Denial of balcony damage claim under deterioration and faulty workmanship exclusions
Text of the determination
Case No: 329019 Determination Page 1 of 10
Case number: 329019
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
26 February 2014
Summary
Description
Claim under a Home Building and Contents Policy for damage to a
balcony in or about March 2010. The FSP has declined the claim
relying upon exclusions contained within the policy relating to faulty
construction, gradual deterioration and rot.
Basis of Determination
The Applicant first lodged a claim on 6 March 2010 for water damage to
the balcony of the Applicant’s home sustained during major storms.
Repairs were completed by the FSP.
In June 2012, the Applicant lodged a claim for earthquake damage on
their current Insurer “C” . During that claim, there was damage identified
to the balcony which was considered to be pre-existing.
The Applicant lodged a claim with the FSP with respect to the damage
on the grounds that the FSP’s repairer had failed to adequately repair
the storm related damage.
Engineering evidence establishes that the balcony has suffered from
pre-existing damage which pre-dated the policy period and was most
likely caused by gradual deterioration, faulty workmanship and/or rot.
As the exclusion does not apply by reference to the condition of the
balcony at the time the contract was entered into, then Section 46 of
the Insurance Contracts Act 1984 has no application.
Determination
The FSP is entitled to rely upon the terms of the policy to deny liability
for the claim.
Determination
Case No: 329019 Determination Page 2 of 10
Background
1. The Applicant held a home building and contents insurance policy (the
policy) with the Financial Services Provider (FSP) with the relevant term of
insurance being 31 October 2009 to 31 October 2010.
2. A claim was lodged on 6 March 2010 for storm damage sustained to the
balcony. This claim was accepted and repairs completed.
3. On or about 21 June 2012, the Applicant lodged a further claim on his then
current home insurance policy with Insurer “C” for possible earthquake
damage including damage to a balcony.
4. Following investigation of the claim by Insurer C and including investigations
by Independent Specialist Technical Consultants, it was determined that the
damage was not related to earthquake. The consultants identified damage to
the balcony and identified water had been flowing over and around the main
beam. They suspected possible rot and suggested inspection and repair was
urgent.
5. Arising from the investigations, it was noted that the damage to the balcony
section of the home was possibly related to previous works undertaken by
the FSP in 2010. The Applicant contacted the FSP and requested the
previous claim be reopened and sought indemnity for this portion (the
balcony) of the damage.
6. The FSP investigated the cause of the damage and proceeded to decline
indemnity for the claim on the basis the cause for the damage was pre-
existing damage (deterioration and rot) and therefore excluded from cover
under the policy.
7. The Applicant remains dissatisfied with the FSP’s position and is seeking a
review of the decision to decline the claim by the Financial Ombudsma n
Service (FOS).
Summary of Applicant’s position
8. The Applicant has sought the assistance of his broker “RR” to dispute the
FSP’s decision to decline indemnity to him under the claim. In the interest of
brevity reference to “the Applicant” will include both RR as well as the
Applicant for the purpose of this Determination.
9. A claim was lodged under the policy held with the FSP on 6 March 2010 for
damage to the balcony. The claim was accepted and significant repairs were
authorised to the balcony by the FSP th rough its preferred builders “MI”.
10. During the investigations undertaken by Insurer C in 2012, it was noted that
damage to the balcony was related to the previous repairs completed under
the 2010 claim with the FSP.
Case No: 329019 Determination Page 3 of 10
11. The Applicant maintains that the whole frame of the balcony was exposed as
part of the repairs undertaken by MI in 2010. Therefore, MI should
reasonably have identified the pre -existing damage referred to at this time
and its failure to do so has now resulted in the current damage to the
balcony.
12. The Applicant is concerned the FSP maintains that it was unreasonable for
MI not to have adequately investigated the balcony framework in its entirety.
The fact that MI acknowledges in 2010 some deterioration of the framework
confirms that it should have investigated this aspect further. It should not just
have assumed that the previous rectification works noted were satisfactory.
13. The Applicant is seeking for the FSP to take responsibility for the failure of its
appointed consultants and therefore provide completed indemnity to him for
repair of the balcony structure and floor.
Summary of FSP’s position
14. A claim was lodged under the policy in March 2010 for water damage to the
soffit of the balcony. The Applicant believed the water had leaked through
the balcony to the soffit during major storms.
15. The FSP appointed engineers “AB” to the claim and it was determined that
the balcony was leaking as a consequence of the failure of the waterproofing
system. AB recommended that the balcony flooring and waterproofing be
replaced.
