Quality of flood repairs and repair guarantee

FirmFinancial Firm (Unknown - Insurer)
Decided2014-07-25
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed$15,000
SourceAFCA PDF

Summary

The Applicant disputed the quality of remedial works after a 2007 flood and sought $15,000 to finalise her claim. AFCA required the FSP to cash settle or remedy about 17 listed items, including bathtub replacement and door and paint defects, and rejected most of the remaining items as private works, unrelated to the claim, or unproven.

The FSP must accept responsibility for defective workmanship or materials in repairs it authorised under the repair guarantee, but the insured must prove the items are claim-related and FOS cannot consider private works.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimreassess claimrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 324999 Determination Page 1 of 30 Case number: 324999 General Insurance - Domestic Insurance - Home Building - Service - Delay in Claim Handling - Repair Quality - Repair Guarantee 3 June 2014 Summary Description:  This dispute is about a claim under a home building and contents policy as a result of damage done by a flood in June 2007 and the standard of the remedial work done by the FSP‟s builders.  The FSP denies it is liable as the claim was made several years after the event which leads to problems of proof. Further it contends that the Applicant signed Releases at the completion of the repairs, and some of the claim for remedial work is for work done on a private basis for the Applicant by the builders. Basis for Determination:  As there are over 100 items in dispute, it is very difficult to summarise the basis for the determination for each item save to say that generally on the available information the bulk of the items in dispute are not related to the claimed event but are related to private works or the Applicant has provided insufficient material to support her claim particularly in view of the passage of time since the damage and the repairs. Determination:  The FSP is required to cash settle or remedy items 17, 19, 23, 27, 36, 43, 44, 47, 53, 63, 64, 65, 67, 70, 72, 77, and 93 in addition to those items it has already agreed to cover;  As for item 63, the FSP is liable for the cost of centring the vanity and repositioning it but only if once it is moved it is discovered there is an obstacle preventing its centring;  As for item 19, the FSP is liable for the costs to install a telephone outlet in the skirting board of the bedroom but only if the removal of the skirting board reveals the prior location of a telephone outlet; Determination Case No: 324999 Determination Page 2 of 30  As for items 65 and 67, the FSP is liable to replace the bathtub as part of the claim related repairs, and insofar as the replacement of the bathtub and the shifting of the vanity may affect items 65 and 67, then the FSP is liable if the tiles need to be removed or replaced due to this consequential work but not otherwise;  The FSP is required to assess its liability under the terms of the policy for item 83 and for the Applicant‟s father‟s contents items upon the receipt of requisite information from the Applicant;  As for item 105, on present material, the FSP is not liable to the Applicant for this item but should the Applicant provide further information in this regard, the FSP is required to assess its liability under the terms of the policy; and  The FSP is not liable to remedy the remainder of the items as I am not satisfied on the available information these are related to the claimed event. Background 1. The Applicant held a home building and contents policy underwritten by the Financial Services Provider (FSP). The policy was incepted on 4 June 2007 and was current at the time of the loss. 2. On 8 June 2007 the property was damaged by storm and flood waters. The FSP accepted the claim and authorised for remedial repairs to be undertaken to the property. The repairs were completed in July 2008, with some minor rectifications completed by January 2009. 3. The Applicant is dissatisfied with the quality of repairs and is seeking the FSP authorise rectification to her home. Summary of Applicant’s p osition 4. The Applicant says she has been engaged with the builder “PB” authorised by the FSP over the past four years to try and get him to finalise the repairs to her home. After repeated broken promises by PB she has sought the assistance of this Service (FOS) to bring the repairs to a conclusion. 5. She has called the FSP many times over the years for assistance but they could not find her in their system and just told her they had no record of her and would not assist. 6. PB has not repaired or replaced some of the items accounted for on his scope of works (SOW) and others such as the entry cupboards were replaced in a different format, affecting their functionality. She is seeking that the home be restored to the condition it was in prior to the flood. Case No: 324999 Determination Page 3 of 30 7. She does not agree with the report prepared b y the building consultant “S”. He failed to appreciate that while he was inspecting the property five years later, many of the defects he viewed were present at the time of the completion of repairs. She also disputes S‟s conclusion that anything about the flood level cannot be flood related, due to the ferocity of the rushing water. S has also drawn wrong conclusions as to who was responsible for works as she did not have any other contractors undertake work at the house. 8. She has provided some photographs of the pre-flood condition of her home as well as some of the items in dispute to show that PB did not replace things correctly or at all. 9. She had to pay out of her own pocket for many of the fixtures and fittings such as bathroom tap ware. The FSP has ne ver reimbursed her for any of these things. 10. The Applicant is unhappy that where it is her word against PB‟s that the FSP insisted on her providing documented evidence to support her assertions. She posits that if PB does not have documented evidence either, why should her version not be accepted as the more preferable version? 11. The Applicant is seeking the sum of $15,000 to finalise her claim. Summary of FSP’ s position 12. The FSP says it has no record of the Applicant raising any issues regarding the repairs with it post January 2009 until it received a referral notice from FOS. Further, the Applicant signed a release on 26 August 2008 stating all repairs were complete and she was satisfied with the quality of repairs. Further, she signed another release on 2 January 2009 relating to some rectification works that had been completed. Accordingly it does not consider it is liable for any further work at the Applicant‟s home. 13. It questions why the Applicant waited such an extended period of time before raising her concerns, particularly as the Applicant raised issues with the initial builder “SS” and requested SS be taken off the job. PB then took over works with the approval of the Applicant. The FSP considers the Applicant was not hesitant in raising concerns with her claim or the appointed builders and therefore it is curious that she did not raise these issues at the time. 14. Some minor issues were brought to its attention in September 2008, with those items resolved by January 2009. Accordingly, the FSP closed its file at that point and had not heard from the Applicant since. Further, PB denies being contacted by the Applicant at any point since the finalisation of the repairs and was surprised to be informed she was questioning the quality of repairs after such an extended period of time. 15. In order to assess its liability for the claim under the terms of the policy, the FSP arranged for a building consultant S to inspect the home in the Case No: 324999 Determination Page 4 of 30 company of both the Applicant and PB. S considered that many of the items the Applicant was dissatisfied with related to private works undertaken by PB for the Applicant, ongoing maintenance issues at the home, and/or works undertaken by other unknown contractors. 16. However, S did agree that some of the works undertaken by PB required remediation, and PB agreed to undertake some additional works at the property on a without prejudice basis. The FSP is agreeable to following the recommendations set out by S in his report; however the Applicant remained dissatisfied with this response. As the Applicant has chosen to pursue the matter, the FSP is not willing to consider those items S recommended it settle on a commercial basis and requests that FOS issue a decision on those items, although it accepts S‟s recommendations for the repairs w hich are subject to the repair guarantee. 17. The FSP relies on the following policy provisions contained within the Product Disclosure Statement (PDS), which the Applicant does not dispute receiving: “ Accidental Damage cover If you have chosen Accidental Damage Home Insurance, we will cover your buildings or contents for any accidental loss or damage. ... Any cover we provide is subject to exclusions. ... How we settle a buildings claim 1 We will decide how we will settle your claim If your buildings suffer loss or damage, we will decide whether to  Repair  Rebuild, or  Pay you the cost to repair or rebuild that part of your buildings that suffered loss or damage. ” Issue 18. Whether the FSP has fulfilled its obligations to the Applicant pursuant to the terms of the policy. Reasons for Recommendation 19. As advised to the parties, FOS considers it appropriate to expedite this dispute in accordance with the Operational Guidelines to the FOS Terms of Reference, due to the nature of the dispute. Accordingly, this dispute has not been the subject of a Recommendation and has proceeded directly to Determination. Case No: 324999 Determination Page 5 of 30 20. I am satisfied a full exchange of information has taken place between the parties and each party has had the opportunity to address any issues raised. 