Storm and hail damage settlement: carpet scope, bungalow repairs, contents and pool; claims delay
Text of the determination
Case No: 326445 Determination Page 1 of 11
Case number: 326445
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Claim amount
16 June 2014
Summary
Description
Claim under a Home and Contents Policy for storm related damage.
The Applicant disputes the FSP’s settlement of the claim.
Basis of Determination
The Applicant is entitled to rely on the PDS in his possession at the
time of the loss.
The FSP had failed to provide proof of despatch of any supplementary
PDS.
The Applicant is entitled to have the carpet replaced in the adjoining
rooms.
The FSP offered to repair the bungalow. The Applicant is entitled to be
covered for the cost of the repairs agreed to by the FSP.
The Applicant has provided a list of contents replaced and additional
damage. The FSP has provided no evidence to dispute the items
claimed.
The Applicants have experienced considerable delay due to the FSP’s
claims handling and are entitled to compensation under Paragraph 9.3
of Terms of Reference.
Determination
The FSP is liable to meet the Applicant’s claim for refurbishment of the
bungalow, replacement of carpets in the adjoining rooms, cost of
replacement of numerous contents items and damage.
The FSP is to pay compensation for non-financial loss of $750.
Determination
Case No: 326445 Determination Page 2 of 11
Background
1. The Applicant held a Home Building and Contents Insurance Policy (the
policy) with the Financial Services Provider (FSP).
2. On or about 6 March 2010, the Applicant’s property sustained extensive
water damage during a hail storm. Following assessment of the damage, the
FSP accepted liability.
3. The FSP arranged for loss adjusters to attend the Applicant’s property and
appointed a building group to attend to repairs. After difficulties with the
building group, the FSP appointed another builder to attend to the internal
damage and settle the Applicant’s claim.
4. The Applicant is dissatisfied with the FSP’s settlement of his loss and
maintains that he is entitled to the cost of replacement of the carpet, the cost
of refurbishment of the bungalow, the cost of replaceme nt of various
contents and building damage and in addition, the cost of the replacement of
the swimming pool solar panels and other damage.
5. The FSP maintain the Applicant has relied upon an incorrect PDS when
seeking replacement of the carpet and that they are only authorised under
the policy to receive payment for the reasonable cost of replacing the
damaged area of the carpet.
6. As far as the refurbishment of the Applicant’s bungalow is concerned, the
FSP maintain as the Applicant elected to remain in the bungalow and as the
Applicant did not need to rent another property, the FSP is not required to
reimburse the Applicant for temporary accommodation.
7. Insofar as the Applicant’s claim for damage contents are concerned, the FSP
maintain that it had requested a list of contents items since November 2011
and that as the Applicant is unable to provide any receipts, it will refer the
information onto its assessor for further review.
Summary of Applicant’s p osition
8. The Applicant maintains:
The policy terms relied upon by the FSP to limit its liability under the
claim with respect to the carpets replacement are incorrect.
If the FSP claims that the Product Disclosure Statement (PDS) it relies
upon is the correct version for the assessment of this claim. It should
provide evidence of when the terms of the policy were altered as well
as when it made this information available to the Applicant.
In the absence of such the Applicant is entitled to rely upon the policy
terms which were actually made available to him by the FSP.
The policy terms made available to the Applicant provide that he is
entitled to replacement of all the carpet where not to do so would result
Case No: 326445 Determination Page 3 of 11
in inconsistency throughout the dwelling. The Applicant arranged for
the replacement of carpets at a cost of $21,000 and is seeking
reimbursement for these costs under the claim.
The costs incurred in the refurbishment of the bungalow ($5,048)
located behind the main insured home building have not been met by
the FSP and therefore remain in dispute.
The Applican t elected, as per the option given to him by the FSP’s
builders “P”, to stay in the bungalow whilst repairs to the main dwelling
were completed.
Arising from the delay in finalising the authorised repairs to the main
building the Applicant had to stay in the bungalow for 281 nights. Had
the Applicant accepted the FSP’s offer to provide self serviced
accommodation, he estimates this would have cost the FSP up to
$39,000.
The Applicant is also seeking reimbursing for costs incurred in
attending to contents and building damage arising from the insured
event in the estimated amount of $9,850.
