Denial of dam wall damage claim under flood and erosion exclusions
Summary
The Applicants claimed for damage to a farm dam wall after June 2012 heavy rain, and the FSP denied it under the flood and erosion exclusions. The Panel found the damage was caused by excluded flood and erosion and made no order.
Concurrent flood (excluded) and rainwater (covered) causes engage the Wayne Tank principle, so the claim fails.
Issues
- Claim denial primary · not upheld“The Panel determines the FSP is entitled to deny the claim under the terms and conditions of the policy.”
- Product terms interpretation secondary · not upheld“Damage caused by both flood and erosion is specifically excluded under the policy, so the claim must fail.”
Subjects and remedies
natural disasterno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 326852 Determination Page 1 of 6
Case number: 326852
General Insurance - Farm Insurance - Home Building and Contents - Storm -
FSP Decision - Denial of claim - Exclusion/Condition - Flood - Erosion
21 February 2014
Summary
Description
Claim under a Farm Insurance Policy following heavy rainfall in East
Gippsland, Victoria, in June 2012. The FSP declined the claim relying on
flood and erosion exclusions.
Basis of Determination
The heavy rain in the East Gippsland area caused the land to be saturated
and the levels of the Scrubby Creek to rise eventually causing a flood.
The dam started to overflow and it is likely the combination of flood water
from the dam and rainwater run-off inundated the property.
The concurrent inundation of the property caused by an excluded event
(flood) and insured event (rainwater) attracts the “ Wayne Tank ” principle to
defeat the claim.
Determination
The FSP is entitled to deny liability for the claim pursuant to the terms of
the policy.
Background
1. The Applicants held a farm insurance policy with the Financial Services
Provider (FSP) which covered their domestic building and contents against
listed insured events.
2. On 21 June 2012, the Applicants lodged a claim for damage to the base of a
dam wall following severe rain events over East Gippsland, Victoria.
3. The FSP denied the claim on the basis the damage was due to “flood” and
“erosion” which are both excluded under the policy. The Applicants have
disputed this decision and want payment of the cost to repair the dam.
Determination
Case No: 326852 Determination Page 2 of 6
Summary of Applicants ’ position
4. The Applicants say the dam overflow mechanism was probably sufficient
when it was built 20 years ago but with a nearby quarry expanding, the areas
with no vegetation or topsoil to soak up water runoff are increasing. Now
water run-off enters the back of their property.
5. They say they do not live in a flood prone area and the dam wall was
capable of resisting floods, which have occurred in the past. Thus, they
disagree flood and erosion damaged the dam wall.
6. During the most recent severe rain event in June 2013, the dam wall was
completely washed through causing further damage which has increased the
cost of restoration.
7. The cost of building the dam wall, piping network and spillway is in excess of
$100,000. The male Applicant has many years experience in installing dams
and could assist in restoring the dam, reducing the cost to $30,000.
Summary of FSP’s position
8. The FSP retained a hydrologist firm (W) to report on the loss. Based on W’s
report, the FSP states the cause of inundation was river flood.
9. The FSP also argues the dam is a modified part of a natural watercourse
running through the site and the damage to the dam wall occurred when
water in the dam overflowed and escaped onto normally dry land, causing
erosion of the dam wall and dislodgement of a nearby fence.
10. As flood is excluded under the policy, the FSP is not liable for the claim. In
any event the damage is also excluded as damage caused by erosion.
11. The FSP relies on the following policy provisions contained in the Product
Disclosure Statement:
“ Words with special meaning
“Flood” means the inundation of normally dry land by water escaping, or
being released from, the normal confines of a reservoir, natural watercourse
or lake (whether or not they have been altered or modified). Flood also
includes water discharge from any sewerage or waste water systems due to
pressure induced by Flood water.
...
Section A – Home Cover
Defined Events Cover
We will pay for loss or damage at the Address caused by the Following
Defined Events:
…
8. Storm or rainwater,
Case No: 326852 Determination Page 3 of 6
…
What you are not insured for
Under Section A – Home Cover, we will not pay for:
1. …
2. loss or damage to your property caused by:
a. Flood, the action of water from the sea, high sea water, tidal action or
Tsunami;
b. earth movement, vibration, erosion, landslide or subsidence (except
when caused by earthquake) ” .
Issue
12. Whether the FSP is entitled to deny the claim under the terms and conditions
of the policy.
Reasons for decision
13. As advised to the parties, due to the nature of the dispute, the Financial
Ombudsman Service (FOS) has considered it appropriate to expedite the
dispute to Determination in accordance with the Operational Guidelines to
the FOS Terms of Reference.
14. This decision has been made by a Panel consisting of an Ombudsman and
two Panel members with extensive experience in insurance industry matters
and consumer claims.
15. The Panel is satisfied a full exchange of information has taken place
between the parties and each party has had the opportunity to address the
issues raised.
16. The Panel notes there is no dispute the wall to the Applicants’ dam was
damaged following a severe rainfall event in East Gippsland. The central
issue in dispute is whether this damage is covered by the policy.
17. The FSP says the damage was caused by flood and erosion. To support its
position, the FSP has provided reports by a loss assessor (C) and W.
18. C’s report of 4 July 2012 relevantly says:
The claim follows weeks of very heavy rainfall in East Gippsland, with
some areas reporting 150mm in 48 hours. During this time the dam
overflowed and the dam wall collapsed.
