Text of the determination
Case No: 323844 Determination Page 1 of 12
Case number: 323844
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Dispute Over Extent of Damage - Quality of Repairs
06 May 2014
Summary
Description:
This dispute concerns a claim by the Applicant under a home and contents
insurance policy for damage to the home which she claims was caused by an
insured event, namely, a storm in 2011 or as a result of poor repairs done by
the FSP to earlier storm damage in 2010.
Basis for Determination:
The material provid ed supports the FSP‟s contention that the roof was not
damaged by the storm event in June 2011 nor was the damage caused by
faulty workmanship done by the FSP in 2010. Rather, on balance the
evidence is that the damage was caused by wear and tear and gradual
deterioration which are events excluded from cover under the policy.
Determination:
The FSP is not obliged to cover the Applicant for the roof damage, other than
for the six tiles it agreed to cover and the resultant damage it assessed to the
inside of the property.
The FSP is not obliged to return the excess payment to the Applicant, unless
she chooses not to proceed with the claim.
The FSP is to refund the cost of the expert report obtained by the Applicant
from ST, upon provision by the Applicant of proof of the cost of the report.
Background
1. I have reviewed all the material submitted by the parties and save where I
make note specifically, I am satisfied the Background as set out in the
Recommendation is accurate and is as follows.
2. The Applicant held a home and contents insurance policy with the Financial
Services Provider (FSP) from 17 December 2009. The policy provided
Determination
Case No: 323844 Determination Page 2 of 12
building cover for up to $375,000 and contents cover for up to $78,000. It
was subject to an excess in the event of a claim of $500.
3. On 2 June 2011, the Applicant lodged a claim for roof damage to her home,
after noting that water had entered the ceiling and was affecting her son‟s
bedroom. She believed that the damage was related to previous repairs
undertaken by the FSP after a hail damage claim in 2010.
4. The FSP reviewed the damage and ultimately determined that the damage
was not related to prior repairs or caused by a specific insured event. It
allowed some tile replacement for damage possibly caused by foot traffic
from the previous claim but otherwise restricted the cover offered to the
resultant damage to the interior of the home.
5. The Applicant considers that the FSP‟s resolution of the claim was un fair and
seeks indemnity for the replacement of the damaged section of the roof, at
an estimated cost of $3,000.
6. As the Applicant did not agree with the FSP‟s decision, the dispute was the
subject of a Recommendation. The Recommendation was in favour of the
FSP and was not accepted by the Applicant. The FSP accepted the
Recommendation. In the circumstances, the matter has been referred to me
for Determination.
Summary of Applicant’s p osition
7. I have reviewed all the material submitted by the parties and save where I
make note specifically, I am satisfied the Applicant‟s position as set out in
the Recommendation is accurate and is as follows.
8. The Applicant says that the repairs completed by the FSP‟s contractor in
2010 were not to an acceptable standard and that this was the reason for the
water ingress in 2011. She believes that it is inappropriate that the FSP
should charge separate excesses for the loss in 2010 and the subsequent
problems in 2011, as the events are directly linked.
9. She asks that:
The roof is fixed so it no longer leaks;
The ceiling is replaced in bedroom 2;
The ceilings in the hall, lounge room and backroom are restored;
The $500 excess is refunded; and
The damage is completed by her tradesman.
10. The Applicant rejected the Recommendation and p rovided no further
documentary information in support of her position. She wrote that provided
that the following conditions are met, she is prepared to discontinue the
claim:
Case No: 323844 Determination Page 3 of 12
The cost of the expert assessment on the roof is refunded (this is
claimed as $700 but earlier it was claimed as $580);
The $500 excess for the claim is refunded; and
That once she has repaired the roof, the FSP repairs the internal
damages that has occurred due to the water damage/leaking roof and
treat it as an existing claim not requiring another excess fee.
Summary of FSP’ s position
11. I have reviewed all the material submitted by the parties and save where I
make note specifically, I am satisfied the FSP‟s position as set out in the
Recommendation is accurate and is as follows.
12. The FSP attempted to negotiate an outcome with the Applicant which
included an agreement that the Applicant obtain a report from a roofing
expert, to conduct an assessment of the extent of damage to the roof, the
cause of the water ingress and provide a quote for the roof repairs.
Specifically the report was to address the following:
The damage relating to previous repairs from the first claim;
The damage related to the current claimed event; and
The damage as a result of wear and tear and lack of maintenance.
13. The FSP agreed to reimburse the Applicant the fair and reasonable cost of
obtaining the report and refund the excess.