There are further outstanding works such as replacement of swimming
pool solar panels ($2,917.20), swimming pool wall spray coat $20,000
and other items for the house estimated at $6,000.
9. The Applicant is seeking indemnity for the costs incurred as well as interest
arising from the significant delay in the FSP’s management of the claim.
Summary of FSP’ s position
10. On or around 16 March 2010 the Applicant lodged a claim for damage to the
insured property by hailstorm on 6 March 2010. The FSP appointed loss
adjusters “C” to the claim.
11. The FSP maintains:
C reported on 27 April 2010 that there was water damage to the
hallway, bedroom, lounge room, dining room and hail damage to the
fascia and laserite. A building company was appointed to commence
repairs to the roof and carport.
On or about 15 July 2010 the Applicant advised the FSP of damage to
the carpet in the main bedroom. C attended and noted water damage
to the carpet measuring 2m x 2m.
The FSP is not obliged to replace the carpet of the adjoining rooms as
this is outside the cover provided under the policy.
Due to difficulties with the building company, a second building
company was appointed to attend to the internal damage.
On 8 June 2011, C advised the Applicant that they had the option of
receiving temporary accommodation for the duration of the repair
Case No: 326445 Determination Page 4 of 11
period but they indicated they preferred to stay in the bungalow. The
FSP requested the repairs to the bungalow be undertaken first prior to
the repairs to the main dwelling.
On 3 November 2011, C requested the Applicant provide a list of
bedding items that were water damaged and followed up this request
by way of letters on 19 December 2011, 10 February 2012 and 10 May
2012.
The policy clearly states that replacement is limited to the damaged
area only as the policy only responds to “the room, hall or passage
where the loss or damage occurred. ”
The Applicant in seeking reimbursement for replacement of all the
carpets is relying upon the incorrect PDS (policy wording).
Further, replacement of all the carpets would constitute an
improvement/betterment which is not covered under the policy.
The policy provides additional cover for temporary accommodation
when the insured is unable to live in the insured building following loss
or damage. However it is entitled to reduce or stop paying for this
benefit if the Applicant:
receives any payment for rent from another source, or
does not need to rent another property, or
are able to live in your buildings.
As the Applicant chose to live in the bungalow on the insured property,
and did not need to rent another property, the FSP is not required to
indemnify the Applicant for the cost claimed in this regard.
The FSP notes the Applicant has made available a list of contents in a
letter dated 13 May 2013. This information, the FSP maintains, had
been on request from the Applicant since November 2011 and was
never received.
Arising from the fact the Applicant has not made available any
supporting evidence/invoices for the listed items it has referred the list
to C for review and consideration.
Issues
12. Whether the FSP fulfilled its obligations to clearly inform the Applicant of the
relevant policy terms it seeks to rely upon in assessing its obligations under
the claim.
13. Whether the FSP has met its liability under the terms of the policy with
respect to the loss and damage arising from 6 March 2010 hailstorm.
Case No: 326445 Determination Page 5 of 11
Reasons for decision
14. I have had the opportunity of reviewing the submissions made by the parties
and the material exchanged prior to making this determination.
15. I note following the initial exchange of documentation, the Applicant’s
representative notified the Service on 28 August 2013 and requested that
the FSP, if it sought to rely upon a different policy term, provide confirmation
of when the policy terms changed and when the Applicant’s were provided
confirmation of those changes.
16. As for the cost of refurbishment of the bun galow, the Applicant’s
representatives noted that this did not seem to be an issue.
17. With respect to the contents claim, the Applicant’s representatives noted that
they had not been provided a further report from C in relation to the other
items but otherwise submitted the Applicant is entitled to the loss suffered
plus interest for the significant delay in this matter.
18. On 10 October 2013, the Service wrote to the FSP’s representative and
requested comment on the Applicant’s further submissions, confirmati on of
which claims have been paid, a copy of the FSP’s claim file and copies and
information to confirm that the Applicant was informed about any
supplementary PDS or replacement PDS.
19. The Service also sought advice as to whether the FSP had carried out or
paid for the repairs to the Applicant’s bungalow and a copy of the report from
C referred to in the Notice of Response. A response was requested by 24
October 2013.
