Determination 323892

Denial of storm and runoff damage claim

FirmFinancial Firm (Unknown - Insurer)
Decided2014-04-14
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$27,336
SourceAFCA PDF

Summary

The Applicants claimed for storm and runoff damage to their retaining wall, driveway, deck and pool. AFCA found some damage was caused by an excluded cause, and under the Wayne Tank principle the FSP was entitled to decline the claim.

Where a loss has several proximate causes and at least one is an excluded event, the insurer may decline the claim in its entirety.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 323892 Determination Page 1 of 6 Case number: 323892 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 8 April 2014 Summary Description:  Claim under a defined events home insurance policy for damage sustained to the Applicants‟ property following storms in early 2012. The FSP has rejected the Applicants‟ claim on the grounds that the damage did not arise from an insured event and that the policy exclusions apply. Basis for Determination:  There is no dispute that the area in which the Applicants lived were subject to severe storms in early 2012.  The evidence establishes the policy covers defined events including defined event of „storm and rainwater or runoff‟ but excludes damage to „ retaining walls, wear and tear, inherent defects, structural defects and poor workmanship ‟ .  The evidence establishes that some of the damage sustained to the Applicants‟ property was due to effects of stormwater runoff.  Engineering evidence whilst acknowledging that major movement of the retaining wall has occurred during or soon after periods of heavy rain determined that damage was also due to wear and tear, inherent defects, faulty design and structural defects.  As the damage was caused by two or more proximate ca uses, one of which was an excluded event, the FSP is entitled to refuse payment of the claim. Determination:  The FSP is entitled to decline liability for the claim in accordance with the terms of the policy. Determination Case No: 323892 Determination Page 2 of 6 Background 1. The Applicants held a defined events insurance policy with the FSP from 17 June 2004. 2. The policy covered the Applicants‟ property in Buderim Queensland for a sum insured of $417,501 plus contents of $59,097. 3. On or about 6 November 2012, the Applicants lodged a claim with the FSP for damage to the property that occurred allegedly on 2 July 2012. The FSP recorded the claim as follows: “Following storms earlier in the year, the water from the storm has caused the timber decking to subside which has caused damage to the pool.” 4. Following investigation of the claim, the FSP declined liability on the basis that the damage could not be attributed to one of the defined events and notified the Applicants of the same by letter dated 13 December 2012. 5. The Applicants maintain that the retaining wall and driveway were damaged and in need of repair and replacement and that the damage sustained to the property was due to runoff. 6. The FSP maintain the position that the policy does not respond as the damage is not due to one or more of the insured events and further that the damage to the property is the result of structural defects, faulty design and poor workmanship, wear and tear and inherent defects. Summary of Applicant’s position 7. The damage to their driveway and retaining wall was caused by run-off because:  Their property was subjected to an “unusually large amount of rain over 2 years”.  Geotechnical engineer “G” previously reported that the site was “low risk” and had good drainage.  The FSP‟s builder “A” has confirmed that the damage was due to run - off. 8. They seek $27,336, comprising:  $13,700 to repair the property‟s retaining wall;  $5,016 to repair the property‟s driveway;  $4,420 to rebuild the property‟s timber deck; and  $4,200 to reinstate the property‟s swimming pool. Case No: 323892 Determination Page 3 of 6 Summary of FSP’s position 9. It is entitled to decline liability because:  The damage did not arise from a “single event” but over a long period of time.  The movement of the retaining wall was due to it being structurally inadequate at the time of construction. The wall‟s movement was further influenced by vegetation growing in close proximity to the wall and insufficient drainage.  The movement of the timber deck was due to the deck‟s footings being founded at an inadequate depth. The movement of the deck‟s founding soils was also influenced by the movement of the retaining wall.  The damage to the driveway was caused by vehicle traffic and movement of the retaining wall.  The paving stones have suffered damage as a result of seasonal soil settlement over a period of time.  The damage to the property was caused by structural defects, faulty design, poor workmanship, wear and tear, and inherent defects. Issue 10. Whether the damage to the Applicant ‟s property was caused by events insured by the policy and if so, to what extent. Reasons for decision 11. As advised to the parties, the Financial Ombudsman Service (FOS) has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. The dispute has not been the subject of a Recommendation and has proceeded directly to Determination. 12. I am satisfied that the material has been exchanged and the parties have had the opportunity to respond to the issues raised. 13. The Applicants policy is a defined event policy that includes cover for specified events including storm, rainwater or runoff. 