Delay in repairing home after insured burst pipe and claimed consequential losses
Text of the determination
Case No: 326176 Determination Page 1 of 16
Case number: 326176
General Insurance - Domestic Insurance - Home Building - Service - Delay in
Claim Handling
11 April 2014
Summary
Description:
This dispute concerns a claim by the Applicants under a home and contents
insurance policy for damage to their home as a result of an insured event, the
time taken to repair the home, the nature of the work done and claimed losses
consequent to the repairs.
Basis for Determination:
On the information provided it was not accepted that the time taken to do the
repairs or the nature of the repairs was such that it was established this
caused the consequential losses claimed. The policy or the Terms of
Reference did not respond to this consequential financial loss either.
Determination:
The FSP is not obliged to pay the consequential losses claimed or any further
cover to the Applicants;
Should the Applicants accept this Determination, within 7 days of acceptance,
the FSP is to pay the Applicants $750 compensation for non financial loss
pursuant to the Terms of Reference.
Background
1. I have reviewed all the material submitted by the parties and save where I
make note specifically, I am satisfied the background as set out in the
Recommendation is accurate and is as follows.
2. The Applicants held a home and contents policy with the Financial Services
Provider (FSP) from 21 December 2011 for their former home in Tasmania.
The policy provided building cover for complete replacement and contents
cover for up to $110,855.
Determination
Case No: 326176 Determination Page 2 of 16
3. On 27 June 2012, the Applicants lodged a claim for damage caused by a
burst pipe in the ceiling which had flooded areas of the home and contents.
They were in the process of relocating to Queensland, where they now live.
4. The FSP accepted the claim and arranged for experts to inspect and repair
the damage. The Applicants became dissatisfied with the quality of work
done, the extent of damage that was to be covered and the time taken to
repair the home. They say they were unable to rent or sell the property
during this period and sought compensation, which the FSP declined.
5. In December 2012 the Applicants arranged for a different repairer to attend
to work at the home. They seek cover for this and compensation for the time
taken by the FSP.
6. The Applicants did not agree with the FSP’s decisi on, hence the dispute
which was the subject of a Recommendation. The Recommendation was in
favour of the FSP and was not accepted by the Applicants. The FSP
accepted the Recommendation. In the circumstances, the matter has been
referred to me for Determination.
Summary of Applicants’ p osition
7. I have reviewed all the material submitted by the parties and save where I
make note specifically, I am satisfied the Applicants’ position as set out in
the Recommendation is accurate and is as follows.
8. The Applicants say that the FSP took too long to repair the home and left it
in a state where they could neither rent nor sell the property. They say the
house could not be lived in from 27 June 2012 until January 2013.
9. Further the Applicants had to pay to have the garde n maintained and the
electricity supply had to be connected so the repairs could be done.
10. They claim losses of $14,027 which include:
7 months of mortgage repayments;
Electricity $742;
Builder $2,105; and
Garden maintenance $400.
11. They consider that the quality of the work conducted was not acceptable and
so they required the retention of their own repairer to ensure that the work
was completed promptly and to an acceptable standard.
12. The Applicants rejected the Recommendation. They essentially reiterated
their position that:
The repairs took 8 months when they expected the work to be
completed in one month as they were not living there;
Photos and invoices were sent to the FSP of what needed to be done;
Case No: 326176 Determination Page 3 of 16
A report from their builder CT is provided and describes the work done
by CT;
The scope of works was not large and yet it took too much time;
The back yard was full of debris from repair work. Damaged furniture
had to be removed. Labour costs were incurred;
Some insulation work was never completed;
They are seeking compensation for their losses not lost rent or
temporary accommodation;
The FSP acknowledged that the repairs took too long and the case
manager didn’t manage the claim well;
The repairs were delayed. The repairers told neighbours that they were
doing a quick repair as the Applicants were selling the house;
The Applicants are satisfied that the FSP’s initial response was prompt
but the subsequent repairs were mismanaged;
The Applicants could not supervise the repairs as they were in
Queensland but received feedback from neighbours who kept an eye
out for them; and
The Applicants had a similar experience with the claim on their furniture
and its removal which the Service also had to resolve as it was also
mismanaged.
Summary of FSP’ s position
13. I have reviewed all the material submitted by the parties and save where I
make note specifically, I am satisfied the FSP’s position as set out in the
Recommendation is accurate and is as follows.