20. No response was received. A further request was sent to the FSP’s
representative on 25 October 2013 allowing the FSP until 1 November 2013
to provide a response. No response was received. On 6 November 2013, a
further email was forwarded to the FSP’s representative seeking a response.
21. On 13 November 2013, the FSP’s representative contacted the Service and
requested a further extension of seven (7) days to provide a full response
claiming that the loss assessor was no longer employed with C and his
replacement would not be in receipt of the file until 18 November 2013.
22. Further they were seeking further information from the Applicant’s brokers
with respect to the provision of the PDS. There is no indication on the file
that the policy was in fact incepted through the Applicant’s brokers.
23. Despite allowing an extension of time to provide the documentation until 21
November 2013 and despite a further request sent to the FSP on 22
November 2013, no further information has been received from the FSP or
the FSP’s representative.
24. In the circumstances, I propose to determine this dispute on the basis of the
information exchanged.
Case No: 326445 Determination Page 6 of 11
25. As the FSP has not provided a copy of its claims file or other information as
requested, I propose to proceed in accordance with paragraph 7.5 (a) of the
Terms of Reference on the basis that an adverse inference may be drawn
from t he FSP’s failure to comply with the request.
The Claim
26. There is no dispute that the Applicant’s property was damaged by an event
insured under the policy, namely storm and that the Applicant has
established a prima facie claim. The onus is therefore on the FSP to
establish on the balance of probabilities that it is entitled to either limit or
decline indemnity to the Applicant in line with the terms of the policy.
Provision of PDS
27. The Applicant maintains that the relevant PDS received provide cover for the
replacement cost of carpet in adjoining rooms if:
the room in which the carpet damage occurs is connected to the
adjoining room or area by an open archway or doorway which is as
wide (or wider) than two standard household hinged doors and
continuous carpet of the same specifications is laid in both rooms or
areas.
28. The FSP in its Notice of Response has disputed this and maintains that the
relevant PDS is a PDS dated 9 January 2009 and effective from 20 January
2009.
29. The FSP was asked to provide proof that a copy of this PDS or notification of
the changes to the PDS had been provided to the Applicant.
30. Despite the repeated requests for this information, the FSP has failed to
provide proof or to make available evidence of it having informed the
Applicant of any changes or provided the Applicant with the updated policy
terms its seeks to rely upon.
31. The FSP has failed to provide any information or evidence to establish on
the balance of probabilities that the Applicant was provided with the updated
PDS.
32. In the absence of suitable evidence, I am satisfied that the Applicant is
entitled to rely upon the terms of the policy identified by the Applicant.
Carpet Replacement
33. The Applicant seeks indemnity in the form of reimbursement of costs he has
incurred in the replacement of the carpets within the insured dwelling on the
basis this was necessary to maintain a uniform appearance. I note it is not in
dispute that there was damage to the carpet within the dwelling.
Case No: 326445 Determination Page 7 of 11
34. The PDS (03-1997) provides an obligation on the FSP to provide indemnity
for the cost to replace the carpet not only within the main room of the
Applicant’s property but also in a room adjoining the room where the
damage has occurred in the instance that this room is:
connected to the damaged area (room) by an open archway or
doorway which is as wide (or wider) than two standard household
hinged doors, and
the carpet in both rooms is continuous and of the same
specifications.
35. The submission by the Applicant seeks an a mount of $21,500 for the
replacement carpet. The FSP identifies that the carpet had a musty smell.
No evidence has been provided as to whether any attempt to clean the
carpets was made or whether in fact the carpets were able to be cleaned at
that time.
36. I have not been provided with sufficient evidence regarding the outlay of the
dwelling with respect to the main bedroom and its adjoining areas to provide
an informed decision in this regard. However, I can determine the extent of
the FSP’s obligations in li ne with the policy which is:
It is obliged to replace the carpet within the main bedroom.
It is obliged to provide indemnity for the cost to replace carpet in the
an adjoining room to the main bedroom if the two rooms are
connected by an open archway or doorway which is as wide (or
wider) than two standard household hinged doors and both rooms
share a continuous carpet of the same specifications.
37. I am satisfied that the FSP in line with the relevant policy terms is not obliged
to replace the carpet throughout the dwelling with its obligation limited only to
the room where the damage occurred (main bedroom) and an adjoining
room(s) (if existing) that fulfils the above noted criteria.