21. There is no dispute the Applicant suffered a loss from a risk insured against, the FSP accepted the claim and arranged for the repairs to be undertaken. However, a dispute has arisen between the parties as to whether the FSP has appropriately restored the property to its pre-loss condition. 22. It is an accepted principle of general insurance law that an insured bears the onus to establish, on the balance of probabilities, the insured has suffered a loss caused by an event or incident to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove that a specific policy exclusion applies, or the loss is otherwise precluded from cover under the terms of the contract. 23. Accordingly, as the Applicant contends that the property has not been restored to its pre loss condition she bears the onus of establishing this contention or that her claimed losses fall within the terms of the policy. Expert report from S 24. The Applicant provided the FSP with a list of items which she stated were outstanding or in question. The items included incomplete or unstarted repairs, sub-standard repairs, and items missing from the SOW. 25. Due to a number of factors including the lapse of time since the completion of repairs and the fact that the Applicant had entered into a series of private arrangements with PB to not only undertake private works unrelated to the claim but to vary the FSP‟s agreed SOW, the FSP engaged building consultant S to inspect the home and the issues raised to assess its liability under the terms of the policy. Given the complexities listed above, I accept that the FSP‟s action was reasonable in the circumstances. 26. The FSP relies on the report submitted by S in its decision to limit its liability for the items raised. I have considered this report as part of my review in this matter. As the material has been exchanged between the parties I do not propose to recite it again in detail, save for the most pertinent points. 27. There are other items in contention set out by the Applicant in emails to FOS which are not among the many items addressed by S. The case manager has cross referenced the Applicant‟s emails with the report from S and those other items are dealt with later in this Determination under the heading “Other Items Raised.” 28. At the outset, I note that many of the items included in S‟s report purportedly relate to the private works undertaken by PB at the request of the Applicant and she is dissatisfied with the quality of those works. 29. FOS is bound by its Terms of Reference (the Terms) which govern the types of disputes FOS can consider. Accordingly, FOS can only consider disputes between the Applicant and the FSP which relate to the provision and Case No: 324999 Determination Page 6 of 30 application of financial products. FOS is unable to consider issues which relate to any private arrangements the Applicant made with PB relating to building works, as such matters fall outside of FOS‟s jurisdiction. 30. Although the Applicant has challenged S‟s report, she has not provided her own report from an appropriately qualified person to contradict the findings of S. She has supplied several photographs of the items in dispute, which I will address where appropriate later in this Determination. I accept S is appropriately qualified to comment in this matter and in the absence of any conflicting information, I accept I can place weight on his evidence. S is a licensed builder and he has based his comments on two site inspections and documents provided to him by the assessor and the builder. 31. Accordingly, this Determination will give no further consideration to items in S‟s report numbered 5, 6, 8, 14, 15, 21, 34, 50, 54, 60, 66, 75, 78, 79, 80, 82, 98, 99 and 101 as I accept these items relate to private works. It follows t hese items fall outside FOS‟s jurisdiction as they are not related to the Applicant‟s contract with the FSP. The Applicant may investigate what alternative options are available to her if she wishes to pursue those items further. Similarly, S has stated items 28, 71, 87, 88 and 103 relate to works undertaken by unknown contractor(s) at some point in the last five years and did not form part of the insurance claim. It follows I will not consider those items as part of this Determination either for the same reason. 32. The FSP has previously agreed to follow the recommendations by S in his report, and PB has agreed to remedy some items on a without prejudice basis. Therefore, I consider the FSP has agreed it is liable to remedy items 12, 24, 29, 30, 40, 57, 58, 61, 85, and 89 and these items are no longer in dispute and not part of this Determination. 33. Whilst I note the Applicant has signed Releases in respect of the repairs stating she was satisfied with the quality of the work, in my view this is not fatal to her dispute currently before FOS as she may not have been aware of the defects at the time of signing the Releases or the defects may have become apparent at a later time. Further, such Releases are not relevant to the items which are to be considered pursuant to the repair guarantee. 34. For the remainder of the items listed, I will address these individually, although some may be grouped where relevant or necessary. Items not allowed by S Item 1 – front fence replacement offset allowance of $1,600 insufficient 35. Documentation provided by PB confirms he entered into a private arrangement with the Applicant to offset the costs of rebuilding the front fence against the private works undertaken. The Applicant disputes the amount of $1,600 is sufficient to rebuild her front fence, as this is quote for a picket fence only, whereas the original fence was a brick wall with pickets in Case No: 324999 Determination Page 7 of 30 between the piers. Furthermore, the Applicant believes PB‟s quote included the costs to demolish the existing fence. 36. The Applicant has provided a photograph of the original fence showing it was brick with picket infills. 37. However, I have considered SS ‟s original SOW which clearly sets out they allowed to remove the front brick fence and replace it with a picket timber fence. PB‟s private invoi ce to the Applicant also states the demolition of the front fence had been already carried out. Accordingly, in the absence of any contradictory information, I accept SS did this work prior to PB‟s involvement in the claim and PB‟s quote therefore refers o nly to the replacement costs. 38. I have considered the original SOW prepared by loss adjuster “F” which clearly states that the front brick fence is to be replaced with a timber picket fence, something allowed for on both the S and PB quotations. Whilst no reason for the alteration has been provided, on balance, I accept this was done at Applicant‟s request or agreement. Certainly, she has not argued that she did not want the brick replaced with timber. 39. In my view, there is no suggestion the FSP failed to allow for the replacement of the fence in its SOW, and paid PB for same. That the Applicant and PB then entered into a private agreement to offset those costs in lieu of the work being undertaken does not alter the fact that the FSP paid for its liability for the front fence. If the Applicant was not happy with the amount of offset and believed PB had underquoted for the fence, then she should not have agreed to it. 40. The Applicant has not provided any proof that the amount allowed by PB and paid by the FSP is not fair and reasonable, nor has she established that five years after the fact, the FSP should bear any responsibility for any increase in costs for same. Accordingly, I consider the FSP has no liability for any further funds in this regard and the Applicant is to deal directly with PB should she wish to pursue this issue further. Items 2, 3, 9, 16, 90 2 – front steps and verandah repairs not undertaken 3 – front steps and verandah above, underquoted 9 – slab for shed should be thicker and no sealant on shed 16 – shed not replaced as part of claim 90 – tiling not done above hand basin in toilet 41. The FSP says the Applicant was cash settled for these items in lieu of repair and therefore the onus was on her to undertake those repairs. Accordingly it considers it has no further liability for these items. 42. The Applicant does not dispute receiving a cash settlement in January 2009 for the amount of $9,586.94. However, she says she was never given a breakdown of what this settlement comprised of and was therefore unaware if she had been settled for those components she is now claiming. Whether Case No: 324999 Determination Page 8 of 30 the Applicant was provided with a breakdown for the cash settlement, I am unable to determine from the material provided. 43. However, it would seem on balance the Applicant was aware, at least partially, of what this settlement comprised as it was in direct response to issues raised by her at the completion of repairs. Furthermore, she has added additional items to the settlement amount, as per her email of 22 January 2009. In my view, this is suggestive of a degree of review by the Applicant of the settlement breakdown. 44. F has provided the following breakdown of the cash settlement amount:  Repair front verandah tiles $3,690 (quote by PB)  Replace garden shed $1,530 (quote by PB)  Replace tiles, WC vanity and laundry tub $1,327 (quote by PB)  Replace rear garden lights $396 (receipt from Applicant)  Replace deadlocks $104.83 (receipt from Applicant)  Tap ware for back toilet and bathroom $177.99 (receipt from Applicant)  Replacement light fittings $170 (receipt from Applicant)  Replacement TV aerial $310 (receipt from Applicant)  Replacement range hood $324 (receipt from Applicant)  Replacement sink $308 (receipt from Applicant)  Repairs to pool chlorinator $1,150 (quote from Applicant) 45. There is an additional $99.12 included in the settlement amount by the Applicant. It is not clear what this is for as it does not correlate to any of the receipts mentioned and the FSP does not appear to have questioned it either, just paying the requested amount. In any event, the FSP does not appear to be seeking recovery of that amount. 