The owner of a strata unit claimed for water-damaged timber flooring, and the FSP-authorised repairer laid defective substitute flooring. AFCA ordered the FSP to rectify the faulty workmanship, pay temporary accommodation costs, and not cash settle.

Having authorised repairs in accordance with a specific quotation, the FSP is liable for the repairer's defective workmanship unless the Applicant agreed to the variation, which was not established.

Issues

Subjects and remedies

home or building damagepay claimrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 323870 Determination Page 1 of 9 Case number: 323870 General Insurance - Domestic Insurance - Residential Strata Title - FSP Decision - Claim amount 17 January 2014 Summary Description  Dispute arises as to the liability to meet the cost of rectifying faulty and defective workmanship following repairs performed under a claim for water damage in March 2011. Basis of Determination  There is no dispute the repairer SHF in repairing the flooring failed to use the correct installation methods.  The FSP also provided the authority to proceed with the repairs to the owner‟s corporation on the basis of the quotation from SHF.  There is no conclusive evidence that the Applicant agreed to any variation in the repair methods prior to the repairs.  The FSP were aware at the time of authorising the repairs pursuant to the quotation of a second quotation for a significantly greater amount but chose not to either reveal the second quotation to the Applicant or make any further enquiries as to the validity of the quotations provided. Determination  It is fair in all the circumstances that the FSP meet its liability to rectify the damage sustained to the floor due to the faulty workmanship. Background 1. This matter was subject to a Recommendation of the Service dated 3 August 2013. The Recommendation was issued in favour of the Applicant but rejected by the FSP. 2. The dispute arises under a Residential Strata Insurance policy for water damage sustained to a timber flo or in the Applicant‟s premises i n or about Determination Case No: 323870 Determination Page 2 of 9 March 2011. Although the claim was accepted by the FSP a dispute arises as to the quality of the repairs. 3. The Applicant maintains that the authorised repairer SHF failed to repair the floor in accordance with the quotation, used defective materials and is guilty of faulty or defective workmanship. 4. The FSP maintains that whilst it accepts SHF was guilty of faulty or defective workmanship, it was not liable to meet the costs of the repairs as it had authorised the Owners‟ Corporation to proceed with the repairs but had no agreement with SHF and therefore had no guarantee as to the quality of SHF‟s work. 5. The Applicant considers SHF should accept responsibility for the faulty workmanship in accordance with the General Insurance Code of Practice. Summary of Applicant’s p osition 6. A summary of t he Applicant‟s position is accurately set out in the body of the Recommendation as follows:  After submitting the initial claim to the FSP he was informed by the Body Corporate to obtain a plumber‟s report and a quotation to repair the floor.  The FSP did not provide him with a copy of the quotation obtained by it. The FSP selected and approved the quotation obtained by him as it was about $16,000 less than its approved repairer.  Although the FSP claims that it only guarantees work by its approved repairers, he was never given the opportunity to review the FSP‟s approved repairer‟s quote or have any say in who the FSP should select to undertake the repairs.  The FSP approved the quotation submitted by him knowing it was inferior in terms of the work required to repair the floor and with the knowledge of the significant discrepancy in the sum of the quotes.  The FSP did not advise him at the time that it only guaranteed work by its repairers.  The work was inferior with the damaged floor boards not having been replaced. He only discovered this months after the attempted repair. The repairer only glued a 5mm layer of boards over the top of the damaged boards. The corrugations of the old boards have now transferred through to the new boards.  Contrary to the FSP‟s as sertion, he did not agree to SHF installing 5mm laminate over the existing floor.  He did not authorise SHF to fix the ongoing damage to the floor as they only intended to sand the corrugation flat and recoat it. The underlying problem was the water trapped under the old boards. The cosmetic Case No: 323870 Determination Page 3 of 9 repairs offered by SMF would only have been temporary and had nothing to do with him selling his unit. It would have been easier to sell the house with the cosmetic repairs and pass the problem onto someone else.  The FS P sent an authorisation to proceed with SHF‟s quote and did not make available on the documentation an option to select either SHF or JSB. By withholding this information the FSP selected the repairer in accordance with section 3.13 of the General Insurance Code of Practice.  