The Applicants claimed for water inundation to their Queensland home during the January 2011 floods, and the FSP denied the claim as flood damage. AFCA found the loss was caused by flood, which the policy excludes, and that the FSP was entitled to deny the claim.
Hydrology evidence showed the inundation was most likely caused by Brisbane River flooding, which the policy excludes, and the PDS clearly informed the insured of the flood exclusion.
Issues
- Claim denial primary · not upheld“The FSP is entitled to deny the claim in accordance with the terms of the policy.”
- Failure to disclose secondary · not upheld“There is no evidence of any failure on behalf of the FSP to make it known to them.”
Subjects and remedies
home or building damagenatural disasterno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 327509 Determination Page 1 of 8
Case number: 327509
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
20 January 2014
Summary
Description
Claim under Home and Contents Policy for damage due to water
inundation following the heavy rainfall in Queensland in January 2011.
The FSP denied the claim as flood damage.
Basis of Determination
The policy does not include cover for flood damage.
The available hydrology report establishes the inundation was most likely
due to flood.
There is insufficient evidence to establish the initial inundation was
stormwater.
Determination
The FSP is entitled to deny the claim in accordance with the terms of the
policy.
Background
1. The Applicants held a home and contents insurance policy with the Financial
Services Provider (FSP) at the relevant time. The policy provided building
cover for $289,800 and contents cover for $52,500.
2. On or around 12 January 2011, the Applicants state, their home in Fig Tree
Pocket was damaged as a result of water inundation at the time of the
severe weather events that affected significant parts of Queensland.
3. The FSP declined the claim on the basis that it considered that the cause of
the loss was flooding, which is excluded under the policy.
Determination
Case No: 327509 Determination Page 2 of 8
4. The Applicants disagree with the decision and seek reimbursement for their
losses, which exceed $200,000.
Summary of Applicants ’ position
5. The Applicants incepted their policy with the FSP through a broker and claim
that they did not receive a Product Disclosure Statement (PDS) for the
relevant period of cover. The Renewal Notices from the broker for their prior
cover, noted that there was no flood cover however, this was not the case
after they transferred their policy to the FSP. They were unaware that this
policy did not provide flood cover.
6. They consider that the property was first inundated with overflow from the
drainage and/or stormwater run-off up to about one metre in the home and
that they should be indemnified for this. The hydrologist conceded that not all
of the water to inundate the property originated from the river and as the
policy provides accidental damage cover, the onus should rest with the FSP
to prove that all the loss was caused by a flood.
Summary of FSP’s position
7. The FSP says that the provision of the PDS document and notice in relation
to flood cover under the policy was the responsibility of the Applicants‟
broker and not the FSP.
8. As there were no eyewitnesses to the inundation of the home, the Applicants
are unable to establish how, when and what type of water first inundated the
home. Based on the known facts of the flood event and the report from its
hydrologist, the FSP says it is reasonable to conclude that the home was
inundated by floodwater.
9. Whilst there might have been a mixture of rainwater and floodwater which
inundated the property, case law clearly establishes that this is properly
classed as a flood and such a loss is not covered under the terms of the
policy.
10. The loss was caused by the flooding of the Brisbane River, which is located
close to the Applicants‟ home. The policy excludes losses that occur due to
flooding.
11. The FSP relies on the following policy provisions:
Pages 17-18 of the PDS
“ Words that have a special meaning
In this policy there are words that have a special meaning. These words are
listed below. If the meaning of a word is not shown below, we tell you on what
page the meaning is printed.
...
Case No: 327509 Determination Page 3 of 8
Flood The covering of normally dry land by water escaping or
released from the normal confines of a watercourse or lake,
whether or not it is altered or modified. Flood also includes
water escaping from the confines of any reservoir, channel,
canal or dam.”
Pages 19-20 of the PDS
“ Accidental Damage cover
What is covered
Your buildings and/or your contents as set out in your schedule are covered if
they are destroyed, lost or damaged.
...
What we will not pay for
We will not cover your buildings and your contents for any accidental loss or
accidental damage caused by:
...
Flood
Flood is the covering of normally dry land by water escaping or released
from the normal confines of a watercourse or lake, whether or not it is
altered or modified. Flood als o includes water escaping from the confines of
any reservoir, channel, canal or dam.
...”
Page 55 of the PDS
“ What Section 1 and Section 2 of the policy do not cover
We will not pay claims for loss, damage or liability arising from:
...
flood...”
Issues
12. Whether the Applicants were or needed to be “clearly informed” that the
policy did not provide cover for losses due to flooding.
13. Whether any or all of the Applicants‟ loss should be covered under the
policy.
Reasons for decision
14. As advised to the parties, FOS has considered it appropriate to elevate the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the potential complex nature of the issues to
Case No: 327509 Determination Page 4 of 8
be considered. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
15. This decision has been made by a Panel consisting of an Ombudsman, an
insurance industry representative appointed by the Financial Ombudsman
Service Board and a consumer representative appointed by the Financial
Ombudsman Service Board.