46. Accordingly, I accept the Applicant was settled for the verandah tiling, replacement shed and tiling in the toilet by way of cash settlement in lieu of repairs. The Applicant disputes the amount offered by the FSP as sufficient to undertake the repairs, however she has not provided any evidence to support her assertion. In the absence of conflicting information, I accept the FSP has appropriately settled the Applicant for these aspects of her claim and no further action is required on behalf of the FSP. 47. In relation to the thickness of the shed slab, the Applicant asserts it should be thicker as water now floods into the shed because it is lower tha n the pre- existing height. She has provided photographs showing the slab is lower than grass level. PB says the original slab was 50mm thick and the new slab is 100mm thick. 48. I have reviewed the original SOW which states “replace garden shed slab (3.3 x 3.3m) install over existing and reinstate shed ” . In my view, this is Case No: 324999 Determination Page 9 of 30 suggestive of the new slab being installed over the existing and therefore would be more consistent with PB‟s statement that the slab is now double its original thickness. Whilst I acknowledge the Applicant‟s photogr aphs, I consider I can place limited weight on these as they do not depict the shed prior to the loss occurring. 49. Accordingly, I am not persuaded by the Applicant‟s contention that the slab has not been replaced to an appropriate thickness and consider tha t S‟s conclusion that water ingresses the shed due to a lack of sealant and/or flashing between the join and the slab is more likely. As the Applicant was cash settled for the shed and was responsible for its replacement and installation, I do not consider the FSP has any liability in this regard. Item 4 – air vents paid for by Applicant but charged by PB 50. S‟s report confirms the parties agreed on site that a private arrangement was entered into by the Applicant and PB for PB to install air vents in lieu of applying the granosite sealer on the walls. This is confirmed by the Tax Invoice dated 24 September 2008. Accordingly, I consider this aspect should no longer be in dispute and I do not consider the FSP has any liability in this regard Item 7 – PB repaved council footpath instead of replacing cracked step to driveway 51. S‟s report sets out that the repair of the driveway has been completed by PB in accordance with the SOW in a proper and workmanlike manner. The cracked step referred to is that which was included in the cash settlement amount in items 2 and 3. S does not consider the FSP has any further liability in this regard. 52. The Applicant disputes S‟s findings and says the area in question is the footpath leading to the home rather than the driveway. She maintains that PB repaired the council footpath rather than the pathway to her home. Presumably the pathway referred to by the Applicant is a path from the driveway to the front verandah. 53. The Applicant has not provided any evidence to support her assertions that PB repaired the council footpath rather than areas on her property and on balance, I believe it is unlikely he did. Further, the cracked step referred to appears to be the same one as dealt with in items 2 and 3 and cash settled, with S noting the driveway was repaired to standard. 54. I have considered the SOW, which only refers to the section of the cracked driveway, which is reflected on S‟s quote, with no mention anywhere of a council footpath. PB does not include any reference to either in their SOW or invoice. Accordingly, I am not persuaded the FSP has any further liability in this regard. Case No: 324999 Determination Page 10 of 30 Items 10, 11, 59 100 10 – external study wall damaged with a wheelbarrow by SS 11 – poles chipped in carport by workers being careless 59 – damage done to floorboards in kitchen by electrician 100 - filthy ceiling in study 55. S inspected the areas in question and noted there was a small area of impact to the study and carport poles and scratches to the kitchen floors. However, as more than five years had elapsed since the damage allegedly occurred to when he inspected it, S was unable to determine how or when the damage arose. S was also unable to determine how or why the study ceiling became dirty and noted PB‟s statement that it was in that state when he took on the repairs. The Applicant says PB‟s contractors dirtied it when looking for cabling in the ceiling and she made PB aware of this at the time. 56. The Applicant says she was told not to dispute anything to do with SS as the FSP wanted them removed off the job quickly and didn‟t want any problems in doing so. The FSP has not commented on this statement. 57. However, apart from asserting that either SS or PB or their contractors caused the damage now being claimed, the Applicant has not provided any persuasive evidence to suggest they did so. The photographs provided of the damage were taken in 2014 and they do not assist the Applicant in establishing the damage was present in 2007, or that it was caused by SS‟s contractors. 58. There is no evidence to suggest she raised these issues with either the FSP, SS or PB at any point in the last five years and it is my view that the passage of time has most likely eradicated any chance of determining how these issues arose. Accordingly, I am not persuaded the Applicant has discharged the onus on her to establish she is entitled to remediation of these items and therefore no further action is required from the FSP. Item 13 – pavers and concrete around pool sunken and cracked 59. S inspected the area and considered the pavers and concrete had subsided over an extended period of time due to the sand being washed away, as there was no concrete component of the substrate to prevent this from occurring. Further, this would have been ongoing over time as the area has experienced many instances of heavy rainfall in its lifespan. 60. The Applicant says she raised this issue at the time of claims lodgement but was told this was not covered by her policy as pavers were not considered content items. She disputes this is an ongoing issue and says it arose immediately after the storm. 61. The Applicant has provided photographs of the pool and paved area showing it was level prior to the flood. I have considered these photographs as part of my review; however I note that they were taken in 2003, some four years prior to the loss occurring. Accordingly, I consider the photographs to have limited probative value when considering this dispute. Case No: 324999 Determination Page 11 of 30 62. I have considered the policy terms and note that the policy will respond to subsidence as a result of a storm but only where the damage arises within 72 hours of the event. 63. The FSP says it has no record of the Applicant making known this complaint to them. Given the policy will respond to subsidence in some circumstances, then it is unusual that the FSP would not assess its liability in this regard prior to declining liability had the Applicant made them aware of it. Further, it is not clear why pavers would be considered under the contents cover when pavers would more appropriately be considered under the building cover. 64. However, it is my view that the passage of time since the event means it now cannot be determined whether any of the damage arose within 72 hours of the event, which is a requirement to triggering the insuring clause. There is no mention of the pavers on the original SOW, which is suggestive that at the time of F‟s insp ection, there was either no damage present or if there was, he did not consider as part of the claim related repairs. As the Applicant is the party seeking a benefit under the terms of the policy, it is incumbent on her to establish that she is entitled to cover. I am not persuaded the Applicant has discharged this onus. 65. In addition to this, S is quite clear in his conclusion that the damage evident was not as a result of, or contributed to, by the storm event. Accordingly, I accept the FSP is not required to undertake any further action in this regard. Items 17, 22, 35, 44 and 48 17 – peeling paint in main bedroom 22 – gap around door lets vermin in (main bedroom) 35 – gap around door lets vermin in (lounge room) 44 – peeling paint in bedroom three 48 – crack in wall joins in dining room 66. At the time of the inspection with S, PB agreed to rectify all of these items for the Applicant on a without prejudice basis and without any admission of liability. 67. The FSP is agreeable to PB undertaking those items for the Applicant on a goodwill basis however it does not wish to assume any responsibility for same in the event that PB retracts his offer or a further dispute arises out of those repairs. The FSP contends these items do not attract the repair guarantee under the policy terms. 68. As FOS has no jurisdiction over PB or any arrangements he may enter into with the Applicant, I must therefore determine whether, in the event of arrangements with PB falling over, if the FSP bears any responsibility for the claimed items. 69. Items 17 and 44 relate to peeling paint at the junction of the skirting and wall in the main bedroom and bedroom three respectively. S considered that this arose as a result of poor preparation of the surface during the painting process. However, S refe rred to the NSW Office of Fair Trading „Guide to Case No: 324999 Determination Page 12 of 30 standards and tolerances‟ Section 12.05 Paint Durability which set out that such issues will only be considered a defect if it occurs within 36 months of the painting being undertaken. 70. In this instance, it is not possible to determine if the issue arose within the first 36 months as the Applicant did not notify the FSP of it until nearly seven years later. 