Determination 329300
Cyclone Yasi damage claim for unit 15 painting and kitchen cabinets
Summary
The owner of a strata unit claimed for cyclone damage to downstairs painting and kitchen cabinets, and the FSP did not give a specific response. The Panel found the repainting of certain walls and the ceiling covered, refused the cabinets and the wider painting, and ordered interest under the Insurance Contracts Act if the claim is cash settled.
Once the insured shows physical damage in the period of insurance the insurer must establish an exclusion, and covered property must be reinstated to a when-new condition.
Issues
- Claim denial primary · upheld
“The Applicant is entitled to indemnity for the cost of repainting the walls and ceiling shown in the identified photos.”
- Inadequate claim investigation secondary · upheld
“The painting of these areas was not accounted for in the scope of works prepared by the FSP builder.”
Subjects and remedies
natural disasterpay claimpay interest
Text of the determination
Case No: 329300 Determination Page 1 of 6
Case number: 329300
General Insurance - Domestic Insurance - Residential Strata Title - FSP
Decision - Denial of claim
23 July 2014
Summary
Description
A claim under a strata apartment complex insurance policy for loss and
damage following Cyclone Yasi.
Basis of Determination
A consideration of the evidence regarding the loss and damage and
coverage provided by the policy.
Determination
In the circumstances, the Panel determines:
The Applicant is entitled to indemnity for the cost of repainting the
walls and ceiling shown in photos “P1000813”, “P1000814” and
“P1000815” and image 77 of MCS’s report.
The FSP is otherwise entitled to refuse indemnity for the other
items claimed by the Applicant.
If the FSP elects to cash settle any par t of the Applicant’s claim,
the FSP is to pay interest on that amount, in accordance with the
Insurance Contracts Act 1984, from the date of denial of the claim
until the date of settlement.
Background
1. The Applicant is the owner of a unit (unit 15) comprised within a strata
apartment complex insured with the Financial Services Provider (FSP) under
a strata insurance policy.
2. Several units and some common property within the strata complex
sustained damage as a result of Cyclone Yasi in 2011, resulting in a number
of claims being made on the policy.
Determination
Case No: 329300 Determination Page 2 of 6
3. The FSP accepted liability for the claims but disputes have arisen as to the
adequacy of the scope of works prepared and the repairs that were carried
out for the various claims.
4. This dispute concerns the damage to unit 15.
Summary of Applicant ’s position
5. The cyclone has caused damage to the unit’s kitchen cabinets and
downstairs’ ceiling and walls.
6. He seeks:
$3,960, being the cost to repaint the unit’s downstairs’ living areas
(originally quoted at $3,876.55)
$7,645 being the cost to replace the kitchen cabinets (originally quoted
$4,561.53).
Summary of FSP’s position
7. Other than a general submission that it has met its policy obligation, the FSP
has not provided a specific response to the claim involving unit 15.
Issue
8. Whether the FSP has satisfactorily discharged its policy obligations with
respect to unit 15.
Reasons for decision
9. Due to the nature and complexity of the dispute, it has been referred to the
Panel for Determination in accordance with the Operational Guidelines to the
Financial Ombudsman Service’s (FOS) Terms of Reference.
10. The Panel consists of an Ombudsman and two Panel members with
extensive experience in the insurance industry and consumer claims.
11. The Panel is satisfied that the material has been exchanged and the parties
have had the opportunity to respond to the issues raised.
12. As the Applicant is assisted by a representative, references to “the
Applicant” will include the representative unless otherwise indicated.
Case No: 329300 Determination Page 3 of 6
Relevant policy provisions
13. As the FSP has not referred the Service to any policy provisions, the Panel
has reviewed the product disclosure statement (PDS) and noted the
following policy provisions:
“ Building and Common Contents
What you are insured against
We agree to indemnify you against physical loss or damage to your building
and common contents occurring during the period of insurance .
Definitions specific to this Cover Section
Building
…
building does not mean:
(a) temporary wall, ceiling or floor coverings.
…
How much we will pay and how
We will pay up to the sum insured for physical loss or damage to your
building. In the event of a claim for a building we will at our option:
1. repair or replace the building; or
2. pay the reasonable cost of repair or replacement to a condition
substantially the same as but not better or more extensive than when
new; or
…
Additional Benefits above the Sum Insured
We will pay the following additional benefits over and above the sum insured .
…
2. Additional costs
For the costs and expenses necessarily and reasonably incurred for the
purpose of:
…
(b) the temporary protection and safety of the property pending repair or
replacement following an insured loss or damage.