14. The FSP says that the Applicants have not established any entitlement to
further cover under the policy. It concedes that some of the repairs took
longer than might be desired but it is of the view that the Applicants were not
unduly prejudiced by this. The policy does not provide compensation for the
inconvenience arising from the claims process. The Terms of Reference
(TOR) do make provision for compensation but they are not invoked.
15. The FSP also says the Applicants have not provided any evidence to
support that the FSP’s handling of the claim left the property un - tenantable
for an unreasonably extended period of time and so it is not satisfied that the
Applicants suffered a financial loss.
16. Whilst it concedes that some rectification work may have been required, the
Applicants have not provided evidence to establish that there were claims
related to workmanship issues, provided copies of the relevant invoice(s) to
support the work done, allowed its repairer to address the concerns or the
opportunity to review and rectify this damage as stipulated under the terms
of the policy.
Case No: 326176 Determination Page 4 of 16
17. The Applicants / their builder were asked but did not provide photographs of
the alleged faulty workmanship. The FSP says it has been prejudiced in its
ability to assess its liability for the repairs. If the claim was substantiated the
FSP was willing to consider the claim under its guarantee.
18. Further the policy states an insured is not to authorise any rectification work
without the FSP’s written authority.
19. The Applicants have sought cover for items such as loss of rent, temporary
accommodation, garden maintenance, mortgage costs and electricity costs
which are simply not covered under the terms of the policy.
20. Mortgage costs would still have to be paid if the property was being repaired.
In any event it is a consequential loss for which there is no cover under the
policy.
21. Electricity costs are also a consequential loss. Electricity supply would still
have to be continued while repairs took place.
22. The garden was not damaged in the event or the repairs. The policy does
not respond to this claim.
23. The FSP relies on the following policy provisions:
Page 18 of the Product Disclosure Statement (PDS)
“ The [FSP] Home Repair Guarantee
The quality of workmanship and the materials used in any repair or rebuilding
of your home and contents that we arrange and authorise will be guaranteed
for the life of the property.
If you are concerned about the quality of the repair or rebuilding of your home
building, you must call us... We will arrange with you to inspect the repair or
rebuilding and we will arrange any necessary rectification work. You must not
authorise any rectification work without our written authority. ”
Page 20 of the PDS
“ We help with…
The cost of temporary accommodation
When an insured event has caused damage or loss to your building, we will
help with the cost of temporary accommodation for you and, where
necessary, for your domestic pets, provided:
we are satisfied your building is no longer habitable, and
you were living permanently in it at the time, and
you have claimed on this policy and we are satisfied everything is
in order.
We will pay the reasonable cost incurred by you for comparable
accommodation for up to 12 months while your building is being rebuilt or
repaired. ”
Page 23 of the PDS
Case No: 326176 Determination Page 5 of 16
“ Damage to garden beds, trees, shrubs and other plants
We will help pay for damage or loss to trees, shrubs, plants, hedges or garden
beds on your site caused by fire or the impact of vehicles (not driven by you or
by any person living at your home).
The most we will pay is shown on the most recent of your policy schedule and
renewal notice. ”
Page 36 of the PDS
“ Cover for landlords
We provide a separate policy for landlords who rent their property for
domestic residential purposes. Please ask us about the [FSP] Landlord
Policy. ”
24. The FSP accepted the Recommendation and did not provide any further
documentary information in support of its position or make substantive
comment about the Applicants’ further submissions.
Issues
25. Whether the Applicants are entitled to compensation due to the time taken
by the FSP to process the claim.
26. Whether the FSP is liable for any other compensation, costs incurred or
claimed by the Applicants.
Reasons for decision
27. There has been an exchange of material between each party, and I am
satisfied each party has had an opportunity to reply to the issues raised.
28. Each FOS case is decided on its merits, taking into account the facts of the
case. I have reviewed all the material submitted by the parties both before
and after the Recommendation was issued, in order to reach my decision. I
will only refer to the relevant submissions and materials raised.
29. In reaching a decision, it is appropriate to consider the Terms of Reference
under which FOS operate. The Terms of Reference require that I consider
what is fair in all the circumstance having regard to the relevant legal
principles, the terms of the relevant policy and good industry practice.
Regard should also be had to prior Determinations, although such
Determinations are not binding or precedents.