71. In my view, given S agreed that poor surface preparation was the cause of the paint deteriorating, and as the FSP is required to provide a guarantee on the quality of the workmanship and materials then I consider it fair in all the circumstances that the FSP is required to remedy these items under the policy terms. 72. Items 22 and 35 relate to gaps around doorframes. S considered that whilst gaps were evident, these were not visible from normal viewing positions and were as a result of inherent characteristics in the walls, as the architraves need to be aligned with the doorframe. S also considered the architraves had been installed in a proper and workmanlike manner. 73. S referred to the NSW Office of Fair Trading „Guide to standards and tolerances‟ Section 10.01 Gaps which stipulated that gaps are only to be considered defects if they exceed 1mm in depth and arise in the first 12 months after repair, and are visible from a normal viewing position. Further, the issue is non-structural as classified by the Home Building Regulations 2004, which has a two year warranty for non-structural items. S therefore did not consider the gaps defects. 74. I consider that the passage of time has eradicated any chance of fairly determining when the gaps first arose. Further, given S‟s opinion that the architraves were installed correctly and the gaps are as a result of characteristics of the walls themselves, I am not persuaded this is an area where the FSP has any liability. Accordingly, should PB retract his offer to rectify these items for the Applicant, the matter will remain between her and PB but I cannot conclude the FSP has any liability for the gaps. 75. As for item 48 and the crack, S noted a crack measuring 1.5mm was evident at the junction between the door architrave and wall within the room. S considered that the crack had arisen as a result of minor building movement. Further it is not considered to be of any structural significance in its present state and the wall itself was in sound condition. No contrary evidence has been supplied by the Applicant and therefore I rely solely on the findings of S in this matter. 76. Accordingly, I consider the crack has not arisen as a result of either the quality of materials or workmanship on the part of the FSP but general building movement and should PB retract his offer to rectify these items for the Applicant, the matter will remain between her and PB. I cannot conclude the FSP has any liability for the crack. Case No: 324999 Determination Page 13 of 30 Items 18, 25, 38, 45, 92 18 – cracks above front window and ceiling 25 – crack in wall and ceiling in entry 38 – crack in walls bedroom 2 45 – crack in walls bedroom 3 92 – cracks in walls in laundry/toilet 77. S inspected the cracks and determined these were as a result of minor differential movement in the building as the residence is founded on reactive soils. Further, there were no provisions made for movement in the building to prevent consequential cracking. There was evidence of previous repairs to the cracks which have reappeared, indicating the property was subject to long term issues with movement. This is inherent to the building and cannot be attributed to the flood event or any of the works undertaken by either SS or PB. 78. In any event, S did not consider these cracks defects as they were less than 1mm in thickness and were not of structural significance pursuant to the allowances as set out in the Australian Standard 2870 . 79. The Applicant says the cracks are due to uneven plaster not being sanded correctly prior to painting. She has provided photographs of the cracks and says these were not there when she moved back into the house after the flood. She had just had the walls replastered in 2004 and they were smooth without cracks. She has supplied a photograph of one of the replastered walls taken in 2004. However, the remainder of the photographs were taken in 2014. It is not in dispute the cracks exist now, rather the issue is when did they appear and could the repairs undertaken by PB reasonably be considered to be the cause. Accordingly, I consider the photographs have limited probative value when considering this dispute. 80. S concluded the cracks were as a result of ongoing maintenance undertakings required to the home. In the absence of any conflicting information, I accept that the FSP is entitled to rely on S‟s findings to conclude it has no further liability in this regard. Item 19 – phone socket not reinstated on skirtin g board 81. The Applicant says there was originally a telephone outlet on the skirting board in the bedroom and PB failed to reinstate it. PB says SS removed the skirting boards prior to his attendance, which I note the Applicant agrees with, and he does not recall seeing visible phone cable when reinstating the area. I note there is no reference to same in either the original SOW or the SS invoice. 82. S was unable to determine if the cable was present as the area now has skirting boards laid down and it would involve undertaking invasive testing to determine if there is existing cable under the boards. S considered if there were evidence of cabling visible then PB is liable, if the cabling has been dropped into the sub-floor then SS is liable. Case No: 324999 Determination Page 14 of 30 83. In my view, it matters little which builder is responsible for the missing outlet if it is established that an outlet is missing. S has accepted that one or other of the builders appointed by the FSP may not have reinstated the area to its pre-loss condition and accordingly, it is possible that the FSP has not fulfilled its obligations to the Applicant pursuant to the terms of the policy. 84. Accordingly, I consider the FSP is liable for the costs to install a telephone outlet in the skirting board of the bedroom but only if the removal of the skirting board reveals the prior location of a telephone outlet. However, I am mindful of the fact that to make this investigation and install an outlet (if the investigation supports the Applicant‟s contention) requires invasive works and the Applicant may not prefer this course of action given she has resided for the last five years without the outlet. Therefore, the parties may wish to consider a cash settlement for this aspect of the claim. Items 20, 39, 46, 51 20 – gap where skirting board meets floor in main bedroom 39 – gap around door in bedroom 2 46 – gap around door in bedroom 3 51 – gap around door in dining room 85. S inspected the issues raised by the Applicant and was satisfied that there was no discernible gap visible for items 39, 46 and 51. The Applicant has not provided any evidence to the contrary except for a photograph for item 51. The Applicant says she has the bed where it is because of the gap, to hide it from view. If the bed did not block it, the gap would be visible. 86. S agreed there was a gap of 2mm wide between the skirting board and floor under the bed for item 20. However, S considered this was not a defect in accordance with the standards set out in “The NSW Office of Fair Trading, Guide to standards and tolerances, Sec tion 10.01 Gaps”. This Guide considers that gaps appearing within the first 12 months exceeding 1mm are considered defects but after the initial 12 months of repair/installation, only gaps exceeding 2mm in width are defective. Further, the gap was not readily visible. 87. As the Applicant has raised this concern 5 years after the completion of repairs, I am unable to determine if the gaps were present within the initial 12 months of repair, which would therefore class them as a defect requiring rectification. The one photograph available was taken in 2014, which does not assist in establishing when the cracks arose or whether they have arisen as a result of faulty works as opposed to normal movement of the home. Accordingly I am unable to conclude the FSP is required to undertake any further action in regard to these issues. Case No: 324999 Determination Page 15 of 30 Items 23, 36, 43, 47, 53, 70, 72, 77 23 – door and doorway not painted top and bottom in main bedroom 36 – door and doorway not painted top and bottom in lounge 43 - door and doorway not painted top and bottom in bedroom 2 47 - door and doorway not painted top and bottom in bedroom 3 53 - door and doorway not painted top and bottom in dining room 70 - door and doorway not painted top and bottom in bathroom 72 – door on cupboards not painted top and side in bathroom 77 - door not painted top and bottom in sunroom 88. S inspected the various doors and agreed the doors had not been painted on the edges and this practice contravenes the standards set down in “Australian Standard 1909 – Installation of Timber Doors Section 9.2 Application of Finish”. However, S considered no rectification was required as the complaint was not affecting the doors‟ functionality or performance and was non- structural pursuant to the “Home Building Regulation 2004 – Regula tion 71”. Further, as the complaint had occurred more than two years outside of the warranty period for non-structural items, there was no recourse against PB. 89. However, I am not persuaded by S‟s contention in this regard. Whilst I appreciate S has formed his views with regard to the relevant codes, standards and regulations applicable to building practices, he does not appear to have considered FSP‟s obligation to provide a repair guarantee on any repairs it undertakes pursuant to the provisions set out in Section 3.13 of the 2006 version of the General Insurance Code of Practice (the Code). The Code provides: “Repair Workmanship and Materials 3.13 Where we have selected and directly authorised a repairer, we will: a) accept responsibility for the quality o f workmanship and materials.” 