Text of the determination
Case No: 323420 Determination Page 1 of 10
Case number: 323420
General Insurance - Domestic Insurance - Home Building - FSP Decision –
Claim Amount
17 April 2014
Summary
Description
Claim under a Home and Contents Insurance Policy for storm and flash
flood damage. Dispute arises as to the quantum.
Basis of Determination
No dispute the Applicant‟s property suffered substantial damage due to
a storm in January/February 2011.
Whilst some non related damage has been identified, the Panel is not
satisfied the evidence is sufficient to prove on the balance of
probabilities the non insured element of the damage is equivalent to
40% of the loss.
The damage has continued to deteriorate and requires further Scope of
Works and costing.
Determination
The FSP is to attend to the restumping of the home and after allowing
the property to settle, obtain a fresh Scope of Works and costing and
settle the Applicant‟s claim for 85% of the loss assessed.
Background
1. The Applicant held a home and contents insurance policy with the Financial
Services Provider (FSP) from 15 August 1998, which expired on 15 August
2011. The policy provided building cover for complete replacement and
contents cover for up to $51,300.
2. On 30 July 2012, the Applicant lodged a claim for alleged storm/flash flood
related damage to the property, which occurred on or about January /
February 2011. She alleged that the wooden support beams which held up
the home were sinking and that there were cracks through the walls and tiles
Determination
Case No: 323420 Determination Page 2 of 10
of the house. This damage had appeared at the property over the previous
12 months.
3. The FSP arranged for a number of experts to review and comment on the
damage caused to the home. It ultimately determined that the majority of the
damage at the home (60%) was attributable to the storm/flooding event and
offered a cash settlement to the Applicant on this basis.
4. The Applicant considers the offer inadequate and wants the FSP to cash
settle her for the cost of repairing the entire home.
Summary of Applicant’s position
5. The Applicant says that her home was subjected to heavy storms and flash
flooding in early 2011 due to the local council not properly maintaining its
drainage systems. This water caused problems under the home and affected
the integrity of the structure, which has become worse since the lodgement
of the claim and the delays caused by the FSP in investigating the claim.
6. She seeks cover under the policy for the repair of her home to reinstate it to
the condition it was in prior to the rain/flood event.
7. Whilst not having an actual quote for the damage, the Applicant says that
her builder estimates that it would cost between $125,000 and $150,000 to
repair the home, excluding possible additional costs that might arise when
the house is lifted for restumping.
8. Furthermore, the Applicant says that she will require assistance to vacate
the property for the work to be done and to relocate her belongings and
place them in storage. Based on a quote from “RM”, the Applicant estimates
that the costs of this will be $10,423.60. She also believes that she should
be covered for accommodation expenses through this period.
Summary of FSP’s position
9. The FSP accepts that the Applicant has a claim under the policy but does
not consider that the full extent of her loss was caused as a result of the
heavy storms from January/ February 2011. There were other issues with
the home which contributed to the problems now present and the FSP is
entitled to restrict its settlement offer to factor in these additional issues.
10. The FSP maintains the Applicant bears the onus to prove the damage is
covered under the terms of the policy. The FSP initially offered to settle the
Applicant‟s claim for the sum of $6,978.40 allowing for a restumping of the
Applicant‟s property. The FSP subsequently acknowledged that this offer
was inadequate and agreed to further investigate the claim. In doing so, the
FSP relied on its view that only 60% of the Applicant‟s loss had been
conclusively attributed to the flood event.
Case No: 323420 Determination Page 3 of 10
11. Following receipt of a further Scope of Works, and four quotations for cost of
repairs, the FSP offered to settle the Applicant‟s claim on 5 September 2013
for the sum of $22,522.41.
12. On 19 December 2013 the FSP made a further offer of $58,000 representing
$40,000 to cover 60% of the cost of repairs for the overall damage, $18,000
for temporary accommodation and in addition agreed to cover the removalist
cost estimated by RM at $10,423.60.
Issue
13. Whether the FSP‟s offer for settlement is fair in all the circumstances.
Reasons for decision
14. This decision has been made by a Panel consisting of an Ombudsman and
two Panel members with extensive experience in insurance industry matters
and consumer claims.
15. A full exchange of the relevant information has taken place between the
respective parties and each party has had the opportunity of addressing any
issues raised.
16. The Applicant‟s policy is a Defined Events policy which covers a series of
defined events as outlined in the PDS.
17. The cover includes cover for storm and rainwater damage, but under the
General Exclusions excludes cover for wear and tear, rust, deterioration,
corrosion, mould, soil movement or settlement etc.