16. AB also recommended that the balcony structure be checked during the
rectification works to confirm if there was any deterioration/rot damage and if
so, to remove any damaged/deteriorated building elements/members
accordingly.
17. The FSP commissioned MI to undertake the scope of works recommended
by AB. MI inspected the veranda substrate in line with AB’s
recommendations and found rot and deterioration of the existing structure.
However, MI also sighted previous rectification works and reasonably
assumed that these works were sufficient to address the deterioration.
18. AB is of the view that the damage subject to this dispute was caused by pre-
existing timber deterioration and rot, which are specifically excluded under
the policy.
19. Even if MI had identified the damage at the time it undertook the works, the
early detection would not have made a difference to the repair costs. It would
not have altered the fundamental proposition that the damage was caused
by pre-existing timber deterioration and rot.
20. The FSP maintains gradual deterioration and pre-existing damage were, at
the very least, a cause of the need to rectify the damage. At its highest, the
Applicant’s case is “ the weight of the ne w balcony could contribute to the
Case No: 329019 Determination Page 4 of 10
bowing .” The Applicant’s builder concedes that “ compromised joints ” was a
cause of the need to rectify the balcony.
21. The FSP notes faulty construction, gradual deterioration and rot had
occurred before policy inception. This raises the question as to whether the
FSP is precluded from relying upon the exclusion relating to faulty design,
gradual deterioration and rot by virtue of Section 46 of the Insurance
Contracts Act 1984 (the Act).
22. Section 46 of the Act does not come to the assistance of the policyholder as
it does not apply if the time of entry into a contract of insurance is not
relevant to the application of an exclusion.
23. The FSP relies on the following policy provisions:
“ Specific Exclusions
The following exclusions apply to this Section of Your Policy:
…
VI. Existing Damage
We do not cover any loss or damage which occurred prior to the Policy
Period.
VII. Faulty, Inadequate or Defective Planning
We do not cover any loss or damage caused by faulty, inadequate or
defective:
a. planning, development, surveying, siting;
b. design, specifications, workmanship, repair, construction, renovation,
remodelling, grading, compaction;
c. materials used in repair, construction, renovation or remodelling; or
d. maintenance;
of part or all of any property whether on or off the Residence.
However, this exclusion does not apply to ensuing covered loss unless any
other exclusion applies.
…
IX. Gradual Deterioration, Breakdown, Wear and Tear
We do not cover any loss or damage caused by:
a. wear and tear, gradual deterioration;
b. inherent vice, latent defect, mechanical or electrical breakdown that You:
i were aware of at the time this Policy was entered into; or
ii could have been reasonably expected to be aware of when this
Policy was entered into; or
c. warping or shrinkage, rust or other corrosion, wet or dry rot.
However, this exclusion does not apply to ensuing covered loss unless any
other exclusion applies or where the gradual deterioration, breakdown or wear
Case No: 329019 Determination Page 5 of 10
and tear causes water to escape from a household appliance, swimming pool
or plumbing, heating or air conditioning system.
Exclusion (IX b.) does not apply to damage to household electrical motors if
there is actual burning out of the motor which is not caused by improper
maintenance. ”
Issues
24. Whether the FSP is entitled to decline indemnity to the Applicant in line with
the relevant policy exclusions.
25. Whether there is an application of Section 46 of the Insurance Contracts Act
1984 .
Reasons for decision
26. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is due to the circumstances of the dispute. This dispute has
not been the subject of a FOS Recommendation and has proceeded directly
to Determination.
27. Prior to coming to a Determination, I have read and considered all the
evidence made available by the parties to this dispute.
28. The parties do not dispute the following:
The Applicant held a current home insurance policy with the FSP at the
time of the loss subject to this dispute.
The FSP provided and the Applicant had received the relevant policy
documentation including the Product Disclosure Statement (PDS) prior
to the loss.
The Applicant lodged and the FSP accepted a claim for damage to the
balcony flooring and waterproofing in 2010.
Repairs were authorised to be completed based on recommendations
by the appointed engineers AB.
MI proceeded to undertake the repairs. However, concerns have been
raised by AB with respect to the repairs (to be discussed in detail
below).
The Applicant (subsequent to the 2010 claim) changed insurers and a
claim was lodged in 2012 with Insurer C for earthquake damage to the
property including the balcony, however, it was determined there was
no earthquake damage.