14. The FSP received the report from the Applicant. It said the report indicated
that the roof damage and cause of the leaking is as a result of a lack of
maintenance / defect / wear and tear. There is no indication within the report
that any damage is a result of poor workmanship or previous repairs
conducted by the FSP or to an insured event. As such, the FSP said it would
not cover the repairs to the roof. The FSP said it would cover the resultant
damage under the claim.
15. The FSP also says that the damage to the roof was not related to the
previous claim as this damage was to a different area of the roof. It further
considers that there was no specific storm event to account for the roof
damage but agrees it should indemnify the Applicant for the resultant
damage caused.
16. The FSP relies on the following policy provisions:
Page 19 of the Product Disclosure Statement (PDS)
“ What you are covered for
Insured events 1 to 12
When covered under this policy, your home and contents are insured for
loss or damage at the insured address by any of the 12 insured events,
if they happen in the period of insurance.
Case No: 323844 Determination Page 4 of 12
1. Storm and flood
We cover Loss and damage caused by storm and flood e.g. rain,
wind, hail, storm and damage caused by flooding from
rivers, streets and canals.
We do not cover > damage by actions or movements of the sea
but we will cover damage caused by:
> a tsunami
> storm surge if it occurs at the same time your
home or contents are damaged by a storm or
flood
> retaining walls, garden borders and free standing
walls
> the surface of a tennis court
> wharf, jetty, pontoon or sea wall
> water in a tank, swimming pools or spas or their
liners or covers
> the cost of cleaning mud or debris out of tanks,
swimming pools or spas
> damage to swimming pools and their parts or
underground tanks caused by water leaking down
the sides, against the sides, or getting underneath
them
> paint when there is no structural storm damage to
other parts of the home
> gates, fences or wall fences that were in a state of
disrepair which would have been obvious to a
reasonable person before the damage occurred.
... ”
Page 49 of the PDS
“...
We do not cover:
Wear, tear, rust or mould
Loss or damage caused by wear, tear, rust, fading, gradual deterioration,
mould, rising damp, mildew, action of light, atmospheric or climatic conditions,
corrosion or rot unless this is covered under:
> insured event 1 (storm and flood)
> insured event 2 (burst pipes, leaks and overflows). ”
Page 61 of the PDS
“ How we settle your claim
...
Case No: 323844 Determination Page 5 of 12
We will not:
> pay extra to replace your home, contents or landlord‟s fixtures and fittings
to a better standard, specification or quality than it was before the loss or
damage occurred except as stated in „new for old‟ below
> fix a fault that existed before the loss or damage occurred.”
17. The FSP accepted the Recommendation and did not provide any further
documentary information in support of its position.
Issues
18. Whether the FSP is obliged to cover the Applicant‟s claim for roof damage.
19. Whether an excess should apply to the claim.
Reasons for Decision
20. There has been an exchange of material between each party and I am
satisfied each party has had an opportunity to reply to the issues raised.
21. Each FOS case is decided on its merits, taking into account the facts of the
case. I have reviewed all the material submitted by the parties both before
and after the Recommendation was issued, in order to reach my decision. I
will only refer to the relevant submissions and materials raised.
Material and contentions submitted by the parties
The 2010 claim
22. There was an earlier claim relating to a storm on 6 March 2010. The FSP‟s
assessor noted that:
“ A few roof tiles damaged, stained ceilings lin lounge and bedroom, holes in
rear pergola roof (sic) .”
23. The FSP arranged for work to be done to the property in or about late April
2010. I note the Scope of Works included the following work:
External –
Remove and replace approx 3-10 cement roof tiles
Remove and replace poly carbonate corrugated roofing to the
rear yard pergola size approx 7 x 3metres (21 square metres)
Remove and dispose of all associated rubbish / debris
Internal –
Repair fibro plaster join and paint entire ceiling to bedroom 1
Remove and replace (4 square metres) fibro plaster ceiling to
the water damaged area of the lounge room, seal raw plaster
and paint entire ceiling
Case No: 323844 Determination Page 6 of 12
Paint / repair blistered gloss paint to the rear doorway and paint
the rear wall of the office
Repair the water damage to the hallway fibro plaster ceiling and
paint entire ceiling to match.
24. The Applicant says she does not believe that 3-10 tiles would have been
adequate to cover the area that was damaged. She also points out that the
Scope of Work does not say where the tiles were replaced. She says that
the above areas still leak.
