Home / Financial Firm (Unknown - Insurer) / Determination 323986
Determination 323986
Denial of water damage claim to bathroom and ceilings
Summary
The applicant claimed for water damage to her bathroom and ceilings, which the FSP denied as caused by a leaking shower recess and failed waterproof membrane rather than a defined insured event. AFCA preferred the FSP's consultant evidence and found the FSP entitled to deny the claim.
The policy is a defined events policy, and even if the loss fell within a defined event, the exclusions for gradual escape of liquid from a shower recess and lack of maintenance would apply.
Subjects and remedies
no remedy
Text of the determination
Case No: 323986 Determination Page 1 of 5
Case number: 323986
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim
12 November 2013
Background
1. The Applicant held a home building and contents insurance policy with the
Financial Services Provider (FSP) which was current at the time of the loss.
2. On 19 October 2012, the Applicant lodged a claim for water damage to her
bathroom and ceilings.
3. The FSP denied the claim on the grounds the damage was caused by a
leaking shower recess and a failure of the waterproof membrane, rather than
as an event listed under the policy.
4. The dispute was considered by a Case Manager of the Service who issued a
Recommendation. In that Recommendation, the Case Manager determined
the dispute in favour of the FSP on the grounds that she was satisfied that
the damage did not occur as a result of an insured event covered under the
policy and therefore, the FSP was entitled to deny the Applicant’s claim .
5. The Recommendation was not accepted by the Applicant. Pursuant to
clause 8.5c) of the Terms of Reference of the Service, the Applicant
requested that the dispute proceed to Determination.
Summary of Applicant’s p osition
6. The Applicant says there is a leak in one of the taps and her plumber has
confirmed a leak to a shower bridge.
7. The Applicant says that the FSP is liable to accept all, or even part, of the
claim to fix the damages caused, as the Applicant says she has provided
correspondence/quotes from trade professionals , who have deemed the
damage to be covered under her policy.
8. Finally, the Applicant says that she was advised by the assessors sent by
the FSP to her home, that she should take the matter further and that those
same assessors were shocked that the FSP had not covered any of her
claim at all.
Determination
Case No: 323986 Determination Page 2 of 5
Summary of FSP ’ s position
9. The FSP says the damage to the Applicant’s property was not as a result of
an insured event covered under the terms of the policy.
10. Rather, it says the damage was caused by a leaking shower recess and a
failed waterproof membrane.
11. Further, the FSP disputes that their assessor said that the Applicant should
take the matter further and the FSP provides an email from the assessor to
this effect.
12. The FSP relies on the following policy provisions contained within the
Product Disclosure Statement, which the Applicant does not dispute
receiving:
“ Insured events we will pay
...
Water or other liquid damage
...
We will pay for loss or damage which results directly from the bursting,
leaking, discharging or overflowing of:
fixed apparatus,
dishwashers,
washing machines,
fixed tanks,
fixed pipes,
waterbeds, or
aquariums designed to hold more than 20 litres of water.
...
We will not pay:
a. for loss or damage caused as a result of the gradual escape of liquid over
a period of time:
where you or a reasonable person in the circumstances could be
expected to have been aware of such gradual escape of liquid,
due to lack of maintenance, wear and tear, or neglect, or
from a shower base, shower recess, shower alcove or the walls
surrounding the shower
...
d. for loss or damage caused by rust, corrosion, algae, mould or mildew. ”
Case No: 323986 Determination Page 3 of 5
Issue
13. Whether the FSP is entitled to deny the Applicant’s claim.
Reasons for Decision
14. I have reviewed all of the material provided by the parties together with the
reports contained within the respective submissions.
15. The Recommendation of the Case Manager has not been accepted by the
Applicant and as such, this matter will proceed to Determination in
accordance with the Terms of Reference of the Service.
“ 8.5 Process for deciding Disputes
Unless paragraph 8.6 applies, the process for deciding a Dispute is as
follows:
c) If, within 30 days of receiving the Recommendation, either:
(i) the Financial Services Provider does not accept the Recommendation
in relation to the Dispute; or
(ii) either party requests FOS to proceed from a Recommendation to a
Determination,
FOS will proceed to a Determination by either an Ombudsman or by a FOS
Panel (as the Chief Ombudsman or his or her delegate decides is
appropriate). Before the Determination is made, the parties will be given a
reasonable opportunity to make submission, and provide any further
information, in response to the Recommendation.”
16. Subsequent to the Case Manager’s Recommendation, the Applicant has
provided a further submission by way of an email of 26 September 2013. In
response, the FSP has provided a further submission by way of letter and
attachments, of 14 October 2013.
17. I have considered all of the material as part of this Determination.
18. At the outset, it is important to note that the insurance policy, applicable to
the Applicant’s claim , is a defined events policy.
19. This means that not all loss or damage is covered but rather, only damage
specified as arising from defined events within the policy, is covered by the
terms of the policy.
20. It is accepted insurance law that the Applicant bears the onus of proof in
showing that her loss or damage arose from a defined event as covered by
the policy. This is known as a prima facie claim.
21. Once the Applicant has established a prima facie claim, then the onus shifts
to the FSP to establish any exclusion it intends to rely upon.
Case No: 323986 Determination Page 4 of 5
22. I am satisfied that the Case Manager has thoroughly and accurately detailed
the contents of the various reports within her Recommendation. As such, I
do not propose to repeat the contents of those reports, save where it is
relevant.
23. There is no dispute that the property has been damaged by water and the
question is the cause of the leaking water.
24. I have carefully read each of the reports provided by the respective parties
and note that there is a difference of opinion as to the cause of the leaking
water.
25. On the one hand, the reports provided by the FSP confirm water leaking
under the shower screen, as a result of the failure of the water proofing
membrane.
26. In the FSP’s report, it is interesting to note that the consultant specifically
tests and confirms that the breach pipe to the shower, was not leaking.
27. On the other hand, the report provided by the Applicant confirms the
plumber’s view that the damage was caused by a leak on the shower bridge.
28. The FPS’s consultant has specifically responded to the plumber’ s conclusion
and confirms that a specific test was carried out on the breach pipe and
although the breach pipe may now be leaking, it was not leaking at the time.
29. The FSP’s consultant is of the opinion that the breach pipe may have been
disturbed during the strip out.
30. I also note that the Applicant’s plumber , whilst of the view that the damage
was caused by the leak on the shower bridge, also agrees that there was
water leaking from the shower screen and that the shower base required
replacement.
31. Of significance, I note that the report from the Applicant’s plumber is some
three months after the report from the FSP’s consultant.
32. Given the timing of the attendance by the FSP’s consultant, as compared to
the Applicant’s plumber and given the sophistication of the tests carried out
by the FSP’s consultant and the conclusions reached following those tests,
all conducted in the presence of the Applicant, I am satisfied that the
conclusions reached by the FSP’s consultant , are preferable to the
Applicant’s plumber.
33. The result is that I do not accept that water leaking from the breach pipe was
the cause of the Applicant’s loss.
34. As such, I am satisfied that the loss or damage to the Applicant’s property
arose as a result of the failure of the water proofing membrane which led to
leaking under the shower screen.
Case No: 323986 Determination Page 5 of 5
35. As a result, I am of the o pinion that the Applicant’s loss and damage does
not arise from one of the defined insured events, specified within the policy
and even if it could be said that the loss or damage was consistent with one
of the defined events, the exclusions of lack of mai ntenance and gradual
escape of liquid from a shower base, would entitle the FSP to deny the
claim.
Determination
36. I determine that the FSP is entitled to deny the Applicant’s claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.