Materials from the parties
30. The Applicants have provided some emails and invoices which are referred
to in the chronology set out below.
Case No: 326176 Determination Page 6 of 16
31. After the Recommendation the Applicants provided a description of the work
done by their builders as follows:
“ Category Item Trade/Service Description Instructions
Bedroom/Study Ceiling Builder Plaster Ceiling Replace and Paint
to match existing
Bedroom/study Wall Builder Plaster walls Replace and
paint/finish to
match existing
Bedroom/Study Other Builder Ceiling
insulation
Replace to match
existing
Bedroom/Study Ceiling Builder Bedroom light Replace to match
existing
Living areas Ceiling Builder Plaster ceiling
to sitting area
Repair and
paint/finish to
match existing
Living areas Wall Builder Plaster Walls Repair and
paint/finish to
match existing .”
32. The FSP appointed an assessor and his report dated 3 July 2012 says:
“ Extra assmt will be required at later date to inspect property following drying.
Emergency works have not been completed to satisfactory standard with
property remaining very wet. Assr has included carpet & structure drying in
building sow as no contents exposure was added. Carpet replacement will be
added following contents assmt. ” (sic)
33. The Resultant Damage is described by the assessor:
“ Damage to bedroom 2 ceiling (collapsed), bedroom wall, electrical circuit.
Sitting area ceiling. carpets to bedrooms, sitting room, lounge & dining.
various contents- more to follow ” .(sic)
34. The assessor prepared a scope of works (SOW) to dry carpets, fix ceiling,
replace and paint plaster ceiling, walls and insulation in bedroom/study,
replace bedroom light, replace and paint plaster walls and ceiling in living
areas, dry interior and re-lay carpet and clean following building repairs. The
estimate of the repairs was $6,200.
35. The assessor took photographs of the damage at this and subsequent
assessments.
36. Extra damage was noted in an inspection on 16 July 2012
Also noted during assmt was extra building damage not present during
initial assmt. c/m please add these 2 items to building sow. - Repair wall oven
cupbd end edge strip & re - lacquare. Bedroom 1 ceiling repair & paint to
match existing.(sic)
37. The assessment report 19 October 2012 notes remaining repairs required
as:
Case No: 326176 Determination Page 7 of 16
“ bedroom 2 robe melamine shelf to be replaced ( AB)
Stub wall paint next to wall oven unit to be touched up. (AB)
Bedroom 1 ceiling to be painted (AB )
Dining room ceiling crack at plaster joint to be repaired (AB)
General cleaning (vacuum floors, several dirty marks on walls & general
post repairs clean )
The following items were discussed & confirmed as non claim related.
Shelf under cook top stained - Not covered, these marks appear to be
oily stains from cook top above.
Dirty marks inside robe of bedroom 3 - Not covered, Non claim related.
No mould was found on any melamine robe shelves.
Curtains throughout were found to be undamaged.
Wall oven myrtle veneered side - Not covered- this damage appears to
be old, long term damage due to the colour of the damaged area &
inconsistent pattern not related to this water damage. ” (sic)
38. On 22 October 2012 a new SOW was prepared to include these new minor
repair items.
Chronology
39. The FSP has provided its file notes and supporting material which are very
lengthy. I have reviewed them carefully together with material from the
Applicants.
40. The dispute the subject of this Determination has a lot of detail and is
intertwined w ith issues with the Applicants’ contents. A chronology is useful
to set out what was done and when as far as this part of the dispute is
concerned. The use of “Applicants” refers to the male or female Applicant.
AB is the builder appointed by the FSP. CT i s the Applicants’ builder.