Arising from investigations it was determined that there was evidence
of pre-existing damage to the balcony structure due to gradual
Case No: 329019 Determination Page 6 of 10
deterioration and rotting of the timber within the substructure of the
balcony.
Further, loss and/or damage arising from gradual deterioration and/or
rot is specifically excluded from cover under the policy.
The recommendation of the experts provided that rectification of the
damage will consist of the need to demolish, re-design and reconstruct
the balcony.
29. On 1 4 July 2012, “MSC” provided an engineering report to Insurer C. They
concluded that whilst it was not possible to see the actual beams of the
balcony, the main beam appeared to be a steel beam and the other beams
connected to it with timber. The beams appear to have moved downwards at
the end connections. There was evidence of water flowing over and around
the main beam and MSC suspected the timber beams may have rotted at
the connection points. MSC recommended the beams and connections be
directly inspected by a certified engineer.
30. It was after receiving this report and Insurer C ’s rejection of the claim that the
Applicant referred the claim to the FSP arguing the damage arose from the
repairs undertaken by MI in 2010.
31. Relevant comments and/or opinions of the various consultants relevant to
the repairs and assessments completed in 2010 are summarised below:
“G” Plumbers Report dated 16 March 2010
Found balcony ceiling facing the swimming pool area had sustained
extensive water damage. Water had been collecting in the ceiling
causing the plaster to bulge slightly, then, flooding out the down lights.
After dye test, it appeared railing and glass panelling may have been
stressed by excessive winds, pulling the fixings of the railing uprights
compromising the integrity of the waterproofing.
As a temporary measure, G replaced the fixings and applied some
grout to the suspect areas which appeared to prevent further water
ingress.
AB’s (Engineers) Comments via an email to the FSP dated 26 June 2010
Noted widespread water staining to the soffit linings that line the
underside of the external north facing balcony.
It was apparent that the waterproofing system of the existing balcony
was defective / damaged.
As part of the rectifications, AB recommended that the FSP check the
condition of the substrate/sub-structure to determine whether or not
there was any evidence of damage and/or deterioration.
The FSP was to remove any damaged/deteriorated members/elements
as necessary.
Case No: 329019 Determination Page 7 of 10
AB (Engineers) Report dated 5 August 2013
AB reviewed its previous official reports as well as more recent
correspondence regarding the claim in dispute before FOS.
On the basis of its 2010 review, AB provided the following relevant
opinions/recommendations:
After the inspection in 2010, AB recommended that the balcony
flooring and waterproofing system be replaced.
Also, importantly, AB recommended checking the condition of
the balcony substrate during the course of the rectification works
for any evidence of damage deterioration and to remove any
damage / deteriorated building elements / members accordingly.
In August 2012, AB was again commissioned to reassess the
conditions of the balcony with respect to new damage claimed. AB
determined:
There was evidence of failure of the waterproofing system
undertaken by MI.
The failure of the waterproofing was considered to have
occurred due to excessive sag that had developed with respect
to existing balcony floor structure over a prolonged period of
time.
It was assumed the sag was due to deterioration and/or rotting
of the original timber members (joists) over a prolonged period of
time (5-10 years), which pre-dates remedial works completed by
MI.
It was apparent remedial attempts had been made by others
approximately 5-10 years prior to rectifying the deteriorated
framing members by way of laminating timber blocks to the
deteriorating joists. However, the adopted rectification works
were considered inadequate.
There was evidence that the compressed sheet flooring
installation methods adopted by MI were not in accordance with
manufacturers specifications.
Although the installation methods can be considered a
contributing factor to the failure of the waterproofing, it is
considered somewhat irrelevant with respect to the primary
cause of the failure (ie) existing timber deterioration.
AB notes MI removed and replaced the balcony floor tiling and
substrate (compressed sheets) flooring only. It did not undertake
any works to the balcony substrate as recommended by AB in its
initial report.
MI advised it did not replace the balcony sub-structure in
accordance with the recommendation because MI believed that
the rotted joists had been rectified by others, by placing new
joists alongside the rotted joints.
Case No: 329019 Determination Page 8 of 10
In AB’s opinion when MI noticed some timber rot to the balcony
substrate, even if it appeared rectified, it should have reported
the condition and recommended the balcony be re-assessed by
a suitably qualified building professional (engineer) before
continuing repairs.
The installation of 18mm compressed sheet flooring is
considered appropriate material for external balcony substrate
flooring.
AB recommends the existing flooring structure must be
demolished, re-designed and reconstructed.
