Home / Financial Firm (Unknown - Insurer) / Determination 324557

Determination 324557

Cash settlement for bed frame, mattress and wardrobes; compensation for claim handling delay

FirmFinancial Firm (Unknown - Insurer)
Decided2014-05-02
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed$22,000
SourceAFCA PDF

Summary

The applicant sought about $22,000 for a bed frame, mattress and wardrobes damaged by a burst pipe and claimed compensation for delay. AFCA ordered a cash settlement for the bed frame and wardrobes at reasonable quality, refused the mattress, and refused compensation.

The FSP is liable only to the cost of items of reasonable quality, and the claim delay was largely caused by the applicant's lack of cooperation with access.

Issues

Subjects and remedies

home or building damagepay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 324557 Determination Page 1 of 7 Case number: 324557 General Insurance - Domestic Insurance - Home Contents - FSP Decision - Settlement Amount - Compensation - Delay in Claims Handling 22 April 2014 Summary Description  This dispute involves a claim under a home building and contents insurance policy issued by the Financial Services Provider (FSP) to the Applicant’s mother for water damage to their home following a burst pipe. The Applicant says that the amount of the cas h settlement offered by the FSP is inadequate. He also seeks compensation as a result of the manner in which the FSP has handled the claim. Basis of Determination  The available information does not establish that the amount of the cash settlement is inadequate. In particular, there is no information to suggest that the bed frame and wardrobes which suffered damage in the insured event were of especially high quality. Further, it appears that the double bed mattress was able to be restored satisfactorily.  While the claim has taken a considerable period of time to finalise, the FSP’s handling of the claim was reasonable in the circumstances and the Applicant ’s actions have contributed to a significant portion of the delay. Determination  The FSP is entitled to cash settle the Applicant for the damage to the bed frame and wardrobe for an amount which is equal to the cost to the Applicant of purchasing replacement items of standard quality. The FSP is not liable for the cost of a replacement mattress.  The Applicant is not entitled to any compensation as a result of the manner in which the FSP has handled the claim. Background 1. On 24 April 2012, the Applicant lodged a claim under the policy for damage to the property that occurred on 8 March 2012 as the result of a burst pipe Determination Case No: 324557 Determination Page 2 of 7 which had flooded the area under the house . The FSP accepted the claim, arranged for repairs to the ducted heating at the property and reimbursed the Applicant for the cost of repairs to the electrical wiring. 2. In November 2012, the Applicant discovered further damage which had been caused by the burst pipe in March 2012, including water and mould damage to various parts of the property. The FSP took steps to assess the damage and commenced the necessary repairs. However, due to various difficulties which arose, the FSP subsequently decided to cash settle the Applicant for the remainder of the repairs as well as for various contents items which had been damaged as a result of the insured event. 3. The Applicant was dissatisfied with the amount of the cash settlement for a number of reasons. However, he has since confirmed that many of the issues he initially raised have now been satisfactorily resolved. These issues include:  the FSP’s decision to cash settle the claim;  the amount of the cash settlement for repairs;  the amount of the cash settlement for various other items (including carpets, blinds, contents removal, fridge/freezer and utilities at the property); and  the amount paid by the FSP for temporary accommodation. 4. The FSP has also provided the Applicant with a copy of the Scope of Works for the necessary repairs (which the Applicant has accepted) and a breakdown of the amounts included in the cash settlement paid to date. 5. As at the date of this Determination, the only issues which remain in dispute are:  the FSP’s liability for the cost of replacing a double bed frame, mattress and two wardrobes which suffered water damage as a result of the insured event; and  the Applican t’s claim for compensation as a result of the manner in which the claim has been handled. Issues 6. Whether the cash settlement offered by the FSP is reasonable, having regard to the terms of the policy and, in particular, whether the FSP is liable to cash settle the Applicant for the cost of replacing the double bed frame, mattress and wardrobes. 7. Whether the Applicant is entitled to compensation for the manner in which the FSP has handled his claim. Case No: 324557 Determination Page 3 of 7 Reasons for decision 8. As advised to the parties, FOS has considered it appropriate to expedite this dispute in accordance with the Operational Guidelines to the FOS Terms of Reference, due to the nature of the dispute. Accordingly, this dispute has not been the subject of a Recommendation and has proceeded directly to Determination. 