Determination 323870
Quality of strata water damage repairs and authorisation of repairer
Summary
The owner of a strata unit claimed for water-damaged timber flooring, and the FSP-authorised repairer laid defective substitute flooring. AFCA ordered the FSP to rectify the faulty workmanship, pay temporary accommodation costs, and not cash settle.
Having authorised repairs in accordance with a specific quotation, the FSP is liable for the repairer's defective workmanship unless the Applicant agreed to the variation, which was not established.
Issues
- Repairs or contractors primary · upheld
“It is fair in all the circumstances that the FSP meet its liability to rectify the damage sustained to the floor due to the faulty workmanship.”
- Claim denial secondary · not upheld
“FSP relied on exclusion 2b; AFCA was not satisfied the Applicant agreed to the variation of the quotation.”
- Poor claim handling secondary · upheld
“The FSP provided the authorisation based on the lowest quote without reference to the higher quotation.”
Subjects and remedies
home or building damagepay claimrepair or rectify
Text of the determination
Case No: 323870 Determination Page 1 of 9
Case number: 323870
General Insurance - Domestic Insurance - Residential Strata Title - FSP
Decision - Claim amount
17 January 2014
Summary
Description
Dispute arises as to the liability to meet the cost of rectifying faulty and
defective workmanship following repairs performed under a claim for
water damage in March 2011.
Basis of Determination
There is no dispute the repairer SHF in repairing the flooring failed to
use the correct installation methods.
The FSP also provided the authority to proceed with the repairs to the
owner‟s corporation on the basis of the quotation from SHF.
There is no conclusive evidence that the Applicant agreed to any
variation in the repair methods prior to the repairs.
The FSP were aware at the time of authorising the repairs pursuant to
the quotation of a second quotation for a significantly greater amount
but chose not to either reveal the second quotation to the Applicant or
make any further enquiries as to the validity of the quotations provided.
Determination
It is fair in all the circumstances that the FSP meet its liability to rectify
the damage sustained to the floor due to the faulty workmanship.
Background
1. This matter was subject to a Recommendation of the Service dated 3 August
2013. The Recommendation was issued in favour of the Applicant but
rejected by the FSP.
2. The dispute arises under a Residential Strata Insurance policy for water
damage sustained to a timber flo or in the Applicant‟s premises i n or about
Determination
Case No: 323870 Determination Page 2 of 9
March 2011. Although the claim was accepted by the FSP a dispute arises
as to the quality of the repairs.
3. The Applicant maintains that the authorised repairer SHF failed to repair the
floor in accordance with the quotation, used defective materials and is guilty
of faulty or defective workmanship.
4. The FSP maintains that whilst it accepts SHF was guilty of faulty or defective
workmanship, it was not liable to meet the costs of the repairs as it had
authorised the Owners‟ Corporation to proceed with the repairs but had no
agreement with SHF and therefore had no guarantee as to the quality of
SHF‟s work.
5. The Applicant considers SHF should accept responsibility for the faulty
workmanship in accordance with the General Insurance Code of Practice.
Summary of Applicant’s p osition
6. A summary of t he Applicant‟s position is accurately set out in the body of the
Recommendation as follows:
After submitting the initial claim to the FSP he was informed by the
Body Corporate to obtain a plumber‟s report and a quotation to repair
the floor.
The FSP did not provide him with a copy of the quotation obtained by it.
The FSP selected and approved the quotation obtained by him as it
was about $16,000 less than its approved repairer.
Although the FSP claims that it only guarantees work by its approved
repairers, he was never given the opportunity to review the FSP‟s
approved repairer‟s quote or have any say in who the FSP should
select to undertake the repairs.
The FSP approved the quotation submitted by him knowing it was
inferior in terms of the work required to repair the floor and with the
knowledge of the significant discrepancy in the sum of the quotes.
The FSP did not advise him at the time that it only guaranteed work by
its repairers.
The work was inferior with the damaged floor boards not having been
replaced. He only discovered this months after the attempted repair.
The repairer only glued a 5mm layer of boards over the top of the
damaged boards. The corrugations of the old boards have now
transferred through to the new boards.
Contrary to the FSP‟s as sertion, he did not agree to SHF installing
5mm laminate over the existing floor.
He did not authorise SHF to fix the ongoing damage to the floor as they
only intended to sand the corrugation flat and recoat it. The underlying
problem was the water trapped under the old boards. The cosmetic
Case No: 323870 Determination Page 3 of 9
repairs offered by SMF would only have been temporary and had
nothing to do with him selling his unit. It would have been easier to sell
the house with the cosmetic repairs and pass the problem onto
someone else.