90. Accordingly, the FSP has an obligation to accept responsibility for any repairs conducted to the Applicant‟s home which are not up to standard. S inspected the various doors and agreed the doors had not been painted on the edges and this practice contravenes the standards. On this basis, pursuant to the terms of the policy, I am satisfied that the FSP is required to cover the costs of painting the surfaces of the doors and doorway edges which were unpainted. Items 26 and 32 26 – floorboards buckled in cupboard in entryway 32 – buckled floorboards in lounge room 91. S inspected the areas of concern to the Applicant and could not observe any evidence of buckled floorboards. The Applicant says the floorboards buckle. And she says that at the time of S‟s inspection they were not buckled to the same extent so that it was visible to him. 92. The Applicant has not provided any other evidence to support her assertions such as a report from a suitably qualified person. Accordingly, I will rely on Case No: 324999 Determination Page 16 of 30 the report prepared by S. On this basis, I am satisfied there is no further action required on the part of the FSP. Item 27 – cupboard in entryway not replaced to ceiling height 93. Although S was unable to determine the original configuration of the cupboard doors and therefore unable to apportion any liability to the FSP, the Applicant has now provided FOS with a photograph of the original cupboards showing the doors did in fact extend to the ceiling. The FSP has not commented on the photograph provided. 94. Accordingly, I accept the doors were not replaced to the same standard as existed leading to a loss of amenity for the Applicant. Accordingly, I accept the doors require rectification and the FSP is required to attend to this pursuant to the terms of the policy. Items 31, 37, 68, 69, 74, 81, 94, 97 31 – flaky and bubbled cheap paint on lounge room walls and ceiling 37 – flaky and bubbled cheap paint on bedroom 2 walls 68 – gloss paint used in bathroom against Applicant’s instructions 69 – flaky and bubbled cheap paint on bathroom walls 74 – cheap paint and unprofessional job in sunroom 76 – gloss paint on doorways in sunroom 81 – flaky and bubbled cheap paint on laundry/toilet walls 94 – gloss paint used on laundry toilet walls 97 – cheap paint used in study 95. In regard to item 31, S inspected the area and noted the walls were originally covered with wallpaper, which the Applicant elected not to replace. PB gave the Applicant a credit of $2,640 for painting the wall in lieu of replacing the wall paper. 96. S considered there are slight imperfections in the wall surface which had been concealed by the wallpaper but he says the imperfections are not visible in a normal position or in uncritical light. Accordingly S considers this is not a defect in accord ance with the standards set out in “The Office of Fair Trading Guide to Standards and Tolerances”. S requested that PB undertake works to eliminate the imperfections to the wall but he was under no obligation to do so. I accept S‟s findings and accept that the FSP has no further liability for this item. 97. With regard to 37, S considered the painting was undertaken in proper and workmanlike manner. S says the crack evident in the wall is the result of building movement rather than any defect with the painting. In the absence of rebuttable evidence from the Applicant I accept this finding and consider the FSP has no further liability for this item. 98. With regard to items 69, 74, 81 and 97 S says there was no evidence of blistered or flaky paint, and S considered the painting was done properly. The Applicant has since provided a photograph of item 69. However in my Case No: 324999 Determination Page 17 of 30 view this depicts a crack forming in the wall rather than any defect or fault with the paint. As S has earlier detailed, the property is subject to seaso nal movement and has no provisions to counteract this. I consider it likely to be a continuation of the same issue and consider the FSP has no further liability for these items. 99. Whilst S has accepted gloss paint was used, he says the painting was completed in proper and workmanlike manner and he is unable to fault the standard of work. Further he says there is no documentation that supports the Applicant‟s assertions about her instructions. 100. The Applicant is adamant that she gave verbal instructions that no gloss paint be utilised in the repairs. She concedes there is no evidence to support her position. 101. In my view, it is not incumbent on the FSP to ensure the house is repaired with every detail being exactly the same as it was before the loss. Rather, as long as the repairs are to the same overall standard as what was there, I accept the FSP has fulfilled its liability under the terms of the policy. 102. As there is no information regarding what type of paint was in place originally, no information to suggest that the paint used is inferior or the workmanship is inferior, I am satisfied the FSP has no further liability in this regard. Items 33 & 52 33 – different colour floor stain in lounge room 52 – floor stain different colour in dining room 103. S inspected the area and agreed that there is a distinct straight line on the polished floorboards. S considered the line was consistent with the polish fading in that area due to being covered by an object. S noted a rug was currently being used to cover the line. 104. The Appl icant disagrees with S‟s conclusions saying direct sunlight does not reach the area in question therefore it cannot be fading. She considers the marks in the floor are not lines or indents although they are almost in line with the fridge. 105. S considered the differences in colour in the dining room and considered this was as a result of scratches in the floor, which the Applicant had mistaken as colour differences. S noted the scratches were adjacent to where the fridge was and considered the scratches had most likely arisen when the fridge was being moved. S was unable to attribute this to PB, particularly due to the passage of time which has elapsed since the damage allegedly occurred. 106. I note the Applicant has not provided any information to contradict the conclusions S has drawn and to support her contention that these items are as a result of faulty works by PB. In the absence of any conflicting Case No: 324999 Determination Page 18 of 30 information I accept the FSP is entitled to rely on the findings of S and I am unable to conclude the FSP is required to undertake any further action in this regard. Item 41 – holes left in wall where picture hooks ripped out in bedroom 2 107. The Applicant says picture hooks were removed from the walls and not filled prior to the wall being painted. She says she repaired the holes and replaced the hooks which were nailed directly onto the masonry, rather than secured with rawl plugs. 108. S inspected the area however was unable to determine if the holes were left by PB as stated due to the area being repaired and his inspection taking place five years after the event. Accordingly S was unable to conclude that PB had any liability in this regard. The Applicant has not provided any evidence to support her position other than to say she had to remove the pictures in order for the repairs to be undertaken. 109. Accordingly, due to the passage of time since the repairs and the lack of evidence supporting the Applicant‟s position, I am unable to conclude the FSP has any further liability in this regard. Item 42 – holes in wall in bedroom 2 where curtain rod incorrectly installed 110. At the joint inspection, PB denied installing the curtain rods, stating this was not on the SOW. S has not commented in his report if the holes are there but on balance, I assume they are. I have reviewed the SOW and there is no mention of the curtain rods or railings forming part of the repairs. 111. Further, the photographs provided showing the tide or water mark show the water only inundated the property to a level of approximately 1 metre. On balance, I accept there would be no need to replace the plaster to the height of the curtain rods and therefore no need to alter the location of the existing curtain rod/railings. Accordingly, I am unable to conclude the FSP has any further liability in this regard. Items 49 & 73 49 – circle around ceiling light where ceiling not painted in dining room 73 – towel rails not removed, just painted around 112. S noted that the painting of the ceiling in the dining room was not included in the SOW and therefore it did not form part of the claim related repairs undertaken by PB. Further, S noted the Applicant was cash settled for the replacement light fitting and the replacement light appears to be of smaller diameter flange to that it replaced. This is the reason for the visible mark. 113. The Applicant says the new light fitting has paint on it, which is proof it was fitted prior to repainting, and therefore should have been removed as part of the paint preparation. However, I note the Applicant has not provided any evidence to support her assertions. Case No: 324999 Determination Page 19 of 30 114. Further, as stated above, water did not reach the height of the ceiling and it is clear from the SOW that no works were to be undertaken to the dining room ceiling. There is no information before me to suggest anyone other than the Applicant was responsible for changing the light fitting. Accordingly, I am unable to conclude the FSP has any liability in this regard. 115. S inspected the fixing holes in the bathroom wall however considered the Applicant had relocated the towel rail after the completion of the painting by PB. Accordingly, S was unable to conclude that PB held any responsibility in this regard. The Applicant denies that the towel rail was moved at any point post repairs. 