9. I am satisfied there has been an exchange of material information between the parties and that each party has had the opportunity to address any issues raised by the other. Double bed, mattress and wardrobes 10. The Applicant seeks the sum of approximately $22,000 for the replacement of a timber bed frame, mattress and two wardrobes which he says suffered water damage and were unable to be replaced . The Applicant says that these items were imported and of high quality, and the quotations provided reflect the cost of replacing them with items of similar quality. 11. The FSP has agreed to cash settle the Applicant for the cost of replacing the timber bed frame and wardrobes, however it says that the amounts included in the quotations provided by the Applicant are not fair and reasonable, as there is no information to suggest that these items were of especially high quality. The FSP has not agreed to replace the mattress as it says that this item did not suffer irreparable damage. 12. The FSP has provided a report from its restoration company (“S” ) dated 16 January 2013 which confirms that the timber bed frame and wardrobes were non- salvageable due to mould. S’s report states that the mould affected the legs of the bed frame but does not refer to the mattress. 13. The FSP has also provided a copy of an invoice dated 25 January 2013 from a cleaning company engaged by S to clean clothes and soft furnishings removed from the Applicant’s house. This invoice lists each item which was removed for cleaning, but does not refer to the mattress. 14. The FSP has also provided a copy of a report from S dated 28 March 2014 which states that the files notes in relation to the Applicant’s claim state that the mattress was okay and was stored in the front bedroom. 15. The Applicant has not provided any independent information to refute the FSP ’s position that the mattress did not require replacement. In these circumstances, I am not satisfied that the Applicant has established that he is entitled to reimbursement for the cost of a replacement mattress. 16. In relation to the timber bed frame and the wardrobes, the Applicant has acknowledged that he does not have any information which establishes that they were imported or which would assist in determining their value. Case No: 324557 Determination Page 4 of 7 17. S’s report dated 16 January 2013 indicates that S took photographs of the wardrobes but not the timber bed frame. However, the Applicant has advised that none of the photographs provided by the FSP show the timber bed frame and wardrobes, which have since been disposed of. The Applicant has also been unable to provide any photographs of these items. 18. S’s rep ort dated 28 March 2014 notes that a review of the photographs in its file indicates that the other furniture shown (being laminated cupboards, drawers and an older style solid timber dressing table) does not appear to be of high quality. 19. In light of the available information, I consider that the FSP is entitled to limit its liability for the replacement of the bed frame and the wardrobes to the cost of replacing these items with items of reasonable (but not unusually high) quality. Accordingly, the FSP should obtain a quote for these items and cash settle the Applicant for the amount of the quote. In the circumstances, I consider that the quotation to be provided by the FSP should reflect the amount for which the Applicant is able to purchase the bed frame and wardrobes from the relevant supplier (ie it should not be reduced by any trade discounts available to the FSP). Claims handling and compensation 20. The Applicant says the FSP has failed to progress his claim in a timely manner. He notes that it is over two years since the damage occurred and yet the building repairs have still not commenced, even though they are estimated to take only three weeks to complete. 21. The Applicant says that , as a result of the FSP’s delays, his family had to move into temporary accommodation and had to then find replacement accommodation when the initial short term lease over their temporary rental property expired. As a result, they have suffered significant stress and inconvenience. 22. The FSP denies that it has failed to progress the Applicant’s claim. It says that it has acted in a prompt and expedient manner in an attempt to resolve the claim but has been hampered by the Applicant’s conduct . In particular, the FSP says the Applicant has continually delayed the progress of the claim and has refused to allow its contractors access to the property to allow essential works to be carried out. 23. The FSP has provided extensive information regarding the conduct of the Applicant’s claim , including copies of its claim records which provide a contemporaneous account of the claim process. 24. The available information establishes that the repair of the initial damage identified as arising from the leaking pipe in March 2012 was repaired by mid-August 2012. The time taken to complete these repairs was due to a number of factors including the following:  the Applicant did not lodge the claim until 24 April 2012; Case No: 324557 Determination Page 5 of 7  after the claim was assessed, the FSP sought an engineering report to determine whether certain damage to the property had been caused by the water leak. This damage was ultimately identified as pre-existing damage caused by factors other then the water leak; and  some time after the claim was lodged, the Applicant raised concerns about possible damage to a refrigerator, and the FSP arranged for an electrician to inspect the refrigerator. 