Home / Financial Firm (Unknown - Insurer) / Determination 329296

Determination 329296

Denial of claim

FirmFinancial Firm (Unknown - Insurer)
Decided2014-08-06
ProductGeneral Insurance · Strata
OutcomeFor the complainant
Amount awarded$4,400
Non-financial loss—
Amount claimed$4,400
SourceAFCA PDF

Summary

The applicants claimed $4,400 under a strata building policy for Cyclone Yasi water damage to their unit, which the FSP had not specifically answered. AFCA ordered the FSP to pay $4,400 with statutory interest from the date the invoice was paid.

Once the insured has shown physical loss within the policy period, the insurer bears the onus of proving an exclusion applies, and the policy requires reinstatement to the condition when new.

Issues

Subjects and remedies

natural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 329296 Determination Page 1 of 6 Case number: 329296 General Insurance - Domestic Insurance - Residential Strata Title - FSP Decision - Denial of claim 23 July 2014 Summary Description  A claim under a strata apartment complex insurance policy following damage to the complex as a result of Cyclone Yasi. Basis of Determination  A consideration of the evidence regarding the damage and loss and policy coverage. Determination  The Panel determines that the FSP pays the Applicants $4,400 together with interest at the statutory rate from 21 October 2011 (the date the Applicants paid invoice 516), until their claim has been settled. Background 1. The Applicants are the owners of a unit (unit 8) comprised within a strata apartment complex insured with the Financial Services Provider (FSP) under a strata insurance policy. 2. Several units and some common property within the strata complex sustained damage as a result of Cyclone Yasi in 2011, resulting in a number of claims being made on the policy. 3. The FSP accepted liability for the claims but disputes have arisen as to the adequacy of the scope of works prepared and the repairs that were carried out for the various claims. 4. This dispute concerns the damage to unit 8. Determination Case No: 329296 Determination Page 2 of 6 Summary of Applicants ’ position 5. Their tenants vacated unit 8 within a few weeks of the cyclone, reporting that water has been entering through the top of the bedroom doors, running down the internal wall and pooling at the bottom of the stairwell. 6. Mould has developed on the walls where water had entered unit 8. 7. Builder MD said cyclonic winds had damaged the upstairs glass doors (and not the windows) and this was allowing water to enter unit 8. 8. They were unable to let unit 8 out until after they repaired the damage in September 2011. 9. Whilst they have had the whole unit repainted, they are only claiming for work done to make essential repairs necessitated by the cyclone. 10. They have paid builder MD $4,400 to carry out repairs to prevent further damage from occurring and have received verbal consent from the insurance broker to proceed with the relevant repairs. They have not been reimbursed for the cost to date. 11. Unit 8 never had leaks or mould until after the cyclone. In particular:  Their tenants never reported any leaks in the 12 months prior to the cyclone. There were also no reports of any water leaks in the 18 months prior to the 12 months.  Unit 8 was regularly inspected by their managing agent. They are also active members of the body corporate committee and personally inspect unit 8 at least once a year from 2003 to 2008 and twice a year from 2009 to 2011.  Unit 8’s 18 February 2010 Routine Inspection Report does not identify the presence of mould. Summary of FSP’s position 12. Other than a general submission that it has met its policy obligation, the FSP has not provided a specific response to the claim involving unit 8. Issue 13. Whether the FSP has satisfactorily discharged its policy obligation with respect to unit 8. Case No: 329296 Determination Page 3 of 6 Reasons for decision 14. Due to the nature and complexity of the dispute, it has been referred to the Panel for Determination in accordance with the Operational Guidelines to the Financial Ombudsman Service’s (FOS) Terms of Reference. 15. The Panel consists of an Ombudsman and two Panel members with extensive experience in the insurance ind ustry and consumer claims. 16. The Panel is satisfied that the material has been exchanged and the parties have had the opportunity to respond to the issues raised. 17. As the Applicants are assisted by a representative, references to “the Applicants” will include the representative unless otherwise indicated. Relevant policy provisions 18. As the FSP has not referred the Service to any policy provisions, the Panel has reviewed the product disclosure statement (PDS) and noted the following policy provisions: “ Building and Common Contents What you are insured against We agree to indemnify you against physical loss or damage to your building and common contents occurring during the period of insurance . Definitions specific to this Cover Section Building … building does not mean: (a) temporary wall, ceiling or floor coverings. … How much we will pay and how We will pay up to the sum insured for physical loss or damage to your building. In the event of a claim for a building we will at our option: 1. repair or replace the building; or 2. pay the reasonable cost of repair or replacement to a condition substantially the same as but not better or more extensive than when new; or … Additional Benefits above the Sum Insured We will pay the following additional benefits over and above the sum insured . … 2. Additional costs For the costs and expenses necessarily and reasonably incurred for the purpose of: Case No: 329296 Determination Page 4 of 6 … (b) the temporary protection and safety of the property pending repair or replacement following an insured loss or damage. (c) the removal of debris or the demolition, dismantling, shoring