The FS P sent an authorisation to proceed with SHF‟s quote and did not
make available on the documentation an option to select either SHF or
JSB. By withholding this information the FSP selected the repairer in
accordance with section 3.13 of the General Insurance Code of
Practice.
The alternate works carried out by SHF were not agreed to by him.
SHF were to carry out the work according to the quotation and he was
none the wiser. He gave the key of the unit to SHF and collected it one
week later. In the meantime he stayed with his parents and only had
contact with SHF on the day the job was completed.
The Applicant argues the SHF quote was incomplete in that the
remedial works should have included removal of the kitchen. This in
turn would involve a new stone bench top, a new tiled splash back, the
cost to remove and install the existing kitchen, new timber skirting and
painting of walls.
In addition to the cost of repairing the floor in the sum of $23,111, he is
seeking the cost to remove the 5mm boards, temporary
accommodation costs while the work is carried out, and furniture
removed and stored being in total about $27,711.
7. Since the rejection of the Recommendation, the Applicant has provided
further information including:
A Statutory Declaration confirming that he only became aware of the
inferior work undertaken after the work had been completed. He
believes the FSP‟s assessor may have misunderstood his response
with respect to this.
He is currently employed in a senior position and has experience
working with timber. He admits he was well aware of the dangers of
water being trapped under timber boards. He was not aware SHF had
adopted a “quick fix solution” and he did not agree to thi s alternative.
He disputes the comments by the FSP‟s assessor KH with respect to
this.
8. Insofar as other issues raised by the FSP in its further submission, the
Applicant made the following comments:
The FSP is responsible to remedy inferior workmanship regardless of
whether the insured person is qualified in the trade processes.
He had questioned the workmanship as soon as the floor started to
buckle and advised the Body Corporate Manager who in turn informed
the insurer. At that time he did not know it was due to water being
trapped.
Case No: 323870 Determination Page 4 of 9
Insofar as the FSP believes the Applicant was in a position to supervise
the work, he maintains he was not in a position to do so. He did not
question the workmanship immediately because the work looked good
aside from the slightly patchy lacquer job. There were some slight
imperfections but he accepted that these must have been due to
slightly thicker underlay than previously used.
He did not go ahead with the repairs suggested by SHF as they had
only agreed to sand the corrugations flat and relacquer. This would not
fix the underlying problems. He had no opportunity to have the floor
repaired a second time as the FSP only mentioned that he contact the
repairer rather than authorise the repair of the faulty workmanship.
He denies that the claim was cash settled with him as the insured and
denies that he received at any stage any cash, EFT transfer, cheque or
payment of any type from the FSP.
Summary of FSP’ s position
9. The FSP‟s position is accurately summarised in the Recommendati on as
follows:
The FSP states it did not authorise the repair works carried out by SHF
but it was agreed independently by the Applicant without any reference
to it. Its authorisation of SHF‟s quote was based on removal and
complete replacement of the flooring including installation of 115mm
Tasmanian Oak flooring covering 49.5m.
Those authorised works were not carried out as the Applicant agreed to
SHF proceeding to supply and install 5mm laminate timber flooring to
the existing floor. The Applicant did not seek any adjustment to the
SHF invoice which was paid by it. Had SHF‟s quoted works been
carried out in accordance with its authority, the current situation would
not have arisen.
The SHF invoice included $3,960 for 115mm Tasmanian Oak floor
boards which were not supplied and $1,250 for removal of the existing
floor which did not occur. The Applicant agreed to these matters
without prior notification to it. This caused it to pay for work which was
not authorised.
The quote from JSB was obtained at the FSP‟ s request. No objection
was made by the Applicant regarding the FSP‟s authorisation of SHF‟s
quote.
The repairs which were not carried out in accordance with SHF‟s quote
and not authorised by it were in any event faulty and defective.
Exclusion 2b of the policy excludes cover for cost of rectifying faulty or
defective material or faulty or defective workmanship.
Section 3.13 of the General Insurance Code of Practice is enlivened
when an insurer „ selected and directly authorised a repairer’. The
circumstances indicate the FSP did not select the repairer. It simply
Case No: 323870 Determination Page 5 of 9
authorised certain repairs to be carried out by SHF in accordance with
SHF‟s quotation.
Its authorisation of SHF‟s quoted works does not equate to „selecting‟
SHF as the repairer for the purpose of section 3.13 of the General
Insurance Code of Practice. The authority was expressly limited to
„ repairs in accordance with the quotation’ provided by SHF. It was not
an authorisation in respect to „ a repairer’ but authorised specific repairs
in accordance with SHF‟s quote.