116. Viewing the photograph supplied by the Applicant, it is clear the towel rail has been moved at some point, leaving the original holes in the wall. Whilst I am unable to determine when or why this was moved, it is my view this was done post repair due to the fact that the wall has clearly been painted where the holes are. It is not the case the holes were painted around an in situ rail. Accordingly, I cannot conclude the FSP has any further liability in this regard. Item 55 – collapsed shelving in kitchen under sink 117. S inspected the area of concern to the Applicant and could not observe any evidence of collapsing shelving, noting that the shelf appeared well supported. The Applicant has not provided any evidence to support her assertions other than to say she has loaded it with items to counterbalance the missing support, which S did not want her to remove at the time of his inspection. Accordingly, in the absence of any conflicting information, I will rely on the report prepared by S. On this basis, I am satisfied there is no further action required on the part of the FSP. Item 56 – cover peeling off cabinet doors in kitchen 118. S inspected the cabinet doors and agreed the door is delaminating along the bottom edge. S considered this attributable to the adverse effects of heat and steam generated by the usage of the cook top, rather than any action on behalf of PB. 119. I accept that the repair guarantee only applies to the quality of workmanship and materials used by the FSP in the repair. That is, if either the materials or workmanship are faulty which leads to the repairs failing, the FSP will remedy those. However, the lifetime repair guarantee does not provide blanket coverage for any and all perils which may befall a repaired area in the future. 120. The Applicant has not provided any evidence to support her assertion that the damage arose as a result of either faulty materials or workmanship used by the FSP in the repair, which is a requirement to trigger the repair guarantee provision as set out in the Code. She says the cause cannot be heat and/or steam as she always uses the range hood when cooking. Case No: 324999 Determination Page 20 of 30 However, the Applicant has not presented evidence to suggest any alternative cause of the damage. 121. Accordingly, in the absence of any conflicting information, I accept the FSP is entitled to rely on S‟s report to conclude it has no liability in this regard. Item 62 – bathroom hardware replaced with incorrect taps 122. The Applicant says a flick mixer was installed instead of the existing basin set of a spout and taps. PB says the Applicant chose the hardware herself and supplied it to him for installation. S reviewed the SOW but it did not specify anything with regard to the hardware. Accordingly, S considered the claim to be unsubstantiated and on this basis he could not conclude any fault lay with PB although he requested the Applicant provide information supporting her position for further consideration. 123. The Applicant agrees she did purchase the tap ware and pro vided it to PB to install. However, she says she provided a set with two taps and a spout and when she next returned to the property, she found a flick mixer had been installed. She raised the issue with PB at the time, but he told her it was too late to do anything about it. 124. In my view, it is unlikely PB would have installed any tap ware other than that which was provided to him by the Applicant expressly for that purpose. Further, even if I were to accept that PB erred in installing a flick mixer rather than a tap set, I am not persuaded that the installation of same has or would lead to any loss of amenity in the function of the vanity and bathroom. Accordingly, I conclude the FSP has no further liability in this regard. Items 63, 64, 65 & 67 63 – vanity not centred 64 – bathtub rusting 65 – tiles popped off wall 67 – mud stains on the grout 125. S agreed the vanity was installed in a recess in the bathroom and it was noticeable that it was slightly off centre. PB said that there was a reason why the vanity was installed in its current position but he could not recall the reason. PB was willing to shift the vanity at no cost on the proviso that he would be reimbursed if it was necessary to return the vanity to its current location. S recommended that the FSP compensate the builder in the event the vanity cannot be centred. I accept S‟s findings and accept the FSP is liable for the cost of centring the vanity and repositioning it if once moved it is discovered there is an obstacle preventing its centring. 126. S agreed the bathtub was showing signs of corrosion. S could not determine if the corrosion was pre-existing or as a result of the flood. S noted the FSP originally authorised a new bathtub but subsequently reused the existing one. I note in PB‟s supplementary S OW of 25 February 2008, it was noted Case No: 324999 Determination Page 21 of 30 that the original bath was suitable for re-use. I consider it was most likely this was why the FSP declined to cover a new one. 127. I accept the decision to reuse the bathtub may have been appropriate at the time. It does not appear to be disputed that the bathtub was affected by the water in the home and to the extent that it is now showing signs of rust and corrosion, I am satisfied that it is fair to conclude that on balance, the bathtub was affected by the floodwaters albeit this was not obvious at the time. 128. On this basis, I consider the FSP is liable to replace the bathtub as part of the claim related repairs. Insofar as the replacement of the bathtub and the shifting of the vanity may affect items 65 and 67, then the FSP is liable if the tiles need to be removed or replaced due to this consequential work. 129. In the event the replacement of the bathtub and the shifting of the vanity do not affect items 65 and 67, then the FSP is not liable if the tiles need to be removed or replaced as the opinion of S is that the crack is due to minor building movement and there is no persuasive evidence that the tiles have changed colour especially in view of the passing of time and the fact of no earlier complaint. Item 83 – damaged wall above clothes dryer 130. The Applicant advised that water has entered from the roof and damaged the wall above the dryer which occurred after the completion of the painting. S inspected the area and noted the roof leak is a separate event to the claimed event. The leaking roof has since been fixed by persons unknown. 131. The Applicant has provided a photograph of the damaged ceiling, showing the flaking paint. However, the Applicant claims the water ingressed through the roof at the same time as heavy rains which lead to the flood event. 132. Whilst I agree that it is entirely possible that the heavy rains could have entered through the roof, it is clear from the photograph the damage is over a fairly freshly painted area. In my view, this is suggestive of the water ingress occurring at some point post repair completion. 133. Accordingly, I am unable to conclude the FSP is liable for this issue under the current claim as it would appear to be a separate event that post dated the subject claim and therefore not subject to the repair guarantee. However, insofar as the event may be a valid claim under the terms of a policy, the FSP is required to assess its liability for same if it insured the Applicant at the time of the subsequent loss. Items 84 and 86 – Floor drain in laundry 134. The Applicant says PB failed to install a floor waste in the laundry and tiled over the existing drain. She requested a drain be installed but PB told her it was not needed. Case No: 324999 Determination Page 22 of 30 135. PB says that although there was an existing floor drain it did not discharge into the sanitary system so he installed a fall in the tiles to the external door to compensate and furthermore, this was discussed and agreed with the Applicant at the time. 136. S notes in his report that pursuant to the Building Code of Australia, it is currently not necessary to install a floor waste in the laundry. Accordingly, S did not consider this a defect. 137. As stated previously, whilst the obligation of the FSP is to place the insured back in the position they enjoyed prior to the loss or damage occurring, in my view this does not mean the insured must be provided with exactly the same features as before provided there is no overall loss of amenity. 138. Further, the FSP is not required to provide better features or functionality to that which was enjoyed prior to the loss. In this situation, the floor drain did not discharge into the sanitary system. Therefore, the installation of the drain would have been pointless unless considerable upgrades were made to the plumbing to ensure it functioned as intended. Such upgrades are not the responsibility of the FSP and in my view, the alteration of the floor grade to ensure water discharge to the external door in case of flood or overflow is reasonable in the circumstances. 139. The Applicant has not provided any evidence to suggest the original floor drain was connected to the sanitary system or that the solution installed by PB is not a workable solution. Accordingly, I consider the FSP has met the extent of its liability in this regard. Item 91 – shower rail not screwed into the wall 140. The Applicant said the bathroom fixtures were removed by SS. She provided a shower curtain and rail to PB for installation. PB says he advised the Applicant at the time that the shower rail provided was a suction fitting but the Applicant told him to install it regardless. The Applicant latterly says in an email to FOS that she did not supply the shower rail, but that PB supplied it and that when she pointed out that it was just a suction model, PB gave an undertaking to screw in for her. 141. S considered that the replacement of the shower rail as a result of this event was not warranted. S was also unable to determine whether SS removed the shower curtain rail as alleged by the Applicant. 