Home / Financial Firm (Unknown - Credit) / Determination 323853

Determination 323853

Default interest, break costs and fees, and financial difficulty assistance

FirmFinancial Firm (Unknown - Credit)
Decided2014-02-13
ProductCredit · Business lending
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicants complained that the FSP did not assist them in financial difficulty and that default interest and fees were excessive. AFCA found the FSP met its obligations and the charges were properly imposed, so no compensation was ordered.

A financial services provider must give genuine consideration to hardship proposals, and fees and default interest are recoverable where disclosed and correctly applied under the facility terms.

Issues

Subjects and remedies

financial hardshipno remedy

Related

All Financial Firm (Unknown - Credit) determinations · Find similar determinations

Text of the determination

Case No: 323853 Determination Page 1 of 12 Case number: 323853 Credit - Business Finance - Business Loans - Charges - Incorrect fees/ costs 11 Februrary 2014 Summary Description  This dispute concerns a claim by the Applicants that the Financial Services Provider (FSP) did not give them appropriate assistance when they found themselves in financial difficulty. The Applicants also say that the default interest and other fees and charges imposed by the FSP were unreasonable and excessive. Basis of Determination  The available information establishes that the FSP met its obligations in dealing with the Applicants’ financial difficulty. The FSP gave genuine consideration to the Applicant s’ requests for assistance and extended the term of their facilities in order to give them time to arrange for the sale of the mortgaged property and the refinancing of their remaining debt.  Under the terms of the facility agreements and the repayment arrangements entered into with the Applicants, the FSP was entitled to charge default interest and impose various other fees and charges. The available information does not establish that the default interest and other fees and charges imposed by the FSP were either improperly charged or incorrectly applied. Determination  There is no basis on which the FSP should compensate the Applicants. Background 1. As advised to the parties, the Financial Ombudsman Service (FOS) has considered it appropriate to expedite this dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. Accordingly, this dispute has not been the subject of a Recommendation and has proceeded directly to Determination. 2. The Applicants held several facilities with the FSP which included a bill facility for $2.25 million with a fixed interest rate of 7.58% per annum (the Bill Determination Case No: 323853 Determination Page 2 of 12 Facility). The Bill Facility commenced on 17 October 2007 and was due to expire on 30 November 2010. 3. As security for the Bill Facility, the Applicants granted the FSP a mortgage over their home, as well as a mortgage over an industrial property on which they had built four warehouses. 4. During 2008, the Applicants approached the FSP for assistance as they were having difficulty meeting their repayment obligations. By mid 2009, the Applicants had stopped making payments under the Bill Facility and the FSP served several demands on the Applicants in relation to their various facilities. 5. On 2 October 2009, the FSP terminated the Bill Facility and refinanced the outstanding debt of $2.25 million into a Business Cheque Facility with a commencing interest rate of 15.22% per annum. 6. During 2009 and 2010, the Applicants put various proposals to the FSP in an attempt to work through their financial difficulties. The FSP rejected the Applicants’ proposals. 7. In May 2010, the FSP and the Applicants entered into a Deed of Extension under which their outstanding debt under the Business Cheque Facility was refinanced into a short term Market Rate Facility with a limit of $2.77 million at a commencing interest rate of 11.372%, and the Applicants were given a limited period to sell the warehouses (and refinance their remaining debt) in order to repay their outstanding debt to the FSP. 8. The deadlines under the Deed of Extension were extended several times, while the Applicants undertook the subdivision and sale of the warehouses. In May 2011, the Applicants completed the sale, refinanced their remaining debt and fully paid out their facilities with the FSP . Reasons for decision Did the FSP provide appropriate financial difficulty assistance? FSP’s obligations 9. The FSP is a member of the Australian Bankers Association and has adopted the Code of Banking Practice (CBP), clause 25.2 of which states: “ With your agreement, we will try to help you overcome your financial difficulties with any credit facility you have with us. We could, for example, work with yo u to develop a repayment plan.” 10. T he phrases “with your agreement” and “work with you” reflect a customer ’s obligation to work with their financial services provider if they want its assistance to overcome their financial difficulty. For example, FOS expects a customer to respond promptly to reasonable requests for information, Case No: 323853 Determination Page 3 of 12 provide current and accurate details of their financial position when requested and make whatever payments they can while the financial services provider is considering their application. 