25. In November 2012, the Applicant notified the FSP of additional water and mould damage to the floor and walls which had been caused by the insured event. It is not clear why this damage was not identified initially. The Applicant says that the FSP’s delays in carrying out the repairs to the ducted heating caused the further damage, although he has not provided any information to support this. 26. In light of the extensive water inundation of the property as a result of the leaking pipe, I consider it more likely that the further damage would have occurred regardless of the time taken to complete the initial repairs. It may be that this damage was not initially visible and only became apparent when mould developed in internal areas of the property. I note that, by the time the Applicant notified the FSP of the additional damage in November 2012, extensive areas of mould were visible on the walls of the property, although the Applicant had not advised the FSP of a mould problem when it contacted him in September and October 2012 to confirm whether he was satisfied with the quality of the initial repairs. 27. After the FSP became aware of the additional mould and water damage, it took steps to assess the damage, arranged for mould remediation of the damaged building and contents, sought to finalise the Scope of Works and obtained quotes from two builders for the necessary repairs. This process was delayed by various issues, including concerns raised by one of the builders about potential termite infestation at the property. 28. The FSP says that the progress of the claim was also delayed by the fact that the Applicant refused to provide its contractors with access to the property on several occasions during this period. The Applicant denies this. 29. Based on my review of the available information, I am satisfied that the Applicant was, at the very least, difficult to contact and failed to co-operate with the FSP at various stages during the claim process. It appears that this was because, among other things, he was not comfortable with the builder initially appointed by the FSP and was also dissatisfied with the FSP’s continued denial of a previous claim. 30. The FSP’s cla im records indicate that it notified the Applicant in February 2013 that his failure to co-operate would result in the building repairs being delayed. It appears that several of the contractors appointed by the FSP had difficulty contacting the Applicant to arrange to attend the property to carry out the various inspections required to resolve the claim. Eventually, the Case No: 324557 Determination Page 6 of 7 builder appointed by the FSP to complete the repairs refused to continue with the job in light of the difficulties he had encountered. 31. Based on the available information, I am satisfied that the FSP acted reasonably in its management of the Applicant’s claim and, in particular, that it sought to address the various concerns raised by the Applicant during the claims process in an appropriate manner. Further, I consider that a significant portion of the delay in finalising the claim is attributable to the Applicant’s conduct during the course of the claim. I note that, under the terms of the policy, the Applicant (as the insured’s representative) was required to allow the FSP and its contractors reasonable access to the property, and to otherwise co-operate with the FSP in relation to the claim. 32. The FSP has paid for temporary accommodation for the Applicant and his family for a total of more than fifteen months from the time the property was identified as being uninhabitable due to mould in November 2012, at a cost of approximately $40,000. The FSP accommodated the Applicant’s preference to stay in a rental property rather than a serviced apartment during this period. 33. The FSP has continued to fund the Applican t’s temporary accommodation costs while seeking to resolve this dispute and has also settled the Applicant for the cost of a further period of temporary accommodation while the repairs are completed. This is despite the fact that the available information (including the builder’s quotes obtained by the FSP) does not indicate that temporary accommodation was required during the repairs. The FSP paid the Applicant the cash settlement for the repairs in February 2014 and therefore he was then in a position to arrange the necessary repairs. 34. While I accept that the claims process has been stressful and inconvenient for the Applicant and his family, I do not consider that the FSP’s actions in managing the claim caused the Applicant and his family such an unusual degree of stress, inconvenience and delay as to entitle him to compensation for non-financial loss. 35. Accordingly, I do not consider that the Applicant is entitled to any compensation in this regard. Determination 36. On the basis of the available information I determine that:  within 14 days of the date the Applicant accepts this Determination, the FSP is to obtain a quote for the cost of replacing the timber bed frame and two wardrobes which were irreparably damaged by the insured event with items of reasonable (but not unusually high) quality and cash settle the Applicant for the amount of the quote (which should not include any trade discounts available to the FSP);  the FSP is not liable for the cost of replacing the mattress claimed by the Applicant; Case No: 324557 Determination Page 7 of 7  the cash settlement provided by the FSP is otherwise reasonable and in accordance with the terms of the policy; and  the Applicant is not entitled to any compensation for the manner in which the FSP has handled his claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.