142. I have considered the SOW and note no allowance was made for a shower rail and in my view, given water did not reach the height so as to affect the existing shower rail so that it could not be reused, on balance, I accept the Applicant decided to replace it outside of the claimed event. Even if I were to accept it required replacement as part of the claimed event, there is no information before me to suggest anyone other than the Applicant is responsible for the purchase of the shower rail. On balance, I consider it unlikely PB fitted a rail other than that whic h was provided to him. Case No: 324999 Determination Page 23 of 30 143. The Applicant has also raised a further query as to why she was required to pay for the replacement of the fixtures. Generally, this would not be the case as any items requiring replacement under the claim would be covered by the FSP. However, where the Applicant has elected to replace items outside of the SOW, then these will be her responsibility. Item 93 – nail heads popping out on walls 144. The Applicant says her father installed a broom rack following the painting on the walls. S inspected the area and noted exposed plugs directly under the rack. He considered the rack had been moved at some point or alternatively another item had been removed from the wall to facilitate the installation of the rack. S was unable to attribute this to faulty works by PB. 145. The Applicant says her father‟s work was professional and had nothing to do with nails popping out; they were like this when she moved back into the house. I note the nail heads have been painted over, which is suggestive of them being there protruding at the time of PB painting the house. On this basis, I consider the FSP is liable to remove the nails and repair the affected area. Item 95 – holes in walls where iron board incorrectly hung 146. The Applicant says PB installed the wall mounted ironing board in the incorrect position which meant it was not accurately supported so it was relocated, leaving the exposed fittings on the wall. PB denied ever installing the holder. The Applicant says she was going to get her father to do but then PB offered and his apprentice placed it in the wrong position. 147. S considered that due to the time lapse since the repairs and the fact that no complaint had ever been raised by the Applicant, he was unable to apportion liability to PB. 148. In my view, given the passage of time since the repairs, it is difficult to apportion the responsibility of this incident to any particular person although in my view it is unlikely that PB would just leave holes in the wall from an error caused by one of his employees. Whilst the Applicant has provided photographs of the current location of the ironing board and holes, this does not assist her in establishing that PB is responsible for the holes in the wall. Accordingly, I cannot conclude the FSP has any liability in this regard. Item 96 – cupboard not sealed and has swollen, unable to access safe 149. S inspected the area in question and noted the kickboards beneath the cabinet housing had swollen slightly. S considered the kickboards had been completed in a proper and workmanlike manner and the reason for the swelling was due to moisture being absorbed into the kickboards during routine cleaning of the floor. The Applicant says the cupboards are chipboard which should not be used in wet area and furthermore they are not sealed, which allows the moisture in. Case No: 324999 Determination Page 24 of 30 150. The Applicant has not provided any evidence supporting her assertions and in the absence of conflicting information, I accept the FSP is entitled to rely on S‟s findings that this aspect is not claim related. Item 102 – Applicant had to pay for replacement aerials, sockets etc 151. The Applicant says she had to pay for various fixtures and fittings that were removed by SS and therefore should have been replaced by PB as part of the SOW. 152. I note that as set out in paragraph 44, upon presentation of a number of receipts such as the aerial replacement, the FSP promptly reimbursed the Applicant for the outlay of those funds. The Applicant was been requested to provide receipts or further information regarding the items she was allegedly required to purchase. 153. Although I have considered the SOW, it makes no reference as to whether the majority of the hardware and/or fixtures were salvageable and could therefore be used. As it is incumbent on the Applicant to demonstrate she suffered a loss, and furthermore that the items were required as part of the claim related repairs, I consider the FSP‟s request that the Applicant provide further information in order for it to assess its liability under the terms of the policy is fair in all the circumstances. Items 104 & 106 104 – payment for all locks to be re-keyed alike 106 – Applicant had to pay for new bathroom hardware 154. The Applicant says she had to pay for all of her doors to be rekeyed to the same lock, as after repairs she had seven separate ke ys instead of only one. She says she also had to pay for all new bathroom and laundry hardware as SS removed and discarded these items. 155. S noted that the replacement of the locks did not form part of the SOW and no further information had been provided by the Applicant to support her assertions. 156. I note the cash settlement considered in paragraph 44 above, included a component for replacing the deadlocks, and tap ware and sink etc for the bathroom/laundry for which the Applicant was reimbursed. In my view, it would appear that not only did the Applicant herself purchase the replacement locks, which would mean she is responsible for any keying issues with same, but that the FSP has reimbursed her appropriately for this. 157. Were it the case the Applicant was required to purchase additional items for which she has not yet sought reimbursement, then the Applicant is required to provide receipts or other documentation to the FSP for consideration. In the absence of any further or conflicting information, I accept the FSP has fulfilled its obligations to the Applicant in this regard. Case No: 324999 Determination Page 25 of 30 Item 105 – no safe access under floorboards in bedroom 158. The Applicant says there was a safe located under the bedroom floor which was accessed by a removable floorboard. She says PB installed the new floors without access for this provision. PB says he did not remove the existing floorboards and does not recall the floor containing a safe compartment in the subfloor area. I note the Applicant agrees SS removed the floorboards. 159. S noted that access to the subfloor was restricted and as the flooring had been reinstated, it was now not possible to determine if there was a safe compartment fitted. 160. I have considered the paperwork from both SS and PB and it is not possible, on the information provided, to determine which builder removed the floorboards although on balance I accept it was likely to be SS. The paperwork also does not assist as to whether there was a safe compartment covered by a removable floor board in this bedroom before the loss. 161. I do note the quote from SS date 20 June 2007 makes no mention of a safe compartment under the bedroom. But I also note the tenth report from the assessor dated 27 November 2007 provides some relevant information. The assessor notes that during a recent reinspection that the Applicant pointed out some additional repairs were required. They included: “1. Demolish and replace floor safe in laundry....” 162. I also note from a Tax Invoice from SS dated 14 February 2008 that pursuant to a variation notice SS “(has) almost removed a concrete em bedded safe from the laundry”. 163. As the party seeking the benefit, the onus lies with the Applicant to demonstrate she has suffered a loss whereby the manner in which the floorboards were replaced has caused her loss of function or amenity and that there was a safe compartment under the floorboard in the bedroom before the flood. I accept there was a safe compartment under the laundry but on current information I am not satisfied that there was also a safe compartment under the bedroom floor or that the work of the builders meant there was no access to another safe compartment under the bedroom. On present material, I find the FSP is not liable to the Applicant for this item but should the Applicant provide further information in this regard, the FSP is required to assess its liability under the terms of the policy. Items 107 and 108 107 – receipt from PB 108 – Credits to owner 164. The Applicant raised issues with the invoice she received from PB, which were discussed between the parties at the site inspection. It was noted that the invoice related to the private works undertaken by PB on behalf of the Applicant, and set out where he offset some of those costs in lieu of undertaking some of the claim related works on the SOW. From the Case No: 324999 Determination Page 26 of 30 information provided by S I accept that the parties are in agreement that the document and credits were satisfactory and this aspect is no longer in dispute. Other items raised 165. While the matter was with FOS, the Applicant also raised a number of issues that were not canvassed in S‟s report. S has submitted an addendum report in relation to these issues. For the purposes of this Determination, these issues will also be referred to by the numbering used in S‟s report, plus the letter A so they are distinguishable from the original items. 166. Item 1 raised in this report is no longer in dispute as the Applicant now accepts this was cash settled as set out above. Item 2a – cracks in laundry wall 167. The Applicant has provided a photograph of a crack in the laundry wall. S advises he is unable to determine whether this occurred recently or as a result of the claimed event. 