11. A financial services provider is not obliged to grant every request made for financial hardship assistance. However, FOS expects a financial services provider to give genuine consideration to a repayment proposal or hardship variation request and, where it rejects any such request, to provide written reasons for the rejection that reflect legitimate considerations referable to the customer’s circumstances. The financial services provider must not commence enforcement action against the customer before making and communicating its decision in relation to their request. 12. The circumstances of each customer’s particular situation will dictate whether either a short-term or a long-term solution is appropriate. While a financial services provider must give genuine consideration to a customer’s financial circumstances, it is not obliged to place a moratorium on i nterest or repayments for an indefinite period, nor is it obliged to waive interest which has been charged in accordance with the facility agreement. The aim of any repayment arrangement should be that the debt is repaid, even if that happens over a longer period. Any repayment proposal should therefore be realistic and should not simply postpone an inevitable default. Available information 13. The Applicants say that they acted openly and responsibly by informing the FSP of their financial difficulties from the outset. They say that the FSP did not act appropriately to assist them, but instead referred their accounts to its collections department and commenced enforcement action. 14. The FSP says that it worked with the Applicants to extend their expired facilities so as to avoid default interest, and to provide them with enough time to subdivide the industrial land and sell the warehouses individually, thereby maximising the sale price. 15. The parties have provided copies of correspondence, emails and systems notes which show that the Applicants made various requests to the FSP for financial difficulty assistance and put forward a number of repayment proposals between 2009 and 2011. The key events during the Applicants’ period of financial difficulty were as follows:  during 2008, the Applicants were sued by the purchasers of a business they had sold in 2004, and they incurred substantial legal fees as a result. They also struggled to secure appropriate tenants for the four warehouses they had built, due to the effects of the Global Financial Crisis;  by the end of 2008, the Applicants found themselves in financial difficulty. The Applicants say that they advised the FSP’s local branch manager by telephone of their financial difficulties in late 2008 and again in February 2009. However, it is not clear from the Applicants’ submissions whether they Case No: 323853 Determination Page 4 of 12 put forward a repayment proposal at this time, and the FSP has not provided any copies of relevant records for this period;  by mid-2009, the Applicants had stopped making repayments under the Bill Facility and, on 22 June 2009, they emailed the FSP with a proposal designed to clear their outstanding debt. This proposal involved increasing the Bill Facility by $240,000, capitalising the interest for 12 months and extending the term of the Bill Facility for 18 months so that the Applicants could subdivide and sell the warehouses and meet their living expenses;  on 7 July 2009, the FSP rejected the Applicants ’ proposal on the basis that, even if the warehouses were fully tenanted (which at the time they were not), the rent would not be sufficient to allow the Applicants to service the debt and meet their living expenses. The FSP asked the Applicants to provide a new proposal for the short-term repayment of the debt and told them that it would commence enforcement action if the new proposal was not acceptable;  on 16 July 2009, the Applicants put forward an alternative proposal during a teleconference with the FSP. This proposal involved the FSP agreeing to capitalise interest for nine months and provide additional funding of $100,000 for the costs of sub-dividing and selling the warehouses. During the course of the teleconference, the Applicants advised that they were on Centrelink pensions of $600 per fortnight . The FSP’s systems notes indicate that, at the time, two of the warehouses were vacant and the Applicants were still involved in litigation;  on 26 August 2009, the Applicants put their proposal in writing, following which the FSP reviewed it and advised them that it was not acceptable. The FSP rejected the Applicants’ proposal due to their continuing inability to service the debt and because their proposed repayment strategy was long- term and required the FSP to provide further funds and capitalise interest;  o n 8 September 2009, the Applicants’ accountant met with the FSP and asked the FSP to reconsider the Applicants ’ proposal;  