41. I note the following relevant events:
o 19.4.12 – 15.1.13 electricity charges to house total $742.03
o 14.5.13 $2,056 deducted to pay mortgage this day and monthly
thereafter
o 11.6.12 Property last occupied (file note of FSP 28.6.12)
o 25.6.12 House up for sale/ rental as evidenced from email from
property manager
o 27.6.12 pipe burst in the ceiling
o 27.6.12 claim lodged
Case No: 326176 Determination Page 8 of 16
o 28.6.12 H authorised to arrange a make safe to the property
o 28.6.12 Assessor appointed
o 28.6.12 property assessed – couldn ’t restore c arpets as ceiling had
collapsed
o 3.7.12 assessment report and SOW prepared
o 4.7.12 furniture due for removal as Applicants relocated to Queensland
o 4.7.12 drying equipment installed
o 4.7.12 FSP advised Applicants that claim is accepted and the builder
AB organised to do repairs
o 16.7.12 assessor reports on damaged contents and noted other minor
building damage
o 19.7.12 Applicant raised issues including skirtings and cupboards that
are standing in water and wet and swelling
o 27.7.12 complaint noted about the scope of work. Assessor to call
Applicants
o 27.7.12 AB noted additional damage to 7 internal doors and
rectification work required
o 1.8.12 Applicants’ email request to halt repairs because of
dissatisfaction with work done
o FSP sent assessor to re attend re quality of workmanship and mould
damage
o 9.8.12 FSP conversation with the Applicants re concerns
o 10.8.12 SOW provided by FSP to Applicants
o 14.8.12 mould inspection report and carpet at back of house was
beyond salvage, window sill in back bedroom has mould and will need
to be replaced and concrete floors have mould growth
o 15.8.12 Applicants advise they have arranged for another to attend the
house and report on the works (no report provided)
o 29.8.12 FSP notes assessor to attend with insured
o 3.9.12 AB updated FSP on limited remaining work to be done – he
noted ceiling plaster damage not near burst pipe
o 5.9.12 Applicants email FSP with concerns re investigation of water
damage
o 7.9.12 lengthy conversation: FSP updating Applicants
o 7.9.12 FSP asked AB to comment on Applicants’ concerns
o 13.9.12 message left with Applicants to update
o 13.9.12 email from FSP and AB answering concerns and noting all
carpet to be replaced save for carpet in lounge room and main
bedroom and all wet insulation to be replaced on completion
o 14.9.12 lengthy telephone discussion re various issues
Case No: 326176 Determination Page 9 of 16
o 19.9.12 Applicant wants confirmation that wet ceiling insulation
removed
o 23.9.12 email: Applicants say repairs can re-commence
o 23.9.12 Applicants asks for work to be completed as the house is to be
put back up for sale after the repairs.
o 28.9.12 email from FSP: builder to proceed with repairs and confirming
guarantee on repairs
o 28.9.12 replacement of 7 sets of curtains put in train
o 11.10.12 Applicants advised property manager had forwarded photos
showing faulty workmanship and a mess left by the builders. (photos
not provided). FSP said AB must be allowed to address the issues
o 11.10.12 FSP note: repairs are not yet completed but will be in 3 to 4
days but insured said repairs were completed and builder handed back
keys. FSP to contact AB
o 12.10.12 FSP contacted Applicants to discuss repairs and complaints
and said an assessor was to attend
o 12.10.12 Replacement curtains arranged
o 15.10.12 assessor appointed
o 19.10.12 Assessor Report – The assessor met with the builder and
reported repairs were of a reasonable standard and two additional
repairs were required and scope of work (SOW) to be forwarded. Noted
non claim related issues and debris to be removed
o 21.10.12 the Applicants’ builder CT inspected t he house and made a
list of what still needs to be fixed by FSP
o 24.10.12 SOW sent to Applicants. Some items not claim related.
Arranged removal and disposal of unsalvageable items
o 29.10.12 AB aware of new items and rectification works and need to
clean up
o 12.11.12 FSP notes show it approved AB’s account
o 14.11.12 FSP spoke to AB - all repairs completed including extra work
and all necessary insulation installed
o 14.11.12 the FSP agreed to cover the cost of transport of contents
o 16.11.12 email from FSP: AB confirms with FSP that all repairs have
been completed including replacement of all necessary insulation
o 22.11.12 Applicants said repairs not completed, clean up and removal
of debris required. All insulation has still not been replaced. Wall has
been patched up but now blotchy. Carpet is dirty. Own builder
appointed. Insured asked to send in photo of poor repairs. (Photos not
sent)
o 5.12.12 FSP left message to discuss
Case No: 326176 Determination Page 10 of 16
o 5.12.12 FSP confirmed it had arranged for the restorer to attend to the
carpet clean and dispose of carpet debris
o 7.12.12 FSP follow up re cleaning and disposal
o 7.12.12 FSP to follow up builder re complaint about insulation
o 7.12.12 Applicants said their repairer had completed the repairs and
clean up so people can be shown through the home and some of the
insulation had not been replaced
o 12.12.12 FSP confirmed the carpets had been cleaned and debris
removed and curtains hung
o 11.12.12 invoice from CT in the amount of $3,520 for gardening work,
painting, new shower screens and labour
o 12.12.12 email from FSP advising Applicants that the FSP had
completed all repairs
o 20/12/12, 10/1/13 and 29/1/13 gardening work done by CT - $205.
