Determination 327618

Claim amount

FirmFinancial Firm (Unknown - Insurer)
Decided2015-02-09
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$7,950
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

After a house fire the applicants disputed the sums insured and the make-safe and restoration costs deducted from their settlement. AFCA found $7,949.65 of removal and storage costs was wrongly deducted and ordered reimbursement with interest, but rejected their other claims.

Settlement is based on the sums insured in the policy period when the loss occurred, and make-safe and restoration costs were deductible under the PDS, but removal and storage costs are an additional benefit outside the contents sum insured.

Issues

Subjects and remedies

home or building damagepay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim amount General Insurance - Domestic Insurance - Home Contents - FSP Decision - Claim amount Determination Case No: 327618 Determination Page 1 of 8 Case number: 327618 20 October 2014 1 Overview 1.1 Dispute The Applicants lodged a claim under their home building and contents insurance policy with the Financial Services Provider (FSP) after their home was damaged in a fire on 16 May 2011. The FSP accepted the Applicants’ claim and assessed their home and contents as a total loss. The FSP paid the Applicants an amount equal to the sums insured for their building and contents, less amounts paid by the FSP to third party providers for make safe repairs to the building and the attempted restoration and storage of contents items. The Applicants dispute the sums insured used by the FSP to calc ulate the settlement amounts, and say that the FSP did not adequately inform them about the deductions to be made. The Applicants consider these deductions to be excessive in light of the works carried out by the contractors, which they say caused further damage to their home and contents. 1.2 Issues and key findings Did the FSP use the correct sums insured to calculate the settlement amounts? The FSP correctly calculated the settlement amounts based on the sums insured under the Applicants’ policy of insurance for the period from 23 May 2010 to 23 May 2011, during which the fire occurred. The FSP was not obliged to increase these amounts to reflect the higher sums insured which applied to the following policy period (commencing 23 May 2011). Are the Applicants entitled to any further payments under the policy? Under the terms of the policy, the FSP was entitled to deduct amounts paid to third party service providers for make safe repairs and the attempted restoration of contents items. By providing the Applicants with a copy of the PDS, the FSP clearly informed them of the basis on which these deductions were made. However, the FSP incorrectly included in the amount deducted from the contents sum insured the costs of $7,949.65 incurred for the removal and temporary storage of the Applicants’ contents items. Under the terms of the policy, the Applicants are entitled to payment of these costs in addition to the contents sum insured. They are also entitled to payment of future costs incurred in moving their contents items back to the property once it has been repaired or rebuilt. Case No: 327618 Determination Page 2 of 8 Is the FSP liable for the further damage to the Applicants’ property? The FSP’s obligations in respect of the building claim were fully satisfied by payment of the settlement amount in September 2011. As the claim was settled on a total loss basis, the FSP is not liable for any further damage to the timber floors and doors following the fire. The FSP is not liable for mould damage to the Applicants’ contents stored in containers provided by th e FSP’s restoration company (S). The damage did not become apparent until over nine months after the FSP had paid the contents settlement amount, following which the FSP was no longer responsible for the provision of services by S. The FSP is not required to compensate the Applicants in respect of the contents abandoned at the dry cleaner’s premises, as there is insufficient information available to establish how the loss occurred or the extent of the loss. 1.3 Determination This Determination is substantially in favour of the FSP. The FSP is to pay the Applicants $7,949.65 (as reimbursement for the amount incorrectly deducted from the contents sum insured), plus interest on this amount in accordance with section 57 of the Insurance Contracts Act 1984 from 20 September 2011 (being the date the FSP paid the contents sum insured) until the payment date. The Applicants are entitled to reimbursement for the costs of moving their contents back to the property once it has been repaired or rebuilt, in accordance with the terms of the policy and subject to providing the FSP with appropriate proof of the costs incurred. The Applicants are not entitled to any other payments. Case No: 327618 Determination Page 3 of 8 2 Reasons for Determination 2.1 Did the FSP use the correct sums insured to calculate the settlement amounts? FSP