Determination 329296
Denial of claim
Summary
The applicants claimed $4,400 under a strata building policy for Cyclone Yasi water damage to their unit, which the FSP had not specifically answered. AFCA ordered the FSP to pay $4,400 with statutory interest from the date the invoice was paid.
Once the insured has shown physical loss within the policy period, the insurer bears the onus of proving an exclusion applies, and the policy requires reinstatement to the condition when new.
Issues
- Claim denial primary · upheld“The FSP cannot simply decline a particular damage on the basis it is not cyclone damage. It must demonstrate that the damage is excluded or not covered.”
- Inadequate claim investigation secondary · upheld“There appears to be no evidence in the material exchanged that supports assessor C's assertions of pre-existing long term water entry issues.”
Subjects and remedies
natural disasterpay claimpay interest
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 329296 Determination Page 1 of 6
Case number: 329296
General Insurance - Domestic Insurance - Residential Strata Title - FSP
Decision - Denial of claim
23 July 2014
Summary
Description
A claim under a strata apartment complex insurance policy following
damage to the complex as a result of Cyclone Yasi.
Basis of Determination
A consideration of the evidence regarding the damage and loss and
policy coverage.
Determination
The Panel determines that the FSP pays the Applicants $4,400
together with interest at the statutory rate from 21 October 2011 (the
date the Applicants paid invoice 516), until their claim has been settled.
Background
1. The Applicants are the owners of a unit (unit 8) comprised within a strata
apartment complex insured with the Financial Services Provider (FSP) under
a strata insurance policy.
2. Several units and some common property within the strata complex
sustained damage as a result of Cyclone Yasi in 2011, resulting in a number
of claims being made on the policy.
3. The FSP accepted liability for the claims but disputes have arisen as to the
adequacy of the scope of works prepared and the repairs that were carried
out for the various claims.
4. This dispute concerns the damage to unit 8.
Determination
Case No: 329296 Determination Page 2 of 6
Summary of Applicants ’ position
5. Their tenants vacated unit 8 within a few weeks of the cyclone, reporting that
water has been entering through the top of the bedroom doors, running
down the internal wall and pooling at the bottom of the stairwell.
6. Mould has developed on the walls where water had entered unit 8.
7. Builder MD said cyclonic winds had damaged the upstairs glass doors (and
not the windows) and this was allowing water to enter unit 8.
8. They were unable to let unit 8 out until after they repaired the damage in
September 2011.
9. Whilst they have had the whole unit repainted, they are only claiming for
work done to make essential repairs necessitated by the cyclone.
10. They have paid builder MD $4,400 to carry out repairs to prevent further
damage from occurring and have received verbal consent from the
insurance broker to proceed with the relevant repairs. They have not been
reimbursed for the cost to date.
11. Unit 8 never had leaks or mould until after the cyclone. In particular:
Their tenants never reported any leaks in the 12 months prior to the
cyclone. There were also no reports of any water leaks in the 18
months prior to the 12 months.
Unit 8 was regularly inspected by their managing agent. They are also
active members of the body corporate committee and personally
inspect unit 8 at least once a year from 2003 to 2008 and twice a year
from 2009 to 2011.
Unit 8’s 18 February 2010 Routine Inspection Report does not identify
the presence of mould.
Summary of FSP’s position
12. Other than a general submission that it has met its policy obligation, the FSP
has not provided a specific response to the claim involving unit 8.
Issue
13. Whether the FSP has satisfactorily discharged its policy obligation with
respect to unit 8.
Case No: 329296 Determination Page 3 of 6
Reasons for decision
14. Due to the nature and complexity of the dispute, it has been referred to the
Panel for Determination in accordance with the Operational Guidelines to the
Financial Ombudsman Service’s (FOS) Terms of Reference.
15. The Panel consists of an Ombudsman and two Panel members with
extensive experience in the insurance ind ustry and consumer claims.
16. The Panel is satisfied that the material has been exchanged and the parties
have had the opportunity to respond to the issues raised.
17. As the Applicants are assisted by a representative, references to “the
Applicants” will include the representative unless otherwise indicated.
Relevant policy provisions
18. As the FSP has not referred the Service to any policy provisions, the Panel
has reviewed the product disclosure statement (PDS) and noted the
following policy provisions:
“ Building and Common Contents
What you are insured against
We agree to indemnify you against physical loss or damage to your building
and common contents occurring during the period of insurance .
Definitions specific to this Cover Section
Building
…
building does not mean:
(a) temporary wall, ceiling or floor coverings.
…
How much we will pay and how
We will pay up to the sum insured for physical loss or damage to your
building. In the event of a claim for a building we will at our option:
1. repair or replace the building; or
2. pay the reasonable cost of repair or replacement to a condition
substantially the same as but not better or more extensive than when
new; or
…
Additional Benefits above the Sum Insured
We will pay the following additional benefits over and above the sum insured .
…
2. Additional costs
For the costs and expenses necessarily and reasonably incurred for the
purpose of:
Case No: 329296 Determination Page 4 of 6
…
(b) the temporary protection and safety of the property pending repair or
replacement following an insured loss or damage.