Had the Applicant‟s flooring been repaired in accordance with SHF‟s
quote and its authority, the claim would not have arisen. The alternate
repair works carried out by SHF were agreed independently by the
Applicant without reference to it. The current damage is a result of that
agreement.
The FSP relies on the following terms of the policy:
“ 2 We will not pay for
...
b the cost of rectifying faulty or defective material or faulty or
defective workmanship;”
10. In a submission following the Recommendation, the FSP have relied upon a
Statutory Declaration from its assessor BKT dated 2 December 2013. BKT
has referred to discussions held with the Applicant on 8 November 2012.
According to the Statutory Declaration to the best of B KT‟s recoll ection, the
Applicant informed him that SHF did not remove the damaged flooring as
quoted but lightly sanded the damaged floor and then installed what he was
informed as being a 5mm laminate material over the existing floor.
11. BKT claimed the Applicant informed him that he had agreed to this
alternative after the contractor had told him it was all that needed to be done
rather than remove the existing floor.
12. The Applicant ‟s agreement to the variation in the repair works constitut es an
intervening causal event between the original damage and the unsatisfactory
repairs thus entitling it to rely upon the exclusion for the cost of rectifying the
faulty or defective repairs or material.
13. Further, the authorisation of the repairs by SHF did not constitute a broad
authorisation to engage SHF to carry out whatever work SHF and/or the
Applicant and/or the Owners‟ Corporation deemed suitable. It was
specifically directed to the work set out in the SHF quote. Insofar as the FSP
may have some liability under the general insurance code, the FSP
maintains the code is only enlivened where the FSP selected and directly
authorised a repairer.
14. A second response was provided by the FSP on 19 December 2013.
Interestingly the assessor purports to offer opinion as to the contractual
relationship between the FSP and SHF, whether the variation to the quoted
works was made known or requested and why the Applicant if he
Case No: 323870 Determination Page 6 of 9
established the workmanship was not acceptable, did the contractor receive
payment.
15. These comments are largely speculative given the admissions of BKT that
he was not instructed to assess the property until 2 November 2012
approximately twelve (12) months after the work was completed.
16. The FSP has further stated through BJK that they settled the claim by way of
cash settlement to the insured. No evidence has been presented of this.
Issue
17. Whether the FSP is responsible for the cost of rectifying the damaged
flooring to the Applicant‟s unit.
Reasons for Decision
18. There has been a full exchange of material between the parties and I am
satisfied that each party has had the opportunity of commenting on the
issues raised.
19. Both parties have had the opportunity of making further submissions
following the Recommendation issued in this matter.
20. It is not in dispute that th e timber flooring to the Applicant‟s unit was
damaged when a water pipe burst in March 2011.
21. It is not in dispute that the FSP accepted liability for that damage and
authorised the repairs based on the quotation submitted by the Applicant.
Significantly the FSP in its latest submissions through its solicitors concedes
that the authorisation of repairs by SHF were specifically directed to the work
set out in the SHF quote which included the supply and installation of
115mm Tasmanian Oak floorboards over 49.5mm following the takeup and
removal of the existing floor. The FSP concedes that had the work been
carried out in accordance with the quote, the current dispute would not have
arisen.
22. The FSP had available to it two (2) quotations prior to authorising the
repairs.
23. There was the quotation from SHF after the Applicant had been requested to
obtain a quotation which included the following works:
“Product: Tasmanian Oak, Width 115 mm – supplied & laid in random lengths
from 1.2 to 3.1 metres Timber Strip Flooring
Total Area for Installation: 49.5 m2 – Materials supplied to be sufficient to
cover quoted area only
..
Case No: 323870 Determination Page 7 of 9
Preparation: Moisture proofing membrane used on concrete. Plywood &
underlay fixed to sub-floor with 36mm screws
...
Installation Variations: Take-up & remove water damaged floor $1,250
(Direct stick to concrete slab)
Area to be installed includes Kitchen, dining/lounge, entry & study
...
Labour including installation, Sanding & Coating $1,732.50
...
Materials Tasmanian Oak 49.5 @ $80 per m2 $34,960.00
Total Cost inc GST $6,942.50”
24. The second quotation was obtained from JSB by the FSP as follows:
“Throughout
1.0 Disconnect and re-connect dishwasher
1.1 Remove and replace kitchen cupboard kickers and panels
1.2 Lift, remove and dispose of existing damaged flooring
1.3 Supply and lay new „Tas Oak‟ overlay flooring on 12mm ply
1.4 Sand, and 3 x coat polish
1.5 Lift and re-fit skirtings
1.6 Paint touch up skirtings only
Nil provision for furniture removal/replacement
...