168. It is my view that the passage of time has most likely eradicated any chance of determining how or when this issue arose. Accordingly, I am not persuaded the Applicant has discharged the onus on her to establish she is entitled to remediation of this item and therefore no further action is required from the FSP. Item 3a – quality of wardrobe in master bedroom 169. The Applicant says the replacement wardrobe in the master bedroom is of far inferior quality to that which was originally there. When she raised this with PB, he advised her he had offset the lower quality by adding a second wardrobe in the second bedroom for which he then charged her. S advises he is unable to determine the quality of the original wardrobe due to the time lapse since the event. 170. In reviewing PB‟s invoice to the Applicant, I accept he has charged her for an additional wardrobe in the second bedroom. I note the Applicant paid PB‟s invoice at the time. I consider that had this not been an accurate reflection of the works agreed and undertaken, the Applicant would have raised this with PB at that time. 171. Further, the Applicant has not provided any persuasive evidence that the replacement wardrobe is not of similar quality to that which it replaced. Accordingly, I am unable to conclude the FSP has any further liability in this regard. Case No: 324999 Determination Page 27 of 30 Item 4a – tiles at foyer not re-laid 172. The Applicant says the tiles were not re -laid as the builder said he didn‟t re - lay them as it would have created a step into the main bedroom and lounge room. The Applicant says she has not seen the credit for those tiles and labour anywhere. 173. S agrees the foyer floor now consists of a timber floor and no tiles are laid. However, he was unable to determine what materials were there originally as the remedial works had been completed prior to his attendance. S says the Applicant is entitled to be provided with similar finishes unless there has been a mutual agreement to the contrary. S couldn‟t confirm such an agreement. 174. I note the original SOW from SS dated 20 June 2007 states: “12. Allow to remove tiles from floor so underlay will dry out. 13. Re-lay new tiles. PC allowance $45 per sqm plus GST.” 175. But I also note an email from PB to the FSP dated 25 February 2008 which refers to a list of additional works which included: „Flooring – allowed to replace the existing flooring to bedroom 3, front entry and kitchen. We have allowed a PC sum of $65 per square metre inclusive of GST to supply new Australiana Grade Spotted Gum or Blackbutt flooring. Polish new floor.” 176. I note also another email dated 27 July 2008 in which the floor is mentioned. The FSP notes that the Applicant has moved the furnishings back into the house and “ that all that remains is ...to put another coat on the polished floor.” 177. Not long after on 26 August 2008 the Applicant acknowledges that repairs to the premises have been completed to her satisfaction. 178. Accordingly, I accept from the material provided that the fo yer (or front entry) was originally tiled but I also accept that on the balance of probabilities the parties agreed to replace the floor with wood not with tiles. If this was not the case I am of the view that an issue as significant and obvious as this wo uld have been raised by the Applicant with PB and the FSP at the time of the work in 2008. 179. Accordingly, on the material provided I am unable to conclude the FSP has any further liability in this regard. Item 5a – quality of front door 180. The Applicant says the front door was not a hollow core but was solid, and it has been replaced with a hollow core door. S was unable to determine the quality of the original door due to the works being completed at the time of his inspection. 181. I note the original SOW which s ays “20. Replace front external door (hollow core external grade).” The tax invoice dated 24 September 2008 shows an Case No: 324999 Determination Page 28 of 30 additional amount of $150 was charged for the replacement of the front external grade door and confirms the original scope of works. 182. The Applicant has not provided any evidence to suggest the original door was solid and the evidence before me confirms it was not. Accordingly, I am satisfied the FSP has fulfilled its obligations in this regard. Item 6a – Sliding doors to bathroom, workroom, toilet and laundry 183. The Applicant says she was charged to replace the sliding doors to the above rooms whereas they were included in the SOW and should have been paid for by the FSP. 184. S says the Applicant has misinterpreted the SOW and the replacement of those doors was not part of the scope. 185. I have considered the contents of the SOW and note there is no mention of the replacement of doors as maintained by the Applicant. PB‟s invoice does include mention of installation of three sliding door cavities. On balance, I accept this forms part of the private works negotiated between the Applicant and PB. Accordingly, I am unable to consider this aspect further. Item 7a – inspection by S 186. The Applicant has raised concerns in the manner in which S conducted his inspect ion, stating it was conducted as an “[Applicant] bashing exercise”. She alleges S was not impartial and took the side of PB, further colluding with PB as to the contents of his report. S strenuously denies the allegations as stated by the Applicant and mai ntains his inspection was conducted on a fair and impartial basis. 187. Whilst I accept that discussions between the parties may have been difficult during the inspection and the Applicant felt dissatisfied with the proceedings, there is nothing in S‟s report w hich suggests to me that he conducted himself in anything but a professional manner, and in fact, found in favour of the Applicant on a number of the issues raised. 188. Accordingly, I am unable to accept on the information provided that S‟s inspection and report were not conducted in a professional manner. I also accept that engaging S represented a good way to try to resolve the issues in dispute at the time. Item 8a – skirting and wall in bedroom 2 189. The Applicant has provided photographs of cracked render and gaps in the skirting board and floor junction, which she says are poor repairs conducted on the part of PB. S considers the provision of the photographs is insufficient to determine which rooms the issues are located in or if they are separate issues to that already addressed, noting that he did include similar issues in Case No: 324999 Determination Page 29 of 30 item 20 of his original report. S also again referred to the Australian Standard for gaps and considers the gaps may not be defects. 190. In my view, the photograph is of limited probative value when considering this dispute. I am unable to determine which room these relate to or whether it is a duplication of the items addressed in S‟s earlier report (items 18, 20, 25, 38, 39, 45, 46, 51 or 92). 191. In addition, I am unable to determine whether these arose as a result of the quality of the workmanship of PB or are attributable to general wear and tear and movement of the property. Accordingly, I am unable to conclude the FSP has any further liability in this regard. Contents items 192. The Applicant has also raised an issue of contents coverage for items owned by her father which were damaged in the event. The FSP notes the policy allows cover for visitor‟s contents, up to a maximum of $5,000. The FSP notes the Applicant had previously claimed the sum of $3,579 under this benefit for a visitor. 193. The assessor‟s report of 4 December 2008 refers to this claim and attaches the items claimed. The assessor notes the balance left over of $1,421 after the claim for the visitor‟s contents and says: “ we are satisfied that the contents owned by the insured’s parents that were damaged exceeds this amount on a replacement basis.” 194. The assessor made no allowance for the parents‟ goods pending advice on the potential of a claim against their insurer. 195. Accordingly, there remains a balance of $1,421 under this benefit the Applicant is entitled to claim. In the event the Applicant provides satisfactory proof of the loss sustained to the FSP, then the FSP is required to assess its liability under the policy for these items. 196. The Applicant is also to provide previously requested material being the name of her father‟s insurer and whether there is any cover available for contents temporarily removed from his house under his insurance policy. Determination 197. On the basis of the available information and for the reasons stated, I determine:  The FSP is required to cash settle or remedy items 17, 19, 23, 27, 36, 43, 44, 47, 53, 63, 64, 65, 67, 70, 72, 77, and 93 in addition to those items it has already agreed to cover;  As for item 63, I accept S‟s findings and determine the FSP is liable for the cost of centring the vanity and repositioning it but only if once it is moved it is discovered there is an obstacle preventing its centring; Case No: 324999 Determination Page 30 of 30  As for item 19, I consider the FSP is liable for the costs to install a telephone outlet in the skirting board of the bedroom but only if the removal of the skirting board reveals the prior location of a telephone outlet;  As for items 65 and 67, as I determine the FSP is liable to replace the bathtub as part of the claim related repairs, I also determine that insofar as the replacement of the bathtub and the shifting of the vanity may affect items 65 and 67, then the FSP is liable if the tiles need to be removed or replaced due to this consequential work but not otherwise;  The FSP is required to assess its liability under the terms of the policy for item 83 and for the Applicant‟s father‟s contents items upon the receipt of requisite information from the Applicant;  As for item 105, on present material, I find the FSP is not liable to the Applicant for this item but should the Applicant provide further information in this regard, the FSP is required to assess its liability under the terms of the policy; and  The FSP is not liable to remedy the remainder of the items as I am not satisfied on the available information these are related to the claimed event.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.