The June 2011 claim
25. The FSP‟s file notes on 2 June 2011 say:
“ Following heavy rain in past two weeks there is significant water dmg to my
son's bedroom ceiling. The ceiling is cracked across the middle and I am
concerned for structural safety. The ceiling is plasterboard. One light has
stopped working and there is water leaking down wall under window. My
partner has put a tarp over the roof to prevent further water entering as I
believe it may be entering through cracked tiles which were prev repaired
following hail dmg 2010. ”
OS report 2 June 2011
26. A Building Services company (OS) attended on 2 June 2011.OS noted:
“ Carpenter attended site and investigated damage as requested. Loose debris
was cleaned up and disposed of. Damaged openings have been made safe
so no entry can be gained according to the following details:
*Type: Ceiling
*Frame: Plaster
*Size: 4000mm x 3500mm
*Damage To: Ceiling
*Location: Ground Floor
*Room: Bedroom
*Damage Cause: Unknown
Cracked has formed in the ceiling, as a likely result of water build up over
time.
*Repair work will be required
*Action Taken:
*Findings: Contractor attended site and replaced several tiles on the roof,
readjusted other tiles, inspected roof space, insulation was damp only. The
screws fixed inside the plaster (ceiling cavity) may require further investigation
by (FSP) contractor. Make safe complete .”
Building Assessment report 20 June 2011
27. A site visit was made 20 June 2011. Photographs were taken. It was noted
that the home was about 60 years old with old cement roof tiles. The
Case No: 323844 Determination Page 7 of 12
resultant damage was noted to the ceiling and walls in bedroom 2 and that
the ceiling in the toilet needed repairs too. The FSP was told that
maintenance issues with the roof needed to be addressed.
28. As a result of the report, the FSP told the Applicant the damage to the roof
was not storm related and that the Applicant had to repair a broken tile and
repoint the hips. Once done, the internal damage would be repaired by the
FSP.
29. The Applicant insisted the damage to the roof was from the previous claim.
The FSP advised the earlier damage was in a different part of the roof.
30. The report said:
“ The insured had complained in bedroom 2 water had entered causing a slight
stain to the ceiling and wall beside the window. The ceiling measures
approximately 3m x 3m and wall approximately 3m x 2.7m.
The insured has also complained that in the toilet to the rear of the dwelling,
bubbling has affected the paintwork to the cement sheet in the ceiling. We
inspected the roof over these areas and could not determine why bubbling
has occurred in the toilet area. We found 2 x broken tiles above the bedroom
and supplied plastic to stop further water ingress occurring.
In addition the hip requires repointing and the roof needs to be maintained as
this is a maintenance issue with the roof. ”
CS report 6 December 2012
31. In May 2012 and in November 2012, the Applicant said that the roof repairs
had been completed so a quote for internal repairs was arranged. The
Applicant has not provided evidence of these repairs nor what was repaired.
32. “ CS ” is a builder who visited the property on 6 December 2012 for the FSP,
to do an estimate on work needed to rectify internal storm damage. The
estimate to do the repairs was $1,305.28. CS recommended a cash
settlement as he said the roof is in poor condition and he could not
guarantee the paint work and plaster repairs to the ceiling before the roof
issue is addressed.
33. CS reported:
“Damage has occurred to the ceilings in four rooms at this property where the
plaster is affected and paintwork is stained that requires repair and repainting.
We noted many cracks in the ridge capping pointing and hip pointing, and
many dislodged and uneven tiles on the roof area directly above. We believe
that the roof condition at this property is poor, and we highly recommend that
the Policyholder undertakes maintenance works to the roof area before any
work is commenced on the ceilings below, as if this issue is not looked at and
rectified, damage will only reoccur to the ceilings directly below. ..” [sic]
JL report 3 January 2012
34. As the parties could not agree about the damage to the roof, JL was asked
by the FSP to report, which he did after inspecting the roof and taking
Case No: 323844 Determination Page 8 of 12
photographs. The inspection was conducted on 3 January 2013 (not 2012 as
noted) and relevantly noted:
“ Roof tiles are standard concrete tiles in poor condition and are approximately
0 years old.
However, maintenance has been kept up on this roof as it appears to have
been painted about 4-5 years ago.
Over the affected Area I stripped back approx. 30 tiles and found 4 broken
tiles. These could have been broken from hailstones or more likely by foot
traffic. The roof has also been repaired in this area where some ridge caps
have been poorly repointed. I moved the 4 broken tiles to the bottom row to
help prevent further ceiling damage. ” [sic]
35. Once the FSP considered this report and clarified it with JL, it agreed to pay
for six cracked tiles caused by its assessors‟ foot traffic and cash settle for
the internal repairs. The FSP says that all the reports note issues with the
pointing of the ridge caps and that the pointing was not repaired by the FSP
in the earlier claim. Further, it says the roof damage is not related to an
insured event.