16. The Panel is satisfied that a full exchange of the relevant information has
taken place between the respective parties and that each party has had the
opportunity of addressing any issues raised.
Whether the Ap plicants were ‘clearly informed’ of the limits of the cover
17. The Applicants note that they had insured through their broker, “IC”, since
around 1979/80. They changed the cover for their home to the FSP on
5 January 2010 and renewed this cover the following year.
18. It is not alleged that the Applicants were not provided with a copy of the
PDS, only that they did not receive a new copy upon renewal of this policy
for the period relevant to the loss.
19. The Applicants ‟ claim that the previous cover they had clearly articulated on
the renewal notices/certificates, that no flood cover was provided for their
home. This was not the case after they changed the cover to the FSP.
20. Whilst their home was being inundated during the event, the Applicants say
they contacted IC who informed them that they were not covered for flood.
They noted that a neighbour was indemnified for flooding and queried why
their broker had not obtained similar cover for them. IC allegedly suggested
they “only know what policies are available from the insurance companies
with whom they deal.”
21. A broker owes a duty of care to exercise all reasonable care and skill in
advising an insured with respect to the suitability of insurance cover and
types of cover available. In this dispute, the broker was responsible for duly
informing the Applicants of the options available and for arranging suitable
cover.
22. It is unclear from the information exchanged just what enquiry was made of
the Applicants or advice given by the broker, however, as the dispute before
the Service is with the FSP and not the broker, then the Panel will limit its
consideration to the issues in dispute with the FSP.
23. The Applicants have supplied copies of the certificate of insurance received
after the inception of the policy and the renewal notice for the relevant period
when the loss occurred. These documents were provided to the Applicants
by IC.
24. It‟s likely that the original certificate of insuran ce was provided with a copy of
the PDS. The Applicants have not suggested that they did not receive a copy
Case No: 327509 Determination Page 5 of 8
of the PDS at inception, only that they did not receive it at renewal. There is
no onus on the FSP to provide new PDS documents on an annual basis.
25. In all likelihood, the Applicants had opportunity to familiarise themselves with
the cover provided under the policy. Even if they had not, there is no
evidence of any failure on behalf of the FSP to make it known to them.
26. The Panel is satisfied that the PDS serves to clearly inform the reader that
the policy provides cover for “accidental loss or accidental damage” subject
to exclusions, which include any losses that are attributable to flooding. In
any event, the broker was aware of the nature of cover and pursuant to
Section 71 of the Insurance Contracts Act 1984 , notice provided by the FSP
to the broker is deemed to be notice given to the Applicants.
27. On this basis, the Panel is satisfied that the FSP is entitled to rely upon the
terms and conditions in the PDS in relation to the claim.
Consideration of the loss
28. The Applicants were not present at the time of inundation and there is no
witness evidence to account for the circumstances of inundation.
29. The FSP did not retain a loss adjuster to inspect the damage and originally
denied the claim based on the reported material from the Applicants,
surmising that the loss was due to flooding. It has since retained a
hydrologist (“WP”) to comment on the damage caused and ratified its
conclusion that the loss was excluded under the policy.
30. WP attended the Applicants‟ home and reported on the damage caused to
the property. This report of 30 March 2011 relevantly notes that:
the Applicants‟ home was a single storey residence located “within the
Brisbane River floodplain ”. It is approximately 100m west of the main
river channel. The ground level of the home was situated at about 8.0m
AHD (Australian Height Datum);
the area of Fig Tree Pocket is located in a horseshoe shaped
peninsula, formed by the Brisbane River;
flood depths at the property were estimated to be about two metres.
Other homes in the area had also been inundated;
it was “highly unlikely that there was sufficient local stormwater run - off”
to inundate the property or for it to be a contributing factor;
using local river gauges Jindalee Bridge and Oxley Creek, the water
level was at 9.0m AHD and 8.4m AHD at 1.00am on Wednesday
12 January 2011. These respective gauges measured 11.4m AHD and
10.8m AHD by 10.00am that morning;
the hydrologist considered that there was a “backing up” of floodwaters
along the sub-surface drainage pipes from late on 11 January 2011.
Overland flooding over the banks of the river (situated at about 10.0m
AHD) likely occurred at about 10.00am on 12 January 2011;
Case No: 327509 Determination Page 6 of 8
the peak river levels would have occurred at about 10.00pm on
12 January 2011 at approximately 12.1m AHD at Jindalee Bridge and
11.5m AHD at Oxley Creek;
the cause of the inundation was “directly related to rising flood levels in
the nearby Brisbane River”.
31. The Applicants allege that the stormwater run-off was responsible for up to
the first metre of inundation of their home and rely on the emergence of
water from the drains prior to overland flow, which is hinted at in WP‟s report.