38. Accordingly, in the instance there does exist an adjoining room that fits t he
above criteria noted within the PDS, the FSP is to reimburse the Applicant by
way of cash settlement an amount that represents the cost incurred by the
Applicant to replace the carpet within these rooms only and not the complete
dwelling.
Refurbishment costs associated with the bungalow
39. The Applicant seeks reimbursement of costs incurred in the amount of
$5,048 which he maintains was incurred in making the bungalow liveable.
This was one of the options offered by and discussed with th e FSP’s
commissioned builders P, the other being that the FSP would arrange for
self serviced accommodation at much higher cost estimated by the Applicant
at $39,000.
Case No: 326445 Determination Page 8 of 11
40. It is not in dispute that the option to repair and reside within the bungalow
was discussed with and accepted by the FSP and/or its representatives.
Further, the FSP within its own submission to the Service acknowledges that
priority was given to the repairs of the bungalow over the main dwelling.
41. I am satisfied the Applicant was given the impression the repairs to the
bungalow necessary to bring it to a habitable condition, were to be covered
under the claim. I do not believe it would be reasonable to accept the
Applicant would have elected to live in an unrepaired bungalow (as opposed
to accept temporary self serviced accommodation at the cost of the FSP)
had he not been given the impression he would be covered for the
associated repair costs. Given this, I am satisfied that the Applicant is
entitled to have the costs of the repair of the bungalow covered by the FSP.
42. As the Applicant has claimed the refurbishment costs of $5,048 and as the
FSP has not challenged this amount, I determine the FSP is to pay the
Applicant, if it has not already done so, the sum of $5,048 together with
interest pursuant to section 57 of the Insurance Contracts Act 1984 from the
date of the refurbishment was completed to date of payment of the claim.
List of Contents/damage
43. In a letter dated 13 May 2013, the Applicant provided an extensive list of
contents items lost or damaged in the storm. He claimed he had to replace
these items and therefore is seeking reimbursement of the cost to do so.
44. The FSP maintains that it had requested and was waiting for the Applicant to
make this information available since November 2011. In the absence of the
Applicant making available any evidence to support these costs were
actually incurred it was not able to authorise reimbursement of such costs
under the claim and had referred the list to C for assessment.
45. I note that on 19 December 2011, C wrote to the Applicant requesting the
Applicant provide a list of the number of bedding items damaged with the
anticipated values. They were to advise which items would require
replacement quotations to be sourced. What appears to be a duplicate letter
was sent to the Applicant on 10 February 2012 again requesting a list with
the Applicant’s anticipated values.
46. On 10 May 2012, a similar letter has been sent to the Applicant although on
this occasion they also requested the Applicant provide quotations in order
to review the replacement of blinds.
47. It appears that there was no follow up from May 2012.
48. In the FSP’s Notice of Response, it referred to having referred the list
provided by the Applicant to C for further review. The Notice of Response is
dated 26 July 2013. Despite numerous requests for a copy of C’s report and
the FSP’s further undertaking in November 2013, no response has been
provided from C.
Case No: 326445 Determination Page 9 of 11
49. The Applicant has complied with C’s request. He has provided a list of items
with his anticipated costs. The FSP has not provided any information to
dispute these items. Given the extensive delays in this matter and in the
absence of any evidence to dispute the claimed values on the various items,
I am satisfied that the FSP should meet the costs of attending to the
replacement items and building damage in the sum of $9,850 as claimed by
the Applicant.
50. I am further satisfied in the absence of any information disputing the
Applicant ’s claim with respect to the cost of the swimming pool solar panels
that the FSP should meet the cost of the same subject to the Applicant
providing proof of payment of the amount. If the solar panels have not been
replaced the FSP should attend to replacement of the swimming pool solar
panels.
51. Insofar as the swimming pool wall spray coat is concerned, again no
evidence has been provided to dispute the Applicant’s claim with respect to
this.
52. In the circumstances subject to the Applicant providing a quotation with
respect to the costs of repairs, the FSP should arrange within 28 days of
receipt of the relevant quotation, for a suitably qualified person to inspect the
pool and determine the cost of repairs. The FSP is entitled to either to attend
to repairs of the swimming pool or determine to cash settle the Applicant for
the swimming pool wall damage.