18. Whilst the FSP concedes that the principal cause of damage to the
Applicant‟s property was the heavy rain in January/February 2011 which falls
within the insured event of „storm‟, it maintains that approximately 40% of the
damage identified was related to other issues to which the policy does not
respond.
19. As the FSP seeks to rely upon exclusions contained within the policy to limit
the extent of the damage, then the onus rests with the FSP to establish that
the 40% of the damage was not related to the insured event.
Expert reports
20. The FSP obtained a report from an internal loss assessor KF who
considered that at least some of the damage was not related to the
storm/flood event from 2011 and suggests that an engineer be retained to
evaluate the extent of damage to the home and liability.
Case No: 323420 Determination Page 4 of 10
21. KF estimated the original Scope of Works at $19,100. Significantly,
photographs provided show that the home had separated from the timber
stumps in place.
22. A subsequent inspection was arranged by engineer “HC”, who compiled a
report dated 9 November 2012. This report noted:
Cracks were apparent throughout the residence and the Applicant
reported that these have occurred gradually over the last 12 months;
The Applicant attributed these problems to the heavy storms and
resultant flash flooding from early 2011. This water apparently did not
enter the home but did flood the sub-floor space underneath;
Apart from the extensive internal cracking to the walls, doorways and
tiling, the HC observed that the floor “feels out of level when walked
upon”;
Under the floor, large gaps were present between the tops of the
stumps and some of the bearers and the unattached stumps can be
moved with ease. HC su ggested that the stumps were “inadequately
founded”;
Severe water damage was observed below the bathroom and the water
closet, which HC attributed to problems with the water proofing in the
bathroom;
An examination of the soil found it to be “moderately reactive” Class S
soil, which seasonal changes in moisture content can cause up to
20mm of movement in the soil surface; and
HC attributed the problems at the home (excluding those under the
bathroom) to a combination of the settlement of the soil affecting the
stumps, inadequate foundation of the stumps and possibly the effects
of the heavy rainstorm from 2011. A geotechnical investigation of the
stumps was recommended to confirm the foundation materials were
adequate.
23. An examination of the footings was subsequently conducted by engineer
“FM”, on 23 January 2013. FM considered appropriate footings for the home
should be set at a minimum depth of 475mm below surface level, with the
existing footings examined shown to be at a depth of 650mm in one location
and 600mm in another.
24. The results from this inspection imply that the existing footings for the
property were more than adequate for the construction built.
25. The FSP requested a further structural engineering report from “IL” on 9 April
2013 to again evaluate the extent of damage to the home, taking into
consideration the findings of FM.
26. IL concluded that the heavy rain event from 2011 was “not the sole cause” of
the observed damage at the home, although it was considered “the principle
Case No: 323420 Determination Page 5 of 10
factor”. Other factors affecting and exacerbating the damage to the home
included:
“... natural settlement of foundations over time, a disconnected downpipe,
concrete paving graded towards the dwelling and the prolonged drought
period.” [sic]
27. Leaving aside the damaged render, IL estimated that the rain could
reasonably be considered responsible for 60% of the observed remaining
damage.
28. The balance of the damage present to the home was attributed to the other
listed factors, which were unrelated to the storm/flooding event.
29. IL recommended that the home be re-stumped so that the floor could be re-
levelled internally, with the roof trusses then inspected to evaluate the
structural integrity of the home.
30. The Applicant disagrees with some of the conclusions drawn by IL. In
particular, she takes issue with the downpipe and alleged water discharge
under the home. She considers that these were incorrectly reported issues:
the downpipe had only dislodged after Christmas 2012 (as a result of high
winds affecting the home during another storm) and was sighted by no other
expert as an issue for the problems at the home. The grading of the concrete
at the property allows for water to slope away from the home and not
underneath it.
31. The Applicant further contends that these issues were agreed by the builder
who attended her property and she does not consider them relevant to her
loss.
32. The FSP also arranged for a plumber, “MB”, to attend the home and provide
another report to evaluate the roof. This report, dated 19 May 2013,
considered the condition of the wooden support beams holding up the home
and noted that a burst pipe was found in the roof space above the toilet. This
pipe was neutralised to prevent further leakage and damage through this
area.
33. Whilst not specifically related to the February 2011 storm events, any
damage associated with this leak may arguably, be covered under the terms
of the policy and entitle the Applicant to lodge a separate claim. No separate
scope of works to evaluate the extent of this specific damage appears to
have been compiled.