32. Whilst rainfall information is limited in the report from WP, it notes that
rainfall in the Caboolture River Catchment (north of Brisbane) recorded its
most significant falls up until midday on 10 January 2011 and rainfall
“decreased markedly” over the following 12 hours.
33. WP suggests that there was 30-4 0mm of rain in the local catchment “in the
lead up to the flooding”, equating to about a 1 -2 year Average Recurrence
Interval (ARI) storm. Surprisingly, no exact rainfall data for the region was
provided and the Panel is of the view that this should have been done.
34. Notwithstanding this, WP clearly gave consideration to the effect of the
rainfall and ventured that it was “highly unlikely” that run -off was significant
enough to contribute to the inundation of the area.
35. In addition to the report from WP, the FSP relies upon the flood map of the
local region, that shows that the areas in and around the Applicants‟ home
were within the areas known to have been affected by flooding.
36. Based on the information provided, the Panel is in no doubt that the
Applicants‟ home was inundated with floodwater. The only consideration is
whether it was possible that stormwater run-off might have inundated the
property prior to the arrival of floodwa ter.
37. The Applicants consider that given WP was unable to exclude stormwater
run-off as a potential contributing factor to the inundation, the FSP should be
obliged to contribute something towards their loss.
38. There is no eyewitness evidence to support the possibility of stormwater
inundation. The home was likely inundated on or about the early hours of
12 January 2011, by which time it is known that rainfall levels had dropped in
the greater Brisbane area.
39. The Insurance Council of Australia (ICA) compiled reports into the flooding
disasters in Queensland from this period. The reports detailed information
about the rainfall and its effect on the various areas.
40. The ICA noted that rainfall in the Brisbane city area was heaviest through the
6.00am to 4.00pm period on 11 January 2011. Page 41 of Volume 2 of the
report notes:
“Rain ceased over the Brisbane City area around 1800 hours on Tuesday 11
January, some 24-30 hours before flood levels in the Brisbane River peaked.
Case No: 327509 Determination Page 7 of 8
Thus, when the Brisbane River peaked, there is no evidence that there was
any „normal‟ flow of significance from the catchment areas of tributary creeks
draining the Brisbane LGA [Local Government Area]. As the floodwave
passed downstream along the Brisbane River, backwater flooding occurred
up the tributary creeks. The peak flood level and time of peak along the
tributary peaks are expected to be the same as those in the Brisbane River at
the mouth of the creeks. Flooding along the mainstream of the Brisbane River
and along the lower tributaries was principally caused by releases from
Wivenhoe Dam (dam release flooding).”
41. The FSP relies upon rainfall data from the Archerfield Station to suggest that
61.0mm of rain fell on 10 January 2011, with only 28.4mm the next day and
30.8mm the day after.
42. It is well established that stormwater run-off occurs within a short period of
the maximum period of rainfall intensity, generally between 15-30 minutes.
The maximum rainfall intensity figures have not been provided, nor has the
FSP provided evidence of the figures it relies upon. This should have been
done.
43. The Case Manager for the Service conducted internet searches and
confirmed that the Archerfield Airport station is located about 6km southeast
of the Applicants‟ home. It is not unreasonable to conclude that the rainfall
recorded in this area was representative of that which would likely have
affected the Applicants‟ area.
44. Rainfall totals from January 2011 at the Archerfield Airport gauge (obtained
from publicly available records) confirm the figures recorded by the FSP
above, although it should be noted that these figures are relevant for the 24
hour period up until 9.00am on the date recorded.
45. There were falls of 61.0mm recorded for the 24 hours to 9.00am on
10 January 2011, the most intense period of rain to fall and therefore the
maximum likelihood for stormwater run-off to occur whilst 30.8 mm of rain fell
in the 24 hours to 9.00am on 12 January 2011.
46. The initial inundation of the Applicants ‟ property occurred late 11 January
2011 or early 12 January 2011.There is no suggestion of run-off problems at
the Applicants‟ property occurring on or before 10 January 2011. As
established through the rainfall records, the overall rainfall had dropped
significantly by late 11 January 2011 or early 12 January 2011.
47. This was a period that generally coincided with the release of water from the
Wivenhoe Dam and this release caused widespread flooding throughout the
greater Brisbane area. Most likely, water inundating the Applicants ‟ property
late on 11 January 2011 was a combination of water from the river back
flowing through the stormwater drainage network, water escaping the normal
confines of the river and stormwater that was unable to flow into the river
because the river was in flood. Such inundation is considered flood
inundation.
Case No: 327509 Determination Page 8 of 8
48. On balance, it is the Panel‟s view that there was no stormwater run -off
inundation prior to the flooding occurring at the home. On this basis, the
Panel is satisfied that the cause of the loss was the flooding of the Brisbane
River and that this is an event that it properly excluded under the policy.
Determination
49. The Panel determines that the FSP is entitled to deny the Applicants‟ claim.