up, propping, underpinning or other temporary repairs following an insured loss or damage to the property , but not in connection with liability for pollution of any kind. (d) the demolition and removal of any property belonging to you which is no longer useful for the purpose it was intended, provided such demolition and removal is necessary for the purpose of the reinstatement or replacement of the property and is following an insured loss or damage but not in connection with liability for pollution of any kind. … Exclusions … We do not insure you for: … (d) wear and tear, fading, chipping, scratching or marring, rust, gradual corrosion or gradual deterioration or developing flaws, normal upkeep or making good. However, this exclusion will not apply to any subsequent damage to your building or common contents if you were not aware of, and a reasonable person in the circumstances could not be expected to have been aware of, the wear and tear, gradual corrosion or gradual deterioration or developing flaws.” 19. The policy covers the Applicants for any physical loss or damage to their unit. This means they have the onus to show that their unit sustained damage that occurred within the relevant period of insurance. Once shown, the onus is then on the FSP to show that particular claimed damage is excluded or otherwise not covered by the policy. 20. As the Applicants are prima facie entitled to indemnity for any physical loss or damage to the insured building, the FSP cannot simply decline a particular damage on the basis it is not cyclone damage. It must demonstrate that the damage is excluded or otherwise not covered by the policy for some reason. 21. The Panel further notes that where claimed damage is covered, the policy requires the FSP to reinstate such property to substantially the same condition it was in “when new” and no t to the condition it may have been in immediately before the event that caused the damage claimed. 22. For the purposes of this dispute, this means that the FSP is required to reinstate particular damaged property to the condition it was in “when new” if it is established that it was damaged by the cyclone. That the particular property may have been aged would generally be irrelevant unless the FSP is able to demonstrate that the property would not have sustained the damage claimed without the contribution from its aged state. Case No: 329296 Determination Page 5 of 6 The claimed damage 23. According to repairer MBHI:  It repaired a leaking sill on the first floor of unit 8.  It repaired water damage to the unit’s front wall, which also entailed re - sheeting part of the ceiling, installing a new cornice and painting.  It replaced water damaged carpets in the main bedroom and at the bottom of the stairs.  It issued the Applicants with two invoices (invoice 516 and invoice 521) for carrying out the above works. 24. The Applicants have provided a copy of invoice 516 (for the sum of $4,400), which they say was the cost incurred to carry out essential repairs to the cyclone affected areas. The Applicants also say they have painted the entire unit but do not seek reimbursement for this cost. 25. Whilst the FSP has not specific ally responded to the Applicants’ claim, it seems that its assessor C had somehow concluded that unit has had “pre - existing long term” issues with water entry through allegedly “severely deteriorated windows/doors”. Assessor C also alleges that building co nsultant MCS had “verbally” said unit 8 “have had major defects and pre - existing problems”. 26. There appears to be no evidence in the material exchanged that supports assessor C’s assertions. Building consultant M commented that “… internal painting repairs ha d already commenced……the possible extent of TC Yasi damage could NOT be identified. 27. The Panel has carefully reviewed unit 8’s undated Entry Condition Report and 18 February 2010 Routine Condition Report. Whilst the Panel accepts that the window and security screens in bedroom 1 have corroded and one of them apparently has holes, the Panel finds insufficient evidence to support a suggestion that the unit has been having continuing and long term issues with water entry. 28. Although the Routine Condition Report has identified a small watermark in each of the bedrooms (the exact locations of which are unclear), the Panel does not consider this in itself is sufficient to conclude that the unit has been having continuing and long term issues with water entry. 29. There is also no evidence to suggest that unit 8’s tenants had already been complaining of water entry prior to the cyclone event. The property agent’s 20 July 2011 letter does not expressly indicate that the tenants have complained of water entry before the cyclone event. 30. Ultimately, the policy covers the Applicants for physical loss or damage to their unit that occurs during a relevant period of insurance. There is no dispute unit 8 was struck by C yclone Yasi and had sustained water damage Case No: 329296 Determination Page 6 of 6 as a result of this event, so the onus is essentially on the FSP to establish the operation of an exclusion to refuse the Applicants’ claim. 31. The Applicants have provided a Tax Invoice from their repairer who certifies that the repairs are Cyclone Yasi related. The FSP has not provided any probative evidence to show that was not the case, other than the suggestions by the assessor that there may have been long term issues and the consultant’s report that they could not id entify what was cyclone related. 32. In the circumstances, it follows that the Applicants are entitled to indemnity for their claim. Determination 33. The Panel determines that the FSP pays the Applicants $4,400 together with interest at the statutory rate from 21 October 2011 (the date the Applicants paid invoice 516), until their claim has been settled.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.