on 9 September 2009, the FSP served demands on the Applicants in relation to various facilities they held with the FSP. Further demands were served on 28 September 2009, including a Notice of Termination of the Bill Facility;  on 2 October 2009, the Bill Facility was terminated and refinanced into a Business Cheque Account, resulting in break fees of $78,580;  on 15 October 2009 and 24 November 2009, the FSP served further demands on the Applicants and, on 14 December 2009, the FSP asked the Applicants to submit a further repayment proposal by 23 December 2009;  on 15 January 2010, the Applicants advised the FSP that they had received an offer to purchase one of the warehouses (conditional on subdivision) and requested the FSP’s approval to proceed wit h the sale. The Applicants say that they did not receive any response from the FSP and proceeded to accept the offer, on the basis that the sale proceeds would significantly reduce their outstanding debt; Case No: 323853 Determination Page 5 of 12  the FSP put enforcement action on hold while it considered its position, but remained concerned that the Applicants were not contributing any income to service the debt and were not willing or able to fund the subdivision themselves. On or around 19 February 2010, the FSP also advised the Applicants that they may need to sell their house and retain some of the warehouses so that they could use the rental income to service the debt;  on 24 February 2010, the Applicants emailed the FSP asking that they be given time to sell all of the warehouses, instead of being required to sell their home. They also asked that the FSP reconsider the default interest already imposed and consider whether anything could be done to reduce the restructure charges which were preventing them from clearing their debt;  during March and April 2010, the Applicants continued to progress the leasing and sale of the warehouses, and provided regular updates to the FSP;  in May 2010, the Applicants and the FSP entered into a Deed of Extension under which: the outstanding debt under the Business Cheque Facility was refinanced into a short term Market Rate Facility; the outstanding interest, fees and charges were capitalised into the Market Rate Facility; a deadline of 30 June 2010 was set for the sale of the warehouses; and a deadline of 31 August 2010 was set for the repayment of the outstanding debt;  the Deed of Extension was subsequently varied on three occasions to extend the deadlines for the sale of the warehouses and the refinancing of the remaining debt;  in July 2010, the FSP obtained a n order for possession of the Applicants’ home in the Supreme Court of Queensland; and  the warehouses were sold between July 2010 and March 2011, and the net sale proceeds (together with funds obtained through refinancing with another lender) were applied to pay out the Applicants’ outstanding debt in full. Analysis 16. In my view, the available information establishes that, when the Applicants encountered financial difficulties, they proactively sought to address their situation by communicating with the FSP and putting forward various proposals for the FSP’s consideration. 17. However, it appears that the Applicants ceased to make repayments to the FSP in mid-2009 and were unable to make any repayments at all while they were suffering from financial hard ship (other than the deposit of proceeds received from the sale of the warehouses ) . 18. Further, although the Applicants put forward several repayment proposals, each of these proposals required the FSP to advance further funds at a time when the Applicants were unable to service the existing debt. Case No: 323853 Determination Page 6 of 12 19. In my view, the available information indicates that the FSP gave due consideration to the various repayment proposals put forward by the Applicants and rejected them based on legitimate considerations. At the time the Applicants made their repayment proposals, they were receiving Centrelink payments, their ability to derive income from the warehouses was uncertain (as they were not fully tenanted) and their ongoing exposure under the litigation remained unknown. Acc ordingly, the Applicants’ proposals effectively required the FSP to increase its exposure at a time when the Applicants’ financial difficulties appeared to be long term. 20. When no further repayments had been received for a number of months, the FSP proposed that the parties enter into the Deed of Extension, to extend the terms of the facilities in order to give the Applicants time to sell the warehouses. It appears from the information provided that, other than the sale of the Applicants’ home, this represen ted the only feasible way in which the FSP could be repaid. 