used sums insured for the policy period during which the loss occurred The fire at the Applicants’ property occurred on 16 May 2011, seven days before the expiry of their policy for the period from 23 May 2010 to 23 May 2011. The FSP used the sums insured specified in the Applicants’ certificate of insurance for this policy period to calculate the settlement amounts. The Applicants say that given the loss occurred just before the end of the policy period, in calculating the settlement amount, the FSP should have taken into account the higher sums insured which applied under their policy for the following period of insurance (from 23 May 2011 to 23 May 2012). They say that in the circumstances it would have been appropriate for the FSP to calculate the settlement amounts using the higher sums insured (or at least on a pro rata basis). FSP was not required to take into account sums insured for the next policy period The product disclosure statement (PDS) and certificate of insurance (COI) for the period of cover from 23 May 2010 to 23 May 2011 (which the Applicants do not dispute receiving) clearly sets out the sums insured which apply during this period. The PDS also states that the most the FSP will pay under a claim is the sum insured. At law, the policy of insurance for each policy period is a separate contract between the parties. A new contract is formed on each renewal of an insurance policy. The FSP’s obligations and the Applicants’ entitlements in respect of the fire on 16 May 2011 are governed by the terms of their policy for the period from 23 May 2010 to 23 May 2011. There is no basis at law to apply the terms of the policy for the subsequent period of insurance to a loss which occurred before that prospective policy commenced (either fully or on a pro rata basis). Accordingly, the FSP used the correct sums insured for the purpose of calculating the settlement amounts payable to the Applicants. 2.2 Are the Applicants entitled to any further payments under the policy? The FSP was entitled to deduct make safe costs from the building sum insured In addition to cover for loss or damage to the insured building, the Applicants’ policy provides cover for certain other expenses incurred in connection with an Case No: 327618 Determination Page 4 of 8 insured event. This includes cover for the costs of demolishing all or part of the building and removing debris, and the costs of making the site safe. The PDS clearly and unambiguously states that any amounts paid for demolition and make safe costs are paid as part of the building sum insured (and not in addition to the building sum insured). By providing the Applicants with a copy of the PDS, the FSP complied with its obligations to inform them that any amounts paid for make safe costs would reduce the settlement amount to be paid for the building. The FSP has provided a copy of an invoice from its builder (T) for $22,970.30 for works undertaken to demolish, clean up and make safe fire damage at the Applicants’ property. These costs include labour costs for 234 hours of work , together with additional costs for the hire of scaffolding, a skip and a cherry picker. The builder (T) has confirmed that the make safe works were carried out by three workers (plus supervisors) over nine days and included the demolition and make safe of severely fire damaged roofs at the property and the construction of a temporary frame to allow the Applicants to remove antique furniture from the property. The Applicants say that these costs were excessive and the nature of the works being undertaken was unclear. However, other than the damage to the timber floors and doors (which is considered separately below), the Applicants have not identified any specific issues with the manner in which the make safe works were conducted. The photographs and other information provided by the parties establishes that the fire caused significant structural damage to the Applicants’ home. Given the nature and extent of the damage, and the size of the building, the Panel considers that the make safe costs incurred by the FSP were not unreasonable. The FSP’s claim notes (together with a statement provided by its loss assessor (C)) reflect that the Applicants were consulted about the final settlement amount for the building claim before it was paid in September 2011, and confirmed that they were satisfied with it. In the circumstances, the Panel is satisfied that the FSP was entitled to deduct the make safe costs of $22,970.30 from the building sum insured in order to calculate the settlement amount for the building claim. The FSP was entitled to deduct restoration costs from the contents sum insured The amounts deducted by the FSP from the contents sum insured included costs paid by the FSP to its restoration company (S) for the cleaning and restoration of the Applic ants’ smoke affected contents. The terms of the policy provide that, where a claim is made for damage to contents, the FSP is entitled to elect to repair or replace the damaged contents, or pay the