The alternate works carried out by SHF were not agreed to by him. SHF were to carry out the work according to the quotation and he was none the wiser. He gave the key of the unit to SHF and collected it one week later. In the meantime he stayed with his parents and only had contact with SHF on the day the job was completed.  The Applicant argues the SHF quote was incomplete in that the remedial works should have included removal of the kitchen. This in turn would involve a new stone bench top, a new tiled splash back, the cost to remove and install the existing kitchen, new timber skirting and painting of walls.  In addition to the cost of repairing the floor in the sum of $23,111, he is seeking the cost to remove the 5mm boards, temporary accommodation costs while the work is carried out, and furniture removed and stored being in total about $27,711. 7. Since the rejection of the Recommendation, the Applicant has provided further information including:  A Statutory Declaration confirming that he only became aware of the inferior work undertaken after the work had been completed. He believes the FSP‟s assessor may have misunderstood his response with respect to this.  He is currently employed in a senior position and has experience working with timber. He admits he was well aware of the dangers of water being trapped under timber boards. He was not aware SHF had adopted a “quick fix solution” and he did not agree to thi s alternative. He disputes the comments by the FSP‟s assessor KH with respect to this. 8. Insofar as other issues raised by the FSP in its further submission, the Applicant made the following comments:  The FSP is responsible to remedy inferior workmanship regardless of whether the insured person is qualified in the trade processes.  He had questioned the workmanship as soon as the floor started to buckle and advised the Body Corporate Manager who in turn informed the insurer. At that time he did not know it was due to water being trapped. Case No: 323870 Determination Page 4 of 9  Insofar as the FSP believes the Applicant was in a position to supervise the work, he maintains he was not in a position to do so. He did not question the workmanship immediately because the work looked good aside from the slightly patchy lacquer job. There were some slight imperfections but he accepted that these must have been due to slightly thicker underlay than previously used.  He did not go ahead with the repairs suggested by SHF as they had only agreed to sand the corrugations flat and relacquer. This would not fix the underlying problems. He had no opportunity to have the floor repaired a second time as the FSP only mentioned that he contact the repairer rather than authorise the repair of the faulty workmanship.  He denies that the claim was cash settled with him as the insured and denies that he received at any stage any cash, EFT transfer, cheque or payment of any type from the FSP. Summary of FSP’ s position 9. The FSP‟s position is accurately summarised in the Recommendati on as follows:  The FSP states it did not authorise the repair works carried out by SHF but it was agreed independently by the Applicant without any reference to it. Its authorisation of SHF‟s quote was based on removal and complete replacement of the flooring including installation of 115mm Tasmanian Oak flooring covering 49.5m.  Those authorised works were not carried out as the Applicant agreed to SHF proceeding to supply and install 5mm laminate timber flooring to the existing floor. The Applicant did not seek any adjustment to the SHF invoice which was paid by it. Had SHF‟s quoted works been carried out in accordance with its authority, the current situation would not have arisen.  The SHF invoice included $3,960 for 115mm Tasmanian Oak floor boards which were not supplied and $1,250 for removal of the existing floor which did not occur. The Applicant agreed to these matters without prior notification to it. This caused it to pay for work which was not authorised.  The quote from JSB was obtained at the FSP‟ s request. No objection was made by the Applicant regarding the FSP‟s authorisation of SHF‟s quote.  The repairs which were not carried out in accordance with SHF‟s quote and not authorised by it were in any event faulty and defective. Exclusion 2b of the policy excludes cover for cost of rectifying faulty or defective material or faulty or defective workmanship.  Section 3.13 of the General Insurance Code of Practice is enlivened when an insurer „ selected and directly authorised a repairer’. The circumstances indicate the FSP did not select the repairer. It simply Case No: 323870 Determination Page 5 of 9 authorised certain repairs to be carried out by SHF in accordance with SHF‟s quotation.  Its authorisation of SHF‟s quoted works does not equate to „selecting‟ SHF as the repairer for the purpose of section 3.13 of the General Insurance Code of Practice. The authority was expressly limited to „ repairs in accordance with the quotation’ provided by SHF. It was not an authorisation in respect to „ a repairer’ but authorised specific repairs in accordance with SHF‟s quote.  Had the Applicant‟s flooring been repaired in accordance with SHF‟s quote and its authority, the claim would not have arisen. The alternate repair works carried out by SHF were agreed independently by the Applicant without reference to it. The current damage is a result of that agreement.  