Home / Financial Firm (Unknown - Insurer) / Determination 324830
Determination 324830
Sewer pipe leak claim denied under earth movement exclusion
Summary
The applicants' home and contents claim for a broken sewer pipe was denied under an earth movement exclusion. AFCA found the insurer had not proven the exclusion, so covered costs are payable, though the cost of repairing the pipe itself is excluded.
The insurer bore the onus to establish the exclusion, and its expert evidence did not show that earth movement caused the pipe failure.
Issues
- Claim denial primary · upheld“FSP not entitled to deny the claim; it did not establish the earth movement exclusion on the balance of probabilities.”
- Inadequate claim investigation secondary · upheld“Expert report from RH was unclear and not convincing, and did not establish that earth movement caused the pipe failure.”
Subjects and remedies
home or building damagepay claimpay interestrepair or rectify
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 324830 Determination Page 1 of 8
Case number: 324830
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim
14 February 2014
Summary
Description
Claim under a Home and Contents Insurance Policy for damage
sustained as a result of a leaking sewer pipe. The FSP has declined
the claim relying on exclusions contained within the policy.
Basis of Determination
There is no dispute that the Applicants‟ property was inundated when a
sewer pipe broke causing saturation of the surrounding area.
The evidence establishes that the sewer pipe, a PVC line broke having
had 1m to 1.2m of fill placed on top of it , crushing it.
The onus is on the FSP to establish the application of the exclusion
relating to the loss. The evidence presented by the FSP does not
establish the application of the exclusion.
Determination
The FSP is liable to meet the Applicants‟ claim in accordance with the
terms of the policy.
Background
1. The Applicants held a home and contents insurance policy with the Financial
Services Provider (FSP) providing cover for their residence. The policy was
current at the time of the reported damage.
2. On 28 February 2013 the Applicants reported that a leaking sewer pipe at
their property was causing effluent to leak onto their property. The FSP
appointed experts to attend to report on the cause and extent of damage.
3. As a result of its investigation, the FSP denied the Applicants‟ claim on the
basis the loss was excluded under the terms and conditions of the policy.
4. The Applicants dispute the denial of their claim.
Determination
Case No: 324830 Determination Page 2 of 8
Summary of Applicants ’ position
5. The Applicants say:
they were never advised that their claim would be denied during the
course of the claims process;
the FSP‟s assessor was provided ample opportunity to inspect the
property prior to and at the time repairs were completed, but the
Assessor was too busy to attend the property during this time;
the FSP‟s assessor authorised them to proceed with the repairs;
the FSP‟s assessor and engineer did not attend their property until
sometime after repairs were completed; and
had they been aware that the claim would not be accepted, they would
have looked at alternative cheaper methods of repairs, including using
their own labour to reinstate the property after the pipe repairs were
completed.
6. The Ap plicants‟ seek to have their claim accepted and to be reimbursed for
their costs. They also seek to have damage to their building repaired by the
FSP.
Summary of FSP’s position
7. The FSP says:
its appointed assessor, ST, was unable to attend the Applicants‟
property until 28 March 2013 due to other work which ST had been
engaged to perform as a result of a natural disaster;
it or its representatives never authorised the repairs;
the Applicants would have had to go ahead with repairs regardless of
the acceptance of the claim given the nature of the event and the
hazards involved in not proceeding with repairs; and
its experts have clearly indicated the claim is not covered and it is
therefore entitled to deny the Applicants‟ claim.
8. The FSP relies on the followi ng policy provisions of its Product Disclosure
Statement (PDS):
“ Insured events
We cover loss or damage to your home or contents that is caused by certain
events. We call them insured events. For us to cover you for loss or damage
caused by an insured event, the event must happen:
at the insured address, .....
...
Leaks
Leaks are liquids that are leaking, bursting, discharging or overflowing from
certain items or devices....
Case No: 324830 Determination Page 3 of 8
We may also cover some other costs under the extra benefit „Investigating
leaks‟ – see page 35.