Applicants the sum insured. However, the most that the FSP is obliged to pay for a contents claim is the contents sum insured. Case No: 327618 Determination Page 5 of 8 The policy does not provide any additional cover for costs incurred in cleaning and restoring damage contents. Accordingly, it is clear from the terms of the policy that any amounts incurred by the FSP to restore contents items will necessarily reduce the amount available to be paid as a cash settlement. The FSP’s claim notes reflect that the FSP liaised with the Applicants and the restoration company to arrange for the cleaning a nd restoration of damaged items, and the removal and disposal of those items which were unable to be restored. The FSP’s loss assessor says that the Applicants were aware that they would bear the costs of these services and attempted to minimise these costs by cleaning some of the items themselves. The FSP’s claim notes reflect that the Applicants were consulted about the final settlement amount for the contents claim before it was paid in September 2011, and confirmed that they were satisfied with it. In the circumstances, the Panel is satisfied that the FSP was entitled to deduct costs paid to its restoration company for the cleaning and restoration of the Applicants’ damaged contents, in order to calculate the settlement amount for the contents claim. The specific concerns raised by the Applicants about the manner in which the restoration company carried out these works is considered in section 2.3 below. The FSP was not entitled to deduct the costs of removing and storing undamaged contents The FSP deducted total costs of $26,577.60 from the contents sum insured, on account of amounts paid to its restoration company (S). The invoice provided by S indicates that this amount included fees for work undertaken in removing and storing the Applicants’ undamaged contents, as well as cleaning and restoring their damaged contents. The additional cover provided under the Applicants’ policy includes cover for temporary accommodation costs where the insured property is uninhabitable. The FSP provided the Applicants with temporary accommodation benefits for the maximum period of 12 months available under the policy. The temporary accommodation cover provided under the policy includes cover for the costs of removing and storing contents items, as well as the costs of returning contents items to the insured property. The policy clearly states that this cover is provided in addition to the buildings sum insured. Given that removal and storage costs are to be paid as an additional benefit, the FSP was not entitled to deduct these costs from the contents sum insured in order to determine the settlement amount. Based on the itemised invoice provided by S, the Panel estimates that $7,949.65 of total costs of $26,577.60 deducted from the contents sum insured are attributable to the removal and storage of the Applicants’ contents. Accordingly, the FSP is required to reimburse the Applicants for this amount (plus interest). Case No: 327618 Determination Page 6 of 8 Under the policy, the Applicants are also entitled to a further payment for the costs of returning their contents items to their property once it has been repaired or rebuilt, subject to providing the FSP with appropriate proof of the costs incurred. 2.3 Is FSP liable f or further damage to the Applicants’ property? FSP is not liable for damage to timber floors and doors The Applicants say that the make safe repairs carried out by the FSP’s builder (T) were inadequate and resulted in further damage to timber floors and doors at the property. Specifically, they say that T failed to adequately waterproof the roof which allowed rainwater to enter, causing an estimated $45,000 worth of damage to the floors and doors. The available information establishes that:  shortly after the fire, T installed a tarpaulin over the damaged roof area;  on 14 June 2011, the Applicants raised concerns that the make safe repairs (including the demolition of the damaged roof and ceilings) had left the floors exposed to the weather;  in response to th e Applicants’ concerns, the FSP advised that it was not possible to effectively cover the floors without partially rebuilding and re- roofing the relevant area which was not feasible, given that this would subsequently have to be replaced when the house was rebuilt;  the Applicants advised that they wanted to protect the floor to allow for re- sanding in the future, but agreed that it would not be appropriate to cover the floor itself with a tarpaulin, as this would trap moisture, causing further damage; and  on 3 August 2011, the Applicants advised the FSP that other builders who had attended the property (to quote on the rebuilding) had mentioned that the floor could have been saved, if the tarpaulin had been of better quality and correctly installed. Under th e terms of the Applicants’ policy, where there is any damaged property remaining after their claim is settled on a total loss basis, the FSP is entitled to