14. In order to succeed, the Applicants must be able to establish that the damage sustained to the property has arisen as a result of a defined event. Once the Applicants establish this, then the onus is on the FSP to establish that a relevant exclusion applies. Case No: 323892 Determination Page 4 of 6 Prima facie claim 15. When the Applicants lodged a claim on 6 November 2012, they explained that they delayed lodging the claim as they did not believe the damage was insured. 16. Following the lodgement of the claim, the property was inspected by assessor C and builder A, both of whom appear to have provided fairly consistent opinions, that the damage (or at least some of the damage) to the Applicants‟ property was caused by significant stormwater runoff. 17. Assessor C identified a number of significant rainfall events occurring in the months of January, February, March 2012 whilst builder A considered there were large volumes of water saturating the foundation which applied greater pressure on the retaining walls and ultimately caused deterioration of the timber decking, pool deck, garden timber stairs and house verandah piers. 18. The FSP has suggested that the evidence is not sufficient to establish that the damage was sustained in a single event and that the policy would only respond to damage sustained in a single event. 19. I do not agree. The policy responds to various defined events that occur subject to them occurring within the insured period. The fact that the Applicants‟ property may have been impacted by a number of heavy rain/storm events does not prevent the Applicant from succeeding with the claim subject to the Applicants establishing that the events were defined events and that the damage was sustained during the relevant insured period. 20. Based on the information provided, I am satisfied that the Applicants have established a prima facie claim under the terms of the policy for damage sustained as a result of a defined event namely storm/rainwater or runoff. The onus is therefore on the FSP to establish the application of any relevant exclusions. Relevant Exclusions 21. The FSP obtained a detailed report from a structural engineer KA. Whilst KA acknowledged that most likely the major movement of the property‟s retaining wall occurred during or soon after periods of heavy rain, KA considered that the damage to the Applicants‟ property was predom inantly caused by poor construction. 22. In a detailed report, KA identified construction issues with the retaining wall and concluded that movement to the retaining wall is due to both sections of the wall being structurally inadequate since construction as well as being possibly influenced by large vegetation located nearby and poor drainage. 23. KA considered the movement of the deck surrounding the swimming pool is again due to the depth of the footing supporting the deck being inadequate since construction and movement of the retaining walls, whilst the cracking Case No: 323892 Determination Page 5 of 6 of the asphalt driveway was due to movement of the retaining walls as well as lack of edge restraint provided to the driveway edge. 24. In a supplementary report KA indicated that he believed the retaining walls construction was insufficient to bear the loads placed on the walls. 25. Under the relevant insured event of „storm/rainwater or runoff‟ , the policy specifically excludes loss or damage caused by soil movement including erosion, landslide, mudslide, subsidence, shrinkage or expansion of the earth or land or to gates, fences and retaining walls. 26. Insofar as the damage has been sustained to the retaining wall, then I am satisfied that the policy does not respond to that damage. Damage to Driveway/Timber Deck 27. The policy also specifically excludes claims due to wear and tear, inherent defects caused directly or indirectly, faulty design, structural defects or poor workmanship. 28. The damage to the retaining wall itself was caused by a combination of incidents including the rainwater runoff, soil erosion, plant growth and inadequate construction. The damage to the retaining wall was therefore caused as a result of a number of excluded events in addition to the insured event of rainwater runoff. 29. It is an established legal principle that an insurer is entitled to decline liability for a claimed loss in its entirety where there are a number of proximate causes for the claimed loss, and at least one proximate cause is an excluded event. This is known is known as the Wayne Tank principle. 30. Whilst the evidence establishes that there was damage sustained due to storm/rainwater runoff, it is clear based on the evidence from the structural engineer that the damage in particular to the driveway edge most likely occurred as a result of a combination of erosion to that part of the edge not supported by the retaining wall and due to movement of the retaining wall itself. 31. In the circumstances, I am satisfied that the damage to the driveway would be excluded on the basis of the Wayne Tank principle. 32. I am also satisfied that the damage to the timber deck and swimming pool be excluded. 33. The available evidence in particular from KA is persuasive that the movement of the timber deck was most likely caused by:  Soil erosion near the deck‟s footings overtime (as this appears evident from the photos); and  The movement of the retaining wall in the area. Case No: 323892 Determination Page 6 of 6 34. As soil erosion is an excluded cause, and I have previously concluded that the retaining wall had failed as a result of a number of excluded causes, it follows that the policy would not respond to the damage to the timber deck (as well as the swimming pool for purposes of repair) on the basis of the Wayne Tank principle. Determination 35. Accordingly, I determine that the FSP is entitled to decline liability in response to the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.