o End January 2013 - this is when the Applicants say the house was
liveable
o 4.2.13 Applicants complain about claims service and time taken to
finish works and say lost rent of $350 per week
o 7.2.13 FSP spoke to Applicants about the claim. Applicants agreed
shower screen not part of claim. Applicants asked for further
information to resolve the dispute but o nly wanted now to deal with IDR
o 21.2.13 invoice shows gardening work done by CT - charge $65.
o 27.2.13 IDR letter from FSP – FSP agrees that the claim could have
been processed in a timelier manner through closer management but
otherwise not liable without further proof
o 15.3.12 further IDR letter
o 22.3.13 email from FSP asking for evidence that there were
workmanship or material issues with the completed work and any costs
to correct this so the claim can be considered
o 13.6.13 FSP asks for proof of poor workmanship
o 5.7.13 Applicants reply to say invoices previously given and matter now
in the hands of FOS.
Analysis
42. The Applicants had a claim for loss and damage to their home and contents
to which the policy responded. Having accepted the claim, the FSP agreed
to repair the property. The essence of this dispute is that the repairs were
not done well and took too long as a result of which the Applicants have
suffered further loss as they could not rent or sell the home. In order to do so
they say they had to engage their own builder.
Case No: 326176 Determination Page 11 of 16
The time taken to do the repairs
43. A careful review of the FSP’s claim file shows there were many issues of
concern to the Applicants and much of the file notes are taken up with issues
concerning the Applicants’ contents which is not the subject of this
Determination.
44. As for this dispute from the information to hand I accept that:
The Applicants were no longer living in the house when it flooded but
their contents were still there;
They had moved to Queensland and made arrangements to rent or sell
the house;
The damage was assessed promptly on 3 July and repairs began in a
timely fashion;
The water damage was throughout the house and the initial estimate of
repairs was $6,200;
The damage was assessed twice more and some extra but minor items
noted for repair as the SOW prepared in October was just $6,300;
There was a delay in the works as the Applicants halted the works on 1
August 2012 and did not allow resumption of the works until 23
September 2012;
Once the works were resumed, they were completed on or about 14
November 2012 save for carpet cleaning and disposal of some debris.
The FSP confirmed this was done on or about 12 December 2012;
The Applicants have had the property inspected by their neighbours,
the property manager and another builder and indicate photographs
were taken of the poor workmanship yet despite requests these
photographs have not been produced;
The FSP acknowledges in its IDR letter there were issues with
timeliness but the FSP was not satisfied the Applicants had sustained a
financial loss as a result of the claims handling;
No reports or statements in support have been provided by the
Applicants save for the description of work done by their builder and
provided after the Recommendation; and
At all times the FSP was willing to investigate and rectify the complaints
made by the Applicants but the Applicants did not allow this and had
the work done by their own builder.
45. Having carefully considered the available information I am satisfied that the
work took about 10 weeks to complete in total as I accept the bulk of the
work was done by mid November 2012. The works were delayed for about 7
weeks from 1 August 2012 when the Applicants called a halt to the works.
The work that remained after mid November 2012 was only some cleaning
of the carpet and removal of debris. I have carefully considered the
photographs taken by the assessor in October 2012 and I am not satisfied
Case No: 326176 Determination Page 12 of 16
that the state of the house was such that it could not have been rented or
sold at that time. And from the limited information provided by the Applicants,
I am not satisfied that this remaining work would have prevented the rental
or sale of the property and caused the other consequential losses claimed.
46. The Applicants says that as the house was empty the repairs should have
taken a month to finish but do not adduce any evidence to support this
contention from their builder or any other source.
47. I do accept that the work was in many rooms in the house and was extensive
and probably hampered initially by the fact that the house had to be dried
out. However taking into account the photographs from the assessor, the
descriptions by the assessor and the Applicants’ builder of the work to be
done and the cost of the work to be done , I am not satisfied that the time
taken to do the work was acceptable. Taking all matters into account, I am of
the view that the work should have been completed at least by the end of
October. After the final assessment, which took place on 19 October 2012
only some minor work remained to be done.