ownership of such property (unless the FSP agrees that the Applicants may keep it, in which case they are responsible for it and may use it however they wish). In the present case, the FSP settled the building claim on a total loss basis and the Applicants retained ownership of the damaged property. In these circumstances, payment of the settlement amount for the building claim fully satisfied the FSP’s obligations in relation to all parts of the building and effectively included an amount in respect of the floors and the doors. Accordingly, the FSP was not obliged to take any steps to prevent further damage to the floors and the doors, as it had fully complied with its obligations under the policy by settling the claim on a total loss basis. Case No: 327618 Determination Page 7 of 8 Available information does not establish that Applicants have suffered loss due to mismanagement of contents claim The Applicants say that the services provided by the FSP’s restoration company (S) were inadequate. Specifically, the Applicants say that:  the container provided by S to store their contents at the property leaked, which resulted in mould damage to approximately half of all their contents (valued at $50,000); and  S took six months to remove the contents from the property and lost around ten bags of clothing, some of which the Applicants found by chance at a drycleaner’s premises nine months after the fire . The FSP denies that it was responsible for the mould damage to the Applicants’ contents. The statement provided by the FSP’s loss adjuster notes that S had confirmed that the storage container was inspected after the Applicants raised their concerns, but no leaks were identified. S suggested that the damage may have been caused by the Applicants failing to properly close the door of the container. S has subsequently confirmed that the Applicants have not been charged for six months’ worth of storage cos ts or for the delivery of some items to their property. Based on the available information, it is not possible to determine how the mould damage to the Applicants’ items occurred. Further, it appears that the damage did not become apparent until mid-2012, over nine months after the FSP had paid the contents settlement amount. Following settlement of the Applicants’ claim, it was their responsibility (and not that of the FSP) to manage the continued provision of services by S. In these circumstances, the Panel considers that the FSP is not liable for the mould damage to the Applicants’ contents. The available information establishes that the Applicants liaised directly with S in relation to the dry cleaning of their contents items, from the early stages of t he claim process. Following payment of the settlement amount, they were solely responsible for managing this process. The Applicants have provided photographs showing their missing contents items located at the drycleaner’s premises. However, it is not cl ear from the information provided whether there are further items which the Applicants have failed to recover (and, if so, the value of those items). Accordingly, even if the Panel were to accept that the FSP should be liable for the manner in which S carried out the dry cleaning, there is insufficient evidence to establish the loss suffered by the Applicants as a result. In these circumstances, the FSP is not required to compensate the Applicants. Case No: 327618 Determination Page 8 of 8 3 Supporting information 3.1 FOS approach for this dispute This dispute has not been the subject of a FOS Recommendation. Due to its nature, FOS has considered it appropriate to proceed directly to Determination in line with the Operational Guidelines to the FOS Terms of Reference. This decision has been made by a Panel consisting of an Ombudsman and two Panel members with extensive experience in insurance industry matters and consumer claims. 3.2 Relevant material relied upon There has been a full exchange of material information between the parties and each party has had the opportunity to address the issues raised. The key materials relied on by the Panel for the purposes of this Determination include the following:  Product Disclosure Statement and policy booklet dated 1 June 2009.  Certificates of Insurance for Building and Contents for the period 23 May 2010 to 23 May 2011  FSP’s claim notes  FSP’s chronology of the claim  Invoice from the FSP’s builder (T) dated 21 June 2011  Invoice from the FSP’s restoration company (S) dated 9 September 2011  Statement from the FSP’s loss assessor (C)  Structural report & proposed scope of repairs prepared by the FSP’s engineer (SC) dated 18 June 2011  Special purpose inspection cost report (timber floors and internal doors) dated 13 May 2014 prepared by the Applicants’ building consultants ( P)  Quotation dated 19 May 2014 from Applicants’ removalists for returning their contents to the property  Various photographs of the property and contents provided by the parties  The parties’ submissions

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.