the
Mundubbera gauges station (0.75km from property) shows the property
yard would have been inundated around 11.00am on 27 January.
Further it reached 126.12mAHD on 28 January at 1.00am.
Given the height of floor levels (121.4m AHD) of the insured building it
would have been inundated above this level at approximately 12.15pm
on 27 January.
C’s Final and Supplementary Report dated 4 February 2014
The roof is a corrugated pitched tin roof that appeared to be at least 25
years old. The exact age and condition of the roof was hard to
determine as the assessment was conducted in very low light and
debris swept in by the floodwaters was located on the roof.
Given the pitch of the roof and that fascia gutters were installed, the
roof, if reasonably maintained should have been able to withstand the
elements regardless of intensive rain over a period of three days.
Rainwater should have been able to drain away from the dwelling freely
without entering the interior.
On inspection of the ceiling linings C was able to confirm varied levels
of damage, depending upon the material used to line the ceiling. The
solid timber linings showed evidence of cupping, which indicated that
the timber was submerged in water for a period of time. The same was
the case with plywood linings.
Had water leaked through the roof, C would expect there to be missing
corrugated iron roof sheets or holes, which were not evident at the time
of the inspection.
It is unlikely that rainwater had entered the insured dwelling through the
roof and caused any damage prior to the arrival of floodwater and the
subsequent inundation of the insured building.
46. The Panel has carefully considered the evidence made available by the
parties and is satisfied that:
The insured building was subjected to severe and significant storm
conditions over the three day period up to late morning on 27 January
2013.
The weather conditions included high winds and substantial amounts of
rainfall.
The insured dwelling was not inundated by water building above
ground level until later in the day on 27 January and after the Applicant
and her family had evacuated.
Case No: 329831 Determination Page 10 of 11
At its peak the floodwater levels at the insured property effectively
completely submerged the building.
Any evidence of water damage to the internal sections of the property
as well as the roof would reasonably have been affected by the fact the
dwelling remained submerged in floodwater for over a period of time.
The policy does not provide indemnity for loss or damage arising from
flood.
47. The Applicant maintains that while she and her family were present at the
insured property, there was significant stormwater inundation of the insured
building through the roof and ceilings.
48. The expert reports do not indentify damage to the insured dwelling‟s roof
consistent with storm damage that would allow the claimed stormwater
inundation e.g. missing roof sheets and/or holes in the sheeting etc. Having
regard to the design of the roof, if it was in a reasonably maintained
condition, it is likely that the rainwater would have dispersed away from the
dwelling and not entered the building.
49. There is no evidence of wear, tear, gradual deterioration, a lack of
maintenance, structural defect or the like effecting the roof however there is
evidence to establish on the balance of probabilities the damage was due to
water entering the roof in the storm.
Premium Refund
50. The Applicant is seeking a refund of policy premium payments made to the
FSP subsequent to the lodgement and assessment of her claim on the basis
the FSP was reasonably aware the insured building was beyond economical
repair.
51. The FSP maintains that the policy clearly provides that it is only when a
claim is paid out to the extent of the sum insured that the policy would
automatically come to an end. In the absence of payment under the claim to
the full extent of the sum insured the FSP is not obliged to cancel the policy.
52. Further, the FSP maintains the onus rests with the Applica nt to inform it of
her intention to cancel the policy and in the absence of such notification it is
not in breach of its duty to act with utmost good faith as alleged.
53. The Panel notes that the assessor‟s report of 6 February 2013 states: “…the
entire dwell ing, and rear shed had sustained significant water damage… ”
and “ Given the extent of the damage, it is likely that the entire dwelling might
need to be demolished and rebuilt ” . He also noted the claimed damage to be
$214,000 (plus other claim costs) which is equivalent to the total sum
insured.
54. On that basis the FSP was reasonably aware that the claim (if accepted)
would be a total loss, relative to the sum insured.
Case No: 329831 Determination Page 11 of 11
55. Whilst the Panel accepts the FSP‟s argument and acknowledges there is no
breach of duty of utmost good faith the Panel having regard to the fact the
house was effectively a total loss considers it fair in the circumstances that
the FSP refund the policy premium payments made after the loss.
Compensation
56. The Panel accepts that the FOS ToR allow for compensation to be awarded
to an Applicant for non-financial loss but only where there has been an
unusual degree or extent of physical inconvenience, time taken to resolve
the situation or interference with the Applicant‟s expectation of enjoym ent or
peace of mind has occurred.
57. In line with the matters discussed above, the Panel is not satisfied that it
would be reasonable to require the FSP to make any payments to the
Applicant by way of compensation in line with section 9.3 b) of the FOS ToR.
The FSP have acted within a reasonable time to assess and notify the
Applicant of the decision on liability.
Determination
58. On the basis of the available information the Panel determines:
The Applicant has not fulfilled the onus to establish, on the balance of
probabilities, that the loss claimed is covered under the policy .
T he FSP clearly informed the Applicant of the flood exclusion as per its
obligations under the Act.
The FSP and its representatives have not breached the duty of utmost
good faith and/or been responsible for misleading conduct.
The FSP is to refund any premiums paid from the time of the loss.
59. The FSP is not obliged to make payment to the Applicant in the form of
compensation in line with section 9.3 b) of the FOS Terms of Reference.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.