Architect Advice report from ST
36. The Applicant obtained a report from an architect “ST”. ST inspected the roof
on 23 August 2013. ST was told that the original work from 2010 was “found
to be inadequate by the [Applicant]”. ST had the benefit of the original Scope
of Works. He was also told by the Applicant that “many assessors have
looked and been on the roof possibly causing damage”. He was al so told the
replaced rear pergola still leaks.
37. ST inspected and made observations about what he saw which are set out in
the report and include:
Damp staining to bedroom 1;
Crack to ceiling sheet in bedroom 2 and damp staining to underside
roof tiles observed directly above;
Damp patch in hall;
Damp stain in living room;
Roof tiles comprehensively failed to many areas;
Broken tile painted over prior to storm damage;
Moss growing through painted finish of some tiles;
Loose ridge grout;
About 8 non matching replacement tiles;
One fully split tile to the roof edge above eaves outside bedroom 2;
Uneven tile gaps to some areas;
Repainted tiles which have not fixed leakage.
Case No: 323844 Determination Page 9 of 12
38. In analysing the damage, ST found that the “ rear roof slope is set at 2.5
degree pitch which is less than 5 degrees recommended for corrugated
sheeting.” He wrote:
“ It is also likely that wind driven rain is permeating under failed counter
flashing between the house gutter & upper edge of roof. Damp staining
running down the far side of WC [water closet] outside wall appears to show
that the problem between gutter & lower corrugated roof extends all the way
across the rear of building (including Colorbond area not re-roofed by the
[FSP]). Similar damp observed in the rear WC under the low pitch roof is also
not apparently beneath area repaired after the storm damage. These things
lead me to understand that although the new polycarbonate sheeting fitted to
rear porch area roof is of inadequate pitch, it has been repaired to an equal
configuration to original. It may be that the original roofing was sealed in to top
edge with silicone or similar to stop back flow over the edge.
This type of edge seal could be applied again but would likely require ongoing
maintenance. Similarly the flexible over flashing between gutter & rear
corrugated roof should be replace[d] & fitted snug right across rear of house.
We recommend to increase roof fall to 5 degrees minimum during any major
upgrade or to use a deck roof profile more suited to this pitch when re-
roofing.” [sic]
39. ST concluded:
“ Replaced tiles (non-matching) appear in place, but are not the only source of
leakage & tile failure.
Roof tiles appear to be nearing the end of their life generally due to the
amount of moisture observed to underside of many roof tiles & various
areas observed with slow drips beneath points of saturation.
Rear porch, laundry & WC corrugated skillion roof is set at inadequate
pitch with failed counter flashing to the top edge (between the main
house gutter and roof). Both new and old rear skillion are at the same
pitch and failure above original indicates that flashing failure may not be
the only problem.
Urgent attention to fallen plasterboard sheet in bedroom 2 is required to
address the possibility of unstable plaster falling....”
UT roofing 13 October 2013
40. The Applicant arranged for “ UT ” to inspect the roof. UT took photographs
which showed what he described as examples of insufficient repairs and
holes in the pointing. UT is described as a roof restoration specialist. UT
wrote:
“... the previous rep airs done on your roof were insufficient and incomplete
which has not stopped water leaking into your home.
We found numerous broken tiles which had been glued back together, not
replaced as they should have been. There were broken water courses which
allowed water seepage into the roof cavity...
The pointing on the ridge capping was poorly repaired with holes in the
pointing clearly visible, as shown below. This allowed water seepage into the
roof cavity...”
Case No: 323844 Determination Page 10 of 12
Analysis
41. It is an accepted principle of general insurance law that an insured bears the
onus to establish on the balance of probabilities that they have suffered a
loss caused by an event to which the policy responds. This is known as a
prima facie claim. Once so established, the onus shifts to the insurer to
prove on the balance of probabilities that an exclusion applies if it seeks to
deny or limit its liability for the loss.
42. Accordingly in this matter, the Applicant must prove on the balance of
probabilities that the loss was caused to the home by an insured event such
as a storm in June 2011.
43. If that loss is established, the onus shifts to the FSP to prove on the balance
of probabilities the loss was caused by the exclusions relied on by the FSP
in this dispute and that the work done in 2010 was done to an adequate
standard.
44. The parties do not dispute that there is damage to the inside of the
Applicant‟s home and that this damage has been caused by water ingress.