21. The arrangements set out in the Deed of Extension provided a clear timeframe for the sale of the properties and the repayment of the debt. The FSP subsequently agreed to extend this timeframe when the Applicants were unable to comply with it. As outlined above, the Applicants eventually managed to subdivide the warehouses (without obtaining additional funds from the FSP) and sold the warehouses for an amount which allowed them to repay their outstanding debt, without having to sell their home. 22. While the FSP continued to issue legal demands during 2009, it did not obtain an order for possession of the Applicants’ home until July 2010. The FSP says that it obtained an order for possession as a fallback measure in case the Applicants were unable to sell the warehouses, or the proceeds from the sale were insufficient to repay the outstanding debt. Under clause 8 of the Deed of Extension entered into in May 2010, the Applicants expressly agreed that the FSP could continue with proceedings to obtain an order of possession over their home. 23. Given the above, I am satisfied that the FSP acted appropriately in the circumstances and met its obligations in dealing with the Applicants’ financial difficulty. Were the interest, fees and charges imposed by the FSP excessive or unreasonable? 24. The Applicants say that the default interest imposed by the FSP during their period of financial difficulty was excessive and unreasonable. The Applicants also dispute a number of specific fees and charges imposed by the FSP, including break costs, legal fees and extension fees. 25. FOS will not review a financial services provider’s general policy decision to charge a fee for its services or to recover its costs. However, where a dispute involves a complaint about a particular fee charged to a customer, FOS will consider: Case No: 323853 Determination Page 7 of 12  whether the fee has been properly disclosed to the customer;  whether the fee has been properly charged in accordance with the customer’s contract with the financia l services provider; and  whether the fee has been correctly applied by the financial services provider, having regard to any scale of charges generally applied by the financial services provider. 26. It is not FOS’s role to audit accounts in order to find a po ssible error or to review the records of a financial services provider for the general purpose of establishing whether an error has occurred. However, where an applicant has raised concerns about specific fees or charges, FOS will review the available information to determine whether these fees and charges have been properly charged and correctly applied. Default interest 27. The Applicants say that the interest charged by the FSP on their facilities was excessive and put them in a worse financial position tha n they would otherwise have been in. 28. The FSP has provided FOS with copies of the facility agreements (including the letters of offer and accompanying terms and conditions) which were entered into by the Applicants in respect of the Bill Facility (which commenced in October 2007 and was terminated in October 2009) and the Market Rate Facility (which commenced in May 2010 and was paid out in May 2011). As outlined above, between the date the Bill Facility was terminated and the date the Market Rate Facility was opened, the Applicants’ debt was refinanced into a Business Cheque Account. 29. The available information indicates that:  under the terms of the Bill Facility, the FSP was entitled to impose default interest when the Applicants failed to meet their repayment obligations. The Letter of Offer for the Bill Facility sets out the basis on which default interest is calculated and provides an indicative default interest rate;  when the FSP refinanced the Applicants’ outstanding debt under the Bill Facility into the Business Cheque Account in October 2009, it appears that it continued to apply the default interest applicable under the terms of the Bill Facility. This is consistent with the holding over provisions in clause 18 of the general terms and conditions applicable to the Bill Facility; and  under the terms of the agreement for the Market Rate Facility, the FSP was entitled to impose default interest when the Applicants failed to meet their obligations under the facility. The account statements for the Market Rate Facility reflect that the only periods during which the Applicants were charged default interest on this facility was after the expiry of the various deadlines for selling the warehouses under the Deed of Extension. 30. The Applicants acknowledge that they were in default under the Bill Facility and do not dispute the manner in which default interest was calculated and Case No: 323853 Determination Page 8 of 12 applied. However, they say that the amount of interest imposed was excessive and presented a further impediment to them resolving their financial difficulties. They also say that they accrued additional default interest during periods while they were waiting for the FSP to review and respond to their repayment proposals. 31. As set out, the FSP’s right to impose default interest was clearly disclos ed to the Applicants in each of the facility agreements. Accordingly, once the Applicants were in default, the FSP was entitled to charge interest at the default rate. 32. As outlined above, the FSP was required to give due consideration to the Applicants’ re payment proposals and provide an appropriate response. While I consider that the FSP was obliged to do so within a reasonable timeframe, I am not satisfied that the available information indicates any excessive delay by the FSP in responding to the repayment proposals put forward by the Applicants which resulted in them incurring additional interest. 