53. Insofar as the Applicant has claimed for additional items estimated in the
amount of $6,000, I am not satisfied the information as presented is
sufficient to establish the loss.
54. Should the Applicant wish to claim for the additional items, the Applicant is to
provide a full list of items together with the Applicant’s anticipated values.
Within 28 days of receipt of the list of additional items, the FSP is to arrange
an assessment as to liability and the replacement costs and upon receipt of
the same to arrange to cash settle the Applicant’s claim for the additional
items for which it is liable based on the replacement quotations obtained by
the FSP.
Compensation for non-financial loss
55. Paragraph 9.3 of the Terms of Reference under which the Service operates
provides the Service may award compensation for non-financial loss of up to
$3,000 in circumstances where an Applicant experiences an unusual degree
or extent of physical inconvenience, time taken to resolve the situation or
interference with an Applicant’s expectation of enjoyment or peace of mind.
56. The undisputed evidence in the current case is that the Applicant moved into
a bungalow at the rear of their premises whilst the works to the main
residence were completed. They remained in the bungalow for 281 nights as
a result of the FSP’s delay in fixing the main residence.
Case No: 326445 Determination Page 10 of 11
57. The Notice of Response indicates the FSP initially appointed a builder in or
about April 2010 to attend to the repairs. The FSP had difficulties with the
builder and if I accept the FSP’s Notice of Response , it was not until June
2011 that the FSP through C offered the Applicant the opportunity of either
moving into temporary accommodation or staying in the bungalow on
commencement of repairs.
58. No explanation has been provided as to why such a significant gap existed
between identifying the initial damage, appointing the original builder
replacing that builder and the commencement of repairs.
59. The Applicant accepts that the FSP has now attended to fix most of the
problems. Further, I acknowledge the FSP may have had difficulties at times
obtaining information from the Applicant and this may have added to the
delays.
60. Nevertheless, I am satisfied that the FSP’s handling of this dispute has led to
an excessive time taken to resolve the matter and impacted on the
Applicant’s expectation or enjoyment of peace of mind. Not only does the
Applicant seem to have been left in limbo prior to referring the matter to the
Service, the delays have continued with the FSP failing to respond to the
requests by the Service for information.
61. Accordingly, I determine that pursuant to paragraph 9.3 of the Terms of
Reference, compensation for non-financial loss in the sum of $750 is
appropriate.
Determination
62. The FSP is to meet the Applicant’s claim for refurbishment of the bungalow
in the sum of $5,048 and subject to the Applicant providing proof of payment
of the same, pay interest in accordance with section 57 of the Insurance
Contracts Act 1984 from the date the Applicant paid the amount to date of
payment of this claim.
63. The FSP is to meet the costs to replace the carpet in the room/s adjoining
the Applicant’s main bedroom subject to the rooms being connected by an
open archway or doorway which is as wide (or wider) than two standard
household hinge doors and share a continuous carpet.
64. The FSP is to appoint a suitably qualified expert to attend the Applicant’s
property within 21 days of the Applicant providing notice of acceptance of
this Determination, to determine the cost to replace the carpets.
65. The FSP is to meet the Applicant’s claim for the list of content and building
repairs in the sum of $9,850.
66. The FSP is to meet the costs incurred by the Applicant in replacement of the
swimming pool solar panels ($2,917.20) or alternatively attend to
replacement of the same.
Case No: 326445 Determination Page 11 of 11
67. The FSP is to meet the cost of the repairs to the swimming pool wall. Subject
to the Applicant accepting this Determination, the FSP is to arrange for a
suitably qualified expert to attend and inspect the Applicant’s swimming pool
to determine the extent of damage and cost of repairs. The FSP may choose
to conduct the repairs or alternatively cash settle the Applicant for the
estimated cost of repairs.
68. Insofar as the Applicant seeks to claim for additional items, the Applicant is
to provide the FSP with a detailed list of items and the anticipated values.
The FSP upon receipt of this list is entitled to arrange for a suitably qualified
expert to assess the items claimed, determine liability and and either cash
settle the Applicant for the relevant items or attend to the replacement of the
items.
69. Further, I determine pursuant to paragraph 9.3 of the Terms of Reference
that the FSP pay the Applicant the sum of $750 by way of non-financial
compensation.