Yes The following items or devices malfunction at or near your
home and leaks from them cause loss or damage to your home
or contents:
...
pipes, gutters and drains which are fixed or connected to
your home
...
No Loss or damage to the item or device which leaked.
...
The items we don‟t cover as your home or contents shown on
pages 11 and 14.
The general exclusions shown on pages 55-57. ”
“ Investigating leaks
We pay the reasonable costs to locate where a leak is coming from.
Yes If a leak has caused loss or damage to your home, then we pay
the reasonable costs to locate where the leak is coming from.
No The cost to fix the leak.
The general exclusions shown on pages 55-57.
Limits $ Up to 10% of you home sum insured for each claim.
$ We pay this benefit on top of your home sum insured.”
General exclusions
These general exclusions apply to all of the cover we provide under
your policy.
We don’t cover you under your policy for loss or damage to your home
or contents or legal liability which is caused by or arises in connection
with any of the following items or events:
...
Erosion and landslide Erosion, landslide, subsidence, vibration, earth
shrinkage or expansion or any other earth
movement no matter how it is caused (but we
do cover earthquake and we cover some
landslide or subsidence that happens within 72
hours of the first loss or damage to your home
or contents caused by the flood or water runoff
– see page 20).”
9. The FSP have paid the Applicants $470 in relation to the loca tion of the
sewerage discharge on an ex gratia basis and the policy excess of $750 was
not applied to that payment.
Case No: 324830 Determination Page 4 of 8
Issues
10. Whether the FSP is entitled to deny the Applicants ‟ claim.
11. Whether the FSP authorised the Applicants to proceed with the repairs.
12. Whether the Applicants have suffered any detriment as a result of the
authorisation.
Reasons for decision
13. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
14. I am satisfied there has been a full exchange of material between the parties
and each party has had the opportunity of clarifying the iss ues which arise
from the material.
15. There is no dispute between the parties that:
the Applicants‟ property was inundated by effluent;
a sewer pipe under the Applicants‟ property was the source of the
inundation;
the sewer pipe was broken;
there is evidence of cracking to walls/paths in the vicinity of where the
sewer pipe was leaking; and
these cracks have been caused by the settling of the ground in the area
where the sewer pipe was leaking.
16. The Applicants contacted the FSP on 28 February 2013 to report a leaking
sewage pipe at their property. The FSP advised the Applicants that an
assessor would be appointed to inspect the property to provide a report on
the cause and extent of damage. The Applicants expressed the urgency of
the situation given effluent was leaking into their property and a storm drain
causing concerns for themselves, their neighbours and their local council.
17. The FSP‟s assessor, ST, was unable to attend the property until 28 March
2013. ST had been inundated with other work as a result of a natural
disaster which caused the delay in attendance. However during the period of
28 February 2013 and 28 March 2013 the Applicants had been in contact
with the FSP and ST. During this time the Applicants were advised to
proceed with repair works at the property. The context of this “authority” will
be discussed in more detail further in this Determination.
18. ST ‟s report dated 5 April 2013 confirmed the Applicant‟s property had been
inundated with effluent as a result of a leaking sewage pipe. ST also
confirmed that repairs to the pipe had been completed prior to their
attendance. It was noted that there was cracking evident to the rear external
Case No: 324830 Determination Page 5 of 8
render of the home and pathways caused by the ground in the area
subsiding. However, ST commented that they were unable to determine the
cause of the leaking pipe.
19. ST put forward the following possible causes:
a slight amount of erosion underneath a join in the pipe coupled with
the extensive amount of water in the earth above the pipe making it
significantly heavier;
a small existing crack in the pipe or join causing a slow leak could
cause erosion or softening of the earth around it, paired with the
amount of extra weight in the earth above it due to extensive water in
the ground; and
the extreme weather conditions and the abnormal amount of water in
the ground may have caused a slight amount of subsidence which in
turn has caused the pipe to crush.