The workmanship and claimed loss
48. However, the question then becomes did the failure to complete the work or
this remaining work more quickly cause the Applicants ’ loss. Did it prevent
the Applicants from renting the property or arranging for it to be sold?
49. The assessor’s photographs and the assessor’s report show that the work to
be done was very minor – a replacement shelf, a touch up of paint next to
the wall oven, the bedroom ceiling to be painted, a crack to be repaired in
the dining room ceiling and some general cleaning. I am not satisfied on the
material to hand that this remaining work was such that the Applicants have
sustained the loss they claim. For example there are no photographs from
them of the state of the property although it is indicated from the file notes
some were taken. Further, there is no statement from the property manager
saying that the state of the property was such that it could not be rented or
sold at or about this time.
50. In that last assessment report the assessor says the work done was of a
reasonable standard. The Applicants disagreed as evidenced by the email
dated 22 November 2012. And some time before 11 December 2012 the
Applicants engaged their own builder to rectify the work.
51. I note that if rectification work is requir ed, the FSP’s policy provides a lifetime
guarantee on repairs. This ensures that any unsatisfactory work is
completed by the original repairer. I also note the policy says that an insured
must not authorise any rectification work withou t the FSP’s written authority.
However, I also acknowledge the countervailing argument of the Applicants
that they could wait no longer and so engaged their own builder.
52. The invoice from CT dated 11 December 2012 shows there was 18 hours of
painting done and 11 hours of labour to clean up and organise works. Paint
and a new water pipe were purchased. The invoice does not particularise
Case No: 326176 Determination Page 13 of 16
where the work was done. CT’s email dated 22 October 2012 lists work he
says had to be done but it is minor compared to the description of work
provided after the Recommendation.
53. After the Recommendation, the Applicants attach a document which is called
CT’s report but it is not dated or on letterhead. It indicates that work was
done to the same areas worked on by AB – to the bedroom/study and living
room. The work replicates work done by AB too – to replace and paint
plaster ceilings, plaster walls, ceiling insulation and a bedroom light.
54. I do not find the material provided by the Applicants to be sufficiently
compelling in view of the photographs and the last report from the assessor
who says the work done was reasonable. There are no photographs from
the Applicants of the faulty work despite many requests. Nor is there a
statement from CT saying exactly what the state of the work was and what
he had to do to rectify it. Moreover the list of work set out in the email 22
October 2012 lists work he says had to be done. It is not dissimilar to the
work the assessor wanted AB to do to complete the work yet AB is not given
that opportunity as the policy provides.
55. I note also that part of the invoice dated 11 December 2012 is for new
shower screens. There is no compelling evidence that this relates to the
damage from the insured event. I note also the file note made by the FSP
that the Applicants concede this is not claims related.
56. The policy provides that an insured must not do rectification work without the
FSP’s written authority yet work was done by CT without the FSP’s authority.
Further the FSP had indentified the remaining work to do be done and had
set in train for that work to be done. I am not satisfied on the material to hand
that the work done by CT was justifiable in all the circumstances of the
dispute and I do not accept that the FSP is liable to compensate the
Applicants for the cost of CT ’s work.
57. The event caused damage that required repairs. During this time the
Applicant still had to maintain the property, maintain the garden, keep on
electricity and pay the mortgage. On the information provided and for the
reasons stated, I do not accept that the event, the ensuing repairs or the
policy terms respond to the claimed losses. I will deal with the specifics of
each part of the rest of the claims in turn.
The garden
58. The Applicants claim they had to maintain the garden for longer than was
necessary because of the repairs.
59. Aside from the broad general finding that on the information provided I am
not satisfied that the repairs and the time taken to do the repairs led to the
claimed losses, the Applicants were still obliged to maintain the ho use and
garden while the repairs were taken place.
Case No: 326176 Determination Page 14 of 16
60. In addition the policy does not respond to any claim for damage to the
gardens by this event.
61. Finally, much of the sum of the amount claimed is for work done after the
repairs were finished.
Mortgage and electricity
62. The Applicants claim they had to pay the mortgage and keep the electricity
connected for longer than was necessary.
