Home / Financial Firm (Unknown - Insurer) / Determination 326852

Determination 326852

Denial of dam wall damage claim under flood and erosion exclusions

FirmFinancial Firm (Unknown - Insurer)
Decided2014-02-24
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$30,000
SourceAFCA PDF

Summary

The Applicants claimed for damage to a farm dam wall after June 2012 heavy rain, and the FSP denied it under the flood and erosion exclusions. The Panel found the damage was caused by excluded flood and erosion and made no order.

Concurrent flood (excluded) and rainwater (covered) causes engage the Wayne Tank principle, so the claim fails.

Issues

Subjects and remedies

natural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 326852 Determination Page 1 of 6 Case number: 326852 General Insurance - Farm Insurance - Home Building and Contents - Storm - FSP Decision - Denial of claim - Exclusion/Condition - Flood - Erosion 21 February 2014 Summary Description  Claim under a Farm Insurance Policy following heavy rainfall in East Gippsland, Victoria, in June 2012. The FSP declined the claim relying on flood and erosion exclusions. Basis of Determination  The heavy rain in the East Gippsland area caused the land to be saturated and the levels of the Scrubby Creek to rise eventually causing a flood.  The dam started to overflow and it is likely the combination of flood water from the dam and rainwater run-off inundated the property.  The concurrent inundation of the property caused by an excluded event (flood) and insured event (rainwater) attracts the “ Wayne Tank ” principle to defeat the claim. Determination  The FSP is entitled to deny liability for the claim pursuant to the terms of the policy. Background 1. The Applicants held a farm insurance policy with the Financial Services Provider (FSP) which covered their domestic building and contents against listed insured events. 2. On 21 June 2012, the Applicants lodged a claim for damage to the base of a dam wall following severe rain events over East Gippsland, Victoria. 3. The FSP denied the claim on the basis the damage was due to “flood” and “erosion” which are both excluded under the policy. The Applicants have disputed this decision and want payment of the cost to repair the dam. Determination Case No: 326852 Determination Page 2 of 6 Summary of Applicants ’ position 4. The Applicants say the dam overflow mechanism was probably sufficient when it was built 20 years ago but with a nearby quarry expanding, the areas with no vegetation or topsoil to soak up water runoff are increasing. Now water run-off enters the back of their property. 5. They say they do not live in a flood prone area and the dam wall was capable of resisting floods, which have occurred in the past. Thus, they disagree flood and erosion damaged the dam wall. 6. During the most recent severe rain event in June 2013, the dam wall was completely washed through causing further damage which has increased the cost of restoration. 7. The cost of building the dam wall, piping network and spillway is in excess of $100,000. The male Applicant has many years experience in installing dams and could assist in restoring the dam, reducing the cost to $30,000. Summary of FSP’s position 8. The FSP retained a hydrologist firm (W) to report on the loss. Based on W’s report, the FSP states the cause of inundation was river flood. 9. The FSP also argues the dam is a modified part of a natural watercourse running through the site and the damage to the dam wall occurred when water in the dam overflowed and escaped onto normally dry land, causing erosion of the dam wall and dislodgement of a nearby fence. 10. As flood is excluded under the policy, the FSP is not liable for the claim. In any event the damage is also excluded as damage caused by erosion. 11. The FSP relies on the following policy provisions contained in the Product Disclosure Statement: “ Words with special meaning “Flood” means the inundation of normally dry land by water escaping, or being released from, the normal confines of a reservoir, natural watercourse or lake (whether or not they have been altered or modified). Flood also includes water discharge from any sewerage or waste water systems due to pressure induced by Flood water. ... Section A – Home Cover Defined Events Cover We will pay for loss or damage at the Address caused by the Following Defined Events: … 8. Storm or rainwater, Case No: 326852 Determination Page 3 of 6 … What you are not insured for Under Section A – Home Cover, we will not pay for: 1. … 2. loss or damage to your property caused by: a. Flood, the action of water from the sea, high sea water, tidal action or Tsunami; b. earth movement, vibration, erosion, landslide or subsidence (except when caused by earthquake) ” . Issue 12. Whether the FSP is entitled to deny the claim under the terms and conditions of the policy. Reasons for decision 13. As advised to the parties, due to the nature of the dispute, the Financial Ombudsman Service (FOS) has considered it appropriate to expedite the dispute to Determination in accordance with the Operational Guidelines to the FOS Terms of Reference. 14. This decision has been made by a Panel consisting of an Ombudsman and two Panel members with extensive experience in insurance industry matters and consumer claims. 15. The Panel is satisfied a full exchange of information has taken place between the parties and each party has had the opportunity to address the issues raised. 16. The Panel notes there is no dispute the wall to the Applicants’ dam was damaged following a severe rainfall event in East Gippsland. The central issue in dispute is whether this damage is covered by the policy. 17. The FSP says the damage was caused by flood and erosion. To support its position, the FSP has provided reports by a loss assessor (C) and W. 18. C’s report of 4 July 2012 relevantly says:  The claim follows weeks of very heavy rainfall in East Gippsland, with some areas reporting 150mm in 48 hours. During this time the dam overflowed and the dam wall collapsed.  When water levels started rising, the Applicants say they pumped as much water as possible out of the dam in an effort to stop it from overflowing. Despite this, the dam overflowed and continued doing so for a couple of days before water levels subsided. Case No: 326852 Determination Page 4 of 6  The dam wall held but there has been substantial erosion to the low side or “downstream side” of the wall. The policy does not provide cover for soil erosion damage. 