20. ST also provided the following comment:
“ These are only 3 scenarios of what may have caused the pipes to become
crushed and it is hard to determine weather any of these have in fact been the
cause.” [sic]
21. On the advice of ST, the FSP appointed an engineer, RH, to inspect the
property and provide a report on the cause of damage. RH inspected the
property on 7 May 2013. In his report dated 14 May 2013 RH concluded:
“ This firm is of the firm opinion that the failure of the service in the rear of this
property was due to ground movement and not due to the fracture of the
service, as the movement of the ground would have fractured the line not the
line fractured thereby placing fluid to increase the moisture content and
thereby increase the movement.
This material behind the retaining wall is uncontrolled fill and could not be
compacted and has slumped and that slumping is of a greater settlement than
ground movement and subsidence.
The claim is for the movement of the pipe, whereas the whole of the rear of
this property from the notated line of the cut/fill by the Contractors plans is
such that this is a problem site and this site was always in a mode of
movement due to ground movement and settlement.”
22. The Applicants provided a report prepared by a geotechnical analyst, EC, to
the FSP and its experts. This report detailed soil samples taken from the
vicinity of the broken pipe. These samples were taken after the pipe had
been repaired and the property reinstated. RH has made reference to EC‟s
findings and site plans provided by the Applicants in his report.
23. I have reviewed RH‟s report and note, in particular, his following comments:
“ ... this firm would suggest that the acceptance of the claim was preempt, and
that the failure of the in ground service in or around this area was possibly
due to the location of 1 metres to 1.2 metres of fill on top of a line thereby
crushing it as it is only a PVC line, and that it may also be that the line was
Case No: 324830 Determination Page 6 of 8
crushed due to the movement of the retaining wall or impact from construction
vehicles.” [sic]
24. I note there is no co mmentary in RH‟s report with respect to:
the repairs had been completed prior to any assessment being
completed;
ST‟s comments regarding the extreme weather conditions experienced
in the area prior to the pipe bursting; and
ST‟s comments regarding the abno rmal amount of water in the ground.
25. In my opinion, the report from RH is unclear. On the one hand, he offers the
opinion that the pipe was broken due to ground movement. Yet, on the other
hand, he suggests that the pipe was crushed due to the location of a metre
to 1.2m of fill on top of the PVC line. He considers it possible that the line
was crushed due to movement of the retaining wall or impact from
construction vehicles. His findings are not convincing.
26. The onus is on the Applicants to establish a prima facie claim under the
terms of the policy. In this instance, the Applicants have established that the
sewer pipe had broken and the quote from EBA supports that the Applicant
incurred the cost of repairing the broken sewer. The policy covers : “ Leaks
are liquids that are leaking, bursting, discharging or overflowing from certain
items or devices including from pipes, gutters and drains which are fixed or
connected to the home.” The policy would cover damage caused by the
burst or broken sewer pipe.
27. The onus is therefore on the FSP to establish on the balance of probabilities
the operation of the exclusion. The only applicable exclusion is “ any other
earth movement no matter ho w it is caused .” I am not satisfied that the
evidence from RH is sufficient to establish on the balance of probabilities
that the damage to the sewer pipe was caused by earth movement or in fact
movement of the retaining wall. The damage could easily be due to the 1m
to 1.2m of soil fill on top of the PVC line crushing it.
28. In the absence of any further evidence, I am satisfied in the circumstances
that the FSP is liable to accept that the damage sustained to the Applicants‟
home sustained as a result of the leaking pipe.
Repair costs
29. The actual costs of repairing the leaking pipe are excluded from cover as
loss or damage to the item or device that leaked.
30. Based on the invoice from EBA, it is unclear exactly what the break up of the
costs were for the repair of the broken sewer pipe as against investigating
the leak and the reasonable cost to locate where the leak was coming from. I
note the Applicant has been paid on an ex gratia basis the sum of $470 by
the FSP towards the cost of investigating the leak.