(c) the removal of debris or the demolition, dismantling, shoring up,
propping, underpinning or other temporary repairs following an insured
loss or damage to the property , but not in connection with liability for
pollution of any kind.
(d) the demolition and removal of any property belonging to you which is
no longer useful for the purpose it was intended, provided such
demolition and removal is necessary for the purpose of the
reinstatement or replacement of the property and is following an
insured loss or damage but not in connection with liability for pollution
of any kind.
…
Exclusions
…
We do not insure you for:
…
(d) wear and tear, fading, chipping, scratching or marring, rust, gradual
corrosion or gradual deterioration or developing flaws, normal upkeep
or making good. However, this exclusion will not apply to any
subsequent damage to your building or common contents if you were
not aware of, and a reasonable person in the circumstances could not
be expected to have been aware of, the wear and tear, gradual
corrosion or gradual deterioration or developing flaws.”
19. The policy covers the Applicants for any physical loss or damage to their
unit. This means they have the onus to show that their unit sustained
damage that occurred within the relevant period of insurance. Once shown,
the onus is then on the FSP to show that particular claimed damage is
excluded or otherwise not covered by the policy.
20. As the Applicants are prima facie entitled to indemnity for any physical loss
or damage to the insured building, the FSP cannot simply decline a
particular damage on the basis it is not cyclone damage. It must
demonstrate that the damage is excluded or otherwise not covered by the
policy for some reason.
21. The Panel further notes that where claimed damage is covered, the policy
requires the FSP to reinstate such property to substantially the same
condition it was in “when new” and no t to the condition it may have been in
immediately before the event that caused the damage claimed.
22. For the purposes of this dispute, this means that the FSP is required to
reinstate particular damaged property to the condition it was in “when new” if
it is established that it was damaged by the cyclone. That the particular
property may have been aged would generally be irrelevant unless the FSP
is able to demonstrate that the property would not have sustained the
damage claimed without the contribution from its aged state.
Case No: 329296 Determination Page 5 of 6
The claimed damage
23. According to repairer MBHI:
It repaired a leaking sill on the first floor of unit 8.
It repaired water damage to the unit’s front wall, which also entailed re -
sheeting part of the ceiling, installing a new cornice and painting.
It replaced water damaged carpets in the main bedroom and at the
bottom of the stairs.
It issued the Applicants with two invoices (invoice 516 and invoice 521)
for carrying out the above works.
24. The Applicants have provided a copy of invoice 516 (for the sum of $4,400),
which they say was the cost incurred to carry out essential repairs to the
cyclone affected areas. The Applicants also say they have painted the entire
unit but do not seek reimbursement for this cost.
25. Whilst the FSP has not specific ally responded to the Applicants’ claim, it
seems that its assessor C had somehow concluded that unit has had “pre -
existing long term” issues with water entry through allegedly “severely
deteriorated windows/doors”. Assessor C also alleges that building
co nsultant MCS had “verbally” said unit 8 “have had major defects and pre -
existing problems”.
26. There appears to be no evidence in the material exchanged that supports
assessor C’s assertions. Building consultant M commented that “… internal
painting repairs ha d already commenced……the possible extent of TC Yasi
damage could NOT be identified.
27. The Panel has carefully reviewed unit 8’s undated Entry Condition Report
and 18 February 2010 Routine Condition Report. Whilst the Panel accepts
that the window and security screens in bedroom 1 have corroded and one
of them apparently has holes, the Panel finds insufficient evidence to support
a suggestion that the unit has been having continuing and long term issues
with water entry.
28. Although the Routine Condition Report has identified a small watermark in
each of the bedrooms (the exact locations of which are unclear), the Panel
does not consider this in itself is sufficient to conclude that the unit has been
having continuing and long term issues with water entry.
29. There is also no evidence to suggest that unit 8’s tenants had already been
complaining of water entry prior to the cyclone event. The property agent’s
20 July 2011 letter does not expressly indicate that the tenants have
complained of water entry before the cyclone event.
30. Ultimately, the policy covers the Applicants for physical loss or damage to
their unit that occurs during a relevant period of insurance. There is no
dispute unit 8 was struck by C yclone Yasi and had sustained water damage
Case No: 329296 Determination Page 6 of 6
as a result of this event, so the onus is essentially on the FSP to establish
the operation of an exclusion to refuse the Applicants’ claim.
31. The Applicants have provided a Tax Invoice from their repairer who certifies
that the repairs are Cyclone Yasi related. The FSP has not provided any
probative evidence to show that was not the case, other than the
suggestions by the assessor that there may have been long term issues and
the consultant’s report that they could not id entify what was cyclone related.
32. In the circumstances, it follows that the Applicants are entitled to indemnity
for their claim.
Determination
33. The Panel determines that the FSP pays the Applicants $4,400 together with
interest at the statutory rate from 21 October 2011 (the date the Applicants
paid invoice 516), until their claim has been settled.