The FSP has agreed to pay for the internal damage which it assessed to be
$1,305.28.
45. The parties agree that water has entered via damage on the roof. The
dispute is what caused this damage to the roof and whether it is covered
under the terms of the policy.
46. Having reviewed the material provided from 2010, I accept that;
The damage in the house in 2010 was in the lounge room, bedroom 1,
office, hall and the rear pergola and this was repaired;
The assessor noted then that a few roof tiles were damaged and 3-10
cement roof tiles were removed and replaced as was the corrugated
roofing over the pergola.
47. After the 2011 claim was made, several experts made inspections of the roof
and the damage. I accept that:
When OS attended in 2 June 2011, he noted the damage in bedroom
2. He also replaced several tiles on the roof;
When the assessment was done on 20 June 2011 , two broken tiles
were found above the bedroom and the hip required repointing;
On 6 December 2012, CS also noted cracks in the ridge cap pointing
and hip pointing and many dislodged and uneven tiles on the roof
above the internal damage;
The inspection made by JL on 3 January 2013, showed 4 broken tiles
(this was later agreed to be caused by the assessors‟ foot traffic) and
ridge caps that were poorly repointed;
ST noted roof tiles that had comprehensively failed. He also noted the 8
replacement tiles;
Case No: 323844 Determination Page 11 of 12
Finally, UT noted insufficient previous repairs and poor repairs to the
ridge capping.
48. The Applicant says that 3-10 tiles would not have been adequate to cover
the area that was damaged in 2010 but has not adduced any compelling
evidence in that regard. Rather, the only evidence aside from that assertion
is that the damage done in 2010 was to a few roof tiles only and the
corrugated roof over the pergola and that the said tiles and roof over the
pergola were removed and replaced by the FSP.
49. The damage complained of by the Applicant when she made her claim on
2 June 2011, was to the bedroom 2 and the toilet. I am satisfied that this is a
new area of damage.
50. Having carefully considered all the reports and photographs, I am also
satisfied that the roof is old and generally is not in good condition. There are
issues with the ridge cap pointing and hip pointing. There is no evidence
from the material I have that any work was done to the ridge cap pointing
and hip pointing by the FSP in 2010.
51. In fact I am satisfied that the evidence from ST supports the FSP‟s position.
He says that the replaced non matching tiles are in place but that leakage is
caused by roof tiles which are nearing the end of their life and that the
corrugated roof is set at an inadequate pitch.
52. UT makes similar observations to others in that UT identifies that the
pointing on the ridge capping was poorly repaired. I accept that no work was
done by the FSP to the ridge capping in 2010.
53. Further, although I accept that UT found previous repairs done to the roof
were insufficient, UT does not identify where these previous repairs were
done or that these previous repairs were those done by the FSP in 2010 and
so I do not find his report sufficiently detailed to be persuasive.
54. I note that both ST and UT identify problems with the roof but that neither
says that the roof was damaged by the 2011 storm event.
55. In short, I am not persuaded that on the balance of probabilities, that storm
damage was done to the roof in 2011 or that the internal damage happened
in 2011, because the repairs done in 2010 were not well done. Rather, I am
satisfied on the material to hand that the roof is in poor condition through age
and the FSP is entitled to rely on the policy exclusion that it does not cover
loss or damage caused by wear, tear and gradual deterioration.
56. Having considered all the material, I accept that the loss in 2011 is a fresh
claim to new areas of internal damage and that the FSP is entitled to retain
the excess paid of $500.
57. The FSP offered to refund the excess if the Applicant agreed to the terms of
settlement proposed. As the settlement offer was not accepted by the
Applicant, I accept the FSP is not obliged to return the excess.
Case No: 323844 Determination Page 12 of 12
58. The FSP tried to resolve this matter and agreed that it would pay for a report
from an expert. I accept therefore that it is to pay for the cost of the report
from ST once the Applicant provides sufficient proof of the cost of the report
such as the invoice from ST or proof of payment to ST. I do not accept that
the FSP is to pay for the cost of the report from UT.
Determination
59. On the basis of the available information and for the reasons stated, I
determine that the FSP is not obliged to cover the Applicant for the roof
damage, other than for the six tiles it agreed to cover and the resultant
damage it assessed to the inside of the property.
60. I further determine that the FSP is not obliged to return the excess payment
to the Applicant unless she chooses not to proceed with the claim.
61. I also determine that the FSP is to refund the cost of the expert report
obtained by the Applicant from ST, upon provision by the Applicant of proof
of the cost of the report.