The FSP relies on the following terms of the policy: “ 2 We will not pay for ... b the cost of rectifying faulty or defective material or faulty or defective workmanship;” 10. In a submission following the Recommendation, the FSP have relied upon a Statutory Declaration from its assessor BKT dated 2 December 2013. BKT has referred to discussions held with the Applicant on 8 November 2012. According to the Statutory Declaration to the best of B KT‟s recoll ection, the Applicant informed him that SHF did not remove the damaged flooring as quoted but lightly sanded the damaged floor and then installed what he was informed as being a 5mm laminate material over the existing floor. 11. BKT claimed the Applicant informed him that he had agreed to this alternative after the contractor had told him it was all that needed to be done rather than remove the existing floor. 12. The Applicant ‟s agreement to the variation in the repair works constitut es an intervening causal event between the original damage and the unsatisfactory repairs thus entitling it to rely upon the exclusion for the cost of rectifying the faulty or defective repairs or material. 13. Further, the authorisation of the repairs by SHF did not constitute a broad authorisation to engage SHF to carry out whatever work SHF and/or the Applicant and/or the Owners‟ Corporation deemed suitable. It was specifically directed to the work set out in the SHF quote. Insofar as the FSP may have some liability under the general insurance code, the FSP maintains the code is only enlivened where the FSP selected and directly authorised a repairer. 14. A second response was provided by the FSP on 19 December 2013. Interestingly the assessor purports to offer opinion as to the contractual relationship between the FSP and SHF, whether the variation to the quoted works was made known or requested and why the Applicant if he Case No: 323870 Determination Page 6 of 9 established the workmanship was not acceptable, did the contractor receive payment. 15. These comments are largely speculative given the admissions of BKT that he was not instructed to assess the property until 2 November 2012 approximately twelve (12) months after the work was completed. 16. The FSP has further stated through BJK that they settled the claim by way of cash settlement to the insured. No evidence has been presented of this. Issue 17. Whether the FSP is responsible for the cost of rectifying the damaged flooring to the Applicant‟s unit. Reasons for Decision 18. There has been a full exchange of material between the parties and I am satisfied that each party has had the opportunity of commenting on the issues raised. 19. Both parties have had the opportunity of making further submissions following the Recommendation issued in this matter. 20. It is not in dispute that th e timber flooring to the Applicant‟s unit was damaged when a water pipe burst in March 2011. 21. It is not in dispute that the FSP accepted liability for that damage and authorised the repairs based on the quotation submitted by the Applicant. Significantly the FSP in its latest submissions through its solicitors concedes that the authorisation of repairs by SHF were specifically directed to the work set out in the SHF quote which included the supply and installation of 115mm Tasmanian Oak floorboards over 49.5mm following the takeup and removal of the existing floor. The FSP concedes that had the work been carried out in accordance with the quote, the current dispute would not have arisen. 22. The FSP had available to it two (2) quotations prior to authorising the repairs. 23. There was the quotation from SHF after the Applicant had been requested to obtain a quotation which included the following works: “Product: Tasmanian Oak, Width 115 mm – supplied & laid in random lengths from 1.2 to 3.1 metres Timber Strip Flooring Total Area for Installation: 49.5 m2 – Materials supplied to be sufficient to cover quoted area only .. Case No: 323870 Determination Page 7 of 9 Preparation: Moisture proofing membrane used on concrete. Plywood & underlay fixed to sub-floor with 36mm screws ... Installation Variations: Take-up & remove water damaged floor $1,250 (Direct stick to concrete slab) Area to be installed includes Kitchen, dining/lounge, entry & study ... Labour including installation, Sanding & Coating $1,732.50 ... Materials Tasmanian Oak 49.5 @ $80 per m2 $34,960.00 Total Cost inc GST $6,942.50” 24. The second quotation was obtained from JSB by the FSP as follows: “Throughout 1.0 Disconnect and re-connect dishwasher 1.1 Remove and replace kitchen cupboard kickers and panels 1.2 Lift, remove and dispose of existing damaged flooring 1.3 Supply and lay new „Tas Oak‟ overlay flooring on 12mm ply 1.4 Sand, and 3 x coat polish 1.5 Lift and re-fit skirtings 1.6 Paint touch up skirtings only Nil provision for furniture removal/replacement ... Total inc GST $23,1 11.00” 25. I agree with the comments by the Case Manager in the Recommendation that both quotes are for the most part similar as to the scope of works but have a substantially different price. The quote provided by the FSP‟s preferred repairer is over three times that of the Applicant‟s quote. 