33. Accordingly, I am satisfied that the FSP was entitled to charge interest on the Applicants’ facilities at the default interest rate during the periods when the Applicants were in default. 34. The Applicants say that, in December 2010, the FSP agreed to adjust the interest charged on the Market Rate Facility for the month of November 2010. Interest during this period was charged at the default interest rate (as the most recent deadline under the Deed of Extension had expired). However, the FSP later agreed to adjust this after the parties entered into a deed of variation to extend the deadline. I have reviewed the account statements for the Market Rate Facility and have confirmed that the FSP appears to have made this adjustment by reducing the interest charged for the month of December. Break costs of $78,580 35. When a borrower enters into a fixed rate facility, the financial services provider relies on the fact that the interest rate is fixed in raising the monies to fund the facility. If the facility is terminated before the fixed rate period ends, the financial services provider may incur additional costs as a result of having to cancel or mitigate its funding arrangements. In charging a break cost, the financial services provider is passing on these costs to the borrower. 36. Break cost calculations are generally based on the difference between the financial services provider’s cost of funds as at the date it provided the facility and the cost of funds at the time the facility is terminated, applied to the remaining term of the facility. The potential break costs at some point in the future is not ascertainable at the time the borrower enters into the fixed rate facility as these costs will depend on future movements in interest rates which are unknown and subject to market forces. Case No: 323853 Determination Page 9 of 12 37. FOS accepts that the right to recover the costs incurred as a result of a fixed rate facility being terminated early will be determined by the terms and conditions of the facility agreement. 38. The FSP imposed break costs of $78,580 when the Bill Facility was terminated in October 2009. The Applicants say that they were not notified of these costs and would not have entered into the Deed of Exte nsion had they been aware that this would trigger such significant fees. 39. The FSP advised the Applicants of its intention to terminate the Bill Facility on 25 September 2009. The FSP was entitled to terminate the Bill Facility under clause 14 of the Specific Terms and Conditions, which states that the FSP can immediately terminate the facility if the Applicants are in default. The Applicants do not dispute that they were in default, and therefore I am satisfied that the FSP was entitled to exercise its right to terminate the Bill Facility. 40. Clause 12 of the Specific Terms and Conditions which apply to the Bill Facility provides that: “If an economic event occurs, economic costs or economic benefits may arise”. 41. Further information relating to “economic events” and “economic costs” is set out in clause 8 of the General Terms and Conditions which:  provides that an “ economic event ” includes the Bill Facility being cancelled or the Applicants being in default;  includes a warning that economic costs can be high; and  sets out the manner in which “economic costs” will be calculated. 42. Given the above, I am satisfied that the Bill Facility agreement adequately discloses the circumstances in which economic costs (also known as break costs) may be charged and the basis on which such costs are calculated. 43. FOS’s Industry Adviser has reviewed the break costs of $78,580 charged by the FSP in October 2009, and has confirmed that this amount represents a reasonable estimate of the FSP’s loss, and does not exceed the amount the FSP was entitled to charge under the terms of the Bill Facility. 44. Accordingly, for the reasons outlined above, I am satisfied that the FSP was entitled to charge the break costs of $78,580 imposed in October 2009. 45. The Applicants say that the FSP was required to give them 30 days notice of its intention to charge the break costs. 46. Clause 15.3 of the General Conditions applicable to the Bill Facility provides as follows: “ 15.1 What [FSP] can change [FSP] can, at any time: Case No: 323853 Determination Page 10 of 12 (b) introduce a new fee, charge or premium; ... 15.2 How [FSP] will notify you of changes [FSP] will notify you of any changes it makes under clause 15.1 as follows: (a) we will give you at least 30 days’ prior written notice if we introduce a fee, charge ....” 