When water levels started rising, the Applicants say they pumped as
much water as possible out of the dam in an effort to stop it from
overflowing. Despite this, the dam overflowed and continued doing so
for a couple of days before water levels subsided.
Case No: 326852 Determination Page 4 of 6
The dam wall held but there has been substantial erosion to the low
side or “downstream side” of the wall. The policy does not provide
cover for soil erosion damage.
19. W’s report of 15 August 2 012 relevantly says:
Rainfall data gathered from the area shows a maximum 33 year Annual
Reoccurrence Interval (ARI) for rainfall intervals between 30 minutes
and 48 hours during the early June 2012 rainfall event. The peak
rainfalls occurred in the 24 hours leading up to 9am on 5 June 2012.
The subject property has no land subject to inundation or flooding
overlays on it. It has two large farm dams which are located within the
existing watercourse (Scrubby Creek). The dams consist of earthen
walls within the natural gully features built to retard the water.
There is approximately 8.1km 2 of catchment drains to the farm dam,
with approximately 25km of waterways located within this catchment.
Elevations within the catchment change by as much as 100m between
the level of the dam and the top of the catchment.
The Applicants say:
i. the larger dam has three features to manage the water flowing
downstream: a low outlet at the base, two large balancing pipes and
a large broad crested spillway;
ii. the ground was saturated and prior to the rainfall starting, the larger
dam was full with water moving through the balancing pipes;
iii. on the morning of 4 June 2012, the male Applicant opened the
lower outlet to reduce the dam level, the rain began falling that
evening and continued for three days with an estimated total of
150mm;
iv. on 5 June 2012 at approximately 6am, the male Applicant checked
the dam and found its wall had failed overnight, he also saw
approximately 460mm of water was flowing over the spillway; and
v. the erosion continued until the spillway was no longer engaged.
The catchment is ungauged at the site and W is unable to verify the
time at which the water levels in Scrubby Creek rose.
Given the amount of rainfall in the upper catchment, it is not surprising
the dam’s 100ML capacity was exceeded and the spillway was
engaged.
The dam overflow and the damage to the dam spillway and nearby
fencing is considered to be the result of riverine flooding following
severe rainfall in the large catchment area above the dam.
20. W’s report also contains several maps and graphics, among which are two
showing the extent of the catchment and the mechanics of the flooding in the
area. Both parties have also provided images of the damage to the dam.
Case No: 326852 Determination Page 5 of 6
21. The Applicants, on the other hand, argue the damage was due to storm or
rainwater but have not provided any expert evidence to support this position.
22. The evidence to hand suggests when the damage occurred the land was
saturated and it had been raining for a few hours. It also seems the damage
occurred at the time of peak rainfalls.
23. Considering this information and the extent of the local catchment which
would have been affected by these rainfalls, W notes it is likely the
accumulation of rainfall in the upper catchment would have caused the water
levels of Scrubby Creek to rise, eventually causing a flood.
24. There is no information on the approximate time when the damage occurred;
the male Applicant noted the dam wall had failed when he inspected it at
6.00am on 5 June 2012; there was no evidence of damage when he opened
the lower outlet on the previous day. It is not argued that the damage
occurred prior to the dam starting to overflow.
25. In a telephone conversation of 5 February 2014, the female Applicant
confirmed to FOS that when the dam started overflowing the land around the
dam was saturated so any excess water from the dam or watercourse could
not go into the dry land. She also confirmed the general water levels
exceeded the level of the creek banks.
26. It therefore seems probable that water was escaping from the dam as well
as running across land within the catchment area. However even if the water
running across the land was rainwater runoff this does not assist the
Applicants. On this point, the Panel notes the following established case law
which provides that:
if there are two concurrent causes of a loss where one is subject to
cover and the other is not, an insurer is not liable for the loss (refer to
Wayne Tank and Pump Co Ltd v Employers Liability Assurance Corp
Ltd [1974] QB 57); and
a watercourse is said to overflow its normal banks when all the water
that would otherwise drain into it cannot be contained in it because it is
full, and all the surplus water is then overflow (refer to K Sika Plastics
limited v Cornhill Insurance Co Limited [1982] 2 NZLR 50).
27. Accordingly, the Panel is satisfied that even if the damage had been
concurrently caused by flood (not covered) and rain (covered), the Wayne
Tank principle would apply to defeat the claim.
28. Further, following the Sika Plastics case, any water that could not drain into
the watercourse because it was already in flood (exceeding its banks), is
considered floodwater.
29. This means when the dam was overflowing, both the water within the
watercourse (that could not go onto dry land) and the water on land (that
could not drain into the watercourse) would be considered floodwaters.
Case No: 326852 Determination Page 6 of 6
30. Accordingly, and in the absence of evidence to the contrary, the Panel is
satisfied the damage to the dam wall was, on the balance of probabilities,
caused by flood which is excluded under the policy.
31. Further, based on the evidence provided it appears the damage to the dam
wall was caused by large volumes of water flowing rapidly across the
spillway. W’s records discussions with the Applicants in which they reported;
“ Approximately 460mm (18in) of water was flowing across the
spillway at 0600 on the 5 June 2012, and
Erosion continued until the spillway was no l onger engaged”
32. It is therefore probable that the mechanism for the damage to the wall could
properly be described as erosion.
33. As damage caused by both flood and erosions are specifically excluded
under the policy it follows that the Applicants’ claim must fail.
Determination
34. On the basis of the available information, the Panel determines the FSP is
entitled to deny the claim under the terms and conditions of the policy.