19. W’s report of 15 August 2 012 relevantly says:  Rainfall data gathered from the area shows a maximum 33 year Annual Reoccurrence Interval (ARI) for rainfall intervals between 30 minutes and 48 hours during the early June 2012 rainfall event. The peak rainfalls occurred in the 24 hours leading up to 9am on 5 June 2012.  The subject property has no land subject to inundation or flooding overlays on it. It has two large farm dams which are located within the existing watercourse (Scrubby Creek). The dams consist of earthen walls within the natural gully features built to retard the water.  There is approximately 8.1km 2 of catchment drains to the farm dam, with approximately 25km of waterways located within this catchment. Elevations within the catchment change by as much as 100m between the level of the dam and the top of the catchment.  The Applicants say: i. the larger dam has three features to manage the water flowing downstream: a low outlet at the base, two large balancing pipes and a large broad crested spillway; ii. the ground was saturated and prior to the rainfall starting, the larger dam was full with water moving through the balancing pipes; iii. on the morning of 4 June 2012, the male Applicant opened the lower outlet to reduce the dam level, the rain began falling that evening and continued for three days with an estimated total of 150mm; iv. on 5 June 2012 at approximately 6am, the male Applicant checked the dam and found its wall had failed overnight, he also saw approximately 460mm of water was flowing over the spillway; and v. the erosion continued until the spillway was no longer engaged.  The catchment is ungauged at the site and W is unable to verify the time at which the water levels in Scrubby Creek rose.  Given the amount of rainfall in the upper catchment, it is not surprising the dam’s 100ML capacity was exceeded and the spillway was engaged.  The dam overflow and the damage to the dam spillway and nearby fencing is considered to be the result of riverine flooding following severe rainfall in the large catchment area above the dam. 20. W’s report also contains several maps and graphics, among which are two showing the extent of the catchment and the mechanics of the flooding in the area. Both parties have also provided images of the damage to the dam. Case No: 326852 Determination Page 5 of 6 21. The Applicants, on the other hand, argue the damage was due to storm or rainwater but have not provided any expert evidence to support this position. 22. The evidence to hand suggests when the damage occurred the land was saturated and it had been raining for a few hours. It also seems the damage occurred at the time of peak rainfalls. 23. Considering this information and the extent of the local catchment which would have been affected by these rainfalls, W notes it is likely the accumulation of rainfall in the upper catchment would have caused the water levels of Scrubby Creek to rise, eventually causing a flood. 24. There is no information on the approximate time when the damage occurred; the male Applicant noted the dam wall had failed when he inspected it at 6.00am on 5 June 2012; there was no evidence of damage when he opened the lower outlet on the previous day. It is not argued that the damage occurred prior to the dam starting to overflow. 25. In a telephone conversation of 5 February 2014, the female Applicant confirmed to FOS that when the dam started overflowing the land around the dam was saturated so any excess water from the dam or watercourse could not go into the dry land. She also confirmed the general water levels exceeded the level of the creek banks. 26. It therefore seems probable that water was escaping from the dam as well as running across land within the catchment area. However even if the water running across the land was rainwater runoff this does not assist the Applicants. On this point, the Panel notes the following established case law which provides that:  if there are two concurrent causes of a loss where one is subject to cover and the other is not, an insurer is not liable for the loss (refer to Wayne Tank and Pump Co Ltd v Employers Liability Assurance Corp Ltd [1974] QB 57); and  a watercourse is said to overflow its normal banks when all the water that would otherwise drain into it cannot be contained in it because it is full, and all the surplus water is then overflow (refer to K Sika Plastics limited v Cornhill Insurance Co Limited [1982] 2 NZLR 50). 27. Accordingly, the Panel is satisfied that even if the damage had been concurrently caused by flood (not covered) and rain (covered), the Wayne Tank principle would apply to defeat the claim. 28. Further, following the Sika Plastics case, any water that could not drain into the watercourse because it was already in flood (exceeding its banks), is considered floodwater. 29. This means when the dam was overflowing, both the water within the watercourse (that could not go onto dry land) and the water on land (that could not drain into the watercourse) would be considered floodwaters. Case No: 326852 Determination Page 6 of 6 30. Accordingly, and in the absence of evidence to the contrary, the Panel is satisfied the damage to the dam wall was, on the balance of probabilities, caused by flood which is excluded under the policy. 31. Further, based on the evidence provided it appears the damage to the dam wall was caused by large volumes of water flowing rapidly across the spillway. W’s records discussions with the Applicants in which they reported;  “ Approximately 460mm (18in) of water was flowing across the spillway at 0600 on the 5 June 2012, and  Erosion continued until the spillway was no l onger engaged” 32. It is therefore probable that the mechanism for the damage to the wall could properly be described as erosion. 33. As damage caused by both flood and erosions are specifically excluded under the policy it follows that the Applicants’ claim must fail. Determination 34. On the basis of the available information, the Panel determines the FSP is entitled to deny the claim under the terms and conditions of the policy.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.