26. It is reasonable in the circumstances to expect the FSP acting in accordance with good insurance practice and good faith towards the Applicant would have at least notified the Body Corporate or the Applicant of the significant variations in the quotations and invited the Applicant to either submit a further quotation or seek clarification from both repairers given the nature of the quotations. Whilst this may not be applicable in all circumstances, it would seem a reasonable course of action where the variation is so great. It is apparent that did not occur based on the information exchanged. The FSP provided the authorisation based on the lowest quote without reference to the higher quotation. 27. In authorising the quote, the FSP provided an authority to proceed as follows: Case No: 323870 Determination Page 8 of 9 “we confirm that the Body Corporate may proceed with the repairs in accordance with the quotation obtained.” 28. The FSP did not choose to simply cash settle the claim. The authority is quite specific. The FSP authorised the repairs to proceed in accordance with the quote. The FSP concedes that the authorisation was for the repairer to repair the flooring based on the quotation. 29. It is agreed between the parties that the repairs were not carried out in accordance with the quotation and that the failure to carry out the repairs in accordance with the quotation is largely responsible for the subsequent damage identified. 30. As I accept that the FSP has authorised the repairs in accordance with the quotation, then I accept, that effectively the FSP selected and authorised that the repairs be carried out in accordance with the quotation provided by SHF. 31. I therefore accept that in the circumstances that the FSP is liable for the defective workmanship of SHF unless it can establish that the variation in the quotation was authorised by the Applicant. 32. There is conflicting evidence as to the authorisation of the variation. The FSP‟s assessor who attended the property some twelve months after the repairs maintains the Applicant informed him he had authorised the variation after discussion with SHF. He had somehow agreed to the variation without seeking a variation in the price quoted. I find this unlikely. 33. The Applicant maintains he observed all of the relevant material at his premises and that he was not aware of the variation until after SHF had completed the repairs. He was informed at that time that this was the appropriate way to repair the flooring. Whilst he is experienced in the use of timber, he is not a timber flooring expert but a cabinet maker. It is not unreasonable for him to accept the comments of SHF. 34. On the information as presented, I accept there was misunderstanding between the Applicant and the FSP‟s assessor BKT as to the authorisation of the variation. 35. The Applicant has advised and there is nothing to dispute this that he did not become aware of the faulty workmanship until such time as the floor started to lift. At that time, he immediately notified the Body Corporate, who he understands notified the FSP. He did not delay this process. 36. I am not satisfied that the evidence is sufficient to establish that the Applicant had agreed to a variation of the quotation or work performed such as to allow the FSP to avoid liability for the defective workmanship. I am not satisfied there was any delay in the Applicant reporting the loss which has contributed to the loss. 37. I note in the Recommendation the Case Manager considered it appropriate that the Applicant contribute one-third of the cost to make good the flooring Case No: 323870 Determination Page 9 of 9 in accordance with the terms of the policy in view of the conflicting evidence as to the authorisation of the variant in the agreed statement of works. As I do not consider the variation in the scope of works was authorised by the Applicant, I do not consider the Applicant should contribute to the cost of rectification. 38. In view of the circumstances in this dispute, in my view it would be inappropriate for the FSP to seek to cash settle the claim. The FSP should obtain a further scope of works and arrange for a suitably qualified contractor to complete the repairs. 39. The Applicant in these circumstances would be entitled in accordance with the terms of the contract to temporary accommodation costs whilst the repairs are being conducted subject to the unit being unfit to be occupied during the period of the repairs. Determination 40. Accordingly, I determine the FSP meet its liability to attend to the rectification of the faulty workmanship and repairs as required in accordance with the terms of the policy. 41. I further determine the FSP is liable to meet any temporary accommodation costs incurred by the Applicant during the repair process subject to satisfactory proof that the property is unable to be occupied during that process. 42. Further, I determine that the FSP is not to cash settle this matter but is to obtain an appropriate scope of works and arrange an appropriately qualified contractor to complete the repairs as required.