Scope of Works
34. The Panel notes that whilst IL has stated 60% of the damage was due to the
insured event, little evidence has been provided by IL to support that
conclusion. IL has not provided any particulars as to how such a figure was
reached. Whilst the Panel accepts that this estimation may not necessarily
be wrong, it at best represents an educated guess as to the extent of the
loss as identified by one expert. In this sense, the Panel is surprised given
Case No: 323420 Determination Page 6 of 10
the FSP‟s effort to obtain quotation from numerous experts that it has not
sought alternative expert opinion as to the extent of the loss that was not
covered by the policy.
35. The FSP arranged for SE to provide a Scope of Works to attend to the
repairs taking into consideration the numerous reports acquired from the
various experts.
36. The Scope of Works were provided in June and July 2013. However, the
Scope of Works were provided on the basis that the FSP was liable for 60%
of the damage.
37. It is apparent on looking at the Scope of Works that they have been
prepared on the basis that SE and the subsequent parties who provided
quotations did so on the basis that the claim is to be cash settled. The Panel
notes that none of the quotations include items such as a builder‟s allowance
which you would normally expect to see where a builder was quoting on the
basis of actually completing the works.
38. The Panel notes that in the latest Scope of Works, SE has suggested that
the overall value of repairs as at July 2013 was in the vicinity of $65,542.05.
39. The Applicant maintains that the total repairs to the home were worth in the
vicinity of $153,000. No actual quotes have been supplied by the Applicant
to support these claims.
40. An undated single page report from builder “PH”, for the Applicant, notes that
this builder inspected the property in February 2011 and noted that it had
incurred damage “caused by excessive water penetrating the ground” in the
storm event. He inspected it again on 20 February 2013 at the request of the
Applicant and found that this damage had “worsened”. PH ventured the
opinion that if the condition of the home continued to deteriorate it could
become unsafe to live in.
41. It is apparent that the home has continued to deteriorate since the claim was
lodged and that the 60% of overall damage estimated by IL and costed by
SE several months ago, may have increased since that time.
Consideration of the extent of damage
42. It is fair to say that there is an extensive amount of damage present
throughout the insured home. The Panel is satisfied based upon the
evidence supplied that the totality of this damage cannot be attributed to a
single insured event. By extension, the FSP should not be liable to repair the
entire home.
43. It is apparent that other problems were factors in the damage caused to the
home, including the leaking pipe in the ceiling (which might be claimable as
a separate event), the disconnected downpipe, the age of the home and its
stumps and the run-off problems allowing water to ingress underneath the
property.
Case No: 323420 Determination Page 7 of 10
44. Notwithstanding all of this, the FSP concedes that the storm events from
2011 were the principle cause of the overall extent of damage sustained.
45. The Panel agrees, and accepts the expert evidence, that the property has
deteriorated since the storm event and more particularly since the lodgement
of the claim. The time taken to resolve the claim has coincided with an
apparent rapid deterioration in the state of the home.
46. The Applicant concedes that there was “a little natural settlement over the
years” at the home but the instances of the floor upheaval and the cracking
inside and outside of the home only occurred after the storm events from
early 2011.
47. Noting that SE compiled two scopes of work, the Panel has some difficulty in
understanding why the “resultant damage” quote had to be limited to 60% of
the overall claim. The items considered maintenance related, which had
separately been quoted but not costed, would surely have been part of the
original 60% consideration suggested by IL.
48. By separating the quotes, the FSP should arguably not have then lessened
the “resultant damage” quote as it has done. SE effectively had not included
the unrelated damage.
49. The “rectification” quote was not costed but only related to the supply and
replacement of the disconnected downpipe and the cleaning of the site
afterwards. This damage was therefore not considered within the scope of
the 60% “resultant damage” quote prepared.
50. The Applicant states that the downpipe cited by IL as a significant contributor
to the damage only became disconnected in late 2012. This was well after
the report of the storm/flood event. There is no evidence to contradict this
statement and it is not addressed in the other expert reports.
51. The Panel is sceptical that the disconnected downpipe would have been a
major contributor to the damage at the property, noting the undisputed claim
that it did not occur until after the insured event. Whilst not suggesting that
this damage should be covered under the policy, the Panel is of the view that
any contribution that run-off water made to the overall damage was likely
minor.
52. The Applicant relies on her own unidentified repairer to suggest that the work
at the home may well exceed $150,000. No quote has been provided from
her to attest to this. Allegedly, when asked by the FSP to obtain a written
quote from her nominated repairer, the Applicant refused as the repairer was
not comfortable with submitting such information to an insurer.