47. The effect of clause 15 is that the FSP was required to give the Applicants 30 days prior written notice before introducing “a new fee, charge or premium”. However, as outlined above, the break costs (or “economic costs”) were provided for under the facility agreement entered into by the Applicants in October 2007 and therefore were not a new fee or charge. Accordingly, I am satisfied that the FSP was not required to provide the Applicants with 30 days prior written notice of these fees. 48. As outlined above, the Bill Facility was terminated when the FSP exercised its unilateral right to terminate on the basis that the Applicants were in default. Once the Bill Facility was terminated, the FSP was entitled to charge break costs calculated in accordance with the terms of the agreement. 49. For the reasons outlined above, I consider that the FSP was entitled to charge break fees of $78,580 when the Bill Facility was terminated in October 2009. I note that these fees were imposed well before the Applicants entered into the Deed of Extension, and would have been triggered regardless of whether or not they did so. Restructure fees 50. The available information establishes that the FSP charged the Applicants the following fees when it entered into the Deed of Extension, and on each occasion that the Deed of Extension was subsequently varied:  a restructure fee of $20,000 and legal fees of $2,000 in May 2010 in relation to the Deed of Extension;  an extension fee of $10,000 and legal fees of $500, when the Deed of Extension was varied in August 2010;  an additional fee of $5,000 in November 2010, when the Applicants failed to comply with the revised timelines set out the Deed of Extension (as varied in August 2010);  a variation fee of $5,000 and legal fees of $500, when the Deed of Extension was varied in November 2010; and  an extension fee of $1,800 and legal fees of $500, when the Deed of Extension was varied in March 2011. 51. The Applicants say that the above fees were unreasonable and excessive. 52. Under the Deed of Extension, the FSP agreed to extend th e Applicants’ facilities and capitalise interest, so as to give them a further opportunity to Case No: 323853 Determination Page 11 of 12 arrange for the sale of the warehouses and repay their outstanding debt, in circumstances where the Applicants were in default and the FSP was entitled to take enforcement action. I am satisfied that, in doing so, the FSP was providing the Applicants with a benefit, for which it was entitled to charge a fee and recover its legal costs. 53. I have reviewed the Deed of Extension and the subsequent variation documents entered into by the FSP and the Applicants. I am satisfied that each of the above fees were clearly disclosed in these documents, and were stated to be payable by the Applicants as a condition precedent to the relevant document taking effect. Given the amount of the Applicants’ outstanding debt and the additional time provided, I am satisfied that the fees imposed by the FSP in this regard were not excessive or unreasonable. I note that the Applicants were given an opportunity to review the terms of the Deed of Extension and made a decision to enter into it, presumably because they considered that it offered a more acceptable way of resolving their difficulties than allowing the FSP to take possession of the secured property. Valuation fee of $4,000 54. The Applicants have queried a $4,000 fee charged to the Bill Facility in November 2009. The FSP has advised that this amount represents the valuer’s fees for a valuation of the warehouses obtained by the FSP as part of a review of its security position. 55. The Applicants say that, at the time, they had already provided two recent valuations of the warehouses. However, correspondence between the FSP and the Applicants at the time the valuation was obtained indicates that the FSP wanted to obtain an independent valuation prepared by someone other than the agent who had been appointed to sell the warehouses. 56. I consider that it was reasonable for the FSP to obtain an independent valuation of the warehouses in November 2009, given that the Applicants were in default and the FSP was in the course of considering various repayment proposals at this time. Further, I consider that the amount of the fee was not unreasonable, in the context of the requirement for the valuer to value the four warehouses on three different bases (depending on whether the land was subdivided and whether they were sold individually or as a package). Ombudsman’s Determination 57. I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previo us FOS decisions. I have taken into account all the material submitted by the parties. I am satisfied that the documentation I have relied on has been provided to both parties. Case No: 323853 Determination Page 12 of 12 58. On the basis of the available information I determine in favour of the FSP that:  it met its obligations in dealing with the Applicants’ financial difficulty;  it was entitled to impose the default interest, fees and charges applied to the Applicants’ accounts and the Applicants have not provided any information which establishes that any such charges were improperly imposed or incorrectly applied; and  accordingly, there is no basis on which the Applicants are entitled to compensation.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.