(c) the removal of debris or the demolition, dismantling, shoring up,
propping, underpinning or other temporary repairs following an insured
loss or damage to the property , but not in connection with liability for
pollution of any kind.
(d) the demolition and removal of any property belonging to you which is
no longer useful for the purpose it was intended, provided such
demolition and removal is necessary for the purpose of the
reinstatement or replacement of the property and is following an
insured loss or damage but not in connection with liability for pollution
of any kind.
…
Case No: 329300 Determination Page 4 of 6
Exclusions
…
We do not insure you for:
…
(d) wear and tear, fading, chipping, scratching or marring, rust, gradual
corrosion or gradual deterioration or developing flaws, normal upkeep
or making good. However, this exclusion will not apply to any
subsequent damage to your building or common contents if you were
not aware of, and a reasonable person in the circumstances could not
be expected to have been aware of, the wear and tear, gradual
corrosion or gradual deterioration or developing flaws.”
14. The policy covers the Applicant for any physical loss or damage to his unit.
This means he has the onus to show that his unit sustained damage that
occurred within the relevant period of insurance. Once shown, the onus is
then on the FSP to show that particular claimed damage is excluded or
otherwise not covered by the policy.
15. As the Applicant is prima facie entitled to indemnity for any physical loss or
damage to his unit, the FSP cannot simply decline particular damage on the
basis it is not cyclone damage. It must demonstrate that the damage is
excluded or otherwise not covered by the policy for some reason.
16. The Panel further notes that where claimed damage is covered, the policy
requires the FSP to reinstate such property to substantially the same
condition it was in “when new” and not to the condition it ma y have been in
immediately before the event that caused the damage claimed.
17. For the purposes of this dispute, this means that the FSP is required to
reinstate particular damaged property to the condition it was in “when new” if
it is established that it was damaged by the cyclone. That the particular
property may have been aged would generally be irrelevant unless the FSP
is able to demonstrate that the property would not have sustained the
damage claimed without the contribution from its aged state.
The claimed damage
18. The Panel understands that the dispute concerning unit 15 relates to the:
Repainting of the unit’s downstairs living areas
Replacement of the kitchen cabinets.
Repainting
19. On review of the material, the Panel is satisfied that the Applicant is entitled
to indemnity for the cost of repainting the walls and ceiling shown in photos
he has identified as “P1000813”, “P1000814” and “P1000815” and image 77
of MCS’s report (which the FSP has not denied was of unit 15). It is noted
Case No: 329300 Determination Page 5 of 6
that the painting of these areas were not accounted for in the scope of works
prepared by FSP builder TM.
20. The FSP has not provided any rebuttal to the evidence that this damage was
due to the cyclone.
21. However, apart from the above areas, the Panel finds insufficient evidence
to justify the contention that the whole downstairs area of the unit required
repainting as a result of the cyclone. If anything, the routine condition report
of 9 November 2010 (about 4 months before the cyclone) already noted that
the area had pre-existing issues with the condition of the interior paint.
Specifically, the report states that there was paint peeling in the lounge and
that the kitchen walls required cleaning.
Kitchen cabinets
22. The Panel finds insufficient evidence to support the Applicant’s cl aim that the
kitchen cabinets were damaged by the cyclone. The limited photographs he
has provided of the cabinets do not clearly indicate any water damage (i.e.
P1000816 and P1000817). They do show chips on the edges which cannot
be considered cyclone damage and generally the images appear more
consistent with wear and tear over time.
23. Furthermore, the Applicant’s tenant does not appear to have reported any
water entry in the kitchen. The tenant appears to indicate that there was little
water entry in the l ounge only (see Applicant’s property agent’s 1 March
2011 email).
Kitchen door frame
24. Although the Applicant has provided a photo of the damage (i.e. P1000818),
to the kitchen door frame he has not claimed for the damage in his
submission. It is unclear why this image was included.
25. For the sake of completeness, the Panel is not sufficiently satisfied that he is
entitled to indemnity. In this regard, the Panel notes that the 9 November
2010 routine condition report had indicated that the door frame was alread y
mouldy which suggests that it was already deteriorating from water damage
prior to the cyclone.
Determination
26. In the circumstances, the Panel determines:
The Applicant is entitled to indemnity for the cost of repainting the walls
and ceiling shown in photos “P1000813”, “P1000814” and “P1000815”
and image 77 of MCS’s report.
The FSP is otherwise entitled to refuse indemnity for the other items
claimed by the Applicant.
Case No: 329300 Determination Page 6 of 6
If the FSP elects to cash settle any part of the Applicant’s claim, the
FSP is to pay interest on that amount, in accordance with the Insurance
Contracts Act 1984, from the date of denial of the claim until the date of
settlement.