Case No: 324830 Determination Page 7 of 8
31. There are indications in the material that a camera was used to locate the
leak however there are also indications that soil, the retaining wall and other
items had to be moved and “dug up” to locate the leaking pipe.
32. Whilst I accept that the Applicant was aware that the cost of repairing the
sewerage pipe would not be covered, I am satisfied that the policy does
cover the cost of investigation of the location of the pipe.
33. I consider amongst those reasonable costs would be the costs associated
with using a camera to locate the leak and would include items such as the
disconnection and reconnection of the air conditioning unit, regassing of the
air conditioning unit, cutting of concrete, excavation of the area to locate the
sewer line and replacement of the spoil.
34. In order to adequately assess these costs, the Applicants should obtain a
more detailed breakdown from EBA of the costs incurred and the parties
should work together to a mutually agreeable sum. In reaching this amount,
the FSP is entitled to take into account the amount already paid by way of an
ex gratia payment.
Authorising repairs
35. I note the Applicants‟ comments that they were authorised to proceed with
the repair work. It is agreed by all parties that repairs had to be undertaken
due to the hazard involved with having leaking effluent onto the property.
36. Of particular relevance are file notes made by JA of ST on 4 March 2013.
These notes include an email sent by JA to the Applicants. In timeline order,
these notes read:
“Customer contacted 04/03/2013 [JA]
10:03:01
Call to customer, advised customer that we have been given authorisatoion
for cusotme rto proceed with works. Advised customer do not cover the cost
of fixing the leak only cover the cost of investigating the leak the resulting
damage. Advised customer claim has not been accepted. For consideration
only. Still require assessment for cracks in building. Inspection required.
...
Dear [male Applicant] 04/03/2013 [JA]
10:05:46
As discussed please proceed with works carried and send invoices/report to
[ST email address] and quote reference [ST‟s reference number]. As
discussed [the FSP] will be sent the reports and invoices for consideration.
We will arrange for building consultant to attend to inspect the cracks on the
property. Please contact [ST telephone number] if you have any further
queries. We look forward to speaking to you soon.
Kind Regards,
[JA]” [sic]
37. Whilst the file note and email do not exactly match, I am satisfied that:
Case No: 324830 Determination Page 8 of 8
ST spoke with the Applicants and confirmed that the FSP had provided
authorisation for repairs to proceed;
the Applicants were advised that the repairs to the pipe were not
covered but resultant damage would be;
that the claim was still under consideration at this time; and
ST would arrange for an engineer to attend to inspect the cracking
damage at the property.
38. In view of my earlier findings in this dispute, the Applicants have not been
prejudiced by the actions of the FSP or ST. If I were to have found in favour
of the FSP with respect to liability under the terms of the policy, it is likely
that the work performed by the Applicants were necessary works in any
event. The information suggests that whilst ST authorised the Applicants to
proceed with repairs, the Applicants were informed that the claim was still
under consideration. In these circumstances, I do not believe the Applicants
would have been prejudiced.
Determination
39. On the basis of the available information I determine that the FSP is not
entitled to deny the Applicants‟ claim.
40. The FSP should, within 21 days of the Applicants‟ acceptance of this
Determination, provide the Applicants with settlement for those costs already
paid by the Applicants and for which cover exists under the policy, that is:
investigation costs not already paid (ie: to locate the damaged pipe and
reinstate any property damaged as a result of locating the damaged
pipe); and
reinstatement costs for items covered by the policy.
41. The FSP should, within 21 days of the Applicants‟ acceptance of this
Determination, appoint relevant experts to attend to provide a scope of
works/quotations for the remaining damage and offer settlement or authorise
repairs, within 21 days of the scope/quotations being received.
42. I further determine that should any part of the claim be settled by way of a
cash payment, that interest is to be paid to the Applicants from the date the
claim was denied (20 May 2013) until the date on which settlement is made.
Interest should be calculated in accordance with Section 57 of the Insurance
Contracts Act 1984 (Cth) .
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.