53. This is not helpful to the Applicant. The alleged opinion of this repairer about
the extent of damage to the home is at odds with the accumulated reports
from the FSP‟s chosen repairers.
Case No: 323420 Determination Page 8 of 10
54. A complete, costed scope of repairs to account for all damage at the
property has not been attended to. In the Panel‟s view, this should have to
more accurately reflect the intent of the IL report.
55. The Panel notes in a quote obtained by the FSP from “PP”. PP identified the
final costs of the work required might be significantly higher than the amount
quoted (based on the 60% assessment of IL) noting that there were issues
which might require additional work, investigational and consideration. In
essence, PP was of the view that it was not possible to provide a complete
quote as there were many unknown factors with work to be done on the
property.
56. The second quote from “TB” conceded that the work would not be
guaranteed and that it did not consider it appropriate to quote at 60% of the
work to be done as this was not practical. It later provided a quote for the
total job, for which 60% of this would have been far less than SE‟s original
estimate.
57. Noting the issues TB had with the job and the refusal to guarantee any of the
work, the Panel is of the view that this quote is of little to no value.
58. The Panel considers that the issues highlighted by PP and TB are important
to the consideration of the claim. The FSP erred in allowing or asking its
repairers to quote based on 60% of the likely cost to attend to work at the
property. Such a move provides an incomplete analysis of the work required
to complete the job.
59. A proper analysis of how the matter should be resolved is also difficult. The
Applicant does not deny that she preferred to be cash settled, so that she
might have her own preferred repairer attend to the job. Whilst in normal
circumstances, this might be a perfectly reasonable option the Panel is of the
view that it is less preferable in this instance.
60. The reason for this is the lack of a definitive amount to account for the totality
of the damage at the home. Whilst all of the experts agree that it has been
damaged extensively, the extent of this damage is difficult to accurately
quantify at least until such time as the deterioration of the property is
addressed and stabilised.
Settlement of the claim
61. The Panel is required to do what is fair in all the circumstances having
regard to the information provided, relevant legal principles, good industry
practise, relevant codes and any prior determinations.
62. The Panel is concerned as to the handling of this dispute by the FSP and in
particular the initial approach adopted by the FSP. It was not until the
Applicant has referred this matter to the Service that the FSP has sought to
further investigate the claim or obtain relevant engineering information.
Case No: 323420 Determination Page 9 of 10
63. Those reports have been limited by an insistence that they rely upon the
estimation of IL that only 60% of the identified damage was storm related.
64. The Panel accepts that there may be some unrelated damage and there is
likely some additional water damage caused by the broken pipe in the roof of
the home that may be separately considered as an eligible claim under the
policy and should be paid subject to payment of the relevant excess.
65. The Panel is not satisfied that the balance of the damage should be limited
to 60% of the relevant Scope of Works.
66. The balance of the damage that was caused by issues not related to the
insured event is, in the Panel‟s view , relatively minor. The home was
reported to be in good working order prior to the insured event and the
extension of the property shows no concerns but for some minor cracking of
the exterior render.
67. Whilst there is no perfect way to resolve this dispute to the satisfaction to all
parties, the Panel is of the view that any resolution must consider what is fair
in all the circumstances.
68. In the Panel‟s view, the FSP should restump the foundations of the
Applicant‟s property and allow sufficient time for thi s to settle. Once this has
occurred, it is likely that a more accurate assessment as to the total damage
to the balance of the home may be obtained.
69. The FSP should arrange for a contractor to attend to the restumping work
(and any other immediate repairs) at the property to properly address and
stop the deterioration of the home. Once this work has been done, and an
appropriate period is allowed for the home to settle, then a further Scope of
Works and quotation covering the totality of the remaining damage should be
prepared.
70. Once the further Scope of Works and quotation is obtained, the Panel
determines the FSP is liable to indemnify the Applicant for 85% of the
damage.
Determination
71. Based on the available information, the Panel determines the FSP should
a ttend to the restumping of the Applicant‟s property and once appropriate
amount of time is allowed for the property to settle, obtain a further Scope of
Works as to the balance of the damage sustained and settle the Applicant‟s
claim for 85% of the work required at the home as per the body of this
Determination.
72. Insofar as the Applicant requires temporary accommodation or relocation,
the FSP is to meet the reasonable costs of the same.
Case No: 323420 Determination Page 10 of 10
73. Insofar as the FSP intends to cash settle the claim as any assessment or
Scope of Works will be based on current applicable rates, then no interest
should be paid.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.