Total inc GST $23,1 11.00”
25. I agree with the comments by the Case Manager in the Recommendation
that both quotes are for the most part similar as to the scope of works but
have a substantially different price. The quote provided by the FSP‟s
preferred repairer is over three times that of the Applicant‟s quote.
26. It is reasonable in the circumstances to expect the FSP acting in accordance
with good insurance practice and good faith towards the Applicant would
have at least notified the Body Corporate or the Applicant of the significant
variations in the quotations and invited the Applicant to either submit a
further quotation or seek clarification from both repairers given the nature of
the quotations. Whilst this may not be applicable in all circumstances, it
would seem a reasonable course of action where the variation is so great. It
is apparent that did not occur based on the information exchanged. The FSP
provided the authorisation based on the lowest quote without reference to
the higher quotation.
27. In authorising the quote, the FSP provided an authority to proceed as
follows:
Case No: 323870 Determination Page 8 of 9
“we confirm that the Body Corporate may proceed with the repairs in
accordance with the quotation obtained.”
28. The FSP did not choose to simply cash settle the claim. The authority is
quite specific. The FSP authorised the repairs to proceed in accordance with
the quote. The FSP concedes that the authorisation was for the repairer to
repair the flooring based on the quotation.
29. It is agreed between the parties that the repairs were not carried out in
accordance with the quotation and that the failure to carry out the repairs in
accordance with the quotation is largely responsible for the subsequent
damage identified.
30. As I accept that the FSP has authorised the repairs in accordance with the
quotation, then I accept, that effectively the FSP selected and authorised
that the repairs be carried out in accordance with the quotation provided by
SHF.
31. I therefore accept that in the circumstances that the FSP is liable for the
defective workmanship of SHF unless it can establish that the variation in the
quotation was authorised by the Applicant.
32. There is conflicting evidence as to the authorisation of the variation. The
FSP‟s assessor who attended the property some twelve months after the
repairs maintains the Applicant informed him he had authorised the variation
after discussion with SHF. He had somehow agreed to the variation without
seeking a variation in the price quoted. I find this unlikely.
33. The Applicant maintains he observed all of the relevant material at his
premises and that he was not aware of the variation until after SHF had
completed the repairs. He was informed at that time that this was the
appropriate way to repair the flooring. Whilst he is experienced in the use of
timber, he is not a timber flooring expert but a cabinet maker. It is not
unreasonable for him to accept the comments of SHF.
34. On the information as presented, I accept there was misunderstanding
between the Applicant and the FSP‟s assessor BKT as to the authorisation
of the variation.
35. The Applicant has advised and there is nothing to dispute this that he did not
become aware of the faulty workmanship until such time as the floor started
to lift. At that time, he immediately notified the Body Corporate, who he
understands notified the FSP. He did not delay this process.
36. I am not satisfied that the evidence is sufficient to establish that the
Applicant had agreed to a variation of the quotation or work performed such
as to allow the FSP to avoid liability for the defective workmanship. I am not
satisfied there was any delay in the Applicant reporting the loss which has
contributed to the loss.
37. I note in the Recommendation the Case Manager considered it appropriate
that the Applicant contribute one-third of the cost to make good the flooring
Case No: 323870 Determination Page 9 of 9
in accordance with the terms of the policy in view of the conflicting evidence
as to the authorisation of the variant in the agreed statement of works. As I
do not consider the variation in the scope of works was authorised by the
Applicant, I do not consider the Applicant should contribute to the cost of
rectification.
38. In view of the circumstances in this dispute, in my view it would be
inappropriate for the FSP to seek to cash settle the claim. The FSP should
obtain a further scope of works and arrange for a suitably qualified contractor
to complete the repairs.
39. The Applicant in these circumstances would be entitled in accordance with
the terms of the contract to temporary accommodation costs whilst the
repairs are being conducted subject to the unit being unfit to be occupied
during the period of the repairs.
Determination
40. Accordingly, I determine the FSP meet its liability to attend to the rectification
of the faulty workmanship and repairs as required in accordance with the
terms of the policy.
41. I further determine the FSP is liable to meet any temporary accommodation
costs incurred by the Applicant during the repair process subject to
satisfactory proof that the property is unable to be occupied during that
process.
42. Further, I determine that the FSP is not to cash settle this matter but is to
obtain an appropriate scope of works and arrange an appropriately qualified
contractor to complete the repairs as required.