32. In an email to the FSP dated 8 March 2013, AB advised that the work carried
out by MI did not cause failure of the balcony structure nor by extension, any
damage resulting from the failure of the balcony and save for the negligible
increase in labour and material costs, there would be no difference in the
balcony rectification costs. This arises from the fact that the balcony should
have been totally demolished and replaced initially due to the underlying
issues discovered and in its current condition, the same scope of works
apply.
33. I have carefully considered the available evidence including the FSP’s
commissioned engineers’ findings, initial assessment and recommendations
as well as its subsequent observations and recommendations. I am satisfied
that amongst the various consultants appointed to the claim, AB is the more
qualified. It was involved with the claim prior to repairs being authorised (ie)
for the most part since the concerns of the Applicant were brought to the
FSP in 2010.
34. I am also satisfied that it was on the basis of AB’s assessment and
recommendations that the scope of works provided to MI were authorised
and were to be followed. Essentially, in order to consider whether the scope
of works were completed appropriately, it is necessary to consider the
recommendation put forward by AB, MI’s completion (or not) o f the
recommendations and AB’s subsequent assessment of the repairs
completed by MI under the claim. I note the following:
It is not in dispute that AB was clearly concerned about the possible
existence of damage/deterioration of the balcony’s substrate/st ructure
and therefore clearly recommended that the FSP arrange for this to be
checked as part of the rectification works.
Upon re-inspection of damage to the balcony in 2012 (after repairs
were completed by MI) it was apparent to AB that the rectification
works completed by the previous owner were inadequate.
AB noted the repairs undertaken by MI were not to manufacturers’
specifications.
AB was of the opinion that when MI noticed the existence of timber rot
to the balcony substrate it should have reported this, as opposed to
Case No: 329019 Determination Page 9 of 10
continuing with repairs, so that a suitably qualified building professional
could investigate/assess.
35. I am concerned that MI failed to report the extent of the damage to the
balcony to the FSP and in particular, the existence of the deterioration and
rot.
36. Whilst I acknowledge that the northern end of the balcony sub-structure was
not accessible at the time MI undertook the repairs, I am not satisfied that it
is a reasonable position for a professional organisation to take, to not notify
the FSP and in turn the Applicant, of what are potentially very serious issues.
37. In my view, MI should have made all efforts to inspect the substrate given
the fact that it identified the deterioration and rot. If this had been done, then
the true extent of the pre-existing deterioration and rot would have been
discovered resulting in a more accurate and informed decision with respect
to the parties ’ liability under the claim in 2010.
38. Despite MI’s failings and my concern as to this, I am satisfied the evidence
establishes on balance that the balcony substrate had been subject to
gradual deterioration and timber rot for quite some time and most likely this
rot had occurred prior to the Applicant arranging the policy with the FSP.
This is further supported by the fact that there existed evidence of previous
temporary repairs completed to the balcony area. AB has identified these
repairs as being inadequate in any instance.
39. Whilst it is arguable that the Applicant was not aware of the pre-existing
defect or imperfection in the balcony and therefore Section 46 of the Act may
apply to prevent the FSP relying upon the relevant exclusion, Section 46
does not come to the assistance of the Applicant if the time of entry into the
contract of insurance is not relevant to the application of the exclusion.
40. The case of Nelson v The Hollard Insurance Company Pty Ltd [2010]
NSWSC 199 states that Section 46 of the Act does not apply to an e xclusion
of an event which makes no reference to when the event occurs. Therefore
only exclusions which refer to a condition existing before entry into the
contract of insurance are affected by Section 46.
41. In this dispute, the exclusion from cover loss or damage arising from gradual
deterioration (proximate cause) relied upon by the FSP applies generally and
is not temporal in nature. Accordingly, I am not satisfied that Section 46
assists the Applicant in this dispute.
Contribution to loss
42. Whilst I accept that the balcony requires demolition and reconstruction, I
note from the opinion of AB that he accepts there would be a negligible
increase in labour and material costs.
43. As the balcony would have required demolition and reconstruction
regardless of the actions of MI and as there is no evidence of the Applicant
Case No: 329019 Determination Page 10 of 10
suffering any unusual degree of inconvenience as a result of the actions of
MI, I am satisfied in the circumstances that the FSP should not be required
to contribute to the costs of demolition and reconstruction.
Determination
44. On the basis of the available information I determine the FSP is entitled to
decline indemnity to the Applicant with respect to the damage to the balcony
which now requires total demolition, redesign and reconstruction.