63. Aside from the broad general finding that on the information provided I am
not satisfied that the repairs and the time taken to do the repairs led to the
claimed losses, the Applicants were still obliged to pay the mortgage and
keep on electricity while the repairs were taken place.
64. In addition the policy does not respond to any claim for these losses.
65. As for the amounts claimed, the mortgage payments and electricity charges
claimed include periods before the repairs began and after the repairs were
completed.
Loss of rent
66. The Applicants also claim that they could not rent the property out as
planned because of the poor repairs and the length of time to do the repairs.
They say they would have got rental of $350 per week. They claim
compensation for this loss.
67. Aside from the broad general finding that on the information provided I am
not satisfied that the repairs and the time taken to do the repairs led to the
claimed losses, the Applicants were still obliged to mitigate any loss.
68. I accept that they had approached an agent to sell or rent the property just
before the insured event. However, there is insufficient information to satisfy
me that the property could not be sold or rented out once the repairs or the
bulk of the repairs were completed. The Applicants have provided no
photographs of the property to show it was not fit to sell or rent at the
relevant time. There is no statement from their builder or the property
manager about how the property appeared and how it was not fit for sale or
lease, when it became fit and when attempts were made to sell or lease it.
69. In addition the policy does not respond to any claim for these losses.
Compensation
70. The Terms of Reference provide:
9.3 Other compensation
a) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that
the Financial Services Provider compensate the Applicant for
consequential financial loss or damage up to a maximum amount of
$3,000 per claim made in the Dispute.
Case No: 326176 Determination Page 15 of 16
b) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that
the Financial Services Provider compensate the Applicant for non-
financial loss but only where:
(i) an unusual degree or extent of physical inconvenience, time
taken to resolve the situation or interference with the
Applicant’s expectation of enjoyment or peace of mind has
occurred; or
(ii) in the case of a Dispute pertaining to an individual’s privacy
rights – injury has occurred to the Applicant’ s feelings or
humiliation has been suffered by the Applicant.
The maximum amount of compensation for non-financial loss will
be 3,000 per claim made in the Dispute.
71. I have made a finding that the FSP does not have to compensate the
Applicants for consequential financial loss on the information provided and
for the reasons stated.
72. But there remains the question of non financial loss. The Applicants claim
compensation for the time taken by the FSP to manage the claim. They say
the amount of times they had to call due to issues with the house was
unacceptable.
73. The FSP cites the relevant part of the Terms of Reference in its Notice of
Response but does not address this issue specifically there. However , it
does point out in its submissions that some part of the delay was caused by
the Applicants’ halt in work for almost 2 months from 1 August 2012.
74. However, in its IDR letter dated 27 February 2013 it apologises that the
Applicants “have not received the level of service (they) would expect
throughout this claims process ”. And the letter also says: “(the FSP is) of the
view that the claim could have been processed in a timelier manner through
closer management.”
75. An insurance claim of this kind where there is significant damage to the
house and contents will cause anxiety and inconvenience to an insured.
From one perspective the Applicants were fortunate to no longer be living in
the house, but I accept their situation was also made worse by the fact that
they were not close by and able to deal with day to day issues. And I also
accept that some of the angst had to do with the claim to their contents
which claim has been settled and is not the subject of this dispute.
76. My careful review of the file notes show there were many items that were
damaged and so the parties were in constant discussion about the resolution
of the various aspects of the claim for the damage to the house and to the
contents. Such claims which have so much detail take time to assess, repair
and settle.
77. The file notes show the FSP was responsive t o the Applicants’ many
contacts but nonetheless I am not satisfied that the FSP managed the
builder and the repairs works as closely as is optimum even taking into
Case No: 326176 Determination Page 16 of 16
account the location of the works and the detail of the claims both for the
house and contents.
78. I accept that the FSP acknowledges the claim could have been managed
more closely and faster. I also accept that the time taken to resolve the
situation would have interfered with the Applicants’ expectation of enjoyment
and peace of mind.
79. Taking into account all matters I am of the view that it is fair in all the
circumstances to award the Applicants $750 for compensation for non
financial loss.
Determination
80. On the basis of the available information and for the reasons stated, I
determine:
The FSP is not obliged to pay the consequential losses claimed or any
further cover to the Applicants;
Should the Applicants accept this Determination, within 7 days of
acceptance, the FSP is to pay the Applicants $750 compensation for
non financial loss pursuant to the Terms of Reference.